You are on page 1of 6
LUMMUS, rm 9_o9m_O1 MAT 78 CT Goa PIPING STUDY ENGINEERING DESIGN GUIDE PLANT DESIGN VOLUME 2 SECTION 2 PART 2 VESSELS VESSELS ~ PIPING STUDY (0605.1.401 ES ums ENGINEERING DESIGN GUIDE ev _one_O1 WAY 78 PLANT DESIGN VESSEL PIPING - GENERAL NOTES tote 1 Elevation of Tower platform to be established for access to instruments and narway tote 2 “Elevation of top platform to be approximately 150 mn below face of al? nozzles serviced from platforn. tote 3 Pimp suction Vine to be run above mininun head clearance. tote 4 Bottom invert elevation of vessel to be Fixed by NPSH of pump. wate § we Platform required at manway if centerline of drum 1s generally above Saetres. Alternative location of mnmay 1s on top of drun. tote 6 © Bun piping at & comon 8. . elevation to sim ify supporting, Note 7 Wimiman dimension above grade to be 450m B.0.P. or insulation. tote 8 SNS Ty inlet is gravity flow, Vine should slope to vessel. ote 9 Ret ef valve discharge to be high enoush to aliox Tine to enter top of flare header. If in this case the relief valve is not accessible fron top platform, It must be relocated on the nearest platform with sufficient Clevation. IF relief valve ts Vocated avay from vessel, the line from drum to relief valve mist be checked for correct Tine size Note 10 Talves in control set in the off-gas line to be ortentated so that they are accessible fron tap platform. Note 1. Level instruments to be positioned so that they are accessible from ladder-when the top connection elevation exceeds 3 netres. VESSELS - PIPING STUDY 0608.1.400 m2 oe 5 Ee wus ENGINEERING O:SI6N GUIDE oom OLY 78 PLANT esiGN LUMMUS ENGINEERING DESIGN GUIDE —oom_O1 MAY 78 PLANT DESIGN sana (eet 8) f c - nt ry = A F ! EEL pon H- - 4 t in if NET Ly 1 u t TEE VESSELS = PIPING STUDY 0605.1 401 on ha ES ums ovo O1 MAY 78 ENGINEERING DESIGN GUIDE PLANT DESIGN VESSELS - PIPING STUDY 0608.1.401

You might also like