List of Supporting Document for Cost of Completion which is not submitted by contractor until 17.07.2017 (PO 03) Cross section Quantities for -Road No. 58,59,61,66(0-3km) & 67 Condition Surveyor report -Road No. 61,67 & 71 ‘Traffic sign boards & Road marking drawing: All Roads Culvert drawing for balance 06 Number of culvert Minor repair culvert details list & quantities Complete variation order list & Quantities Service duct location list and Drawings - If necessary Curve widening & Junction improvement Locations & Details - Ifnecessary Balance Retaining Wall Drawing-RD 71 10, Estimation for bridge repairing ~pexaneene 11, By road list and separate quantities 12, Detail list of Rip Rap Protection for Embankment Slopes - Only for necessary road 13. Detail ist of Guard Rails, Guard Walls, Guard Stones - Only for necessary road PO 03 Outstanding Drawings & Document (Up to 08.07.2017) 1. Initial Cross Sections © Road No, 61 (3.0 km) © Road No, 58 (6.0 km) 2 V/A Road No. 61 (3.0 Km) Road No. 58 (6.0 Km) Road No. 67 (2.0 Km) Road No, 59 (2.0 km) 3, DCS (16.5 Km) + Road No, 61 (3.0 Km) © Road No. 58 (6.0 Km) Road No, 67 (2.0 Km) Road No. 59 (2.0 Km) Road NO. 66 (3.0 Km) Road No 74 (0.5 Km) 4, Sign Boards & Road Marking '* Road No, All Roads 5, Tree list Road No. 61 (3.0 Km) Road No. 58 (6.0 Km) Road No. 67 (2.0 Km) Road No. 59 (2.0 km) Road No. 71 3.0 km) 6. Utility Relocation * Road No. 61 (3.0 Km) ‘+ Road No, 58 (6.0 Km) ‘+ Road No, 67 (2.0 Km) + Road No. 59 (2.0 Km) © Road No, 71 (3.0 km) 7. Culvert Drawings (68 Nos, Details Attached) 1200 Dia HP Culverts 02 Nos 600 Dia HP Culverts 01 Nos 900 Dia HP Culverts 03Nos Irrigation out lets 00 Nos Box & Slab Culverts 02 Nos 8, Retaining Wall Drawings 9. Variation Rates & Quantities 10,Cost To Completion ‘These Drawings & Document to be finalized before end of this month (31+ July 2017) Status of Remaining Culvert Drawing - (PO/03) Road No Location Typeof Construction Opening Size Remarks s7__|11+600 Reconstruction/ Hume pipe |1200mm. [To the access road LHS «(ero Reconstruction/ Hume pipe [900mm {To the access road RHS 34757 Widening & Redecking /Slab_|2.2m*1.4m 66 [24825 New construction /Hume pipe |1200mm ~ 10+320 ‘New construction /Hume pipe |600mm_ 67 |o+800 Reconstruction/ Hume pipe |900mm }To the access road Jo+820 Reconstruction/ Hume pipe _|900mm nn |2+188 Reconstruction/ Slab am*2m Repair Culvert Schedule All Roads INTEGRATED ROAD INVESTMENT PROGRAM CONTRACT PACKAGE: RDA/ADB/iROAD(NC)/NCB/CP-RR(PO1) COST TO COMPLETION Original BOQ Revised BOQ [Contract Amount [Total Length of All Road [Cost for Km Summary Note ) Reasons / Justification for Cost Deviation for Project Date Contractor Representative pune “LVA wo 31g 9PH>L HEL Cuore) 180 ang 3094 ns J0 01 ve WORE St aj Ng RISA zi as i wnorsa| reios-ans seo fea] U1 “aang uowsorg] oF oom peg aocnunayng] 6 pou 8 (ung euorsnong ssépu—] 1 sea mazamonns Sumy ans] 8 ateung) wousnea peu] 9 suomi] € auuwepaus| Srv oper, vopippy mig poe Amanwnoral (op runowy pono (ap wnowy 1eez9 wonduasea oN O04 xo AUVINWaS 10 NOLINAA - NOLLITEWOD OL.S09 (10d) W-dD/AONON)AVORVAAW/VRA :IOVNOV LOVALNOD > WVU90Ud INIWISIANI GVOU CILVUDIINI ‘SRAALOMULS ONLLSIXG 40 TVAOWST au gor 10 9] sung Sutorpno jo (sou ‘wa 0021 ons GH] soyoungBurduey290 Jo (0 a ‘we 6990 one weg Suu oy ‘aa oo 0 | mand yo Shans rou va oo ww gor wD pie jo slum ou wail yosdums souey 2100] § we ua gone meup sanyo escuay| (t0e| conor] ¢ worsr09 | womppy (w)annowvaasiam|sd asia | (pixnowy | aud | auva fea | ma spe a sowaniosaa 3ONaUAISIO bog asoAsy B08 TWNIDRIO. wa xnivaio aus TNT TW NOLLWIA NOLL 14WOD OL 1809 (loanneaamoNONNavoUvMayi¥aH 9VXIVE LOVALNOD (= WYWOOWA INSILISTANI aVOU aaLVADaINT INTEGRATED ROAD INVESTMENT PROGRAM (CONTRACT PACKAGE: RDA/ADBIROAD(NCYNCHICP-RR(PO1) COST TO COMPLETION REPORT - ROAD NO. 01 Thakuluwewa Village Road pw! JMMARY. No. Description Amount As perQiyin_| Amount (As per Design Sopplimetory Ducumen | Drawing Qunttes) Deviation to BOQ ‘Amount(+/-) Reasons/ustfication 1 fPretiminary and Genera 2 |sie clearing 3 feartworks 4 Road Pevement 5 [Drainage 6 [outers Retaining Structures & Bus Bays 7. ridges @rovsional Sum) 8 facideaal Conseuetin }-) Perfomance Bast Maintenance 10, Provisional Sums 11 Pay Works 12 JWarition Order [sub-total Discount 0% [sub-Tota Provisional Sum for Prioe Escalation at 10% of Sub Ty Jcomtingencies at 10% of SubTotal 2 [Total Tender Price without VAT (To be mentioned in Letter of Price Bid) WVatue Added Tax (119%) fragt Price including VAT ‘Summary Note [Reasons / Justification for Cost Deviation for This Road zal aeuang 0} poqs2e ZON ta = : = Too a pn Bu noun] (Oz02] 9 low mn miso) HH 30.0 - . . ‘2 | sanopuey pue auois passaup anowar 3p apumusicy| 4202 $1 [ Tal | a wend umsinog) saan] 7 7 7 ~ Pea Asuosews ajqqns wopues asows 7p 2pueUtsiCy| (oeoz} vt — ~ Gann mies) ol - - 7 nO saimonns oassu09 snows yp apurwsig} (220) Et (aque oso 3479 - - - 7. ML | adid Ksuoseur ayqqru wopaes axouias 7p apuEwisic 9 (vz02) 21 | py {anueng) revotstao4g)] 7 S| grongna adid Asuoswan youg axouas 79 auemsic) (azz) m BREET, - - . “= _soypunug Zusderynv0 Jo eroury XOPHO7] OF 2 DOE G08 HD : : - : J spo Bueno joreonny SOOT] 6 , a 990 UE WD - - . ‘soqoueng Surdueynn0 jo eroway|* O07] 8 tn 90° 0 WU Sh . |” - . = son pay) dimomosd jo sds resowns| (O10) & e Tu 0" wot HD . . . + sean payiy Asnoinaid jo sdums reaoussy) (8100) 9 | —_ a ou ‘wu 902" - 009 | J - Aysnowaid jo sdumis yerowny| 102] $ - - - = = nu 0007 90 9 san jo eau] (S)10e| = = : | wntooo'z o0e1 wp senso mrouy) (miee| € : : - = ti 90161009 HH sanyo BrOM>Al@iO2) cv sum ons pone oun p ray een SO im | . . . abs | Sueegjo sun gn pen Su ! Duwi NWONIIVET| (re ava | ve (wasnony| 40 fiwaxnonv| 40 [iaxnonv] aso | auva |v Nowaniosaa wa soe sen /)sunomy OOH o wonEHIG uajsoq sad sy woums0g Asoquomyddng ut 4 aup 49d sy DNRIVEO ALIS? CON TH peoy aBu[,A EMAMNIMIEYI "I - SALLINVAD JO THE ASLMAVOU (loahnt-/f NON) VOUVAAV/VEY

You might also like