JENIS KENDARAAN JUMLAH FAKTOR PENGALI SMP

Mobil Penumpang 1091 1 1091


Bus 179 2 358
Truk 2 as 67 3 201
Truk 3 as 60 4 240
LHR 1890

MASA PEMBANGUNAN = 2
UMUR RENCANA = 20
PERTUMBUHAN LALIN :
SELAMA PEMBANGUNAN = 2.70%
SELAMA UMUR RENCANA = 2.80%
LHR/JAM = 1890
LHR/HARI = 45360
LHR AWAL = 1993.44 77282.63
LHR AKHIR = 3283.40 78801.66
LHR RATA-RATA = 2638.42 (LIHAT TABEL) 78042.14

IDEAL
LEBAR JALUR = 7.00
LEBAR BAHU = 2.00
LEBAR MEDIAN =
1.8144 ≈ 2
ELEVASI (m) BEDA TINGGI (m) JARAK (m) KEMIRINGAN (%)
TITIK STA
A B = A(n)-A(n-1) C D = (B/C)x100%
C 0 + 000 93.00
0.000 25.00 0.000
1 0 + 025 93.00
0.000 25.00 0.000
2 0 + 050 93.00
0.190 25.00 0.008
3 0 + 075 92.81
0.020 25.00 0.001
4 0 + 100 92.79
0.170 25.00 0.007
5 0 + 125 92.96
0.270 11.92 0.023
PI1 0 + 136.919 93.23
0.150 13.08 0.011
6 0 + 150 93.38
0.350 25.00 0.014
7 0 + 175 93.73
0.240 25.00 0.010
8 0 + 200 93.97
0.300 25.00 0.012
9 0 + 225 94.27
0.850 25.00 0.034
10 0 + 250 95.12
0.110 25.00 0.004
11 0 + 275 95.23
0.120 25.00 0.005
12 0 + 300 95.11
0.190 25.00 0.008
13 0 + 325 94.92
0.070 25.00 0.003
14 0 + 350 94.85
0.120 24.43 0.005
PI2 0 + 374.434 94.73
0.020 0.57 0.035
15 0 + 375 94.71
0.200 25.00 0.008
16 0 + 400 94.51
0.280 25.00 0.011
17 0 + 425 94.23
0.510 25.00 0.020
18 0 + 450 93.72
1.490 25.00 0.060
19 0 + 475 92.23
0.960 25.00 0.038
20 0 + 500 91.27
0.390 25.00 0.016
21 0 + 525 90.88
0.310 25.00 0.012
22 0 + 550 90.57
0.340 25.00 0.014
23 0 + 575 90.23
0.350 25.00 0.014
24 0 + 600 89.88
0.150 12.76 0.012
PI3 0 + 612.761 89.73
0.250 12.24 0.020
25 0 + 625 89.98
1.270 25.00 0.051
26 0 + 650 91.25
1.360 25.00 0.054
27 0 + 675 92.61
1.280 25.00 0.051
28 0 + 700 93.89
0.140 25.00 0.006
29 0 + 725 93.75
2.280 25.00 0.091
30 0 + 750 91.47
1.550 25.00 0.062
31 0 + 775 89.92
0.620 15.64 0.040
K 0 + 790.643 90.54
TOTAL 16.900 790.643 0.759
KEMIRINGAN JALAN 2.17%
JENIS MEDAN DATAR

Karna klasifikasi medan yang didapat adalah


DATAR,maka kecepatan rencana (Vr) yang dipilih 80 Km/Jam
adalah....
Jarak Pandang Hent
Diketahui:
Vr = 80
t= 2.5
g= 9.81
fm = 0.46 BINA MARGA 0,38 - 0,55

Jh= 110.272

Jarak Pandang Mendahului


Diketahui:
Vr = 80
m= 10

T1 = 4.2 T2 = 10.4
a = 2.34 d2 = 231.296
d1 = 87.470

d3 = 75 Jd = 547.963
d4 = 154.197
KOORDINAT TITIK AWAL
TITIK X Y X = 10000 x
F 9964.838 9877.579 Y = 10000 112.955
PI1 10077.793 9800.197 212.911
PI2 10290.703 9694.923 238.092
PI3 10528.796 9705.484 162.247
K 10691.043 9778.408

PANJANG TRASE
d JARAK
C-PI1 136.918
PI1-PI2 237.516
PI2-PI3 238.327
PI3-K 177.882
JUMLAH 790.643

SUDUT TRASE
TITIK AZIMUTH SUDUT TIKUNGAN
C 124.4137 180 55.5863 124.4137
8.103
PI1 116.3102 180 63.6898 116.3102
28.850
PI2 87.4601 87.4601
21.662
PI3 65.7978 65.7978
y x y
-77.381 12758.787 5987.881 136.918
-105.274 45331.009 11082.699 237.516
10.561 56687.991 111.543 238.327
72.924 26324.089 5317.924 177.882
Diketahui:
Vr = 80 Km/jam
fmax = 0.14
e max = 10%
Rmin = 209.974 ≈ 210 m
R rencana = 250 m
R tanpa lengkung peralihan = 250 m TABEL
R tanpa superlevasi = 1250 m TABEL

a. Ls berdasarkan waktu tempuh maksimum : (t = 3 s)

Ls = 66.667 m ≈ 67

b. Ls berdasarkan antisipasi gaya sentrifugal :

Ls = 101.732 m ≈ 21

c. Tingkat pencapaian perubahan kelandaian :

Ls= 0.000 ≈ 0

PENENTUAN JENIS TIKUNGAN

P = 0.741 m P < 0,25 m, maka tpe tkungan


adalah Full Circle (FC)

Perencanaan Tikungan FC

Δ= 8.103

Lc = 35.358 m Lt
Tc = 17.709 m
Ec = 0.626 m
e max = 0.06157 = 6.16%
e max = 0.06157 = 6.16%
e max = -0.09969 = -9.97%
e normal = 2%

P < 0,25 m, maka tpe tkungan


adalah Full Circle (FC)
Diketahui:
Vr = 80 Km/jam
fmax = 0.14
e max = 10%
Rmin = 209.974 ≈ 210 m
R rencana = 250 m
R tanpa lengkung peralihan = 900 m TABEL
R tanpa superlevasi = 1250 m TABEL

a. Ls berdasarkan waktu tempuh maksimum : (t = 3 s)

Ls = 66.667 m ≈ 67

b. Ls berdasarkan antisipasi gaya sentrifugal :

Ls = 79.057 m ≈ 79

c. Tingkat pencapaian perubahan kelandaian :

Ls= 36.955 ≈ 37

PENENTUAN JENIS TIKUNGAN

P= 1.042 m P > 0,25 m, maka tpe tkungan


adalah Spiral Circle Spiral (SCS)
P= 1.048 m

Perencanaan Tikungan SCS

Δ= 28.850
θs = 9.059
Δc = 10.732
Ys = 4.167 m
Xs = 78.859 m
Lc = 46.825 m Lc > 25 m (OK)
L tot. = 204.939 m Lt
P = 1.048 m
k = 39.495 m
Ts = 104.071 m
Es = 9.220 m
e max = 0.06157 = 6.16% = 6.15748
e max = -0.08401 = -8.40%
e max = -0.09969 = -9.97%
e normal = 2% = 2

P > 0,25 m, maka tpe tkungan


adalah Spiral Circle Spiral (SCS)
Diketahui:
Vr = 80 Km/jam
fmax = 0.14
e max = 10%
Rmin = 209.974 ≈ 210 m
R rencana = 250 m
R tanpa lengkung peralihan = 900 m TABEL
R tanpa superlevasi = 1250 m TABEL

a. Ls berdasarkan waktu tempuh maksimum : (t = 3 s)

Ls = 66.667 m ≈ 67

b. Ls berdasarkan antisipasi gaya sentrifugal :

Ls = 79.057 m ≈ 79

c. Tingkat pencapaian perubahan kelandaian :

Ls= 36.955 ≈ 37

PENENTUAN JENIS TIKUNGAN

P= 1.042 m P > 0,25 m, maka tpe tkun


adalah Spiral Spiral (SS
P= 1.502 m

Perencanaan Tikungan SS

Δ = 21.662 KONTROL
θs = 10.831 θs = 9.059
Δc = 0.000 Δc = 3.544
Lc = 0.000 m Lc = 15.462
Ls = 94.520 m
L tot. = 189.039 m Lt
Ys = 5.956 m
Xs = 94.182 m
P = 1.502 m
k = 47.203 m
Ts = 95.321 m
Es = 6.064 m

REKAPITULASI TIKUNGAN :
DATA UNTUK PENGECEKAN KETERSEDIAAN JARAK ANTAR
Ls = 66.667
TC PI1 = 17.709
TS PI2 = 104.071
TS PI3 = 95.321
Jarak Minimum = 20

PENGECEKAN JARAK TRASE :


82.153 < 136.918
186.224 < 237.516
219.392 < 238.327
115.321 < 177.882

PERNYATAAN : LANJUTKAN

PANJANG JALAN RENCANA : 785.778 m PANJANG TRASE :

DAERAH BEBAS SAMPING DITIKUNGAN :

TIKUNGAN PERTAMA (FC) : TIKUNG


Lt (Panjang lengkung tikungan) = 35.358 m Lt (Panjang lengku
Jh (Jarak pandang henti) = 110.272 m Jh (Jarak pa
R= 250 m
Jh < Lt , maka :
R' = 248.25 m
E= 6.0986 m
e max = 0.06157 = 6.16% = 6.15748
e max = -0.08401 = -8.40%
e max = -0.09969 = -9.97%
e normal = 2% = 2

P > 0,25 m, maka tpe tkungan


adalah Spiral Spiral (SS)

KONTROL
m
m
m Lc < 25 m (OK)

ERSEDIAAN JARAK ANTAR TITIK YANG DIRENCANAKAN


m Lt1 = 35.358 m
m Lt2 = 204.939 m
m Lt3 = 189.039 m
m
m

KETERANGAN :

20 m ADALAH JARAK MINIMUM YANG


DIPERLUKAN KENDARAAN SEBELUM
MEMASUKI TIKUNGAN BERIKUTNYA

790.643 m

TIKUNGAN KEDUA (SCS) : TIKUNGAN KETIGA (SS) :


Lt (Panjang lengkung tikungan) = 204.939 m Lt (Panjang lengkung tikungan) = 189.039
Jh (Jarak pandang henti) = 110.272 m Jh (Jarak pandang henti) = 110.272
R = 250 m R = 250
Jh < Lt , maka : Jh < Lt , maka :
R' = 248.25 m R' = 248.25
E = 6.0986 m E = 6.0986
S) :
m
m
m

m
m
DAFTAR KURVA TIKUNGAN
NAMA TIKUNGAN P1
JENIS TIKUNGAN FC
PARAMETER SATUAN NILAI P1 (TIKUNGAN FC)
Δ ° 8.103 Δ °
Vr km/jam 80 Vr km/jam
R m 250 R m
Ls m 66.667 Ls m
Lc m 35.358 Lc m
P m 0.741 P m
Tc m 17.709 Tc m
Ec m 0.626 Ec m
Ltotal m 35.358 Ltotal m
en % 2 en %
em % 4 em %

DAFTAR KURVA TIKUNGAN


NAMA TIKUNGAN P2
JENIS TIKUNGAN SCS
PARAMETER SATUAN NILAI P2 (TIKUNGAN SCS)
Δ ° 28.850 Δ °
Vr km/jam 80 Vr km/jam
R m 250 R m
Ls m 79.057 Ls m
θs ° 9.059 θs °
Lc m 46.825 Lc m
Xs m 78.859 Xs m
Ys m 4.167 Ys m
P m 1.048 P m
K m 39.495 K m
Ts m 104.071 Ts m
Es m 9.220 Es m
Ltotal m 204.939 Ltotal m
en % 2 en %
em % 6.16 em %

DAFTAR KURVA TIKUNGAN


NAMA TIKUNGAN P3
JENIS TIKUNGAN SS
PARAMETER SATUAN NILAI P3 (TIKUNGAN SS)
Δ ° 21.662 Δ °
Vr km/jam 80 Vr km/jam
R m 250 R m
Ls m 94.520 Ls m
θs ° 10.831 θs °
Lc m 0.000 Lc m
Xs m 94.182 Xs m
Ys m 5.956 Ys m
P m 1.502 P m
K m 47.203 K m
Ts m 95.321 Ts m
Es m 6.064 Es m
Ltotal m 189.039 Ltotal m
en % 2 en %
em % 6.16 em %
(TIKUNGAN FC)
8.103
80
250
66.667
35.358
0.741
17.709
0.626
35.358
2
4

TIKUNGAN SCS)
28.850
80
250
79.057
9.059
46.825
78.859
4.167
1.048
39.495
104.071
9.220
204.939
2
6.16

(TIKUNGAN SS)
21.662
80
250
94.520
10.831
0.000
94.182
5.956
1.502
47.203
95.321
6.064
189.039
2
6.16
PEMERIKSAAN PELEBARAN PERKERASAN

DIKETAHUI : Lebar total perkerasan pada bagian lurus = Bn = 7


Jumlah lajur = n= 2
Jarak gandar kendaraan = P= 5
Lebar kendaraan rencana (Kendaraan Besar) = b= 2.6
Panjang kendaraan rencana (Kendaraan Besar) = L= 21
Tonjolan depan kendaraan rencana (KB) = A= 1.2
Lebar bebas samping kiri kanan kendaraan = C= 1

TIKUNGAN PERTAMA (FC) : TIKUNGAN KEDUA (SCS) :


Vr = 80 m Vr = 80 m
R= 250 m R= 250 m
z = 0.0336 m z = 0.0336 m
Ri = 246.5 m Ri = 246.5 m
Rc = 247.8 m Rc = 247.8 m
untuk hitung Rw = 247.787 untuk hitung Rw = 247.787
Rw = 246.5001 m Rw = 246.5001 m
B = 2.6293 m B = 2.6293 m
Bt = 7.2922 m Bt = 7.2922 m
Δb = 0.2922 m Δb = 0.2922 m
PPI1 = 29.22 cm PPI2 = 29.22 cm
m
m
m
m b/2 = 1.3
m P+A2 = 6.44
m
m

TIKUNGAN KETIGA (SS) :


Vr = 80 m
R= 250 m
R = 0.0336 m
Ri = 246.5 m
Rc = 247.8 m
untuk hitung Rw = 247.787
Rw = 246.5001 m
B = 2.6293 m
Bt = 7.2922 m
Δb = 0.2922 m
PPI3 = 29.22 cm
ELEVASI (m) BEDA TINGGI (m) JARAK (m)
TITIK STA
A B = A(n)-A(n-1) C
C 0 + 000 93.00
0.000 25.00
1 0 + 025 93.00
0.000 25.00
2 0 + 050 93.00
0.170 69.21
TC 0 + 119.21 92.83
0.020 -44.21
3 0 + 075 92.81
0.050 25.00
4 0 + 100 92.76
0.200 25.00
5 0 + 125 92.96
0.250 11.89
P1 0 + 136.889 93.21
0.160 13.11
6 0 + 150 93.37
0.350 25.00
7 0 + 175 93.72
0.240 25.00
8 0 + 200 93.96
0.020 -45.43
CT 0 + 154.568 93.94
0.340 70.43
9 0 + 225 94.28
0.850 25.00
10 0 + 250 95.13
0.090 25.00
11 0 + 275 95.22
0.020 -4.70
TS 0 + 270.304 95.20
0.100 29.70
12 0 + 300 95.10
0.190 25.00
13 0 + 325 94.91
0.080 25.00
14 0 + 350 94.83
0.040 -0.64
SC 0 + 349.362 94.79
0.080 23.41
P2 0 + 372.774 94.71
0.020 2.23
15 0 + 375 94.69
0.140 21.19
CS 0 + 396.187 94.55
0.090 3.81
16 0 + 400 94.46
0.260 25.00
17 0 + 425 94.20
0.690 25.00
18 0 + 450 93.51
1.030 25.24
ST 0 + 475.244 92.48
0.350 -0.24
19 0 + 475 92.13
0.890 25.00
20 0 + 500 91.24
0.400 25.00
21 0 + 525 90.84
0.010 -10.82
TS 0 + 514.178 90.83
0.340 35.82
22 0 + 550 90.49
0.300 25.00
23 0 + 575 90.19
0.330 25.00
24 0 + 600 89.86
0.150 8.70
SC=CS 0 + 608.698 89.71
0.000 0.00
P3 0 + 608.698 89.71
0.560 16.30
25 0 + 625 90.27
1.260 25.00
26 0 + 650 91.53
1.240 25.00
27 0 + 675 92.77
1.100 28.22
ST 0 + 703.218 93.87
0.160 -3.22
28 0 + 700 93.71
0.430 25.00
29 0 + 725 93.28
2.260 25.00
30 0 + 750 91.02
0.900 25.00
31 0 + 775 90.12
0.420 11.07
K 0 + 786.069 90.54
TOTAL JALAN RENCANA 786.069
ELEVASI (m) BEDA TINGGI (m) JARAK (m) KEMIRINGAN (%)
TITIK STA
A B = A(n)-A(n-1) C D = (B/C)x100%
C 0 + 000 97.07
0.084 158.14 0.053
PV1 0 + 158 97.15
2.224 311.98 0.713
PV2 0 + 470 99.38
2.140 181.68 1.178
PV3 0 + 652 101.518
-0.288 94.20 -0.306
K 0 + 746.000 101.23

CEKUNG
A. Perencanaan Lengkung 1

A= -0.660 0.660

Menghitung Lv

1. Berdasarkan Jarak Penyinaran Lampu

Jh < Lv Lv = 13.69 Tidak Oke

Jh > Lv Lv = -505.84 Tidak Oke

2. Berdasarkan Kenyamanan

Lv = 8.507

3. Berdasarkan Keperluan Drainase

Lv = 32.9877101

4. Menghitung Ev

Ev = 0.00701596

STA PLV1 = 0+ 153.883


STA PTV1 = 0+ 162.390

4.254
KONTROL OVERLAPPING
PV1 - PV2 27.25169844 < 312
PV2 - PV3 32.56330733 < 182
PV3 - PV4 36.72831362 < 94

LANJUTKAN
A TIPE

KETENTUAN :
GALIAN = 2
-0.660 CEKUNG TIMBUNAN = 1.5

-0.465 CEKUNG

1.484 CEMBUNG

Jd = 450.000
Jh = 98.02
Vr = 70

CEMBUNG CEKUNG
B. Perencanaan Lengkung 2 C. Perencanaan Lengkung

A= -0.465 0.4649990249 A= 1.484

Menghitung Lv Menghitung Lv

1. Berdasarkan Jarak Penyinaran Lampu 1. Berdasarkan Jarak Penyinaran Lam

Jh < Lv = Lv = 9.64794441 Tidak Oke Jh < Lv Lv =

Jh > Lv = Lv = -799.81155 Oke Jh > Lv Lv =

2. Berdasarkan Jarak Pandang Mendahului 2. Berdasarkan Kenyamanan

Jd < Lv = Lv = -112.09798 Oke Lv =

Jd > Lv = Lv = 2706.4554 Tidak Oke 3. Berdasarkan Keperluan Drainase

3. Berdasarkan Kenyamanan Lv =

Lv = 5.9960 4. Menghitung Ev

4. Berdasarkan Keperluan Drainase Ev =

Lv = 23.249951245 STA PLV3 =


STA PTV3 =
5. Menghitung Ev

Ev = 0.0035
STA PLV2 = 0 + 467.1157
STA PTV2 = 0 + 473.1117

2.998
CEKUNG CEMBUNG
C. Perencanaan Lengkung 3 D. Perencanaan Lengkung 4

1.484 A= 1.111

Menghitung Lv

arkan Jarak Penyinaran Lampu 1. Berdasarkan Jarak Penyinaran Lampu

35.72 Tidak Oke Jh < Lv = Lv = 26.769984 Tidak Oke

-72.90 Oke Jh > Lv = Lv = -162.8665 Oke

arkan Kenyamanan 2. Berdasarkan Jarak Pandang Mendahului

19.1306 Jd < Lv = Lv = 267.83036 Oke

arkan Keperluan Drainase Jd > Lv = Lv = 143.92439 Tidak Oke

74.180 3. Berdasarkan Kenyamanan

Lv = 14.3261

0.0355 4. Berdasarkan Keperluan Drainase

0 + 642.2320 Lv = 55.55
0 + 661.3626
5. Menghitung Ev
9.565
Ev = 0.0199
STA PLV4 = 0 + 738.83697
STA PTV4 = 0 + 753.16303

7.163
JARAK ELEVASI
TITIK STA (m) (m)
C 0 + 000 0.000 97.07
PLV1 0 + 153.883 153.883 93.70
PV1 0 + 175 21.117 97.15
PTV1 0 + 162.390 -12.610 93.78
PLV2 0 + 467.116 304.725 94.82
PV2 0 + 300 -167.116 99.38
PTV2 0 + 473.112 173.112 94.62
PLV3 0 + 642.232 169.120 91.25
PV3 0 + 525 -117.232 101.52
PTV3 0 + 661.363 136.363 90.99
PLV4 0 + 738.837 77.474 91.90
PV4 0 + 700 -38.837 101.23
PTV4 0 + 753.163 53.163 91.68
K 0 + 786.069 32.906 0.00
ELEVASI (m) BEDA TINGGI (m) JARAK (m)
TITIK STA
A B = A(n)-A(n-1) C
C 0 + 000 93.00
0.000 25.00
1 0 + 025 93.00
0.000 25.00
2 0 + 050 93.00
0.170 69.21
TC 0 + 119.21 92.83
0.020 -44.21
3 0 + 075 92.81
0.050 25.00
4 0 + 100 92.76
0.200 25.00
5 0 + 125 92.96
0.250 11.89
P1 0 + 136.889 93.21
0.160 13.11
6 0 + 150 93.37
0.330 3.88
PLV1 0 + 153.883 93.70
0.020 21.12
7/PV1 0 + 175 93.72
0.060 -12.61
PTV1 0 + 162.390 93.78
0.180 37.61
8 0 + 200 93.96
0.020 -45.43
CT 0 + 154.568 93.94
0.340 70.43
9 0 + 225 94.28
0.850 25.00
10 0 + 250 95.13
0.310 217.12
PLV2 0 + 467.116 94.82
0.400 -192.12
11 0 + 275 95.22
0.020 -4.70
TS 0 + 270.304 95.20
0.100 29.70
12/PV2 0 + 300 95.10
0.190 25.00
13 0 + 325 94.91
0.290 148.11
PTV2 0 + 473.112 94.62
0.210 -123.11
14 0 + 350 94.83
0.040 -0.64
SC 0 + 349.362 94.79
0.080 23.41
P2 0 + 372.774 94.71
0.020 2.23
15 0 + 375 94.69
0.140 21.19
CS 0 + 396.187 94.55
0.090 3.81
16 0 + 400 94.46
0.260 25.00
17 0 + 425 94.20
0.690 25.00
18 0 + 450 93.51
1.030 25.24
ST 0 + 475.244 92.48
0.350 -0.24
19 0 + 475 92.13
0.890 25.00
20 0 + 500 91.24
0.010 142.23
PLV3 0 + 642.232 91.25
0.410 -117.23
21/PV3 0 + 525 90.84
0.010 -10.82
TS 0 + 514.178 90.83
0.160 147.18
PTV3 0 + 661.363 90.99
0.500 -111.36
22 0 + 550 90.49
0.300 25.00
23 0 + 575 90.19
0.330 25.00
24 0 + 600 89.86
0.150 8.70
P3/SC=CS 0 + 608.698 89.71
0.560 16.30
25 0 + 625 90.27
1.260 25.00
26 0 + 650 91.53
1.240 25.00
27 0 + 675 92.77
0.870 63.84
PLV4 0 + 738.837 91.90
1.970 -35.62
ST 0 + 703.218 93.87
0.160 -3.22
28/PV4 0 + 700 93.71
2.030 53.16
PTV4 0 + 753.163 91.68
1.600 -28.16
29 0 + 725 93.28
2.260 25.00
30 0 + 750 91.02
0.900 25.00
31 0 + 775 90.12
0.420 11.07
K 0 + 786.069 90.54
TOTAL JALAN RENCANA 786.069
ELEVASI EXISTING (m)
TITIK STA
KIRI KIRI JALAN AS JALAN KANAN JALAN
C 0 + 000 91.79 93.00 93.00 93.00

1 0 + 025 93.00 93.00 93.00 93.00

2 0 + 050 93.00 93.00 93.00 93.00

TC 0 + 119.21 92.99 92.85 92.83 92.82

3 0 + 075 92.98 92.84 92.81 92.80

4 0 + 100 92.77 92.75 92.76 92.77

5 0 + 125 92.82 92.93 92.96 93.06

P1 0 + 136.889 92.92 93.10 93.21 93.23

6 0 + 150 93.11 93.34 93.37 93.40

7 0 + 175 93.41 93.55 93.72 93.75

8 0 + 200 93.73 93.87 93.96 94.03

CT 0 + 154.568 93.74 93.87 93.94 94.02

9 0 + 225 93.76 94.19 94.28 94.40

10 0 + 250 94.81 95.11 95.13 95.14

11 0 + 275 95.11 95.20 95.22 95.24

TS 0 + 270.304 95.09 95.19 95.20 95.23

12 0 + 300 94.91 95.08 95.10 95.12

13 0 + 325 94.84 94.89 94.91 94.92

14 0 + 350 94.75 94.80 94.83 94.84

SC 0 + 349.362 94.73 94.75 94.79 94.81

P2 0 + 372.774 94.56 94.69 94.71 94.73

15 0 + 375 94.55 94.68 94.69 94.71

CS 0 + 396.187 94.45 94.53 94.55 94.56


16 0 + 400 94.31 94.44 94.46 94.48

17 0 + 425 94.05 94.17 94.20 94.22

18 0 + 450 92.76 93.27 93.51 93.71

ST 0 + 475.244 91.89 92.32 92.48 92.63

19 0 + 475 91.68 91.92 92.13 92.24

20 0 + 500 91.28 91.25 91.24 91.22

21 0 + 525 90.95 90.86 90.84 90.82

TS 0 + 514.178 90.94 90.85 90.83 90.81

22 0 + 550 90.65 90.55 90.49 90.47

23 0 + 575 90.31 90.21 90.19 90.17

24 0 + 600 90.05 89.88 89.86 89.84

SC=CS 0 + 608.698 90.23 89.87 89.71 89.69

P3 0 + 608.698 90.23 89.87 89.71 89.69

25 0 + 625 90.86 90.41 90.27 90.21

26 0 + 650 92.05 91.69 91.53 91.40

27 0 + 675 93.47 92.91 92.77 92.66

ST 0 + 703.218 93.63 93.99 93.87 93.76

28 0 + 700 93.39 93.58 93.71 93.77

29 0 + 725 92.23 93.01 93.28 93.61

30 0 + 750 89.95 90.25 91.02 91.26

31 0 + 775 89.91 90.07 90.12 90.15

K 0 + 786.069 90.38 90.51 90.54 90.56


ELEVASI
KANAN AS JALAN
93.00 93.00

93.00 93.10

92.88 93.21

92.76 93.30

92.75 93.31

92.83 93.41

93.23 93.51

93.41 93.56

93.53 93.62

93.98 93.73

94.26 93.99

94.25 94.00

94.76 94.27

95.40 94.55

95.28 94.82

95.27 94.84

95.22 94.91

95.11 94.63

94.90 94.15

94.85 94.02

94.76 93.72

94.75 93.68

94.67 93.43
94.55 93.21

94.29 92.73

94.05 92.26

93.12 91.92

92.73 91.78

91.37 91.31

90.74 90.98

90.73 90.97

90.36 91.01

90.03 91.18

89.70 91.35

89.60 91.42

89.60 91.42

89.76 91.53

91.03 91.70

92.37 91.87

93.38 91.93

93.83 91.91

93.52 91.60

92.06 91.17

90.27 90.73

90.75 90.54
LEBAR JALAN KEMIRINGAN JALAN LEBAR BAHU JALAN
JARAK (m) (%) (m)
TITIK STA (m)
KIRI KANAN KIRI KANAN KIRI
C 0 + 000 3.5 3.5 -2 -2 2
25.00
1 0 + 025 3.5 3.5 -2 -2 2
25.00
2 0 + 050 3.5 3.5 -2 0 2
69.21
TC 0 + 119.21 3.5 3.5 -2 +2 2
-44.21
3 0 + 075 3.51 3.5 -2 +2 2
25.00
4 0 + 100 3.61 3.5 -2 +2 2
25.00
5 0 + 125 3.71 3.5 -2 +2 2
11.89
P1 0 + 136.889 3.76 3.5 -2 +2 2
13.11
6 0 + 150 3.70 3.5 -2 +2 2
25.00
7 0 + 175 3.60 3.5 -2 +2 2
25.00
8 0 + 200 3.50 3.5 -2 +2 2
-45.43
CT 0 + 154.568 3.5 3.5 -2 +2 2
70.43
9 0 + 225 3.5 3.5 -2 -0.21 2
25.00
10 0 + 250 3.5 3.5 -2 -2 2
25.00
11 0 + 275 3.5 3.5 -2 -2 2
-4.70
TS 0 + 270.304 3.5 3.5 -2 -2 2
29.70
12 0 + 300 3.57 3.5 -2 +1,07 2
25.00
13 0 + 325 3.65 3.5 -4.50 +4,50 2
25.00
14 0 + 350 3.73 3.5 -7.94 +7,94 2
-0.64
SC 0 + 349.362 3.76 3.5 -8.91 +8,91 2
23.41
P2 0 + 372.774 3.81 3.5 -8.91 +8,91 2
2.23
15 0 + 375 3.80 3.5 -8.91 +8,91 2
21.19
CS 0 + 396.187 3.76 3.5 -8.91 +8,91 2
3.81
16 0 + 400 3.72 3.5 -7.32 +7,32 2
25.00
17 0 + 425 3.64 3.5 -3.89 +3,89 2
25.00
18 0 + 450 3.56 3.5 -2 +0,45 2
25.24
ST 0 + 475.244 3.5 3.5 -2 -2 2
-0.24
19 0 + 475 3.5 3.5 -2 -2 2
25.00
20 0 + 500 3.5 3.5 -2 -2 2
25.00
21 0 + 525 3.5 3.5 -2 -2 2
-10.82
TS 0 + 514.178 3.5 3.5 -2 -2 2
35.82
22 0 + 550 3.59 3.5 -2 +2 2
25.00
23 0 + 575 3.68 3.5 -4.46 +4,46 2
25.00
24 0 + 600 3.77 3.5 -7.74 +7,74 2
8.70
SC=CS 0 + 608.698 3.81 3.5 -8.91 +8,91 2
0.00
P3 0 + 608.698 3.81 3.5 -8.91 +8,91 2
16.30
25 0 + 625 3.75 3.5 -6.80 +6,80 2
25.00
26 0 + 650 3.65 3.5 -3.52 +3,52 2
25.00
27 0 + 675 3.56 3.5 -2 +0,24 2
28.22
ST 0 + 703.218 3.5 3.5 -2 -2 2
-3.22
28 0 + 700 3.5 3.5 -2 -2 2
25.00
29 0 + 725 3.5 3.5 -2 -2 2
25.00
30 0 + 750 3.5 3.5 -2 -2 2
25.00
31 0 + 775 3.5 3.5 -2 -2 2
11.07
K 0 + 786.069 3.5 3.5 -2 -2 2
LEBAR BAHU JALAN KEMIRINGAN BAHU JALAN ELEVASI MUKA TANAH ASLI (EXISTING) (m)
(m) (m)
KANAN KIRI KANAN KIRI KIRI JALAN AS JALAN (CL) KANAN JALAN
2 -4 -4 91.79 93.00 93.00 93.00

2 -4 -4 93.00 93.00 93.00 93.00

2 -4 0 93.00 93.00 93.00 93.00

2 -4 +2 92.99 92.85 92.83 92.82

2 -4 +2 92.98 92.84 92.81 92.80

2 -4 +2 92.77 92.75 92.76 92.77

2 -4 +2 92.82 92.93 92.96 93.06

2 -4 +2 92.92 93.10 93.21 93.23

2 -4 +2 93.11 93.34 93.37 93.40

2 -4 +2 93.41 93.55 93.72 93.75

2 -4 +2 93.73 93.87 93.96 94.03

2 -4 +2 93.74 93.87 93.94 94.02

2 -4 -0.21 93.76 94.19 94.28 94.40

2 -4 -4 94.81 95.11 95.13 95.14

2 -4 -4 95.11 95.20 95.22 95.24

2 -4 -4 95.09 95.19 95.20 95.23

2 -4 +1,07 94.91 95.08 95.10 95.12

2 -4.50 +4,50 94.84 94.89 94.91 94.92

2 -7.94 +7,94 94.75 94.80 94.83 94.84

2 -8.91 +8,91 94.73 94.75 94.79 94.81

2 -8.91 +8,91 94.56 94.69 94.71 94.73

2 -8.91 +8,91 94.55 94.68 94.69 94.71


2 -8.91 +8,91 94.45 94.53 94.55 94.56

2 -7.32 +7,32 94.31 94.44 94.46 94.48

2 -3.89 +3,89 94.05 94.17 94.20 94.22

2 -4 +0,45 92.76 93.27 93.51 93.71

2 -4 -4 91.89 92.32 92.48 92.63

2 -4 -4 91.68 91.92 92.13 92.24

2 -4 -4 91.28 91.25 91.24 91.22

2 -4 -4 90.95 90.86 90.84 90.82

2 -4 -4 90.94 90.85 90.83 90.81

2 -4 +2 90.65 90.55 90.49 90.47

2 -4.46 +4,46 90.31 90.21 90.19 90.17

2 -7.74 +7,74 90.05 89.88 89.86 89.84

2 -8.91 +8,91 90.23 89.87 89.71 89.69

2 -8.91 +8,91 90.23 89.87 89.71 89.69

2 -6.80 +6,80 90.86 90.41 90.27 90.21

2 -3.52 +3,52 92.05 91.69 91.53 91.40

2 -4 +0,24 93.47 92.91 92.77 92.66

2 -4 -4 93.63 93.99 93.87 93.76

2 -4 -4 93.39 93.58 93.71 93.77

2 -4 -4 92.23 93.01 93.28 93.61

2 -4 -4 89.95 90.25 91.02 91.26

2 -4 -4 89.91 90.07 90.12 90.15

2 -4 -4 90.38 90.51 90.54 90.56


NG) (m) ELEVASI AS
JALAN
KANAN (m)
93.00 93.00

93.00 93.10

92.88 93.21

92.76 93.30

92.75 93.31

92.83 93.41

93.23 93.51

93.41 93.56

93.53 93.62

93.98 93.73

94.26 93.99

94.25 94.00

94.76 94.27

95.40 94.55

95.28 94.82

95.27 94.84

95.22 94.91

95.11 94.63

94.90 94.15

94.85 94.02

94.76 93.72

94.75 93.68
94.67 93.43

94.55 93.21

94.29 92.73

94.05 92.26

93.12 91.92

92.73 91.78

91.37 91.31

90.74 90.98

90.73 90.97

90.36 91.01

90.03 91.18

89.70 91.35

89.60 91.42

89.60 91.42

89.76 91.53

91.03 91.70

92.37 91.87

93.38 91.93

93.83 91.91

93.52 91.60

92.06 91.17

90.27 90.73

90.75 90.54
LUASAN (m2) ELEVASI AS
JARAK ELEVASI MUKA TANAH ASLI (m)
TITIK STA DRAINASE RENCANA
(m) GALIAN TIMBUNAN
KIRI KANAN KIRI KIRI JALAN AS JALAN (CL) KANAN JALAN KANAN (m)
{1} {2} {3} {4} {5} {6} {7} {8} {9} {10} {11} {12} {13}
C 0 + 000 0.3641 0.3019 0.5243 0.8000 91.79 93.00 93.00 93.00 93.00 93.00
25.00
1 0 + 025 0.1099 0.5000 0.8000 0.8000 93.00 93.00 93.00 93.00 93.00 93.10
25.00
2 0 + 050 0.0000 2.5082 0.7099 0.5616 93.00 93.00 93.00 93.00 92.88 93.21
25.00
3 0 + 075 0.0000 7.0959 0.5144 0.0000 92.98 92.84 92.81 92.80 92.75 93.31
25.00
4 0 + 100 0.0000 9.3941 0.3223 0.0000 92.77 92.75 92.76 92.77 92.83 93.41
25.00
5 0 + 125 0.0000 7.2713 0.3507 0.3416 92.82 92.93 92.96 93.06 93.23 93.51
11.89
P1 0 + 136.889 0.0000 5.3393 0.4296 0.4430 92.92 93.10 93.21 93.23 93.41 93.56
13.11
6 0 + 150 0.0000 3.5249 0.5717 0.5232 93.11 93.34 93.37 93.40 93.53 93.62
25.00
7 0 + 175 0.0000 0.8173 0.6930 0.7801 93.41 93.55 93.72 93.75 93.98 93.73
25.00
8 0 + 200 0.0228 0.4731 0.7511 0.7975 93.73 93.87 93.96 94.03 94.26 93.99
25.00
9 0 + 225 0.8453 0.1549 0.6944 0.8000 93.76 94.19 94.28 94.40 94.76 94.27
25.00
10 0 + 250 4.9051 0.0000 0.8000 0.8000 94.81 95.11 95.13 95.14 95.40 94.55
25.00
11 0 + 275 3.4074 0.0000 0.8000 0.8000 95.11 95.20 95.22 95.24 95.28 94.82
25.00
12 0 + 300 1.2908 0.0000 0.8000 0.8000 94.91 95.08 95.10 95.12 95.22 94.91
25.00
13 0 + 325 1.9828 0.0000 0.8000 0.8000 94.84 94.89 94.91 94.92 95.11 94.63
25.00
14 0 + 350 6.1236 0.0000 0.8000 0.8000 94.75 94.80 94.83 94.84 94.90 94.15
22.77
P2 0 + 372.774 11.0932 0.0000 0.8000 0.8000 94.56 94.69 94.71 94.73 94.76 93.72
2.23
15 0 + 375 11.5431 0.0000 0.8000 0.8000 94.55 94.68 94.69 94.71 94.75 93.68
25.00
16 0 + 400 16.0889 0.0000 0.8000 0.8000 94.31 94.44 94.46 94.48 94.55 93.21
25.00
17 0 + 425 20.2347 0.0000 0.8000 0.8000 94.05 94.17 94.20 94.22 94.29 92.73
25.00
18 0 + 450 16.2156 0.0000 0.8000 0.8000 92.76 93.27 93.51 93.71 94.05 92.26
25.00
19 0 + 475 3.1726 0.0000 0.8000 0.8000 91.68 91.92 92.13 92.24 92.73 91.78
25.00
20 0 + 500 0.4507 0.2707 0.8000 0.8000 91.28 91.25 91.24 91.22 91.37 91.31
25.00
21 0 + 525 0.0872 1.0215 0.8000 0.7320 90.95 90.86 90.84 90.82 90.74 90.98
25.00
22 0 + 550 0.0000 7.3717 0.5112 0.0000 90.65 90.55 90.49 90.47 90.36 91.01
25.00
23 0 + 575 0.0000 15.3743 0.0000 0.0000 90.31 90.21 90.19 90.17 90.03 91.18
25.00
24 0 + 600 0.0000 24.3025 0.0000 0.0000 90.05 89.88 89.86 89.84 89.70 91.35
8.70
P3 0 + 608.698 0.0000 27.2506 0.0000 0.0000 90.23 89.87 89.71 89.69 89.60 91.42
16.30
25 0 + 625 0.0000 19.7351 0.3062 0.0000 90.86 90.41 90.27 90.21 89.76 91.53
25.00
26 0 + 650 1.0447 3.3280 0.8000 0.0000 92.05 91.69 91.53 91.40 91.03 91.70
25.00
27 0 + 675 10.6853 0.0000 0.8000 0.8000 93.47 92.91 92.77 92.66 92.37 91.87
25.00
28 0 + 700 28.4892 0.0000 0.8000 0.8000 93.39 93.58 93.71 93.77 93.83 91.91
25.00
29 0 + 725 25.7964 0.0000 0.8000 0.8000 92.23 93.01 93.28 93.61 93.52 91.60
25.00
30 0 + 750 1.6058 5.4422 0.0000 0.8000 89.95 90.25 91.02 91.26 92.06 91.17
25.00
31 0 + 775 0.0000 7.6738 0.2749 0.4145 89.91 90.07 90.12 90.15 90.27 90.73
11.07
K 0 + 786.069 0.7701 0.0000 0.8000 0.8000 90.38 90.51 90.54 90.56 90.75 90.54
TOTAL KUMULATIF
SELISIH VOLUME GALIAN DAN TIMBUNAN
PERBANDINGAN GALIAN DAN TIMBUNAN
VOLUME (m3) BATAS TOTAL (m3) ORDINAT
DRAINASE SUSUT
GALIAN TIMBUNAN 20% MASS
KIRI KANAN GALIAN TIMBUNAN DIAGRAM
{14} {15} {16} {17} {18}=20%x{15} {14+16+17} {15+18}
0.0000
5.9250 10.0238 16.5538 20.0000 2.0048 42.4788 12.0285
30.4503
1.3738 37.6025 18.8738 17.0200 7.5205 37.2675 45.1230
22.5948
0.0000 120.0513 15.3038 7.0200 24.0103 22.3238 144.0615
-99.1430
0.0000 206.1250 10.4588 0.0000 41.2250 10.4588 247.3500
-336.0343
0.0000 208.3175 8.4125 4.2700 41.6635 12.6825 249.9810
-573.3328
0.0000 74.9634 4.6385 4.6640 14.9927 9.3025 89.9560
-653.9863
0.0000 58.1095 6.5641 6.3340 11.6219 12.8980 69.7314
-710.8197
0.0000 54.2775 15.8088 16.2913 10.8555 32.1000 65.1330
-743.8527
0.2850 16.1300 18.0513 19.7200 3.2260 38.0563 19.3560
-725.1524
10.8513 7.8500 18.0688 19.9688 1.5700 48.8888 9.4200
-685.6837
71.8800 1.9363 18.6800 20.0000 0.3873 110.5600 2.3235
-577.4472
103.9063 0.0000 20.0000 20.0000 0.0000 143.9063 0.0000
-433.5409
58.7275 0.0000 20.0000 20.0000 0.0000 98.7275 0.0000
-334.8134
40.9200 0.0000 20.0000 20.0000 0.0000 80.9200 0.0000
-253.8934
101.3300 0.0000 20.0000 20.0000 0.0000 141.3300 0.0000
-112.5634
196.0493 0.0000 18.2194 18.2194 0.0000 232.4880 0.0000
119.9246
25.1921 0.0000 1.7806 1.7806 0.0000 28.7534 0.0000
148.6780
345.4000 0.0000 20.0000 20.0000 0.0000 385.4000 0.0000
534.0780
454.0450 0.0000 20.0000 20.0000 0.0000 494.0450 0.0000
1028.1230
455.6288 0.0000 20.0000 20.0000 0.0000 495.6288 0.0000
1523.7517
242.3525 0.0000 20.0000 20.0000 0.0000 282.3525 0.0000
1806.1042
45.2913 3.3838 20.0000 20.0000 0.6768 85.2913 4.0605
1887.3350
6.7238 16.1525 20.0000 19.1500 3.2305 45.8738 19.3830
1913.8257
1.0900 104.9150 16.3900 9.1500 20.9830 26.6300 125.8980
1814.5577
0.0000 284.3250 6.3900 0.0000 56.8650 6.3900 341.1900
1479.7577
0.0000 495.9600 0.0000 0.0000 99.1920 0.0000 595.1520
884.6057
0.0000 224.2056 0.0000 0.0000 44.8411 0.0000 269.0468
615.5590
0.0000 382.9794 2.4958 0.0000 76.5959 2.4958 459.5752
158.4796
13.0588 288.2888 13.8275 0.0000 57.6578 26.8863 345.9465
-160.5807
146.6250 41.6000 20.0000 10.0000 8.3200 176.6250 49.9200
-33.8757
489.6813 0.0000 20.0000 20.0000 0.0000 529.6813 0.0000
495.8056
678.5700 0.0000 20.0000 20.0000 0.0000 718.5700 0.0000
1214.3756
342.5275 68.0275 10.0000 20.0000 13.6055 372.5275 81.6330
1505.2701
20.0725 163.9500 3.4363 15.1813 32.7900 38.6900 196.7400
1347.2201
4.2621 42.4706 5.9490 6.7217 8.4941 16.9328 50.9648
1313.1881
4807.1618 3493.9737 -
1313.1881 -
1.38 1 -