LVL +93.20M

LOADING/UNLOADING DIESEL STORE


LVL +92.45M SPACE
LVL +92.30M 3230 X 2500 SHEET ROOFING TO
LVL +92.45M BE SUPPORTED
FROM THE WALL

Primary Pump

Primary Pump

Secondary Pump

Secondary Pump
HVAC Chiller

HVAC Chiller

HVAC Chiller

HVAC Chiller
FEED WATER TANK &
BOILER ROOM BELOW
BOILER ROOM
10082 X 6260

FUEL TANK SKID


3940 X 8500
LVL +92.45M
LVL +92.45M

W2 W2 W2 W2

MCC PANEL ROOM


5950 X 4360
LVL +96.05M

PROCESS CHILLER 150 TR

PROCESS CHILLER 150 TR


CHILLER ROOM
5950 X 12120
LVL +92.45M
BOILER CHIMNEY D3

PIPE RACK PIPE RACK

W2 D1

W2 W2
FF FF FF
5950 X 4160

D4

2M WIDE PEDESTRIAN PATHWAY


LANDSCAPE KITCHEN ENGINEERING STORE CUM WORKSHOP
STORE W2 3200X3940 W2 W2 10082 X 3400 W2
1978X4000 LVL +96.05M

S16 V1
D4 D1
D3

LVL +92.00M
EE
UB5
EE CANTEEN D5

EE EE
3967 X 3600 V1
TOILET
1778 X 1200 D5 LVL +90.20M LVL +94.25M
TOILET
4340 X 3120
LVL +92.45M FLOOR RAISED
V1 D5
(FILLED) BY 150 MM
D4

1.4M WIDE PASSAGE


2M WIDE PEDESTRIAN PATHWAY
FLOOR RAISED
V1 D5 (FILLED) BY 150 MM

D4

D4
S15 S14 PANTRY
HANDWASH
1430 X 1400
5990 X 6411
1910 X 1450

DINNING AREA
4340X2536
UP UP DN UP DN
W3 1.1 M WIDE PASSAGE
LVL +89.15M LVL +92.45M LVL +96.05M

S12 S13
D3

E D4 LVL +92.00M MANAGER CABIN


OP D4
SL 3425X3200
E

S8
OP

S11 LVL +92.30M DN


DD
WORKSTATION
DD
SL

5915 X 3200
PUMP ROOM
12000X2830
LVL +93.20M
DD W3
D4
DD
SUMP LVL +89.15M STORE W3
UB1 S9 RAMP DOWN 2520X1915

S10
SUMP SUMP MANHOLE LVL +92.30M MANHOLE W3 W3 W3 W3

DOMESTIC WATER
UNDERGROUND

(30 cu.m.)
PE
SL O

TANK
UNDERGROUND
DOMESTIC WATER
TANK
S6
S5 3040X4870
SLO

CC
AA

BB
UNDERGROUND FIREFIGHTING WATER TANK (40 cu.m.)
PE
SLOPE

8730X6310
LVL +89.15M
(160 cu.m.) S7
LVL +89.15M
E

S4
OP
SL

UNDERGROUND FIREFIGHTING WATER TANK LVL +93.20M


(150 cu.m.)
3270X1240 LVL +92.30M
S3
MANHOLE

UG SAND UG SAND UG SAND UG SAND


CHARCOAL HOLDING TANK CHARCOAL CHARCOAL CHARCOAL HOLDING TANK
MANHOLE
FILTER 6220X1770 FILTER FILTER FILTER LVL +92.30M
5580X1770 (30 cu.m.)
LVL +92.30M
S2

S1
LVL +92.00M

FIRST FLOOR PLAN

CC
AA

BB
CC
AA

BB

UGT LEVEL PLAN GROUND FLOOR PLAN


NOTE :- ALL DIMENSION ARE IN MM CONFIDENTIAL
NORTH CLIENT :
M/s ACE HEALTHCARE (PVT) LTD.
HORANA, SRILANKA

CONSULTANT :
SCHEDULE OF DOORS VISHVA ASSOCIATES
4 25/04/2017 AS PER CHANGES IN UTILITIES VVB DHS PKJ
TYPE SIZE DESCRIPTION QTY. CBD Belapur, Navi Mumbai, Maharashtra, India.
3 26/12/2016 FOR STRUCTURAL DESIGN VVB VVB VRB
D1 1800x2100 DOUBLE DOOR 03 2 05/11/2016 AS PER CLIENT'S REQUIREMENTS VVB VVB VRB 13/07/16 VVB
D3 1200x2100 DOUBLE DOOR 03 ARCHITECTURAL DRAWINGS OF UTILITY BLOCK
1 02/11/2016 UTILITY BLOCK LAYOUT FOR APPROVAL ASD VVB VRB 13/07/16 PKJ
D4 900x2100 SINGLE DOOR 07 0 13/07/2016 CONCEPTUAL UTILITY BLOCK LAYOUT ASD VVB PKJ 13/07/16 VRB
1:100 A1 VA/I-008-16002/UBL/101/R4
D5 750x2100 SINGLE DOOR 03 1 OF 3 4
CC
BB
AA
SLOPE SLOPE

50mm FLOOR FINISH


(TILE/STONE)
TERRACE FLOOR SLAB
LVL +98.90M
DINNING HANDWASH TOILET
WORKSPACE
W2

W3 W3 W3
D5 D5 D5 ENGINEERING
STORE ROOM
50mm FLOOR FINISH
(TILE/STONE)
FIRST FLOOR SLAB COOLING TOWERS
LVL +96.05M BOILER ROOM

SLOPE
W1 W2 W2
CANTEEN CANTEEN TOILET
LOADING/UNLOADING
KITCHEN
V1

D4
GROUND FLOOR SLAB
LVL +92.45M 50mm FLOOR FINISH
(TILE/STONE)

UGT TOP LVL 150 MM RAISED

LVL +92.30M
UG SAND
GROUND LEVEL CHARCOAL PIPE RACK
LVL +92.00M FILTER

UG FIRE FIGHTING TANK PUMP ROOM


(150 cu.m.)
FF FF
UGT BOTTOM LVL
LVL +89.15M

SECTION AA LVL +98.90M

EE
LVL +97.85M EE

STAIRCASE TOP
LVL +101.70M

TERRACE FLOOR SLAB


DN
LVL +98.90M

STORE ROOM PASSAGE PASSAGE


W2 LVL +98.90M D4 LVL +98.75M

W3
ENGINEERING MCC PANEL ROOM
STORE CUM
WORKSHOP
50mm FLOOR FINISH 50mm FLOOR FINISH

DD
(TILE/STONE) (TILE/STONE)
FIRST FLOOR SLAB
LVL +96.05M DD
CHILLER ROOM

LOADING/UNLOADING
W2 W2

D4 D4
GROUND FLOOR SLAB
LVL +92.45M 50mm FLOOR FINISH 50mm FLOOR FINISH 50mm FLOOR FINISH
(TILE/STONE)
50mm FLOOR FINISH (TILE/STONE) (TILE/STONE)
(TILE/STONE)
UGT TOP LVL

CC
AA

BB
LVL +92.30M
UG SAND
GROUND LEVEL CHARCOAL
LVL +92.00M FILTER

UG FIRE FIGHTING TANK


(160 cu.m.)
PUMP ROOM TERRACE FLOOR PLAN
UGT BOTTOM LVL
LVL +89.15M

SECTION BB
TERRACE FLOOR SLAB
LVL +98.90M
MANAGER CABIN PASSAGE WORKSTATION

W3 W3 W3 W3 W3

50mm FLOOR FINISH


(TILE/STONE)
FIRST FLOOR SLAB
STAIRCASE TOP LVL +96.05M
LVL +101.70M

FOOT PATH LVL


LVL +92.45M
50mm FLOOR FINISH
(TILE/STONE)
TERRACE FLOOR SLAB
LVL +98.90M
ENGINEERING MCC PANEL ROOM UGT TOP LVL
W2 STORE CUM LVL +92.30M
WORKSHOP

MANAGER CABIN
GROUND LEVEL
PUMP ROOM
D4 LVL +92.00M
50mm FLOOR FINISH 50mm FLOOR FINISH
(TILE/STONE) (TILE/STONE)
FIRST FLOOR SLAB
LVL +96.05M
50mm FLOOR FINISH
50mm FLOOR FINISH CHILLER ROOM (TILE/STONE)
(TILE/STONE)
W2 W2
UGT BOTTOM LVL
LOADING/UNLOADING
LVL +89.15M

D4
GROUND FLOOR SLAB
LVL +92.45M
UGT TOP LVL
REMOVABLE STONE
SLAB/TILE
50mm FLOOR FINISH
(TILE/STONE) FILLING FOR RAMP & STEP
50mm FLOOR FINISH
(TILE/STONE)
50mm FLOOR FINISH
(TILE/STONE)
50mm FLOOR FINISH
(TILE/STONE) SECTION DD
LVL +92.30M
HOLDING
GROUND LEVEL TANK
LVL +92.00M CONFIDENTIAL
NOTE :- ALL DIMENSION ARE IN MM
UG DOMESTIC WATER TANK PUMP ROOM
(160 cu.m.) NORTH CLIENT :

UGT BOTTOM LVL M/s ACE HEALTHCARE (PVT) LTD.


LVL +89.15M
HORANA, SRILANKA

CONSULTANT :
SCHEDULE OF DOORS VISHVA ASSOCIATES
SECTION CC TYPE SIZE DESCRIPTION QTY. 4 25/04/2017 AS PER CHANGES IN UTILITIES VVB DHS PKJ
CBD Belapur, Navi Mumbai, Maharashtra, India.
3 26/12/2016 FOR STRUCTURAL DESIGN VVB VVB VRB
D1 1800x2100 DOUBLE DOOR 03 2 05/11/2016 AS PER CLIENT'S REQUIREMENTS VVB VVB VRB 13/07/16 VVB
D3 1200x2100 DOUBLE DOOR 03 ARCHITECTURAL DRAWINGS OF UTILITY BLOCK
1 02/11/2016 UTILITY BLOCK LAYOUT FOR APPROVAL ASD VVB VRB 13/07/16 PKJ
D4 900x2100 SINGLE DOOR 07 0 13/07/2016 CONCEPTUAL UTILITY BLOCK LAYOUT ASD VVB PKJ 13/07/16 VRB
1:100 A1 VA/I-008-16002/UBL/101/R4
D5 750x2100 SINGLE DOOR 03 2 OF 3 4
STAIRCASE TOP
LVL +101.70M

STAIRCASE TOP
LVL +101.70M

TERRACE FLOOR SLAB


LVL +98.90M
PASSAGE TOILET
50mm FLOOR FINISH
(TILE/STONE)
TERRACE FLOOR SLAB
V1
LVL +98.90M
D3 D4
W2
V1 V1 V1
W3 W3
FIRST FLOOR SLAB 150 RAISED
LVL +96.05M
CANTEEN TOILET
FIRST FLOOR SLAB
LVL +96.05M

W2

GROUND FLOOR SLAB


LVL +92.45M 50mm FLOOR FINISH
(TILE/STONE)
D4 D4
UGT TOP LVL 150MM RAISED

GROUND FLOOR SLAB


LVL +92.30M
LVL +92.45M
UGT TOP LVL GROUND LEVEL
LVL +92.30M LVL +92.00M

GROUND LEVEL
LVL +92.00M
UGT BOTTOM LVL
LVL +89.15M

NORTH-WEST ELEVATION
SECTION EE

STAIRCASE TOP
LVL +101.70M

50mm FLOOR FINISH


(TILE/STONE)
TERRACE FLOOR SLAB
LVL +98.90M
TERRACE FLOOR SLAB
LVL +98.90M ENGINEERING STORE CUM WORKSHOP

W2 W2 W2

W3

50mm FLOOR FINISH


(TILE/STONE)
FIRST FLOOR SLAB
LVL +96.05M
FIRST FLOOR SLAB
LVL +96.05M CHILLER ROOM
BOILER ROOM

W2 W2 W2
FOOT PATH LVL
LVL +93.30M

GROUND FLOOR SLAB


LVL +92.45M 50mm FLOOR FINISH
GROUND FLOOR SLAB (TILE/STONE)

LVL +92.45M UGT TOP LVL


LVL +92.30M
UGT TOP LVL
LVL +92.30M GROUND LEVEL
LVL +92.00M
GROUND LEVEL
LVL +92.00M

SOUTH-EAST ELEVATION SECTION FF

STAIRCASE TOP
LVL +101.70M

TERRACE FLOOR SLAB


LVL +98.90M

W3 W3 W3 W3

FIRST FLOOR SLAB


LVL +96.05M

UGT TOP LVL


LVL +92.30M

GROUND LEVEL
LVL +92.00M NOTE :- ALL DIMENSION ARE IN MM CONFIDENTIAL
NORTH CLIENT :
SOUTH-WEST ELEVATION M/s ACE HEALTHCARE (PVT) LTD.
HORANA, SRILANKA

CONSULTANT :
SCHEDULE OF DOORS VISHVA ASSOCIATES
4 25/04/2017 AS PER CHANGES IN UTILITIES VVB DHS PKJ
TYPE SIZE DESCRIPTION QTY. CBD Belapur, Navi Mumbai, Maharashtra, India.
3 26/12/2016 FOR STRUCTURAL DESIGN VVB VVB VRB
D1 1800x2100 DOUBLE DOOR 03 2 05/11/2016 AS PER CLIENT'S REQUIREMENTS VVB VVB VRB 13/07/16 VVB
D3 1200x2100 DOUBLE DOOR 03 ARCHITECTURAL DRAWINGS OF UTILITY BLOCK
1 02/11/2016 UTILITY BLOCK LAYOUT FOR APPROVAL ASD VVB VRB 13/07/16 PKJ
D4 900x2100 SINGLE DOOR 07 0 13/07/2016 CONCEPTUAL UTILITY BLOCK LAYOUT ASD VVB PKJ 13/07/16 VRB
1:100 A1 VA/I-008-16002/UBL/101/R4
D5 750x2100 SINGLE DOOR 03 3 OF 3 4