Problem 1) Assume that the three wells, as shown in the figure, are producing under a
transient flow condition for 15 hours. The following additional data is available:
q,=100 STBID gq, =160 STBID
4, =200 STBID —r, =0.25 ft
Mad op =20ft
By=12 RBISTB— $=0.15
6, =20%10 psi
8 (for welll) = -0.5
If the wells are producing at a constant flow rate, calculate the sand face flowing pressure at
well 1 after 15 hours.
wails
Problem 2) The following figure shows the rate history of a well that is producing under
transient flow conditions for 15 hours. Given the following data’
1, = 03,8 0 ft
B, =1.1 RB/STB 6, = 20x 10° psi
k=40md
Calculate the sand face pressure after 15 hours.Calculate the sand face pressure after 15 hours.
150
z
E
2
Ps +
oO
°
ye
\e
o o
2
o
° =
o
°
2
zs &
eeProblem 3) A well is located between two sealing faults at 100 and 200 feet from the two
faults as shown below. The well is producing under a transient flow condition at a constant
flow rate of 200 STBID. Given:
7, = 03st
B,=L1 RB/STB $=0.17
p, =5000 psi s=0
Calculate the sand face pressure after 10 hours, assuming two image wells as shown.
Image Well
°
100" @.
Image Well