Lampiran 2

DAFTAR BERAT BESI IWF

NO. UKURAN IWF BERAT 12 M1 BERAT PER 1 M1


1 100 x 50 x 5 x 7 mm 112.00 kg 9.33
2 125 x 60 x 6 x 8 mm 158.40 kg 13.20
3 148 x 100 x 6 x 9 mm 253.20 kg 21.10
4 150 x 75 x 5 x 7 mm 168.00 kg 14.00
5 175 x 90 x 5 x 8 mm 217.40 kg 18.12
6 198 x 99 x 4.5 x 7 mm 218.40 kg 18.20
7 200 x 100 x 5.5 x 8 mm 256.00 kg 21.33
8 248 x 124 x 5 x 8 mm 308.40 kg 25.70
9 250 x 125 x 6 x 9 mm 355.20 kg 29.60
10 298 x 149 x 6 x 8 mm 384.00 kg 32.00
11 300 x 150 x 6.5 x 9 mm 440.40 kg 36.70
12 346 x 174 x 6 x 9 mm 497.00 kg 41.42
13 350 x 175 x 7 x 11 mm 595.20 kg 49.60
14 396 x 199 x 7 x 11 mm 679.20 kg 56.60
15 400 x 200 x 8 x 13 mm 792.00 kg 66.00
16 446 x 199 x 8 x 12 mm 794.40 kg 66.20
17 450 x 200 x 9 x 14 mm 912.00 kg 76.00
18 500 x 200 x 10 x 16 mm 1,075.00 kg 89.58
19 588 x 300 x 12 x 20 mm 1,812.00 kg 151.00
20 600 x 200 x 11 x 17 mm 1,272.00 kg 106.00
21 700 x 300 x 13 x 24 mm 2,220.00 kg 185.00
22 800 x 300 x 14 x 26 mm 2,520.00 kg 210.00
23 900 x 300 x 16 x 28 mm 2,916.00 kg 243.00

DAFTAR BERAT BESI SIKU " L "

NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67

KOTA BANJAR Halaman : 1+116


Lampiran 2
AFTAR BERAT BESI IWF

BERAT PER 1 M1
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

TAR BERAT BESI SIKU " L "

BERAT PER 1 M1
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

KOTA BANJAR Halaman : 2+116


Lampiran 1
DAFTAR BERAT BESI KANAL " C "

NO. UKURAN BESI KANAL " C " BERAT 6 M1 BERAT PER 1 M1

6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27

KOTA BANJAR Halaman :3+115


Lampiran 1

BERAT PER 1 M1

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

KOTA BANJAR Halaman :4+115


12 Ruang belajar dan ruang pendukung lainnya yang ada pada saat ini:

Lebar panjang Penutup Rangka Listplank Rangka


No Ruang Jumlah Atap Atap/Kuda2 &Talang Plafond

m m % % % %
1 R. Kelas 1 1 8.00 9.00 100%
2 R. Kelas 2
3 R. Kelas 3
4 R. Kelas 4
5 R. Kelas 5
6 R. Kelas 6
7 R. Kelas 7
8 R. Kelas 8
9 R. Kelas 9
10 R. Kelas 10
11 R. Kelas 11
12 R. Kelas 12
13 R. Kelas 13
14 R. Kelas 14
15 R. Kelas 15
16 R. Kelas 16
17 R. Kelas 17
18 R. Kelas 18
19 R. Kelas 19
20 R. Kelas 20
21 R. Kelas 21
22 R. Kelas 22
23 R. Kelas 23
24 R. Kelas 24
25 R. Kelas 25
26 R. Kelas 26
27 R. Kelas 27
28 Perpustakaan
29 Lab. IPA
30 Lab Bahasa
31 Lab. Komputer
32 R. Kesenian
33 R. Ketrampilan
34 R. Kepsek
35 R. TU/Administrasi
36 R. Guru
37 Tempat Ibadah
38 KM/WC Guru
39 KM/WC Siswa
40 R. OSIS
41 R. UKS
42 Kantin
43 R. BK
44 R. Gudang
45 GEDUNG MESS GURU
GEDUNG ASRAMA
46
SISWA
47 BANGSAL SEPEDA
RUMAH PENJAGA
48
SEKOLAH
RUMAH DINAS
49
KEPALA SEKOLAH
50 POS JAGA
51
52
53
54
55
56
57
g ada pada saat ini:
Pekerjaan Yang akan Dilaksanakan
Penutup Cat Plafond Kolom Dinding Cat Dinding Kusen Pintu Daun Pintu Daun Struktur Penutup
Plafond Ringbalk Pengisi & Jendela Jendela Bawah Lantai
Lantai
% % % % % % % % % %
Fondasi Sloof Utilitas Rabat &
Listrik Drainase Keterangan

% % % %
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

OK
OK
OK
OK
OK
OK
OK
OK
OK
PROGRAM BLOCK GRANT
PEMBANGUNAN UNIT SEKOLAH BARU SMP NEGERI DAN PENGEMBANGAN SD-SMP SATU ATAP
Dengan Mekanisme Partisipasi Masyarakat
0
#REF!

Kode Sekolah : 0
Nama Sekolah : 0
Desa : 0
Kecamatan : 0
Kabupaten : Kab. Kolaka
Propinsi : 0
DAFTAR HARGA UPAH
HARGA
NO JENIS UPAH SATUAN
Rp.

1 Mandor - org-hari
2 Kepala Tukang 500,000.00 org-hari
3 Tukang Batu 500,000.00 org-hari
4 Tukang Kayu 500,000.00 org-hari
5 Tukang Besi / Tukang Pipa 500,000.00 org-hari
6 Tukang Cat 500,000.00 org-hari
7 Tukang Las 500,000.00 org-hari
8 Tukang Listrik 500,000.00 org-hari
9 Pekerja 500,000.00 org-hari

DAFTAR HARGA BAHAN


HARGA
NO JENIS BAHAN SATUAN
Rp.

A. Bahan Agregat Kasar, Bahan Pelekat dan Bahan Jadi


1 Pasir Urug - M3
2 Pasir Pasang - M3
3 Pasir Beton M3
4 Batu Kerikil Beton M3
5 Batu Kali / Belah Belah M3
6 Batu Karang Mati M3
7 Batu Kerikil / Split 2/3 cm M3
8 Bata Merah Bakar Kelas I Bh
9 Batako Bh
10 Paving Block Warna 6 cm M2
11 Paving Block Warna 8 cm M2
12 Paving Block Natural 6 cm M2
13 Paving Block Natural 8 cm M2
14 Semen PC (50 kg) Zak
15 Semen Warna Kg
16 Tanah urug M3
17 Batu Tempel M2

B. Bahan Finishing Laburan Pengisi dan Alatnya


1 Plamir Tembok Kg
2 Plamir Kayu Kg
3 Cat Tembok Kg
4 Kuas Roll Bh
5 Kuas Bh
6 Minyak cat / Thinner Ltr
7 Amplas Lbr
8 Meni Kayu Kg
9 Meni Besi Kg
10 Cat Kayu Kg
11 Cat Besi Kg
12 Residu Ltr
13 Lem Kayu Kg
14 Politur Kg
15 Cat Minyak Kg

C. Bahan Kayu/Baja Berikut Bahan Jadinya


1 Kayu Kelas III Papan M3
2 Kayu Kelas III Balok M3
3 Kayu Kelas II Papan M3
4 Kayu Kelas II Balok M3
5 Kayu Dolken Btg
6 List Plafond Profil 4 Cm Btg
7 Baja Ringan M²
8 Bambu Btg

D. Bahan Penutup Rangka Plafond


1 Triplek 4mm 120 x 240 Lbr
2 Triplek 6mm 120 x 240 Lbr
3 Polywood tebal 9 mm Lbr

E. Bahan Kayu Lapis


1 Multipleks 12mm 120 x 240 Lbr
2 Multipleks 18mm 120 x 240 Lbr
Multipleks 18mm 120 x 240 Lbr
Jabarwood 4 mm Lbr
F. Bahan Lantai dan Pelapis Dinding
1 Keramik 30 x 30 cm Doz
2 Keramik 40 x 40 cm Doz
3 Keramik 20 x 25 cm Doz
4 Keramik 10 x 20 cm Doz
5 Keramik 20 x 20 cm Doz
6 Keramik 15 x 20 cm Doz
7 Keramik Porselen 11 x 11 cm Doz
8 Keramik Porselen 11 x 11 cm, Warna Doz
9 Keramik Porselen 10 x 20 cm, Warna Doz
10 Keramik Porselen 20 x 20 cm, Warna Doz

G. Bahan Saluran Air Kotor (Riolering)


1 Buis belah dia 20 cm Bh
2
H. Bahan Logam dan Bahan Jadinya
1 Besi Beton Polos Dia. 12 mm Kg
2 Besi Beton Polos Dia. 10 mm Kg
3 Besi Beton Polos Dia. 8 mm Kg
4 Besi Siku 50.50.5 panjang 6 m Kg
5 Besi Strip 2x3 M²
6 Besi Strip Kg
7 Kawat Beton Kg
8 Beghel U (Plat Baja U 4.40mm) bh
9 Beghel U (Besi Polos 12mm) bh
10 Plat Baja 4.40mm bh
11 Baut Dia. 10mm (25 - 30 cm) bh
12 Kawat berduri M
13 Pagar BRC Ø6 mm, lengkap dengan tiang dan klem pengikat lbr
14 Almunium M²
15 Pasak Besi f 12 mm Kg
16 Ring Basket bh
17 Papan Pantul + Rangka bh

I. Bahan Kaca
1 Kaca Polos 5 mm M²
Kaca Polos 3 mm M²

J. Bahan Paku
1 Paku Biasa Kg
2 Paku Tripleks Kg
3 Paku Seng + karet seal Kg
4 Paku Ulir bh

K. Bahan Perpipaan (Riolering dan Asineering)


1 Pipa PVC AW 0,5" btg
2 Pipa PVC AW 0,75" btg
3 Pipa PVC AW 1" btg
4 Pipa PVC AW 1,5" btg
5 Pipa PVC AW 2" btg
6 Pipa PVC AW 2,5" btg
7 Pipa PVC AW 3" btg
8 Pipa PVC AW 4" btg
9 Pipa konduit dia 5/8 inch M'
10 Pipa Galvanis 0,5" btg
11 Pipa Galvanis 0,75" btg
12 Pipa Galvanis 1" btg
13 Pipa Galvanis 1,5" btg
14 Pipa Galvanis 2" btg
15 Pipa Galvanis 3" M'
16 Pipa Galvanis 4" btg
17 Pipa GIP 1/2" btg
18 Pipa Stainless Steel Dia. 1,5 " M'
19 Elbow 4" bh
L. Bahan Sanitair dan Perpipaan
1 Kran Air bh
2 Floor Drain bh
3 Closet Jongkok bh
4 Closet Duduk bh
5 Bak Air Mandi bh
6 Bak Cuci Stainless Steel bh
7 Bak Fibreglass bh
8 Washtafel bh
9 Urinoir bh
10 Tangki Air Kap. 2 x 600 Ltr Unit
11 Mesin Pompa Air 350 Watt
12 Water Drain + asesories Set

M. Bahan Penutup Atap


1 Genteng Tanah/Plentong ex. Jatiwangi Bh
2 Bubungan Genteng Tanah Bh
3 Seng Gelombang BJLS 0,3 Lbr
4 Seng Plat BJLS 30 lebar 90 cm M1
5 Atap Spandek Zyncalum Lbr
6 Genteng Metal / metal roof zyncalum Lbr
7 Nok Genteng Metal Bh
8 Nok Tepi Seng Gelombang m1
9 Nok Tepi Zyncalum Bh
10 Nok Tepi Genteng Metal Bh
11 Nok Tepi Atap Spandek Bh
Bh
N. Bahan Alat Penggantung dan Kunci
1 Kunci Pintu Bh
2 Kunci Bulat Bh
3 Kunci Tanam biasa Bh
4 Kunci Tanam Kamar Mandi Bh
5 Kunci Pintu 2 x Putar ( lever handle ) Bh
6 Sloot Tanam Bh
7 Grendel Jendela Bh
8 Kait Angin ps
9 Engsel Pintu 4 " Bh
10 Engsel Jendela 3 " Bh
11 Kunci laci set
12 Pegangan/Handle Pintu Bh
13 Knop Tarikan Bh
14 Kasur Busa Bh
15 Imitatie Lear Unit
16 Sekrup 5 cm Bh
17 Kunci Lemari Bh
18 Engsel Pita psg
19 Rel Pita psg
20 Promika Bh
21 Sekrup Pengantung Bh
22 Kasur Busa Bh
23 Kaca / Cermin muka Bh
24 Gantungan Baju Bh
25 Plank nama ruangan Set
26 Handel tarik jendela Bh
27 Grabbed Bar set

O. Bahan Jadi Penampung Tinja


1 Ijuk Kg
P. Bahan Bakar dan Pelumas
1 Minyak Solar Ltr
2 Oli Mesran 40 SAE Ltr
3 Pelumas Bakesting Ltr

Q. Alat-alat Listrik
1 Kabel 1x2,5mm NYM M1
2 Kabel 2x2,5mm NYM M1
3 Kabel 3x2,5mm NYM M1
4 Kabel 3x2,5mm NYM M1
5 Kabel 3x4mm NYY M1
6 Saklar Tunggal setara Broco Bh
7 Saklar Ganda setara Broco Bh
8 Stop Kontak setara Broco Bh
9 Lampu TL 2 x 40 watt + armaturnya, setara Phillips Set
10 Lampu Pijar 25 watt setara Phillips + fitting Bh
11 Box Sekring Bh
12 Inbowdoos Bh
13 Isolasi/Seal Tape Bh
14 Klem Kabel Bh
15 MCB Bh
16 Panel Box Utama Bh

1 Air m3

R. Bahan Kimia dan Lainnya


1 Anti Rayap Ltr
2 Pupuk Kandang ls

S. Tanaman dan Lainnya


1 Tanaman Perdu/Bunga dll Btg
2 Tanama Keras (Pohon Pelindung) Btg
3 Rumput M²
4 Pembentukan Lahan Taman Unit

Alat
1 Stemper jam
2 Concrete Mixer jam
3 Concrete Vibrator jam
4 Manual Tool ls
5 Alat Semprot ls
Daftar Harga Furniture

Kode R. Furniture Harga Satuan


M-1 Meja Siswa Tunggal Bh
M-3 Meja Baca Individu Bh
M-4 Meja Baca Kelompok Bh
M-5 Meja Baca Serbaguna Bh
M-6 Meja Pimpinan Bh
M-7 Meja Kerja Bh
M-8 Meja Guru Bh
M-10 Meja Sirkulasi Bh
M-11 Meja Demonstrasi Bh
M-12 Meja Ketik Bh
M-13 Meja Tamu Bh
L-1 Lemari Buku Bh
L-2 Lemari Kaca Geser Bh
L-3 Lemari Arsip Bh
L-4 Lemari Pembatas Bh
L-5 Lemari Administrasi Bh
L-6 Lemari Alat Peraga Bh
L-7 Lemari Obat Bh
L-8 Lemari Besi Bh
L-10 Lemari Kertas Kerja Bh
L-11 Lemari Katalog Bh
L-12 Lemari Kardek Bh
L-13 Lemari Kaca Tinggi Bh
L-14 Lemari Gantung/P3K Bh
L-15 Lemari Kunci Bh
L-16 Lemari Locker Bh
L-17 Lemari Pakaian Guru Bh
L-19 Lemari Pakaian Siswa Bh
L-20 Lemari Asam Bh
K-1 Kursi Siswa Tunggal Bh
K-2 Kursi Bulat Tinggi Bh
K-3 Kursi Bulat Pendek Bh
K-4 Kursi Pimpinan Bh
K-5 Kursi Kerja Bh
K-6 Kursi Lipat Bh
K-7 Kursi Putar Bh
K-8 Kursi Tamu Bh
P-1 Papan Tulis Gantung Bh
P-4 Whiteboard Gantung Bh
P-6 Papan Statistik Bh
P-7 Papan Jadwal Bh
P-8 Papan Pameran Bh
P-9 Papan Piket Bh
P-10 Papan Absensi Bh
R-1 Rak Tas Bh
R-2 Rak Buku Satu Muka Bh
R-3 Rak Buku Dua Muka Bh
R-4 Rak Gudang Bh
R-6 Rak Majalah Bh
R-7 Rak Atlas Bh
R-8 Rak Ensiklopedia Bh
R-9 Rak Koran Bh
R-10 Rak Dorong Bh
R-11 Rak Piring Bh
U-1 Filling Kabinet 4 Laci Bh
U-4 Tungku Tiang Bendera Bh
U-6 Dipan Diperiksa Bh
U-7 Dipan Tidur Tunggal Bh
U-8 Dipan Tidur Ganda Bh
U-9 Dipan Tidur Tingkat Bh
KS Kotak Sampah Bh
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

NPSN : 0
NAMA SEKOLAH : 0
KABUPATEN : Kab. Kolaka
PROVINSI : 0

No. Uraian Pekerjaan Harga Harga

I PERSIAPAN - -

II BIAYA KONSTRUKSI 132,127,411 37,726,891


1 GEDUNG KELAS / TEORI 1 37,726,891 Rp 37,726,891
2 GEDUNG KELAS / TEORI 2 - Rp -
3 GEDUNG KELAS / TEORI 3 - Rp -
4 GEDUNG KELAS / TEORI 4 - Rp -
5 GEDUNG KELAS / TEORI 5 - Rp -
6 GEDUNG KELAS / TEORI 6 - Rp -
7 GEDUNG KELAS / TEORI 7 - Rp -
8 GEDUNG KELAS / TEORI 8 - Rp -
9 GEDUNG KELAS / TEORI 9 - Rp -
10 GEDUNG KELAS / TEORI 10 - Rp -
11 GEDUNG KELAS / TEORI 11 - Rp -
12 GEDUNG KELAS / TEORI 12 - Rp -
13 GEDUNG KELAS / TEORI 13 - Rp -
14 GEDUNG KELAS / TEORI 14 - Rp -
15 GEDUNG KELAS / TEORI 15 - Rp -
16 GEDUNG KELAS / TEORI 16 - Rp -
17 GEDUNG KELAS / TEORI 17 - Rp -
18 GEDUNG KELAS / TEORI 18 - Rp -
19 GEDUNG KELAS / TEORI 19 - Rp -
20 GEDUNG KELAS / TEORI 20 - Rp -
21 GEDUNG KELAS / TEORI 21 - Rp -
22 GEDUNG KELAS / TEORI 22 - Rp -
23 GEDUNG KELAS / TEORI 23 - Rp -
24 GEDUNG KELAS / TEORI 24 - Rp -
25 GEDUNG KELAS / TEORI 25 - Rp -
26 GEDUNG KELAS / TEORI 26 - Rp -
27 GEDUNG KELAS / TEORI 27 - Rp -
28 GEDUNG PERPUSTAKAAN - Rp -
29 GEDUNG LABORATORIUM SAINS / IPA - Rp -
30 GEDUNG LABORATORIUM BAHASA - Rp -
31 GEDUNG LAB. KOMPUTER - Rp -
32 GEDUNG KESENIAN - Rp -
33 GEDUNG KETERAMPILAN - Rp -
34 GEDUNG KANTOR KEPALA SEKOLAH - Rp -
No. Uraian Pekerjaan Harga Harga
35 GEDUNG KANTOR DAN ADMINISTRASI - Rp -
36 RUANG GURU - Rp -
37 GEDUNG MUSHOLLA - Rp -
38 GEDUNG KAMAR MANDI / WC GURU - Rp -
39 GEDUNG KAMAR MANDI / WC SISWA - Rp -
40 GEDUNG OSIS/PRAMUKA - Rp -
41 GEDUNG UKS - Rp -
42 GEDUNG KANTIN - Rp -
43 GEDUNG BK - Rp -
44 GEDUNG GUDANG - Rp -
45 GEDUNG MESS GURU - Rp -
46 GEDUNG ASRAMA SISWA - Rp -
47 BANGSAL SEPEDA - Rp -
48 RUMAH PENJAGA SEKOLAH - Rp -
49 RUMAH DINAS KEPALA SEKOLAH - Rp -
50 POS JAGA 94,400,520 Rp -
51 Rp -
52 Rp -
53 Rp -
54 Rp -
55 Rp -
56 Rp -
57 Rp -

III FURNITURE - Rp -

IV BIAYA OPERASIONAL DAN ADMINISTRASI KOMITE 4,000,000 Rp4,000,000.00

TOTAL BIAYA 136,127,411 Rp 41,726,891


DIBULATKAN 136,127,000 Rp 41,727,000

Terbilang :

Perencana
REHABILITASI GEDUNG
REHABILITASI
SMP GEDUNG SMP
Dengan MekanismeDengan
Partisipasi
Mekanisme
Masyarakat
Partisipasi Masyarakat

REKAPITULASIREKAPITULASI
RENCANA ANGGARAN
RENCANABIAYA
ANGGARAN
( RAB ) BIAYA ( RAB )

NPSN : 0
NAMA SEKOLAH : 0
KABUPATEN : Kab. Kolaka
PROVINSI : 0

No. Uraian Pekerjaan Harga Keterangan

I PERSIAPAN -

II BIAYA KONSTRUKSI 132,127,411


1 GEDUNG KELAS / TEORI 1 37,726,891 Harga diatas PAGU yang sudah Ditentukan
2 GEDUNG KELAS / TEORI 2 - .
3 GEDUNG KELAS / TEORI 3 - .
4 GEDUNG KELAS / TEORI 4 - .
5 GEDUNG KELAS / TEORI 5 - .
6 GEDUNG KELAS / TEORI 6 - .
7 GEDUNG KELAS / TEORI 7 - .
8 GEDUNG KELAS / TEORI 8 - .
9 GEDUNG KELAS / TEORI 9 - .
10 GEDUNG KELAS / TEORI 10 - .
11 GEDUNG KELAS / TEORI 11 - .
12 GEDUNG KELAS / TEORI 12 - .
13 GEDUNG KELAS / TEORI 13 - .
14 GEDUNG KELAS / TEORI 14 - .
15 GEDUNG KELAS / TEORI 15 - .
16 GEDUNG KELAS / TEORI 16 - .
17 GEDUNG KELAS / TEORI 17 - .
18 GEDUNG KELAS / TEORI 18 - .
19 GEDUNG KELAS / TEORI 19 - .
20 GEDUNG KELAS / TEORI 20 - .
21 GEDUNG KELAS / TEORI 21 - .
22 GEDUNG KELAS / TEORI 22 - .
23 GEDUNG KELAS / TEORI 23 - .
24 GEDUNG KELAS / TEORI 24 - .
25 GEDUNG KELAS / TEORI 25 - .
26 GEDUNG KELAS / TEORI 26 - .
27 GEDUNG KELAS / TEORI 27 - .
28 GEDUNG PERPUSTAKAAN - .
29 GEDUNG LABORATORIUM SAINS / IPA - .
30 GEDUNG LABORATORIUM BAHASA - .
31 GEDUNG LAB. KOMPUTER - .
32 GEDUNG KESENIAN - .
33 GEDUNG KETERAMPILAN - .
34 GEDUNG KANTOR KEPALA SEKOLAH - .
No. Uraian Pekerjaan Harga Keterangan
35 GEDUNG KANTOR DAN ADMINISTRASI - .
36 RUANG GURU - .
37 GEDUNG MUSHOLLA - .
38 GEDUNG KAMAR MANDI / WC GURU - .
39 GEDUNG KAMAR MANDI / WC SISWA - .
40 GEDUNG OSIS/PRAMUKA - .
41 GEDUNG UKS - .
42 GEDUNG KANTIN - .
43 GEDUNG BK - .
44 GEDUNG GUDANG - .
45 GEDUNG MESS GURU - .
46 GEDUNG ASRAMA SISWA - .
47 BANGSAL SEPEDA - .
48 RUMAH PENJAGA SEKOLAH - .
49 RUMAH DINAS KEPALA SEKOLAH - .
50 POS JAGA 94,400,520 .
51 .
52 .
53 .
54 .
55 .
56 .
57 .

III FURNITURE -

IV BIAYA OPERASIONAL DAN ADMINISTRASI KOMITE 4,000,000 Harga diatas PAGU yang telah ditentukan

TOTAL BIAYA 136,127,411


DIBULATKAN 136,127,000

Terbilang :

Perencana Kepala Sekolah


REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0
NAMA SEKOLAH : 0
KABUPATEN : Kab. Kolaka
PROVINSI : 0

Pekerjaan : PERSIAPAN

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Papan Nama Program + Papan Informasi 1.00 unit - -
2 Pek. Direksi Keet + Gudang 1.00 ls - -
3 Pengadaan Air Kerja 1.00 ls - -
- -

Total -

Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 1 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 30.00 m2 215,000 6,450,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V 6,450,000
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 0.54 m3 8,600,000 4,623,933
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 0.16 m3 50,000 8,102
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 0.12 m3 8,600,000 1,011,933
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 0.68 m3 8,600,000 5,819,333
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 48.00 ttk 50,000 2,400,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 27.72 m1 176,000 4,879,189
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 0.05 m3 50,000 2,367
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 3.00 Unit 50,000 150,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 122.56 m2 93,000 11,398,328
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 9.73 m1 46,500 452,600
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 40.85 m2 13,000 531,105
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII 31,276,891
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 4.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 20.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 20.00 bh 90,000 -
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 10.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 1.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 10.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total 37,726,891
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 2 ( 1 Ruang Kelas ) -

Volume Pemb Volume Harga Satuan


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Pemb Volume Harga Satuan
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Pemb Volume Harga Satuan
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 2 ( 1 Ruang Kelas ) -

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 3 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 1" (3bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 3 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 1" (3bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 4 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 5 ( 1 Ruang Kelas ) -

Volume Volume Rehabilitasi Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (1 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 6 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 7 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 8 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 8 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 9 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 9 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 10 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 10 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 11 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 12 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 13 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 14 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 15( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 16 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 17 ( 1 Ruang Kelas ) -

Volume Volume Rehabilitasi Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 18 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 18 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 19 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 19 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 20 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 21 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 22 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 22 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 23 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 24 ( 1 Ruang Kelas ) -

Volume Volume Rehabilitasi Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 25 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 26 ( 1 Ruang Kelas ) -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 27 ( 1 Ruang Kelas ) -

Volume Harga Satuan


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Harga Satuan
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : GEDUNG KELAS UNIT 27 ( 1 Ruang Kelas ) -

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.270 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.090 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.262 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.000 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.359 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.437 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.305 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.350 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG PERPUSTAKAAN

Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Pemb Baru Sat
Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 56.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 0.70 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.23 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.69 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 1.30 m 2
5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 0.09 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 4.01 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 48.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.25 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.92 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.66 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 11.82 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.54 m 3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.16 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 93.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 153.72 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.84 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 307.43 m 2
260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 21.68 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 329.11 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Pintu P2 A.06.03 3.00 Unit 600,000 -
3 Kusen Jendela J3 A.06.10 2.00 Unit 1,140,000 -
4 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun Pintu P2 A.06.18 3.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 4.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
9 BV2 A.06.14 1.00 Buah 516,000 -
10 BV3 A.06.15 1.00 Buah 732,000 -
11 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
12 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.81 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 - m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 - m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.19 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Pemb Baru Sat
Rehabilitasi ( Rp ) ( Rp )
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 - m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 59.15 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 - m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.09 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 216.88 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Residu Kayu A.11.22 216.88 m2 13,000 -
31 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 176.16 m 2
240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 176.16 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 225.50 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 20.25 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 6.75 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 6.75 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 101.93 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 30.53 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ..........Bermotif ( anti sliip ) A.13.77 m 2
502,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 (10.84) m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.84 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 176.16 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 176.16 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 119.51 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 15.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 20.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 20.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 10.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 4.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 10.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 61.49 m 2 210,000 -
2 Pek. Plesteran Saluran A.05.19 47.09 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.345 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.35 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG LABORATORIUM SAINS / IPA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 49.28 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 16.43 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.46 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 31.79 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 0.00 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 23.58 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 31.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.37 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.87 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.61 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.13 m 3
2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.80 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m 3
2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 54.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 150.14 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.70 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 300.29 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 21.40 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
10 Pek. Acian Dinding 1 : 4 A.05.36 321.69 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Pintu P2 A.06.03 2.00 Unit 600,000 -
3 Kusen Jendela J3 A.06.10 4.00 Unit 1,140,000 -
4 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun Pintu P2 A.06.18 2.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 8.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
9 BV2 A.06.14 1.00 Buah 516,000 -
10 BV3 A.06.15 1.00 Buah 732,000 -
11 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
12 Kaca Mati A.06.32.a 2.84 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.92 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m 3
207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.36 m 3
8,600,000 -
6 Pek. Baut Ø 10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 61.46 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.10 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 235.78 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 235.78 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 192.31 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 192.31 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 171.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 7.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 15.00 m 3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 120.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 30.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Meja Beton+Dinding keramik 20x20 cm A.13.68 15.48 m2 372,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 349.78 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.70 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 192.31 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 192.31 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 126.94 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.48 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 9.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 18.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 8.00 m' 114,750 -
3 Pas. Kran air 1/2" A.10.35 4.00 bh 5,500 -
4 Pas. Kitchen Zink 1 Lubang A.10.33 4.00 bh 180,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 12.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 28.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 28.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 14.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 14.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 63.71 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 48.79 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.45 m 3
962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG LABORATORIUM BAHASA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 40.40 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 13.47 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.46 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 26.07 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m 3
962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 6.72 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 23.57 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 31.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.37 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.87 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.61 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.70 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 54.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 150.14 m 2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.70 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m 2
215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 300.29 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 21.40 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
10 Pek. Acian Dinding 1 : 4 A.05.36 321.69 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Pintu P2 A.06.03 2.00 Unit 600,000 -
3 Kusen Jendela J A.06.12 2.00 Unit 360,000 -
4 Kusen Jendela J3 A.06.10 4.00 Unit 1,140,000 -
5 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
6 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
7 Daun Pintu P2 A.06.18 2.00 Buah 3,150,000 -
8 Daun Jendela J3 A.06.27 8.00 Buah 887,250 -
9 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
10 BV2 A.06.14 1.00 Buah 516,000 -
11 BV3 A.06.15 1.00 Buah 732,000 -
12 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
13 Kaca Mati A.06.32.a 3.74 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.92 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m 3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.36 m3 8,600,000 -
6 Pek. Baut Ø 10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 61.46 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.10 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 235.78 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 235.78 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 192.74 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 192.74 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 216.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 7.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 15.00 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 120.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti slii A.13.75 30.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti slii A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 349.78 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.70 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 192.74 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 192.74 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 126.94 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 21.96 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 12.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 28.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 28.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 14.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 14.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 63.71 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 48.79 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.24 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG LABORATORIUM KOMPUTER

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 40.40 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 13.47 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.46 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 26.07 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 6.72 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 23.57 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 31.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.37 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.87 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.61 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.70 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 54.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 150.14 m 2
215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.70 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m 2
215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 300.29 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 21.40 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
10 Pek. Acian Dinding 1 : 4 A.05.36 321.69 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Pintu P2 A.06.03 2.00 Unit 600,000 -
3 Kusen Jendela J A.06.12 2.00 Unit 360,000 -
4 Kusen Jendela J3 A.06.10 4.00 Unit 1,140,000 -
5 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
6 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
7 Daun Pintu P2 A.06.18 2.00 Buah 3,150,000 -
8 Daun Jendela J3 A.06.27 8.00 Buah 887,250 -
9 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
10 BV2 A.06.14 1.00 Buah 516,000 -
11 BV3 A.06.15 1.00 Buah 732,000 -
12 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
13 Kaca Mati A.06.32.a 3.74 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.92 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.36 m3 8,600,000 -
6 Pek. Baut Ø 10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 61.46 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.10 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 235.78 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 235.78 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 192.74 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 192.74 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 216.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 7.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 15.00 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 120.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti slii A.13.75 30.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti slii A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 349.78 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.70 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 192.74 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 192.74 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 126.94 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 21.96 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 12.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 28.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 28.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 14.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 14.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 63.71 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 48.79 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.24 m 3
962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KESENIAN

Volume Pemb Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 38.43 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 12.81 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.35 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 24.79 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 4.69 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 22.35 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 31.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.33 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.67 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.61 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.13 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.23 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 54.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 143.11 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.10 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 286.22 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 20.20 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 306.42 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200.00 -
2 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000.00 -
3 Kusen Pintu P2 A.06.03 1.00 Unit 600,000.00 -
4 Daun Pintu P2 A.06.18 1.00 Buah 3,150,000.00 -
5 Kusen Jendela J3 A.06.10 4.00 Unit 1,140,000.00 -
6 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
7 Daun Jendela J3 A.06.27 8.00 Buah 887,250.00 -
8 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
9 Kaca Mati A.06.32.a 2.84 m2 90,000.00 -
10 BV2 A.06.14 1.00 Buah 516,000 -
11 BV3 A.06.15 1.00 Buah 732,000 -
12 LA-LB A.06.16 4.00 Buah 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.92 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.36 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 61.46 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.10 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 235.78 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m2 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 235.78 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 192.89 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 192.89 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 216.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 7.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 15.00 m 3
962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 120.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 30.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sliip ) A.13.77 m2 502,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 9.15 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 335.11 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.10 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 192.89 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 192.89 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 117.78 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 2.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 10.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 5.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 2.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 1,000,000 -
9 Pas. Wastafel A.10.05 bh 1,400,000 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 2.00 bh 180,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 9.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 28.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 28.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 14.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 2.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 14.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 63.71 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 48.79 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.45 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KETERAMPILAN

Volume Pemb Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 38.43 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 12.81 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.35 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 24.79 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 4.69 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 22.35 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 31.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.33 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.67 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.61 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.19 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.59 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.23 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.45 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.13 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.23 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 54.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 143.11 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 10.10 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 286.22 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 20.20 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 16.80 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 7.74 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 6.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 8.25 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 306.42 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200.00 -
2 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000.00 -
3 Kusen Pintu P2 A.06.03 1.00 Unit 600,000.00 -
4 Daun Pintu P2 A.06.18 1.00 Buah 3,150,000.00 -
5 Kusen Jendela J3 A.06.10 4.00 Unit 1,140,000.00 -
6 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
7 Daun Jendela J3 A.06.27 8.00 Buah 887,250.00 -
8 Daun Jendela J3a A.06.27a 6.00 Buah 709,800 -
9 Kaca Mati A.06.32.a 2.84 m2 90,000.00 -
10 BV2 A.06.14 1.00 Buah 516,000 -
11 BV3 A.06.15 1.00 Buah 732,000 -
12 LA-LB A.06.16 4.00 Buah 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.92 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.36 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 80.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 61.46 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.10 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 235.78 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m2 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 235.78 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 192.89 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 192.89 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 216.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 7.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 15.00 m 3
962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 120.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 30.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sliip ) A.13.77 m2 502,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 9.15 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 335.11 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 10.10 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 192.89 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 192.89 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 117.78 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 2.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 8.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 10.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 5.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 2.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 1,000,000 -
9 Pas. Wastafel A.10.05 bh 1,400,000 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 2.00 bh 180,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 9.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 28.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 28.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 14.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 2.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 14.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 63.71 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 48.79 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.45 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KANTOR/ADMINISTRASI -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 68.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 66.76 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 22.25 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.88 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 51.43 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 0.00 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.00 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.76 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 37.60 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 0.00 m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 0.00 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 84.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.29 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.70 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.78 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.49 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.31 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.44 m3 2,842,500 -
6 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.89 m3 2,842,500 -
7 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.68 m3 2,842,500 -
8 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.19 m3 2,842,500 -
9 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.54 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.69 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.08 m3 2,842,500 -
12 Pek. Beton Canopy A.07.51 0.25 m3 2,842,500 -
13 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
14 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 45.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 154.59 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 60.22 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 120.44 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 309.17 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 19.60 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 9.03 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 11.20 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 9.90 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 429.61 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ1 / PJ1A A.06.06 3.00 Unit 1,212,000 -
2 Kusen Pintu P2 A.06.03 3.00 Unit 600,000 -
3 Kusen Pintu P3 A.06.04 5.00 Unit 348,000 -
4 Kusen Jendela J3 A.06.10 5.00 Unit 1,140,000 -
5 Daun Pintu PJ1 / PJ1A A.06.18 3.00 Buah 3,150,000 -
6 Daun Jendela PJ1 / PJ1A A.06.23 3.00 Buah 760,500 -
7 Daun Pintu P2 A.06.18 3.00 Buah 3,150,000 -
8 Daun Pintu P3 A.06.18 5.00 Buah 3,150,000 -
9 Daun Jendela J3 A.06.27 10.00 Buah 887,250 -
10 BV1 ( kaca ) A.06.13 7.00 Buah 288,000 -
11 BV2 ( kaca ) A.06.14 1.00 Buah 516,000 -
12 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
13 Kaca Mati A.06.32.a 15.21 m2 90,000 -
Total VI -

Ged. Kantor Page 143 of 254


VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.07 m3 8,600,000 -
2 Pas. Balok Gapit 2( 5/10 ) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II ............ .dihilangkan ( Kalo pakai zinkalum ) A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.20 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.46 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 96.00 ttk 50,000
7 Pek. Kaso 5/7 ............dihilangkan ( Kalo pakai zinkalum ) A.06.37 m3 105,000 -
8 Pek. Reng 3/4 ................. dihilangkan ( Kalo pakai zinkalum ) A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II ..... dihilangkan ( Kalo pakai zinkalum ) A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 68.96 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II ...... Dihilangkan A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.11 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 .......... dihilangkan ( Kalo pakai zinkalum ) A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 5.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 263.52 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 20.00 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 5.14 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 263.52 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 267.49 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 267.49 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 319.97 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 24.30 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 6.67 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 6.67 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 85.78 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm .......... Bermotif ( anti sliip ) A.13.75 33.30 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............. Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 42.02 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.44 14.31 m2 502,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 1 Pek. Cat Dinding berikut plamir A.14.25 479.34 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 14.22 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 267.49 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 267.49 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 172.75 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 33.01 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 25.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 3.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 8.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 6.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 16.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x40 watt L. 01. 07 9.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
10 Pas. Panel Box Utama +MCB L. 01. 10 1.00 bh 80,000 -
Total XI -

Ged. Kantor Page 144 of 254


XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 15.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 15.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 21.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 5.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 5.00 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 1,000,000 -
9 Pas. Wastafel A.10.05 1.00 bh 1,400,000 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 1.00 bh 180,000 -
11 Pek. Floordrain A.10.36 5.00 bh 5,500 -
12 Pas. Grabbed Bar ls bh - -
13 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 5.00 bh 1,650,000 -
14 Pas. Kaca Muka ls 1.00 bh - -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 33.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 26.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 26.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 0.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 13.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 11.00 bh 285,000 -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 5.00 bh - -
8 Pas. Handel tarik jendela ls 13.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 68.64 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 52.42 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.60 m3 150,000.00 -
4 Pek. Rabat Beton Keliling Bangunan A.07.01 2.60 m3 962,500 -
5 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -

Ged. Kantor Page 145 of 254


REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG TU -

Volume Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 68.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 66.76 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 22.25 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.88 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 51.43 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 0.00 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.00 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.76 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 37.60 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 0.00 m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 0.00 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 84.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.29 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.70 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.78 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.49 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.31 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.44 m3 2,842,500 -
6 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.89 m3 2,842,500 -
7 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.68 m3 2,842,500 -
8 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.19 m3 2,842,500 -
9 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.54 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.69 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.08 m3 2,842,500 -
12 Pek. Beton Canopy A.07.51 0.25 m3 2,842,500 -
13 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
14 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 45.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 154.59 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 60.22 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 120.44 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 309.17 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 19.60 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 9.03 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 11.20 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 9.90 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 429.61 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ1 / PJ1A A.06.06 3.00 Unit 1,212,000 -
2 Kusen Pintu P2 A.06.03 3.00 Unit 600,000 -
3 Kusen Pintu P3 A.06.04 5.00 Unit 348,000 -
4 Kusen Jendela J3 A.06.10 5.00 Unit 1,140,000 -
5 Daun Pintu PJ1 / PJ1A A.06.18 3.00 Buah 3,150,000 -
6 Daun Jendela PJ1 / PJ1A A.06.23 3.00 Buah 760,500 -
7 Daun Pintu P2 A.06.18 3.00 Buah 3,150,000 -
8 Daun Pintu P3 A.06.18 5.00 Buah 3,150,000 -
9 Daun Jendela J3 A.06.27 10.00 Buah 887,250 -
10 BV1 ( kaca ) A.06.13 7.00 Buah 288,000 -
11 BV2 ( kaca ) A.06.14 1.00 Buah 516,000 -
12 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
13 Kaca Mati A.06.32.a 15.21 m2 90,000 -
Total VI -

Ged. Kantor Page 146 of 254


VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.07 m3 8,600,000 -
2 Pas. Balok Gapit 2( 5/10 ) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II ............ .dihilangkan ( Kalo pakai zinkalum ) A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.20 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.46 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 96.00 ttk 50,000
7 Pek. Kaso 5/7 ............dihilangkan ( Kalo pakai zinkalum ) A.06.37 m3 105,000 -
8 Pek. Reng 3/4 ................. dihilangkan ( Kalo pakai zinkalum ) A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II ..... dihilangkan ( Kalo pakai zinkalum ) A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 68.96 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II .. .... Dihilangkan A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.11 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 .......... dihilangkan ( Kalo pakai zinkalum ) A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 5.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 263.52 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 20.00 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 5.14 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 263.52 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 267.49 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 267.49 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 319.97 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 24.30 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 6.67 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 6.67 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 85.78 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm .......... Bermotif ( anti sliip ) A.13.75 33.30 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............. Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 42.02 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.44 14.31 m2 502,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 1 Pek. Cat Dinding berikut plamir A.14.25 479.34 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 14.22 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 267.49 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 267.49 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 172.75 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 33.01 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 25.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 3.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 8.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 6.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 16.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x40 watt L. 01. 07 9.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
10 Pas. Panel Box Utama +MCB L. 01. 10 1.00 bh 80,000 -
Total XI -

Ged. Kantor Page 147 of 254


XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 15.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 15.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 21.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 5.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 5.00 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 1,000,000 -
9 Pas. Wastafel A.10.05 1.00 bh 1,400,000 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 1.00 bh 180,000 -
11 Pek. Floordrain A.10.36 5.00 bh 5,500 -
12 Pas. Grabbed Bar ls bh - -
13 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 5.00 bh 1,650,000 -
14 Pas. Kaca Muka ls 1.00 bh - -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 33.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 26.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 26.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 0.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 13.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 11.00 bh 285,000 -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 5.00 bh - -
8 Pas. Handel tarik jendela ls 13.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 68.64 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 52.42 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.60 m3 150,000.00 -
4 Pek. Rabat Beton Keliling Bangunan A.07.01 2.60 m3 962,500 -
5 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -

Ged. Kantor Page 148 of 254


REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : RUANG GURU -

Volume Volume Rehabilitasi Harga Satuan


No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp )
1 2 3 4 5 6
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000
Total I
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000
Total II
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500
Total III
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000
Total IV
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000
4 Pas. Dinding Batako 1:2 A.04.10 m2
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250
Total V
Volume Volume Rehabilitasi Harga Satuan
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000
10 Kaca Mati A.06.32.a 2.03 m2 90,000
Total VI
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000
6 Pek. Kaso 5/7 A.06.37 m3 105,000
7 Pek. Reng 3/4 A.06.38 m3 105,000
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000
Total VII
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500
Total VIII
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500
Volume Volume Rehabilitasi Harga Satuan
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp )
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500
Total IX
Volume Volume Rehabilitasi Harga Satuan
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000
6 Pek. Meni Besi A.14.13 m2 50,000
7 Pek. Cat Besi A.14.31 m2 145,000
Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000
Total XI
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000
7 Pas. Handel tarik jendela ls 4.00 bh -
Total XIII
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500
7 Pek. Plank Nama Ruang ls 1.00 Set -
Total XIV
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.27 m3 200,000
2 Pek. Urugan Kembali bekas Galian A.02.11 0.09 m3 96,000
3 Pek. Urugan Pasir A.02.13 0.26 m3 150,000.00
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.00 m3 1,080,000
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.36 m3 150,000.00
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.44 m3 962,500.00
7 Pek. Canstien Pasangan Bata A.04.11 2.31 m2 215,000.00
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.35 m' 514,310.00
Total XV
Grand Total
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat
NPSN : 0
NAMA SEKOLAH : 0.000
KABUPATEN : Kab. Kolaka
PROVINSI : 0
80.00
Pekerjaan : RUANG GURU -

Volume Volume Rehabilitasi Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 28.53 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 9.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.23 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 18.41 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.46 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 11.67 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 16.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.38 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.34 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.18 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.11 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.61 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.05 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.09 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.82 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.14 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 67.51 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 5.02 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 -
5 Pek. Plesteran Dinding 1 : 4 A.05.21 135.02 m2 260,000 -
6 Pek. Plesteran Dinding 1: 2 A.05.19 10.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.33 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 4.30 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.33 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 145.06 m2 130,250 -
Total V -
Volume Volume Rehabilitasi Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 1.00 Unit 811,200 -
2 Kusen Jendela J3 A.06.10 3.00 Unit 1,140,000 -
3 Kusen Jendela J3a A.06.10a 3.00 Unit 1,015,200 -
4 Kusen pintu P2 (antar ruang kelas) A.06.03a 1.00 Unit 492,000.00 -
5 Daun Pintu P1 A.06.18 2.00 Buah 3,150,000 -
6 Daun pintu P2 A.06.18 1.00 Buah 3,150,000 -
7 Daun Jendela J3 A.06.27 2.00 Buah 887,250 -
8 Daun Jendela J3a A.06.27a 2.00 Buah 709,800 -
9 Angin-Angin LA-LB A.06.16 1.00 Buah 408,000 -
10 Kaca Mati A.06.32.a 2.03 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.54 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.16 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.12 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.68 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 27.72 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 122.56 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 9.73 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 40.85 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 127.99 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 127.99 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 105.47 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.15 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.05 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 4.05 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 63.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm Bermotif ( anti sliip ) A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
Volume Volume Rehabilitasi Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
Volume Volume Rehabilitasi Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Pemb Baru ( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 53.90 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 5.29 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 127.99 m2 50,000 -
4 Pek. Cat Plafond berikut plamir A.14.26 127.99 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 67.92 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 2.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (1bh/pintu) A.12.05 8.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 8.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 8.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 2.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 4.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 4.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 29.38 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 22.50 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.18 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.18 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 0.27 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 0.09 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 0.26 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 0.00 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 0.36 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 0.44 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 2.31 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 36.35 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG MUSHOLLA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 51.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 34.32 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 11.44 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.24 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 22.14 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.21 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 20.11 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 20.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.16 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.42 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 1.64 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.46 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.48 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.26 m3 2,842,500 -
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.48 1.67 m3 2,842,500 -
7 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 1.01 m3 2,842,500 -
8 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.48 m3 2,842,500 -
9 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.90 m 3
2,842,500 -
10 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 30.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 46.79 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 16.12 m2 215,000 -
3 Pek. Plesteran Dinding 1: 2 A.05.19 32.23 m2 260,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 93.57 m2 260,000 -
5 Pek. Acian Kolom Utama 1 : 4 A.05.36 9.80 m2 130,250 -
6 Pek. Acian Kolom Sekasar 1 : 4 A.05.36 29.24 m2 130,250 -
7 Pek. Acian Balok Konsol 1 : 4 A.05.36 8.25 m2 130,250 -
8 Pek. Acian Balok Gantung 1 : 4 A.05.36 24.20 m2 130,250 -
9 Pek. Acian Dinding 1: 2 A.05.36 125.80 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ3 / PJ3A A.06.08 2.00 Unit 1,956,000 -
2 Kusen Jendela J4 A.06.11 4.00 Unit 1,764,000 -
3 Daun Pintu PJ3 / PJ3A A.06.25 4.00 Buah 2,520,000 -
4 Daun Jendela PJ3 / PJ3A A.06.24 4.00 Buah 1,872,000 -
5 Daun Jendela J4 A.06.28 8.00 Buah 1,872,000 -
6 Kaca Mati A.06.32.a 20.17 m2 90,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.46 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan / Juray 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Gording 5/10 kayu klas II A.06.36 1.17 m3 8,600,000 -
5 Pek. Baut Ø 10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
8 Pek. List Plank 3/25 Papan Klas II A.06.50 48.96 m1 176,000 -
9 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
11 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
12 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 0.00 m2 93,000 -
13 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 201.52 m2 93,000 -
14 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
15 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
16 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
17 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
18 Pek. Nok Zyncalum 0,3mm A.08.14 40.00 m1 46,500 -
19 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
20 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
21 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
22 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
23 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
24 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
25 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
26 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
27 Pek. Talang Jurai A.11.20 m¹ 212,500 -
28 Pek. Residu Kayu A.11.22 201.52 m2 13,000 -
29 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 154.84 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 154.84 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 136.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 20.78 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 5.19 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 5.19 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 51.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ..... Bermotif ( anti sliip ) A.13.75 44.28 m 2
502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ..... Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 8.00 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 8.60 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 181.18 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 16.12 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 154.84 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 154.84 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 95.60 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 12.84 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 12.00 m' 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 2.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 6.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 15.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 6.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.31 10.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 6.00 bh 5,500 -
5 Pek. Floordrain A.10.36 2.00 bh 5,500 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 12.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 16.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 16.00 bh 90,000 -
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 4.00 bh 135,000 -
5 Pas. Grendel Jendela A.12.11 8.00 bh 120,000 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 2.00 bh 285,000 -
7 Pas. Handel tarik jendela ls 2.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 47.06 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 36.04 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.45 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.45 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KM/WC GURU

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 40.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 31.88 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 10.63 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.92 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 20.57 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 0.00 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.00 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 3.83 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 19.15 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 29.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.15 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.63 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.29 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.07 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.10 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.25 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.29 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.11 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.18 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.56 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.65 m3 2,842,500 -
11 Pek. Beton Canopy diatas kusen BV A.07.51 0.42 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 27.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING 141.50
1 Pas. Dinding Batubata 1:4 A.04.11 53.52 m 2
215,000 -
2 Pas. Dinding Batubata 1:2 (t=2,1m) A.04.09 87.98 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 175.96 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 107.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 8.40 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 5.16 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.00 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 3.30 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 107.04 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA 4.00
1 Kusen Pintu P2 A.06.03 4.00 Unit 600,000 -
2 Kusen Pintu P3 A.06.04 5.00 Unit 348,000 -
3 Kusen Pintu P5 A.06.05 1.00 Unit 612,000 -
4 Daun Pintu P2 A.06.18 4.00 Buah 3,150,000 -
5 Daun Pintu P3 A.06.18 5.00 Buah 3,150,000 -
6 Daun Pintu P5 A.06.19 1.00 Buah 3,543,750 -
7 BV1 ( Kaca ) A.06.13 3.00 Buah 288,000 -
8 BV2 ( Kaca ) A.06.14 2.00 Buah 516,000 -
9 BV3 ( Kaca ) A.06.15 2.00 Buah 732,000 -
10 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
11 Kaca Mati A.06.32.a 3.87 m2 90,000
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.20 m3 8,600,000 -
2 Pas. Balok Gapit 2 ( 5/10) A.01.P.14 0.04 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Gording 5/10 kayu klas II A.06.36 0.56 m3 8,600,000 -
5 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 32.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 41.15 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.04 m3 50,000 -
12 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 1.00 Unit 50,000 -
13 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
14 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 102.89 m2 93,000 -
15 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
16 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
17 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
18 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
19 Pek. Nok Zyncalum 0,3mm A.08.14 9.20 m1 46,500 -
20 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
21 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
22 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
23 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
24 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
25 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
26 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
27 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
28 Pek. Residu Kayu A.11.22 102.89 m2 13,000 -
29 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 83.47 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 83.47 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 158.98 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 10.37 m 3
150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 2.59 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 2.59 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 11.66 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm .. Bermotif ( anti sliip ) A.13.75 12.43 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm .. Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 87.98 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 27.74 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 124.68 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 2.22 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 83.47 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 83.47 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 101.87 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 12.84 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 3.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 14.00 bh 80,000 -
6 Pas. MCB + Box Sekring L. 01. 08 3.00 bh 80,000 -
7 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 10.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 35.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 29.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 14.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 5.00 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 1.00 bh 1,530,500 -
7 Pas. Jet Washer ls 1.00 bh - -
8 Pas. Urinoir A.10.04 0.00 bh 1,000,000 -
9 Pas. Wastafel A.10.05 4.00 bh 1,400,000 -
10 Pek. Floordrain A.10.36 6.00 bh 5,500 -
11 Pas. Grabbed Bar Ø 1 " (staniless) ls 3.00 set - -
12 Pek. 1 bh Bak Mandi Batu Bata Vol 0,3 m3 + Pas Keramik 20x20 A.10.08 5.00 bh 1,650,000 -
13 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 -
14 Pas. Kaca Muka ls 4.00 bh - -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 30.00 bh 65,000 -
2 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 10.00 bh 285,000 -
3 Pas. Gantungan Baju Km/wc (2 kait) ls 6.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 42.62 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 32.64 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.81 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.81 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KM/WC SISWA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 40.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 31.88 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 10.63 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.92 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 20.57 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 0.00 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.00 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 3.83 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 19.15 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 29.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.15 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.63 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.29 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.07 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.10 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.25 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.29 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.11 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.18 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.56 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.65 m3 2,842,500 -
11 Pek. Beton Canopy diatas kusen BV A.07.51 0.42 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 27.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING 141.50
1 Pas. Dinding Batubata 1:4 A.04.11 53.52 m2 215,000 -
2 Pas. Dinding Batubata 1:2 (t=2,1m) A.04.09 87.98 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 175.96 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 107.04 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 8.40 m2 130,250 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 5.16 m2 130,250 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 3.00 m2 130,250 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 3.30 m2 130,250 -
11 Pek. Acian Dinding 1 : 4 A.05.36 107.04 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA 4.00
1 Kusen Pintu P2 A.06.03 4.00 Unit 600,000 -
2 Kusen Pintu P3 A.06.04 5.00 Unit 348,000 -
3 Kusen Pintu P5 A.06.05 1.00 Unit 612,000 -
4 Daun Pintu P2 A.06.18 4.00 Buah 3,150,000 -
5 Daun Pintu P3 A.06.18 5.00 Buah 3,150,000 -
6 Daun Pintu P5 A.06.19 1.00 Buah 3,543,750 -
7 BV1 ( Kaca ) A.06.13 3.00 Buah 288,000 -
8 BV2 ( Kaca ) A.06.14 2.00 Buah 516,000 -
9 BV3 ( Kaca ) A.06.15 2.00 Buah 732,000 -
10 Angin-Angin LA-LB A.06.16 4.00 Buah 408,000 -
11 Kaca Mati A.06.32.a 3.87 m2 90,000
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.20 m3 8,600,000 -
2 Pas. Balok Gapit 2 ( 5/10) A.01.P.14 0.04 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Gording 5/10 kayu klas II A.06.36 0.56 m3 8,600,000 -
5 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 32.00 ttk 50,000 -
6 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
7 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
9 Pek. List Plank 3/25 Papan Klas II A.06.50 41.15 m1 176,000 -
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.04 m3 50,000 -
12 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 1.00 Unit 50,000 -
13 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
14 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 102.89 m2 93,000 -
15 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
16 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
17 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
18 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
19 Pek. Nok Zyncalum 0,3mm A.08.14 9.20 m1 46,500 -
20 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
21 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
22 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
23 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
24 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
25 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
26 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
27 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
28 Pek. Residu Kayu A.11.22 102.89 m2 13,000 -
29 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 83.47 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 83.47 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 158.98 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 10.37 m 3
150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 2.59 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 2.59 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 11.66 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm .. Bermotif ( anti sliip ) A.13.75 12.43 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm .. Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 87.98 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 27.74 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 124.68 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 2.22 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 83.47 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 83.47 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 101.87 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 12.84 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 14.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 3.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 14.00 bh 80,000 -
6 Pas. MCB + Box Sekring L. 01. 08 3.00 bh 80,000 -
7 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 10.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 35.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 29.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 14.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 5.00 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 1.00 bh 1,530,500 -
7 Pas. Jet Washer ls 1.00 bh - -
8 Pas. Urinoir A.10.04 0.00 bh 1,000,000 -
9 Pas. Wastafel A.10.05 4.00 bh 1,400,000 -
10 Pek. Floordrain A.10.36 6.00 bh 5,500 -
11 Pas. Grabbed Bar Ø 1 " (staniless) ls 3.00 set - -
12 Pek. 1 bh Bak Mandi Batu Bata Vol 0,3 m3 + Pas Keramik 20x20 A.10.08 5.00 bh 1,650,000 -
13 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 -
14 Pas. Kaca Muka ls 4.00 bh - -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 30.00 bh 65,000 -
2 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 10.00 bh 285,000 -
3 Pas. Gantungan Baju Km/wc (2 kait) ls 6.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 42.62 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 32.64 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.81 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.81 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG OSIS DAN PRAMUKA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 46.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 34.54 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 11.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 4.20 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 22.29 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.23 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 20.23 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m 3
604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.32 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.51 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.48 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.42 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.12 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.51 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.15 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.27 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.75 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 48.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 144.21 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 9.58 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 288.41 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 19.16 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 11.20 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 5.16 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 4.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
4 Pek. Acian Dinding 1 : 4 A.05.36 307.57 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2 A.06.07 3.00 unit 1,212,000 -
2 Daun Pintu PJ2 A.06.18 3.00 unit 3,150,000 -
3 Daun Jendela PJ2 A.06.23 3.00 unit 760,500 -
4 Kusen Jendela J3 A.06.10 3.00 unit 1,140,000 -
5 Daun Jendela J3 A.06.27 6.00 unit 887,250 -
6 Kaca Mati A.06.32.a 14.20 m2 90,000 -
7 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.46 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.88 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 49.41 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 153.26 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 12.00 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 153.26 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 125.24 m 2
240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 125.24 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 155.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 18.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 9.00 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 72.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sli A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sli A.13.77 m2 502,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 323.30 m 2
121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 9.58 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 125.24 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 125.24 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 56.86 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 10.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 6.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 4.00 bh 80,000 -
6 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
7 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
8 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 9.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 18.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 18.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 9.00 bh 120,000 -
5 Pas. Handel tarik jendela ls 9.00 bh - -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 50.39 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 38.59 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.94 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.94 m 3
962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : UKS

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 46.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 34.54 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 11.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 4.20 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 22.29 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.23 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 20.23 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.32 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.51 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.48 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.42 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.12 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.51 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.15 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.27 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.75 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 48.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 144.21 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 9.58 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 288.41 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 19.16 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 11.20 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 5.16 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 4.00 m2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
4 Pek. Acian Dinding 1 : 4 A.05.36 307.57 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2 A.06.07 3.00 unit 1,212,000 -
2 Daun Pintu PJ2 A.06.18 3.00 unit 3,150,000 -
3 Daun Jendela PJ2 A.06.23 3.00 unit 760,500 -
4 Kusen Jendela J3 A.06.10 3.00 unit 1,140,000 -
5 Daun Jendela J3 A.06.27 6.00 unit 887,250 -
6 Kaca Mati A.06.32.a 14.20 m2 90,000 -
7 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.46 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.88 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 49.41 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 153.26 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 12.00 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 153.26 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 125.24 m 2
240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 125.24 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 155.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 18.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 9.00 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 72.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sli A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sli A.13.77 m2 502,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 323.30 m 2
121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 9.58 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 125.24 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 125.24 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 56.86 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 10.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 6.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 4.00 bh 80,000 -
6 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
7 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
8 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 9.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 18.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 18.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 9.00 bh 120,000 -
5 Pas. Handel tarik jendela ls 9.00 bh - -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 50.39 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 38.59 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.94 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.94 m 3
962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG KANTIN DAN KOPERASI

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 36.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 25.59 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 8.53 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.56 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 16.51 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m 3
6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 3.13 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 14.95 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 28.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.23 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.81 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.41 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.42 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.13 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.24 m 3
2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.15 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.36 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.10 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.08 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.21 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 24.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 87.65 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 6.30 m2 215,000 -
3 Pek. Plesteran Dinding 1: 2 A.05.19 12.60 m2 260,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 175.30 m2 260,000 -
5 Pek. Acian Kolom Utama 1 : 4 A.05.36 5.60 m2 130,250 -
6 Pek. Acian Kolom Selasar 1 : 4 A.05.36 6.88 m2 130,250 -
7 Pek. Acian Balok Konsol 1 : 4 A.05.36 4.00 m2 130,250 -
8 Pek. Acian Balok Gantung 1 : 4 A.05.36 6.60 m2 130,250 -
9 Pek. Acian Dinding 1 : 4 A.05.36 187.90 m 2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2 / PJ2A A.06.07 5.00 unit 1,212,000 -
2 Daun Pintu PJ2 / PJ2A A.06.18 5.00 unit 3,150,000 -
3 Daun Jendela PJ2 / PJ2A A.06.23 5.00 unit 760,500 -
4 Kusen Jendela J3 A.06.10 1.00 unit 1,140,000 -
5 Daun Jendela J3 A.06.27 2.00 unit 887,250 -
6 Kaca Mati A.06.32.a 21.63 m2 90,000 -
7 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 6/12 kayu kls II A.06.35 0.28 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.66 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 36.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 42.53 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m 3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 185.75 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 11.20 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 185.75 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 92.83 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 92.83 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 135.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 7.20 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 3.60 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 7.20 m 3
962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 48.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 24.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 204.68 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 6.30 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 92.83 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 92.83 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 39.93 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 1.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 4.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 5.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x40 watt L. 01. 07 3.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 5.00 m' 51,000 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 5.00 m' 114,750 -
5 Pas. Kran air 1/2" A.10.35 1.00 bh 5,500 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 1.00 bh 180,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 15.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 14.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 14.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 7.00 bh 120,000 -
5 Pas. Handel tarik jendela ls 7.00 bh - -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 43.73 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 33.49 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.81 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.81 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG BK,

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 46.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 34.54 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 11.51 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 4.20 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 22.29 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m 3
6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.23 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 20.23 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 34.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.32 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.51 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.48 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.42 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.12 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.51 m 3
2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.15 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.27 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.75 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.33 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 48.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 144.21 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 9.58 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 288.41 m2 260,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 19.16 m2 260,000 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 11.20 m2 130,250 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 5.16 m2 130,250 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 4.00 m 2 130,250 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 4.95 m2 130,250 -
4 Pek. Acian Dinding 1 : 4 A.05.36 307.57 m 2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2 A.06.07 3.00 unit 1,212,000 -
2 Daun Pintu PJ2 A.06.18 3.00 unit 3,150,000 -
3 Daun Jendela PJ2 A.06.23 3.00 unit 760,500 -
4 Kusen Jendela J3 A.06.10 3.00 unit 1,140,000 -
5 Daun Jendela J3 A.06.27 6.00 unit 887,250 -
6 Kaca Mati A.06.32.a 14.20 m2 90,000 -
7 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.46 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.88 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 48.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 49.41 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 153.26 m2 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 12.00 m1 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
29 Pek. Residu Kayu A.11.22 153.26 m2 13,000 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 125.24 m 2
240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 125.24 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 155.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 18.00 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 4.50 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 9.00 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 72.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sli A.13.75 18.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sli A.13.77 m2 502,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 323.30 m 2
121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 9.58 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 125.24 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 125.24 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 56.86 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 10.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 6.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 4.00 bh 80,000 -
6 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 6.00 bh 80,000 -
7 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
8 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 9.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 18.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 18.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 9.00 bh 120,000 -
5 Pas. Handel tarik jendela ls 9.00 bh - -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 3.00 bh 285,000 -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 50.39 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 38.59 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.94 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.94 m 3
962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG GUDANG,

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 36.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 25.59 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 8.53 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.56 m 3
150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 16.51 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 3.13 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 14.95 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 28.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.23 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.81 m 3
2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.41 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 1.42 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.13 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.24 m3 2,842,500 -
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 0.39 m3 2,842,500 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 0.15 m3 2,842,500 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 0.36 m3 2,842,500 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.40 m3 2,842,500 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.10 m3 2,842,500 -
11 Pek. Beton Plat Lantai Meja A.07.51 0.08 m3 2,842,500 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.21 m3 2,842,500 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 24.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 87.65 m 2
215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 6.30 m2 215,000 -
3 Pek. Plesteran Dinding 1: 2 A.05.19 12.60 m2 260,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 175.30 m2 260,000 -
5 Pek. Acian Kolom Utama 1 : 4 A.05.36 5.60 m2 130,250 -
6 Pek. Acian Kolom Selasar 1 : 4 A.05.36 6.88 m2 130,250 -
7 Pek. Acian Balok Konsol 1 : 4 A.05.36 4.00 m2 130,250 -
8 Pek. Acian Balok Gantung 1 : 4 A.05.36 6.60 m2 130,250 -
9 Pek. Acian Dinding 1 : 4 A.05.36 187.90 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2 / PJ2A A.06.07 5.00 unit 1,212,000 -
2 Daun Pintu PJ2 / PJ2A A.06.18 5.00 unit 3,150,000 -
3 Daun Jendela PJ2 / PJ2A A.06.23 5.00 unit 760,500 -
4 Kusen Jendela J3 A.06.10 1.00 unit 1,140,000 -
5 Daun Jendela J3 A.06.27 2.00 unit 887,250 -
6 Kaca Mati A.06.32.a 21.63 m2 90,000 -
7 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 6/12 kayu kls II A.06.35 0.28 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.66 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 36.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 42.53 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.05 m 3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 185.75 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 11.20 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 185.75 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 92.83 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 92.83 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 135.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 7.20 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 3.60 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 7.20 m 3
962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 48.00 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ............ Bermotif ( anti sliip ) A.13.75 24.00 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ............ Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 204.68 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 6.30 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 92.83 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 92.83 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 39.93 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 16.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 4.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 1.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 4.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 5.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x40 watt L. 01. 07 3.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 5.00 m' 51,000 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 5.00 m' 114,750 -
5 Pas. Kran air 1/2" A.10.35 1.00 bh 5,500 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 1.00 bh 180,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 15.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 14.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 14.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 7.00 bh 120,000 -
5 Pas. Handel tarik jendela ls 7.00 bh - -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 5.00 bh 285,000 -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 43.73 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 33.49 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.81 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.81 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG ASRAMA SISWA/SISWI

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 54.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 41.29 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 13.76 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.43 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 26.64 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 4.86 m 3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 24.59 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 59.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.31 m 3
962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 3.60 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m 3
2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.87 m3 2,842,500 -
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.48 0.51 m3 2,842,500 -
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.68 m3 2,842,500 -
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.71 m3 2,842,500 -
9 Pek. Beton Plat Lantai Meja A.07.51 2.14 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 42.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 182.30 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 13.14 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 26.28 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 364.61 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 10.50 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 390.89 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ1 / PJ1A A.06.06 5.00 Unit 1,212,000 -
Daun Pintu PJ1 / PJ1A A.06.18 5.00 Buah 3,150,000 -
Daun Jendela PJ1 / PJ1A A.06.23 5.00 Buah 760,500 -
2 Kusen Pintu P2 / P2A A.06.03 2.00 Unit 600,000 -
Daun Pintu P2 / P2A A.06.18 2.00 Buah 3,150,000 -
3 Kusen Pintu P3 A.06.04 2.00 Unit 348,000 -
Daun Pintu P3 A.06.18 2.00 Buah 3,150,000 -
4 Kusen Jendela J2 A.06.09 4.00 Unit 828,000 -
Daun Jendela J2 A.06.26 8.00 Buah 760,500 -
Kaca Mati A.06.32.a 21.13 m2 90,000 -
5 BV1 ( kaca ) A.06.13 2.00 Buah 288,000 -
6 LA-LB A.06.16 4.00 Buah 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.81 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.18 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.02 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 70.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 54.96 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.00 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 180.83 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 180.83 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m 2
36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 140.76 m2 240,000 -
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 140.76 m2 105,000 -
3 Pek. List Plafond 3/3 A.06.60 182.50 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 12.62 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 6.31 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 12.62 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 85.72 m 2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ....... Bermotif ( anti sliip ) A.13.75 40.47 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ....... Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 5.76 m 2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 3.92 m 2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 389.31 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 12.08 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 140.76 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 140.76 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 119.77 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 21.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 2.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 4.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 7.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 8.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x40 watt L. 01. 07 13.00 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 15.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 16.00 m' 114,750 -
3 Pas. Kran air 1/2" A.10.35 2.00 bh 5,500 -
4 Pas. Klosed Jongkok A.10.02 2.00 bh 525,000 -
5 Pek. Floordrain A.10.36 2.00 bh 5,500 -
6 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 2.00 bh 1,650,000 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 27.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 26.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 26.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 13.00 bh 120,000 -
5 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 9.00 bh 285,000 -
6 Pas. Handel tarik jendela ls 13.00 bh - -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 2.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 59.39 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 45.48 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 3.00 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 3.00 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : GEDUNG ASRAMA GURU

Volume Pemb Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 60.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 55.39 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 18.46 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.26 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 35.74 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 6.52 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 33.43 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 69.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.44 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 5.01 m 3
2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 2.13 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.75 m3 2,842,500 -
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.48 0.51 m3 2,842,500 -
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.67 m3 2,842,500 -
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 3.21 m3 2,842,500 -
9 Pek. Beton Plat Lantai Meja A.07.51 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.29 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 5.18 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 235.63 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 17.64 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 35.28 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 471.25 m2 260,000 -
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 19.95 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 506.53 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2A A.06.07 5.00 unit 1,212,000 -
2 Daun Pintu PJ2A A.06.18 5.00 unit 3,150,000 -
3 Daun Jendela PJ2A A.06.23 5.00 unit 760,500 -
4 Kusen Pintu P2 / P2A A.06.03 5.00 Unit 600,000 -
5 Daun Pintu P2 / P2A A.06.18 5.00 Buah 3,150,000 -
6 Kusen Pintu P3 A.06.04 5.00 Unit 348,000 -
7 Daun Pintu P3 A.06.18 5.00 Buah 3,150,000 -
8 Kaca Mati A.06.32.a 21.13 m2 90,000 -
9 LA-LB A.06.16 4.00 unit 408,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.81 m3 8,600,000 -
2 Pas. Balok Gapit 2 ( 5/10) A.01.P.14 0.03 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 - m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.15 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 1.02 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 70.00 ttk 50,000
7 Pek. Kaso 5/7 A.06.37 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 - m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 54.96 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 - m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.07 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 4.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 180.83 m2 93,000 -
Volume Pemb Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 17.20 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 180.83 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 140.74 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 140.74 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 205.00 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 15.75 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 5.25 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 5.25 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 73.42 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm ........... Bermotif ( anti sliip ) A.13.75 15.96 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm ........... Bermotif ( anti sliip ) A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 37.16 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 11.25 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 508.84 m 2
121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 17.64 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 140.74 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 140.74 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 152.37 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 27.51 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 25.00 m' 80,000 -
3 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 10.00 ttk 80,000 -
4 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 5.00 ttk 80,000 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 20.00 bh 80,000 -
6 Pas. Instalasi Lampu TL 2x40 watt L. 01. 07 5.00 bh 80,000 -
7 Pas. MCB + Box Sekring L. 01. 08 4.00 bh 80,000 -
8 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 35.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 50.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 5.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 5.00 bh 525,000 -
6 Pek. Floordrain A.10.36 5.00 bh 5,500 -
7 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 5.00 bh 1,650,000 -
8 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 45.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 10.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 10.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 5.00 bh 120,000 -
5 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 15.00 bh 285,000 -
6 Pas. Handel tarik jendela ls 5.00 bh - -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 5.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 57.05 m2 210,000 -
2 Pek. Plesteran Saluran A.05.19 43.69 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 2.15 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 2.15 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Volume Pemb Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0
NAMA SEKOLAH : 0
KABUPATEN : Kab. Kolaka
PROVINSI : 0

Pekerjaan : ADMINISTRASI

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Volume Sat Periode Sat
( Rp ) ( Rp )
2 3 5 6 7 8 9
I. Biaya Perencanaan dan Pengawasan
1 Perencana dan Pengawas 1.00 orang 4.00 bln 1,000,000 4,000,000
Total I 4,000,000
II. OPERASIONAL KOMITE PEMBANGUNAN
1 Alat Tulis Kantor
- Kertas 2.00 rim 5.00 bln - -
- Tinta Printer 1.00 unit 3.00 bln - -
- Pulpen, Spidol, Pinsil, Penghapus, Penggaris, dll 1.00 set 3.00 bln - -
- Odner 5.00 bh 1.00 kali - -
- …….
- ……. - -
3 Komunikasi Kerja - -
- Pulsa Telepon/HP 2.00 unit 5.00 bln
4 Penyelenggaraan Rapat Koordinasi Mingguan - -
- Konsumsi 1.00 ls 20.00 minggu
5 Transportasi - -
- Survey Harga Material & Bahan 2.00 trip (PP) 5.00 bln - -
- Pengambilan Dana ke Bank 4.00 trip (PP) 5.00 bln
6 Penyusunan dan Penggandaan Pelaporan - -
- Laporan Bulanan 2.00 set 5.00 bln - -
- Laporan Tahap 1 4.00 set 1.00 kali - -
- Laporan Tahap 2 / Laporan Akhir 4.00 set 1.00 kali
- Dokumentasi 4.00 ls 1.00 kali - -
Total III -
Total 4,000,000
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : BANGSAL SEPEDA

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 27.88 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 3.375 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 1.125 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 0.096 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 1.92 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.1344 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 0.576 m3 6,136,110 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 0.3 m3 2,842,500 -
2 Pek. Tiang Beton Kolom 1:2:3 (K2 20/20) A.07.60 0.342 m3 2,842,500 -
3 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.50 0.2352 m3 2,842,500 -
4 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.27 m3 2,842,500 -
Total IV -
V. PEKERJAAN DINDING
1 Pek. Plesteran Beton A.05.19 0.8472 m2 260,000 -
3 Pek. Acian Beton A.05.36 0.8472 m2 130,250 -
Total V -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Gording 5/10 kayu klas II A.06.36 0.164 m3 8,600,000 -
2 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 8 ttk 50,000
3 Pek. Kaso 5/7 A.06.37 m3 105,000 -
4 Pek. Reng 3/4 A.06.38 m3 105,000 -
5 Pek. List Plank 3/25 Papan Klas II A.06.50 7.84 m1 176,000 -
6 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
7 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 27.88 m2 93,000 -
8 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
9 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
10 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
11 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m1 46,500 -
12 Pek. Nok Zyncalum 0,3mm A.08.14 8.2 m1 46,500 -
13 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
14 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
15 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
16 Pek. Residu Kayu A.11.22 2 m2 13,000 -
17 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 17.28 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 17.28 m2 105,000 -
4 Pek. List Plafond 4/4 A.06.60 21.2 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI
1 Pek. Canstien Pasangan Bata A.04.11 18.72 m2 215,000.00 -
2 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
3 Pek. Urugan Tanah bawah lantai A.02.12 0.936 m3 150,000 -
4 Pek. Urugan Pasir bawah lantai A.02.13 0.5616 m3 150,000 -
5 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 1.3104 m3 962,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Plamur Beton A.14.14 0.8772 m2 44,650 -
2 Pek. Cat Beton A.14.25 0.8772 m2 121,500 -
3 Pek Meni Kayu Rangka Plafond A.14.12 17.28 m2 50,000.00 -
4 Pek. Cat Plafond A.14.26 17.28 m2 121,500 -
5 Pek. Meni Kayu A.14.12 2.352 m2 50,000 -
6 Pek. Cat Kayu A.14.30 2.35 m2 145,000 -
Total X -
Grand Total -
PROGRAM BLOCK GRANT PEMBANGUNAN
UNIT SEKOLAH BARU SMP NEGERI
Dengan Mekanisme Partisipasi Masyarakat

Kode Sekolah : 0.000


Sekolah : 0.000
Desa : 0.000
Kecamatan : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : RUMAH PENJAGA SEKOLAH

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 28.30 m' 105,000 2,971,500.00
Total I 2,971,500.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 22.97 m3 200,000 4,594,505.00
2 Pek. Urugan Kembali bekas Galian A.02.11 11.49 m3 96,000 1,102,681.20
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.69 m3 150,000 553,305.00
Total II 6,250,491.20
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.37 m3 604,500 4,456,011.30
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 35.37 m3 1,080,000 38,200,680.00
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 7.37 m3 604,500 4,456,011.30
9 Pas. Pondasi Batu Karang A.03.05 35.37 m3 1,080,000 38,200,680.00
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 btg 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 962,500 -
Total III 85,313,382.60
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.09 m3 2,842,500 11,625,825.00
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 1.02 m3 2,842,500 2,910,720.00
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 3.60 m3 2,842,500 10,233,000.00
4 Pek. Beton Kolom Selasar 1:2:3 (K2 20/20) A.07.60 0.56 m3 2,842,500 1,591,800.00
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/12) A.07.52 0.50 m3 2,842,500 1,432,620.00
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.50 1.68 m3 2,842,500 4,775,400.00
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48 1.21 m3 2,842,500 3,428,055.00
8 Pek. Beton Ring Balok 1:2:3 (R3 12/25) A.07.48 1.96 m3 2,842,500 5,576,985.00
9 Pek. Beton Plat Lantai Meja A.07.51 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 2.57 m3 2,842,500 7,316,595.00
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 m3 50,000 -
Total IV 48,891,000.00
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 219.20 m2 215,000 47,128,215.00
2 Pas. Dinding Batubata 1:2 A.04.09 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 438.40 m2 260,000 113,984,520.00
7 Pek. Acian Dinding 1: 2 A.05.36 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 438.40 m2 130,250 57,101,860.50
Total V 218,214,595.50
VI. PEKERJAAN PINTU DAN JENDELA
1 Jendela J5 3.00 unit -
2 BV1 1.00 unit -
3 Kusen & Daun Pintu P2 / P2A 3.00 unit -
4 Kusen & Daun Pintu P3 1.00 unit -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.62 m3 8,600,000 13,897,600.00
2 Pas. Balok Gapit 6/12 A.01.P.14 0.35 m3 50,000 17,600.00
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.21 m3 207,500 43,367.50
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.35 m3 8,600,000 3,010,000.00
5 Pek. Gording 5/10 kayu klas II A.06.36 2.03 m3 8,600,000 17,458,000.00
6 Pek. Kaso 5/7 A.06.37 2.18 m3 105,000 228,585.00
7 Pek. Reng 3/4 A.06.38 1.22 m3 105,000 128,100.00
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.09 m3 207,500 18,052.50
9 Pek. List Plank 3/30 Papan Klas II A.06.50 83.00 m1 176,000 14,608,000.00
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.52 m3 207,500 107,900.00
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.14 m3 207,500 29,050.00
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 367.69 lbr 93,000 34,194,984.00
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 lbr 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 lbr 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 bh 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 lbr 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 29.20 lbr 46,500 1,357,800.00
20 Pek. Nok Zyncalum 0,3mm A.08.14 lbr 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 bh 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 bh 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 166,500 -
29 Pek. Talang Jurai A.11.20 m¹ 212,500 -
30 Pek. Residu Kayu A.11.22 m2 13,000 -
31 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII 85,099,039.00
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 3.40 m3 240,000 816,960.00
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 300.70 m2 105,000 31,573,080.00
3 Pek. List Plafond 4/4 A.06.60 316.41 m' 52,500 16,611,682.50
Total VIII 49,001,722.50
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
10 Pek. Panggung : -
- Pasangan Bata A.04.11 m2 215,000 -
- Pasangan Batako A.04.12 m2 215,000 -
- Urugan Tanah A.02.11 m3 96,000 -
- Urugan Pasir A.02.13 m3 150,000 -
- Beton Lantai Kerja A.07.01 m3 962,500 -
- Pek. Kuku Keramik -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Plamur Tembok A.14.14 m2 44,650 -
2 Pek. Cat Dinding A.14.25 m2 121,500 -
3 Pek. Cat Plafond A.14.26 m2 121,500 -
4 Pek. Meni Kayu A.14.12 m2 50,000 -
5 Pek. Cat Kayu A.14.30 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 55.52 m' 80,000 4,441,600.00
2 Pas. Instalasi Titik Lampu 2x1,5 NYM L. 01. 02 m' 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x1,5 NYM L. 01. 03 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x1,5 NYM L. 01. 04 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 m' 400,000 -
10 Pas. Panel Box Utama +MCB L. 01. 10 bh 80,000 -
Total XI 4,441,600.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 114,750 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 m' 114,750 -
5 Pas. Kran air 1/2" A.10.35 bh 5,500 -
6 Pas. Klosed Jongkok A.10.02 bh 525,000 -
7 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
8 Pas. Jet Washer ls bh 60,000 -
9 Pas. Urinoir A.10.04 bh 1,000,000 -
10 Pas. Wastafel A.10.05 bh 1,400,000 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 bh 180,000 -
12 Pek. Floordrain A.10.36 bh 5,500 -
13 Pas. Grabbed Bar ls bh 600,000 -
14 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 bh 1,650,000 -
15 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 41,343,570.00
16 Pas. Kaca Muka ls bh 200,000 -
Total XII 41,343,570.00
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 bh 65,000 -
2 Pas. Engsel Pintu 3" (3bh/pintu) A.12.06 bh 60,000 -
3 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 bh 60,000 -
4 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 bh 90,000 -
5 Pas. Slot Tanam Pintu (2 bh/pintu) A.12.10 bh 135,000 -
6 Pas. Grendel Jendela model Spring Knob A.12.11 bh 120,000 -
7 Pas. Kunci Pintu 2 X Putar A.12.14 bh 285,000 -
8 Pas. Handel Pintu (2 bh/pintu) A.12.12 bh 300,000
9 Pas. Kunci Bulat Km/wc A.12.04 bh 255,000 -
10 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh 50,000 50,000.00
Total XIII 50,000.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 52.25 m' 210,000 10,973,130.00
2 Pek. Plesteran Saluran A.05.19 84.73 m2 260,000 22,029,800.00
3 Pek. Urugan Tanah dibawah Rabat Beton A.02.12 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 6.16 m3 962,500 5,933,331.25
7 Pek. Plank Nama Ruang ls 1.00 Set 200,000 200,000.00
Total XIV 39,136,261.25
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total 580,713,162.05
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : RUMAH PENJAGA SEKOLAH

Volume Pemb Volume Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 26.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 17.76 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 6.80 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.67 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 11.46 m2 5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.00 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 3.33 m3 604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 5.90 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 28.00 ttk 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.28 m3 962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.39 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.00 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 0.85 m3 2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 20/20) A.07.60 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.43 m3 2,842,500 -
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.48 0.10 m3 2,842,500 -
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.29 m3 2,842,500 -
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.17 m3 2,842,500 -
9 Pek. Beton Plat Lantai Meja A.07.51 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.25 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 18.00 ttk 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 60.44 m 2
215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 4.92 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 9.84 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 130.72 m2 260,000 -
7 Pek. Acian Dinding 1: 2 A.05.36 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 140.56 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P2/P2A A.06.03 3.00 Unit 600,000 -
2 Kusen Pintu P3 A.06.04 1.00 Unit 348,000 -
3 Kusen Jendela J5 A.06.31 3.00 Unit 372,000 -
4 Daun Pintu P2/P2A A.06.18 3.00 Buah 3,150,000 -
5 Daun Pintu P3 A.06.18 1.00 Buah 3,150,000 -
6 Daun Jendela J5 A.06.29 3.00 Buah 1,207,500 -
7 BV1 ( kaca ) A.06.13 1.00 Buah 288,000 -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 6/12 kayu kls II A.06.35 0.12 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.06 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.35 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 20.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 0.00 m3 105,000 -
8 Pek. Reng 3/4 A.06.38 0.00 m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.00 m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 32.30 m3 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.00 m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.11 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 1.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 lbr 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 65.20 m 2
93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m2 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 8.15 m1 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 bh 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 bh 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 166,500 -
Volume Pemb Volume Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Sat
Baru Rehabilitasi ( Rp ) ( Rp )
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 65.20 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 24.92 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 24.92 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 54.40 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 2.55 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 1.28 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 1.43 m3 962,500 -
4 Pek. Lantai keramik 30x30 cm A.13.75 18.50 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 6.60 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 2.63 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 135.64 m 2
121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 4.92 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 24.92 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 24.92 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 38.00 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 18.00 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 6.00 m' 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 1.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 2.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 3.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 5.00 bh 80,000 -
7 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 -
8 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 2.00 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 2.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 4.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 1.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 1.00 bh 525,000 -
6 Pek. Floordrain A.10.36 1.00 bh 5,500 -
7 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 1.00 bh 1,650,000 -
8 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 12.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 6.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 6.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 3.00 bh 120,000 -
5 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 4.00 bh 285,000 -
6 Pas. Handel tarik jendela ls 3.00 bh - -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 32.79 m 2
210,000 -
2 Pek. Plesteran Saluran A.05.19 25.11 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.28 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.28 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m 3
1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0.000
Nama Sekolah : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : RUMAH DINAS KEPALA SEKOLAH

Volume Pemb Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Rehabilitasi Sat
Baru ( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 25.00 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 22.49 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 7.50 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.32 m3 150,000 -
Total II -
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 14.51 m 2
5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 2.65 m 3
604,500 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 13.47 m3 1,080,000 -
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a m3 604,500 -
9 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 0.71 btg 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 0.19 m 3
962,500 -
Total III -
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 2.10 m3 2,842,500 -
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 m3 2,842,500 -
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 m 3
2,842,500 -
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 m3 2,842,500 -
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 1.90 m3 2,842,500 -
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.48 0.32 m3 2,842,500 -
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' 0.29 m3 2,842,500 -
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.55 m3 2,842,500 -
9 Pek. Beton Plat Lantai Meja A.07.51 0.09 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 0.44 m3 2,842,500 -
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 4.28 bgt 50,000 -
Total IV -
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 109.56 m2 215,000 -
2 Pas. Dinding Batubata 1:2 A.04.09 7.27 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 14.54 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 219.13 m2 260,000 -
7 Pek. Acian Dinding 1 : 4 A.05.36 233.67 m2 130,250 -
Total V -
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ2A A.06.07 1.00 unit 1,212,000 -
Daun Pintu PJ2A A.06.18 1.00 Buah 3,150,000 -
Daun Jendela PJ2A A.06.23 1.00 Buah 760,500 -
2 Kusen Pintu P2 / P2A A.06.03 3.00 Unit 600,000 -
Daun Pintu P2 / P2A A.06.18 3.00 Buah 3,150,000 -
3 Kusen Pintu P3 A.06.04 1.00 Unit 348,000 -
Daun Pintu P3 A.06.18 1.00 Buah 3,150,000 -
4 Kusen Jendela J5 A.06.31 1.00 Unit 1,207,500 -
Daun Jendela J5 A.06.29 1.00 Buah 372,000 -
5 Kusen Jendela J6 A.06.30 3.00 unit 897,000 -
Daun Jendela J6 A.06.32 6.00 Buah 588,000 -
Kaca Mati A.06.32.a 4.23 m2 90,000 -
6 BV1 ( kaca ) A.06.13 1.00 Buah - -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 6/12 kayu kls II A.06.35 0.32 m3 8,600,000 -
2 Pas. Balok Gapit 2 (5/10) A.01.P.14 0.01 m3 50,000 -
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 - m3 207,500 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.05 m3 8,600,000 -
5 Pek. Gording 5/10 kayu klas II A.06.36 0.51 m3 8,600,000 -
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 24.00 ttk 50,000 -
7 Pek. Kaso 5/7 A.06.37 - m3 105,000 -
8 Pek. Reng 3/4 A.06.38 - m3 105,000 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 - m3 207,500 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 46.61 m1 176,000 -
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 - m3 207,500 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.04 m3 50,000 -
13 Papan Nok Tepi 3/30 kelas 2 A.06.39 - m3 207,500 -
14 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 2.00 Unit 50,000 -
15 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 93,000 -
16 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 104.19 m2 93,000 -
17 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 93,000 -
18 Pek. Penutup Atap Genteng Tanah A.08.02 m2 116,500 -
19 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 93,000 -
20 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m2 46,500 -
21 Pek. Nok Zyncalum 0,3mm A.08.14 9.45 m2 46,500 -
22 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 207,500 -
23 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 207,500 -
24 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 46,500 -
25 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 166,500 -
26 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 166,500 -
27 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 166,500 -
28 Pek. Nok Tepi Genteng Tanah A.08.33 m1 166,500 -
29 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 166,500 -
30 Pek. Talang Jurai A.11.20 m¹ 212,500 -
31 Pek. Residu Kayu A.11.22 104.19 m2 13,000 -
32 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII -
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 65.31 m2 240,000 -
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 65.31 m2 105,000 -
4 Pek. List Plafond 3/3 A.06.60 103.85 m' 52,500 -
Total VIII -
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 3.89 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 1.94 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 1.94 m 3
962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 32.45 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm .. Bermotif ( anti sliip ) A.13.75 6.45 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm .. Bermotif ( anti sliip ) A.13.77 m 2
502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 9.72 m 2
372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 2.625 m2 547,500 -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 226.40 m2 121,500 -
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 7.27 m2 145,000 -
3 Pek Meni Kayu Rangka Plafond A.14.12 65.31 m2 50,000.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 65.31 m2 121,500 -
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 78.92 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 13.30 m' 80,000 -
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 2.00 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 4.00 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 8.00 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 3.00 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 -
Total XI -
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 10.00 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 10.00 m' 114,750 -
4 Pas. Kran air 1/2" A.10.35 2.00 bh 5,500 -
5 Pas. Klosed Jongkok A.10.02 1.00 bh 525,000 -
6 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 1,000,000 -
9 Pas. Wastafel A.10.05 bh 1,400,000 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 1.00 bh 180,000 -
11 Pek. Floordrain A.10.36 1.00 bh 5,500 -
12 Pas. Grabbed Bar ls bh - -
13 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 1.00 bh 1,650,000 -
14 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 -
15 Pas. Kaca Muka ls 1.00 bh - -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 15.00 bh 65,000 -
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 16.00 bh 60,000 -
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 16.00 bh 90,000 -
4 Pas. Grendel Jendela A.12.11 8.00 bh 120,000 -
5 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 4.00 bh 285,000 -
6 Pas. Handel tarik jendela ls 8.00 bh - -
7 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh - -
Total XIII -
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 36.85 m' 210,000 -
2 Pek. Plesteran Saluran A.05.19 28.22 m2 260,000 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.28 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.28 m3 962,500 -
7 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total -
RENCANA ANGGARAN BIAYA
PEMBANGUNAN POS JAGA

Pekerjaan : POS JAGA

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 16.00 m' 105,000 1,680,000.00
Total I 1,680,000.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 3.40 m3 200,000 680,000.00
2 Pek. Urugan Kembali bekas Galian A.02.11 1.13 m3 96,000 108,800.00
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 0.20 m3 150,000 30,000.00
Total II 818,800.00
III. PEK. PONDASI
1 Pek. Anti Rayap A. R 4.00 m2 5,000 20,000.00
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 1.40 m3 1,080,000 1,512,000.00
7 Pas. Pondasi Batu Karang A.03.05 m3 1,080,000 -
Total III 1,532,000.00
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.24 m3 2,842,500 682,200.00
2 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.05 m3 2,842,500 127,912.50
3 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 0.24 m3 2,842,500 682,200.00
Total IV 1,492,312.50
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 14.60 m2 215,000 3,139,000.00
2 Pas. Dinding Batubata 1:2 A.04.09 1.40 m2 215,000 301,000.00
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 29.20 m2 260,000 7,592,000.00
5 Pek. Plesteran Dinding 1: 2 A.05.19 2.80 m2 260,000 728,000.00
6 Pek. Acian Dinding 1 : 4 A.05.36 32.00 m2 130,250 4,168,000.00
Total V 15,928,000.00
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Kuda-kuda & Gording 5/10 kayu klas II A.06.36 0.08 m3 8,600,000 688,000.00
2 Pek. Reng 3/4 A.06.38 0.03 m3 105,000 3,024.00
2 Pek. Kaso 5/7 A.06.37 m3 105,000 -
3 Pek. List Plank 3/25 Papan Klas II A.06.50 12.80 m1 176,000 2,252,800.00
4 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 m3 207,500 -
5 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 1.00 Unit 50,000 50,000.00
6 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 lbr 93,000 -
7 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 23.23 lbr 93,000 2,160,390.00
8 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 lbr 93,000 -
9 Pek. Penutup Atap Genteng Tanah A.08.02 bh 116,500 -
10 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 lbr 93,000 -
11 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 lbr 46,500 -
12 Pek. Nok Zyncalum 0,3mm A.08.14 lbr 46,500 -
13 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 207,500 -
14 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 207,500 -
15 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 46,500 -
16 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 166,500 -
17 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 10.40 bh 166,500 1,731,600.00
18 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 166,500 -
19 Pek. Nok Tepi Genteng Tanah A.08.33 bh 166,500 -
20 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 166,500 -
21 Pek. Talang Jurai A.11.20 m¹ 212,500 -
22 Pek. Residu Kayu A.11.22 2.00 m2 13,000 26,000.00
23 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII 6,911,814.00
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 0.30 m3 240,000 72,000.00
3 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 300.70 m2 105,000 31,573,080.00
4 Pek. List Plafond 4/4 A.06.60 316.41 m' 52,500 16,611,682.50
Total VIII 48,256,762.50
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 0.40 m3 150,000 60,000.00
2 Pek. Urugan Pasir bawah lantai A.02.13 0.20 m3 150,000 30,000.00
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.20 m3 962,500 192,500.00
4 Pek. Lantai keramik interior 30x30 cm A.13.75 4.00 m2 502,500 2,010,000.00
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
Total IX 2,292,500.00
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 32.00 m2 121,500 3,888,000.00
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' 1.40 m2 145,000 203,000.00
3 Pek Meni Kayu Rangka Plafond A.14.12 16.00 m2 50,000.00 800,000.00
4 Pek. Cat Plafond berikut plamir A.14.26 16.00 m2 121,500 1,944,000.00
Total X 6,835,000.00
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 5.00 m' 80,000 400,000.00
2 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 1.00 ttk 80,000 80,000.00
3 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 1.00 ttk 80,000 80,000.00
4 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 1.00 bh 80,000 80,000.00
5 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 80,000 80,000.00
6 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 5.00 m' 400,000 2,000,000.00
Total XI 2,720,000.00
XIV. PEKERJAAN LAIN-LAIN
1 Pek. Urugan Tanah dibawah Rabat Beton A.02.12 m3 150,000 -
2 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
3 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
4 Pek. Rabat Beton Keliling Bangunan A.07.01 6.16 m3 962,500 5,933,331.25
5 Pek. Plank Nama Ruang ls 1.00 Set - -
Total XIV 5,933,331.25
Grand Total 94,400,520.25
REHABILITASI GEDUNG SMP
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0
Nama Sekolah : 0
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : FURNITURE

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. GEDUNG KANTOR DAN ADMINISTRASI
1 Meja Pimpinan M-6 1.00 bh - -
2 Meja Kerja M-7 2.00 bh - -
3 Meja Guru M-8 11.00 bh - -
4 Meja Tamu M-13 2.00 bh - -
5 Lemari Buku/Simpan L-1 1.00 bh - -
6 Lemari Kaca Geser L-2 1.00 bh - -
7 Lemari Arsip L-3 1.00 bh - -
8 Lemari Kunci L-15 1.00 bh - -
9 Lemari Locker L-16 1.00 bh - -
10 Kursi Pimpinan K-4 1.00 bh - -
11 Kursi Kerja K-5 13.00 bh - -
12 Kursi Lipat/Hadap K-6 4.00 bh - -
13 Kursi Tamu K-8 8.00 bh - -
14 Papan Tulis Gantung P-1 1.00 bh - -
15 whiteboard Gantung P-4 1.00 bh - -
16 Papan Statistik P-6 2.00 bh - -
17 Papan Jadwal P-7 1.00 bh - -
18 Papan Pameran P-8 2.00 bh - -
19 Tungku Tiang Bendera U-4 1.00 bh - -
20 Kotak Sampah KS 4.00 bh - -
Total I -
II. GEDUNG TEORI / RUANG KELAS UNIT 1
1 Meja Siswa Tunggal M-1 96.00 bh - -
2 Meja Kerja/Guru M-7 3.00 bh - -
3 Lemari Administrasi L-5 3.00 bh - -
4 Kursi Siswa Tunggal K-1 96.00 bh - -
5 Kursi Kerja/Guru K-5 3.00 bh - -
6 Papan Tulis Gantung P-1 3.00 bh - -
7 Papan Absensi P-10 3.00 bh - -
8 Kotak Sampah KS 3.00 bh - -
Total II -
III. GEDUNG TEORI / RUANG KELAS UNIT 2
1 Meja Siswa Tunggal M-1 96.00 bh - -
2 Meja Kerja/Guru M-7 3.00 bh - -
3 Lemari Administrasi L-5 3.00 bh - -
4 Kursi Siswa Tunggal K-1 120.00 bh - -
5 Kursi Kerja/Guru K-5 3.00 bh - -
6 Papan Tulis Gantung P-1 3.00 bh - -
7 Papan Absensi P-10 3.00 bh - -
8 Kotak Sampah KS 3.00 bh - -
Total III -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
IV. GEDUNG PERPUSTAKAAN DAN MEDIA
1 Meja Baca Individu M-3 6.00 bh - -
2 Meja Baca Kelompok M-4 10.00 bh - -
3 Meja Baca Serbaguna M-5 1.00 bh - -
4 Meja Kerja M-7 1.00 bh - -
5 Meja Sirkulasi M-10 1.00 bh - -
6 Meja Ketik M-12 1.00 bh - -
7 Lemari Buku L-1 6.00 bh - -
8 Lemari Katalog L-11 1.00 bh - -
9 Lemari Kardek L-12 1.00 bh - -
10 Kursi Siswa Tunggal K-1 28.00 bh - -
11 Kursi Bulat Pendek K-3 1.00 bh - -
12 Kursi Kerja K-5 1.00 bh - -
13 Whiteboard Gantung P-4 1.00 bh - -
14 Papan Pameran P-8 1.00 bh - -
15 Rak Tas R-1 3.00 bh - -
16 Rak Buku Satu Muka R-2 3.00 bh - -
17 Rak Buku Dua Muka R-3 2.00 bh - -
18 Rak Majalah R-6 1.00 bh - -
19 Rak Atlas R-7 1.00 bh - -
20 Rak Ensiklopedia R-8 1.00 bh - -
21 Rak Koran R-9 1.00 bh - -
22 Rak Dorong R-10 2.00 bh - -
23 Kotak Sampah KS 1.00 bh - -
Total IV -
V. RUANG LABORATORIUM BAHASA
1 Meja Baca Kelompok M-4 6.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Lemari Kaca Geser L-2 1.00 bh - -
4 Lemari Besi L-8 1.00 bh - -
5 Lemari Kaca Tinggi L-13 5.00 bh - -
6 Kursi Putar K-7 33.00 bh - -
7 Papan Tulis Gantung P-1 1.00 bh - -
8 Kotak Sampah KS 1.00 bh - -
Total V -
VI. RUANG SAINS, IPA, KOMPUTER
1 Meja Baca Serbaguna M-5 20.00 bh - -
2 Meja Kerja M-7 2.00 bh - -
3 Meja Demonstrasi M-11 1.00 bh - -
4 Lemari Kaca Geser L-2 3.00 bh -
5 Lemari Alat Peraga L-6 1.00 bh - -
6 Lemari Besi L-8 2.00 bh - -
7 Lemari Kertas Kerja L-10 1.00 bh - -
8 Lemari Gantung/P3K L-14 1.00 bh - -
9 Lemari Asam L-20 1.00 bh - -
10 Kursi Siswa Tunggal K-1 2.00 bh - -
11 Kursi Bulat Tinggi K-2 40.00 bh - -
12 Kursi Kerja K-5 4.00 bh - -
13 Papan Tulis Gantung P-1 1.00 bh - -
14 Kotak Sampah KS 2.00 bh - -
Total VI -
VII. RUANG KETERAMPILAN DAN KESENIAN
1 Meja Baca Serbaguna M-5 20.00 bh - -
2 Meja Kerja M-7 1.00 bh - -
3 Meja Demonstrasi M-11 1.00 bh - -
4 Lemari Arsip L-3 1.00 bh - -
5 Lemari Alat Peraga L-6 1.00 bh - -
6 Lemari Besi L-8 1.00 bh - -
7 Lemari Kertas Kerja L-10 1.00 bh - -
8 Lemari Gantung/P3K L-14 1.00 bh - -
9 Lemari Locker L-16 1.00 bh - -
10 Kursi Bulat Tinggi K-2 41.00 bh - -
11 Kursi Kerja K-5 1.00 bh - -
12 Papan Tulis Gantung P-1 1.00 bh - -
13 Kotak Sampah KS 2.00 bh - -
Total VII -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
VIII. RG, BK, UKS & OSIS, PRAMUKA
1 Meja Baca Serbaguna M-5 6.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Meja Tamu M-13 2.00 bh - -
4 Lemari Buku L-1 1.00 bh - -
5 Lemari Kaca Geser L-2 1.00 bh - -
6 Lemari Pembatas L-4 1.00 bh - -
7 Lemari Obat L-7 1.00 bh - -
8 Kursi Siswa Tunggal K-1 15.00 bh - -
9 Kursi Kerja K-5 3.00 bh - -
10 Kursi Tamu K-8 4.00 bh - -
11 Whiteboard Gantung P-4 1.00 bh - -
12 Papan Jadwal P-7 1.00 bh - -
13 Papan Piket P-9 1.00 bh - -
14 Filling Kabinet 4 Laci U-1 1.00 bh - -
15 Tungku Tiang Bendera U-4 1.00 bh - -
16 Dipan Diperiksa U-6 1.00 bh - -
17 Kotak Sampah KS 1.00 bh - -
Total VIII -
IX. ASRAMA SISWA
1 Meja Siswa Tunggal M-1 16.00 bh - -
2 Meja Baca Serbaguna M-5 2.00 bh - -
3 Lemari Pakaian Siswa L-19 8.00 bh - -
4 Kursi Siswa Tunggal K-1 28.00 bh - -
5 Rak Piring R-11 1.00 bh - -
6 Dipan Tidur Tingkat U-9 8.00 bh - -
7 Kotak Sampah KS 3.00 bh - -
Total IX -
X. GUDANG,KANTIN DAN KOPERASI
1 Meja Baca Serbaguna M-5 3.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Lemari Buku L-1 2.00 bh - -
4 Lemari Alat Peraga L-6 1.00 bh - -
5 Kursi Siswa Tunggal K-1 1.00 bh - -
6 Kursi Bulat Pendek K-3 12.00 bh - -
7 Kursi Kerja K-5 3.00 bh - -
8 Rak Buku Satu Muka R-2 2.00 bh - -
9 Rak Gudang R-4 1.00 bh - -
10 Rak Piring R-11 1.00 bh - -
11 Kotak Sampah KS 1.00 bh - -
Total X -
XI. MESS GURU
1 Meja Guru M-8 10.00 bh - -
2 Lemari Pakaian Guru L-17 10.00 bh - -
3 Kursi Siswa Tunggal K-1 10.00 bh - -
4 Dipan Tidur Tunggal U-7 6.00 bh - -
5 Dipan Tidur Ganda U-8 2.00 bh - -
6 Kotak Sampah KS 5.00 bh - -
Total XI -

XII. KM/WC SISWA


1 Kotak Sampah (ditoilet disabilitas) KS 1.00 bh - -

Total XII -
Grand Total -
Analisa Satuan Pekerjaan

ANALISA SATUAN PEKERJAAN


STANDAR NASIONAL INDONESIA
TAHUN 2008

Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu Kelas III Balok 0.0100 m3 - -
Paku Biasa 0.0200 Kg - -
Kayu Kayu Kelas III Papan 3/20 0.0070 m3 - -
Jumlah Bahan -
UPAH :
Pekerja 0.1000 Oh 500,000.00 50,000.00
P PK05 Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
P PK03 Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
LL01 Mandor 0.0050 Oh - -
Jumlah Pekerja 105,000.00
Jumlah Bahan + Pekerja 105,000.00
A001 Dibulatkan 105,000.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.4000 Oh 500,000.00 200,000.00
P PK05 Mandor 0.0400 Oh - -
Jumlah Pekerja 200,000.00
Jumlah Bahan + Pekerja 200,000.00
A001 Dibulatkan 200,000.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.5260 Oh 500,000.00 263,000.00
P PK05 Mandor 0.0520 Oh - -
Jumlah Pekerja 263,000.00
Jumlah Bahan + Pekerja 263,000.00
A001 Dibulatkan 263,000.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.7350 Oh 500,000.00 367,500.00
P PK05 Mandor 0.0730 Oh - -
Jumlah Pekerja 367,500.00
Jumlah Bahan + Pekerja 367,500.00
A001 Dibulatkan 367,500.00
A.02.11 1 M3 URUGAN TANAH KEMBALI
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 500,000.00 96,000.00
P PK05 Mandor 0.0190 Oh - -
Jumlah Pekerja 96,000.00
Jumlah Bahan + Pekerja 96,000.00
A001 Dibulatkan 96,000.00
A.02.12 1 M3 URUGAN TANAH DIPADATKAN
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 150,000.00
Jumlah Bahan + Pekerja 150,000.00
A001 Dibulatkan 150,000.00
A.02.13 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 150,000.00
Jumlah Bahan + Pekerja 150,000.00
A001 Dibulatkan 150,000.00
A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan) 1.2000 m³ - -

Jumlah Bahan -
UPAH :
Pekerja 0.4500 Oh 500,000.00 225,000.00
Mandor 0.0450 Oh - -
P PK05 Alat Bantu (sewa Stamper) 0.1250 Oh - -
Jumlah Pekerja 225,000.00
Jumlah Bahan + Pekerja 225,000.00

Page 198 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A001 Dibulatkan 225,000.00
A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ - -
Semen PC (50 kg) 267.0000 Kg - -
Pasir Pasang 0.4270 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.5000 Oh 500,000.00 750,000.00
Tukang Batu 0.6000 Oh 500,000.00 300,000.00
Kepala Tukang 0.0600 Oh 500,000.00 30,000.00
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 1,080,000.00
Jumlah Bahan + Pekerja 1,080,000.00
A001 Dibulatkan 1,080,000.00
A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ - -
Semen PC (50 kg) 202.0000 Kg - -
Pasir Pasang 0.4850 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.5000 Oh 500,000.00 750,000.00
Tukang Batu 0.6000 Oh 500,000.00 300,000.00
Kepala Tukang 0.0600 Oh 500,000.00 30,000.00
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 1,080,000.00
Jumlah Bahan + Pekerja 1,080,000.00
A001 Dibulatkan 1,080,000.00
A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ - -
Semen PC (50 kg) 163.0000 Kg - -
Pasir Pasang 0.5200 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.5000 Oh 500,000.00 750,000.00
Tukang Batu 0.6000 Oh 500,000.00 300,000.00
Kepala Tukang 0.0600 Oh 500,000.00 30,000.00
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 1,080,000.00
Jumlah Bahan + Pekerja 1,080,000.00
A001 Dibulatkan 1,080,000.00
A.03.05 1 M3 PASANG PONDASI BATU KARANG MATI 1 Pc : 4 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ - -
Semen PC (50 kg) 136.0000 Kg - -
Pasir Pasang 0.5440 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.5000 Oh 500,000.00 750,000.00
Tukang Batu 0.6000 Oh 500,000.00 300,000.00
Kepala Tukang 0.0600 Oh 500,000.00 30,000.00
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 1,080,000.00
Jumlah Bahan + Pekerja 1,080,000.00
A001 Dibulatkan 1,080,000.00
A.03.13 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KALI
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ - -
Pasir Urug 0.3000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.7800 Oh 500,000.00 390,000.00
Tukang Batu 0.3900 Oh 500,000.00 195,000.00
Kepala Tukang 0.0390 Oh 500,000.00 19,500.00
P PK05 Mandor 0.0200 Oh - -
Jumlah Pekerja 604,500.00
Jumlah Bahan + Pekerja 604,500.00
A001 Dibulatkan 604,500.00
A.03.13.a 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KARANG MATI
BAHAN :
Batu Karang Mati 1.2000 m³ - -
Pasir Urug 0.3000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.7800 Oh 500,000.00 390,000.00
Tukang Batu 0.3900 Oh 500,000.00 195,000.00
Kepala Tukang 0.0390 Oh 500,000.00 19,500.00
P PK05 Mandor 0.0200 Oh - -
Jumlah Pekerja 604,500.00
Jumlah Bahan + Pekerja 604,500.00
A001 Dibulatkan 604,500.00
A.04.09 1 M2 PASANGAN DINDING BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh - -
Semen PC (50 kg) 18.9500 Kg - -
Pasir Pasang 0.0380 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -

Page 199 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 215,000.00
Jumlah Bahan + Pekerja 215,000.00
A001 Dibulatkan 215,000.00
A.04.10 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 2 Ps
BAHAN :
Batako 35.0000 bh - -
Semen PC (50 kg) 9.4750 Kg - -
Pasir Pasang 0.0380 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 215,000.00
Jumlah Bahan + Pekerja 215,000.00
A001 Dibulatkan 215,000.00
A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh - -
Semen PC (50 kg) 11.5000 Kg - -
Pasir Pasang 0.0430 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 215,000.00
Jumlah Bahan + Pekerja 215,000.00
A001 Dibulatkan 215,000.00
A.04.12 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Batako 35.0000 bh - -
Semen PC (50 kg) 5.7500 Kg - -
Pasir Pasang 0.0430 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0150 Oh - -
Jumlah Pekerja 215,000.00
Jumlah Bahan + Pekerja 215,000.00
A001 Dibulatkan 215,000.00
A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM
BAHAN :
Semen PC (50 kg) 15.5000 Kg - -
Pasir Pasang 0.0130 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
Tukang Batu 0.2000 Oh 500,000.00 100,000.00
Kepala Tukang 0.0200 Oh 500,000.00 10,000.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 260,000.00
Jumlah Bahan + Pekerja 260,000.00
A001 Dibulatkan 260,000.00
A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIAN
BAHAN :
Semen PC (50 kg) 9.4800 Kg - -
Pasir Pasang 0.0380 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
Tukang Batu 0.2000 Oh 500,000.00 100,000.00
Kepala Tukang 0.0200 Oh 500,000.00 10,000.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 260,000.00
Jumlah Bahan + Pekerja 260,000.00
A001 Dibulatkan 260,000.00
A.05.36 1 M2 ACIAN PC
BAHAN :
BA34 Semen PC (50 kg) 0.0800 zak - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja 0.1430 org 500,000.00 71,500.00
P PK04 Tukang Batu 0.1070 org 500,000.00 53,500.00
P PK06 Kepala Tukang batu 0.0105 org 500,000.00 5,250.00
P PK19 Mandor 0.0053 org - -
Jumlah Pekerja 130,250.00
Jumlah Bahan + Pekerja 130,250.00
Jumlah 130,250.00
A077 Dibulatkan 130,250.00
A.06.01 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II
BAHAN :
Kayu Kelas II Balok 1.1000 m³ - -
Paku Biasa 1.2500 Kg - -
Lem kayu 0.0500 Kg - -
Jumlah Bahan -
UPAH :
Pekerja 6.0000 Oh 500,000.00 3,000,000.00
Tukang Kayu 15.0000 Oh 500,000.00 7,500,000.00
Kepala Tukang 3.0000 Oh 500,000.00 1,500,000.00

Page 200 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
P PK05 Mandor 0.5000 Oh - -
Jumlah Pekerja 12,000,000.00
Jumlah Bahan + Pekerja 12,000,000.00
A001 Dibulatkan 12,000,000.00
A.06.02 1 UNIT PEK. KUSEN PINTU P1 (L=170 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P1 + Jaluzi 0.06760 m³ 12,000,000.00 811,200.00
Jumlah Bahan 811,200.00
A001 Dibulatkan 811,200.00
A.06.03 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P2 + Jaluzi 0.0500 m³ 12,000,000.00 600,000.00
Jumlah Bahan 600,000.00
A001 Dibulatkan 600,000.00
A.06.04 1 UNIT PEK. KUSEN PINTU P3 (L=70 cm)
BAHAN :
Pek. Kusen pintu P3 0.0290 m³ 12,000,000.00 348,000.00
Jumlah Bahan + Pekerja 348,000.00
A001 Dibulatkan 348,000.00
A.06.05 1 UNIT PEK. KUSEN PINTU P5 (L=100 cm)
BAHAN :
Pek. Kusen pintu P5 0.0510 m³ 12,000,000.00 612,000.00
Jumlah Bahan 612,000.00
A001 Dibulatkan 612,000.00
A.06.06 1 UNIT PEK. KUSEN PINTU JENDELA PJ1/PJ1A + JALUZI
BAHAN :
Kusen Pintu Jendela PJ1 + Jaluzi 0.1010 m³ 12,000,000.00 1,212,000.00
Jumlah Bahan 1,212,000.00
A001 Dibulatkan 1,212,000.00
A.06.07 1 UNIT PEK. KUSEN PINTU JENDELA PJ2 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ2 + Jaluzi 0.1010 m³ 12,000,000.00 1,212,000.00
Jumlah Bahan 1,212,000.00
A001 Dibulatkan 1,212,000.00
A.06.08 1 UNIT PEK. KUSEN PINTU JENDELA PJ3 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ3 + Jaluzi 0.1630 m³ 12,000,000.00 1,956,000.00
Jumlah Bahan 1,956,000.00
A001 Dibulatkan 1,956,000.00
A.06.09 1 UNIT PEK. KUSEN JENDELA J2 + JALUZI
BAHAN :
Kusen Jendela J2 + Jaluzi 0.0690 m³ 12,000,000.00 828,000.00
Jumlah Bahan 828,000.00
A001 Dibulatkan 828,000.00
A.06.10 1 UNIT PEK. KUSEN JENDELA J3 + JALUZI
BAHAN :
Kusen Jendela J3 + Jaluzi 0.0950 m³ 12,000,000.00 1,140,000.00
Jumlah Bahan 1,140,000.00
A001 Dibulatkan 1,140,000.00
A.06.11 1 UNIT PEK. KUSEN JENDELA J4 + JALUZI
BAHAN :
Kusen Jendela J4 + Jaluzi 0.1470 m³ 12,000,000.00 1,764,000.00
Jumlah Bahan 1,764,000.00
A001 Dibulatkan 1,764,000.00
A.06.12 1 UNIT PEK. KUSEN JENDELA J
BAHAN :
Kusen Jendela J 0.0300 m³ 12,000,000.00 360,000.00
Jumlah Bahan 360,000.00
A001 Dibulatkan 360,000.00
A.06.13 1 UNIT PEK. KUSEN BOUVENLICH BV1
BAHAN :
Kusen Bouvenlich BV1 0.0240 m³ 12,000,000.00 288,000.00
Jumlah Bahan 288,000.00
A001 Dibulatkan 288,000.00
A.06.14 1 UNIT PEK. KUSEN BOUVENLICH BV2
BAHAN :
Kusen Bouvenlich BV2 0.0430 m³ 12,000,000.00 516,000.00
Jumlah Bahan 516,000.00
A001 Dibulatkan 516,000.00
A.06.15 1 UNIT PEK. KUSEN BOUVENLICH BV3
BAHAN :
Kusen Bouvenlich BV3 0.0610 m³ 12,000,000.00 732,000.00
Jumlah Bahan 732,000.00
A001 Dibulatkan 732,000.00
A.06.16 1 UNIT PEK. KUSEN ANGIN-ANGIN LA-LB + JALUZI
BAHAN :
Kusen Angin-Angin LA-LB + Jaluzi 0.0340 m³ 12,000,000.00 408,000.00
Jumlah Bahan 408,000.00
A001 Dibulatkan 408,000.00
A.06.17 1 M2 PEKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0400 m³ - -
Lem Kayu 0.0500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 1.0000 Oh 500,000.00 500,000.00
Tukang Kayu 2.5000 Oh 500,000.00 1,250,000.00
Kepala Tukang 0.2500 Oh 500,000.00 125,000.00
P PK05 Mandor 0.0500 Oh - -
Jumlah Pekerja 1,875,000.00
Jumlah Bahan + Pekerja 1,875,000.00
A001 Dibulatkan 1,875,000.00
A.06.18 1 BH PASANGAN DAUN PINTU PANIL
BAHAN :

Page 201 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Pintu Panil 1.6800 m2 1,875,000.00 3,150,000.00
Jumlah Bahan 3,150,000.00
A001 Dibulatkan 3,150,000.00
A.06.19 1 BH PASANGAN DAUN PINTU PANIL P5
BAHAN :
Pintu Panil 1.8900 m2 1,875,000.00 3,543,750.00
Jumlah Bahan 3,543,750.00
A001 Dibulatkan 3,543,750.00
A.06.20 1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0196 m³ - -
Paku Biasa Tripleks 0.0300 kg - -
Lem Kayu 0.3000 kg - -
Tripleks 6 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Kayu 2.0000 Oh 500,000.00 1,000,000.00
Kepala Tukang 0.2000 Oh 500,000.00 100,000.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 1,400,000.00
Jumlah Bahan + Pekerja 1,400,000.00
A001 Dibulatkan 1,400,000.00
A.06.21 1 BH PASANGAN DAUN PINTU TRIPLEKS P3
BAHAN :
Pintu Tripleks P3 1.2600 m2 1,400,000.00 1,764,000.00
Jumlah Bahan 1,764,000.00
A001 Dibulatkan 1,764,000.00
A.06.22 1 M2 PEKERJAAN DAUN JENDELA + KACA
BAHAN :
Kayu Kelas II Papan 0.1000 m³ - -
Kaca Polos 5 mm 1.1000 m2 - -
Lem Kayu 0.3000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.8000 Oh 500,000.00 400,000.00
Tukang Kayu 2.0000 Oh 500,000.00 1,000,000.00
Kepala Tukang 0.2000 Oh 500,000.00 100,000.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 1,500,000.00
Jumlah Bahan + Pekerja 1,500,000.00
A001 Dibulatkan 1,500,000.00
A.06.23 1 BH PASANGAN DAUN JENDELA + KACA (PJ1 dan PJ2)
BAHAN :
Daun Jendela + Kaca (PJ1 dan PJ2) 0.5070 m2 1,500,000.00 760,500.00
Jumlah Bahan 760,500.00
A001 Dibulatkan 760,500.00
A.06.24 1 BH PASANGAN DAUN JENDELA + KACA PJ3
BAHAN :
Daun Jendela + Kaca PJ3 1.2480 m2 1,500,000.00 1,872,000.00
Jumlah Bahan 1,872,000.00
A001 Dibulatkan 1,872,000.00
A.06.25 1 BH PASANGAN DAUN PINTU + KACA PJ3
BAHAN :
Daun Pintu + Kaca PJ3 1.6800 m2 1,500,000.00 2,520,000.00
Jumlah Bahan 2,520,000.00
A001 Dibulatkan 2,520,000.00
A.06.26 1 BH PASANGAN DAUN JENDELA + KACA J2
BAHAN :
Daun Jendela + Kaca J2 0.5070 m2 1,500,000.00 760,500.00
Jumlah Bahan 760,500.00
A001 Dibulatkan 760,500.00
A.06.27 1 BH PASANGAN DAUN JENDELA + KACA J3
BAHAN :
Daun Jendela + Kaca J3 0.5915 m2 1,500,000.00 887,250.00
Jumlah Bahan 887,250.00
Dibulatkan 887,250.00
A.06.28 1 BH PASANGAN DAUN JENDELA + KACA J4
BAHAN :
Daun Jendela + Kaca J4 1.2480 m2 1,500,000.00 1,872,000.00
Jumlah Bahan 1,872,000.00
Dibulatkan 1,872,000.00
A.06.29 1 BH PASANGAN DAUN JENDELA + KACA J5
BAHAN :
Daun Jendela + Kaca J5 0.8050 m2 1,500,000.00 1,207,500.00
Jumlah Bahan 1,207,500.00
Dibulatkan 1,207,500.00
A.06.30 1 BH PASANGAN DAUN JENDELA + KACA J6
BAHAN :
Daun Jendela + Kaca J6 0.5980 m2 1,500,000.00 897,000.00
Jumlah Bahan 897,000.00
Dibulatkan 897,000.00
A.06.31 1 UNIT PEK. KUSEN JENDELA J5
BAHAN :
Kusen Jendela J5 0.0310 m³ 12,000,000.00 372,000.00
Jumlah Bahan 372,000.00
Dibulatkan 372,000.00
A.06.32 1 UNIT PEK. KUSEN JENDELA J6
BAHAN :
Kusen Jendela J6 0.0490 m³ 12,000,000.00 588,000.00
Jumlah Bahan 588,000.00
Dibulatkan 588,000.00
A.06.32.a 1 M2 PASANG KACA TEBAL 5 MM
BAHAN :

Page 202 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
- m³ - -
Kaca Polos 5 mm 1.1000 m2 - -
Paku Biasa Tripleks 0.0300 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0150 Oh 500,000.00 7,500.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 - Oh - -
Jumlah Pekerja 90,000.00
Jumlah Bahan + Pekerja 90,000.00
A001 Dibulatkan 90,000.00
A.06.33 1 M1 PASANG KONSTRUKSI NOK BUBUNGAN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Paku Biasa 0.0500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 207,500.00
Jumlah Bahan + Pekerja 207,500.00
A001 Dibulatkan 207,500.00
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Paku Biasa 5.8000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 4.0000 Oh 500,000.00 2,000,000.00
Tukang Kayu 12.0000 Oh 500,000.00 6,000,000.00
Kepala Tukang 1.2000 Oh 500,000.00 600,000.00
P PK05 Mandor 0.2000 Oh - -
Jumlah Pekerja 8,600,000.00
Jumlah Bahan + Pekerja 8,600,000.00
A001 Dibulatkan 8,600,000.00
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Paku Biasa 5.8000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 4.0000 Oh 500,000.00 2,000,000.00
Tukang Kayu 12.0000 Oh 500,000.00 6,000,000.00
Kepala Tukang 1.2000 Oh 500,000.00 600,000.00
P PK05 Mandor 0.2000 Oh - -
Jumlah Pekerja 8,600,000.00
Jumlah Bahan + Pekerja 8,600,000.00
A001 Dibulatkan 8,600,000.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Paku Biasa 5.8000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 4.0000 Oh 500,000.00 2,000,000.00
Tukang Kayu 12.0000 Oh 500,000.00 6,000,000.00
Kepala Tukang 1.2000 Oh 500,000.00 600,000.00
P PK05 Mandor 0.2000 Oh - -
Jumlah Pekerja 8,600,000.00
Jumlah Bahan + Pekerja 8,600,000.00
A001 Dibulatkan 8,600,000.00
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ - -
Paku Biasa 0.1500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1000 Oh 500,000.00 50,000.00
Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 105,000.00
Jumlah Bahan + Pekerja 105,000.00
A001 Dibulatkan 105,000.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ - -
Paku Biasa 0.1500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1000 Oh 500,000.00 50,000.00
Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 105,000.00
Jumlah Bahan + Pekerja 105,000.00
A001 Dibulatkan 105,000.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II
BAHAN :
Kayu Kelas II Papan 1.0000 m³ - -
Paku Biasa 0.0450 kg - -

Page 203 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 207,500.00
Jumlah Bahan + Pekerja 207,500.00
A001 Dibulatkan 207,500.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II
BAHAN :
Kayu Kls II, Kaso 5/7 Rangka Plafon 0.0154 m³ - -
Paku Biasa 0.2000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1500 Oh 500,000.00 75,000.00
Tukang Kayu 0.3000 Oh 500,000.00 150,000.00
Kepala Tukang 0.0300 Oh 500,000.00 15,000.00
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 240,000.00
Jumlah Bahan + Pekerja 240,000.00
A001 Dibulatkan 240,000.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 25) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0110 m³ - -
Paku Biasa 0.0500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1100 Oh 500,000.00 55,000.00
Tukang Kayu 0.2200 Oh 500,000.00 110,000.00
Kepala Tukang 0.0220 Oh 500,000.00 11,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 176,000.00
Jumlah Bahan + Pekerja 176,000.00
A001 Dibulatkan 176,000.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 3/3
BAHAN :
List Plafond 3/3 1.0500 m' - -
Paku Biasa 0.0100 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0500 Oh 500,000.00 25,000.00
Tukang Kayu 0.0500 Oh 500,000.00 25,000.00
Kepala Tukang 0.0050 Oh 500,000.00 2,500.00
P PK05 Mandor Oh - -
Jumlah Pekerja 52,500.00
Jumlah Bahan + Pekerja 52,500.00
A001 Dibulatkan 52,500.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen PC (50 kg) 218.0000 kg - -
Pasir Beton 0.5200 M3 - -
Batu Kerikil / Split 2/3 cm 0.8700 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.6500 Oh 500,000.00 825,000.00
Tukang Batu 0.2500 Oh 500,000.00 125,000.00
Kepala Tukang 0.0250 Oh 500,000.00 12,500.00
P PK05 Mandor 0.0800 Oh - -
Jumlah Pekerja 962,500.00
Jumlah Bahan + Pekerja 962,500.00
A001 Dibulatkan 962,500.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr
BAHAN :
Semen PC (50 kg) 336.0000 kg - -
Pasir Beton 0.5400 m3 - -
Batu Kerikil / Split 2/3 cm 0.8100 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 2.0000 Oh 500,000.00 1,000,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
P PK05 Mandor 1.0000 Oh - -
Jumlah Pekerja 1,192,500.00
Jumlah Bahan + Pekerja 1,192,500.00
A001 Dibulatkan 1,192,500.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton Polos 1.0500 kg - -
Kawat Beton 0.0150 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0070 Oh 500,000.00 3,500.00
Tukang Besi 0.0070 Oh 500,000.00 3,500.00
P PK05 Kepala Tukang 0.0007 Oh 500,000.00 350.00
P PK05 Mandor 0.0003 Oh - -
Jumlah Pekerja 7,350.00
Jumlah Bahan + Pekerja 7,350.00
A001 Dibulatkan 7,350.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI
BAHAN :
Kayu Kelas III Papan 0.0400 m³ - -
Paku Biasa 0.3000 m³ - -
Minyak Bekisting 0.1000 ltr - -

Page 204 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
Tukang Kayu 0.2600 Oh 500,000.00 130,000.00
P PK05 Kepala Tukang 0.0260 Oh 500,000.00 13,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 293,000.00
Jumlah Bahan + Pekerja 293,000.00
A001 Dibulatkan 293,000.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF
BAHAN :
Kayu Kelas III Papan 0.0044 m³ - -
Paku Biasa 0.3000 m³ - -
Minyak Bekisting 0.1000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
Tukang Kayu 0.2600 Oh 500,000.00 130,000.00
P PK05 Kepala Tukang 0.0260 Oh 500,000.00 13,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 293,000.00
Jumlah Bahan + Pekerja 293,000.00
A001 Dibulatkan 293,000.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM
BAHAN :
Kayu Kelas III Papan 0.0040 m³ - -
Paku Biasa 0.4000 kg - -
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 500,000.00 150,000.00
Tukang Kayu 0.3300 Oh 500,000.00 165,000.00
P PK05 Kepala Tukang 0.0330 Oh 500,000.00 16,500.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 331,500.00
Jumlah Bahan + Pekerja 331,500.00
A001 Dibulatkan 331,500.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK
BAHAN :
Kayu Kelas III Papan 0.0040 m³ - -
Paku Biasa 0.4000 kg - -
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0018 m³ - -
Kayu Dolken 2.0000 btg - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Kayu 0.3300 Oh 500,000.00 165,000.00
P PK05 Kepala Tukang 0.0330 Oh 500,000.00 16,500.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 341,500.00
Jumlah Bahan + Pekerja 341,500.00
A001 Dibulatkan 341,500.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI
BAHAN :
Kayu Kelas III Papan 0.0020 m³ - -
Paku Biasa 0.4000 kg - -
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ - -
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 4.0000 btg - -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Kayu 0.3300 Oh 500,000.00 165,000.00
P PK05 Kepala Tukang 0.0330 Oh 500,000.00 16,500.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 341,500.00
Jumlah Bahan + Pekerja 341,500.00
A001 Dibulatkan 341,500.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING
BAHAN :
Kayu Kelas III Papan 0.0300 m³ - -
Paku Biasa 0.4000 kg - -
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0200 m³ - -
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 3.0000 btg - -
Formtie / Penjaga Jarak Berkisar / Spacer 4.0000 bh -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Kayu 0.3300 Oh 500,000.00 165,000.00
P PK05 Kepala Tukang 0.0330 Oh 500,000.00 16,500.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 341,500.00
Jumlah Bahan + Pekerja 341,500.00
A001 Dibulatkan 341,500.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Papan 0.3700 m³ - -
Paku Biasa 1.5000 kg - -

Page 205 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 152.6578 kg - -
Besi Beton Polos Dia. 8 mm 37.4815 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ - -
Paku Biasa 1.5000 kg - -
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 92.5867 kg - -
Besi Beton Polos Dia. 8 mm 53.3333 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.48'' 1 M3 MEMBUAT RING BALOK 12/20 (177,9556 Kg Besi + Bekesting) 177.9556
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 0 -
Paku Biasa 1.5000 kg 0 -
Pelumas Bekesting 0.4000 lt 0 -
Besi Beton Polos Dia. 10 mm 115.7333 kg 0 -
Besi Beton Polos Dia. 8 mm 62.2222 kg 0 -
Kawat Beton 2.2500 kg 0 -
Semen PC (50 kg) 6.4600 zak 0 -
Pasir Beton 0.5200 m³ 0 -
Batu Kerikil / Split 2/3 cm 0.7800 m³ 0 -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500000 175,000.00
Tukang Kayu 1.0400 org 500000 520,000.00
Tukang Besi 1.0500 org 500000 525,000.00
Kepala Tukang 0.2450 org 500000 122,500.00
Pekerja 3.0000 org 500000 1,500,000.00
Mandor 0.1225 org 0 -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.3700 m³ - -
Paku Biasa 1.5000 kg - -
Pelumas Bekesting 0.4000 lt - -
5.88 Besi Beton Polos Dia. 12 mm 122.8200 kg - -
4.19 Besi Beton Polos Dia. 8 mm 42.6667 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.50 1 M3 MEMBUAT SLOOF SELASAR 15/20 (188,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.2900 m³ - -
Paku Biasa 1.5000 kg - -
Pelumas Bekesting 0.4000 lt - -
3.70 Besi Beton Polos Dia. 12 mm 132.9067 kg - -

Page 206 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
2.64 Besi Beton Polos Dia. 8 mm 53.3333 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Jumlah 2,842,500.00
Dibulatkan 2,842,500.00
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3
BAHAN :
Kayu Kelas III Bekesting 0.3300 m3 - -
Paku Biasa 3.0000 kg - -
Besi Beton Polos Dia. 10 mm 110.0000 kg - -
Kawat Beton 3.0000 kg - -
Semen PC (50 kg) 6.4600 Zak - -
Pasir Beton 0.5200 m3 - -
Kerikil beton 0.7800 m3 - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Jumlah 2,842,500.00
Dibulatkan 2,842,500.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Bekesting 0.4000 m³ - -
Paku Biasa 1.5000 kg - -
Pelumas Bekesting 0.4000 lt - -
20.42 Besi Beton Polos Dia. 10 mm 152.6578 kg - -
10.13 Besi Beton Polos Dia. 6 mm 37.4815 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.4400 m³ - -
Paku Biasa 1.5000 kg - -
Pelumas Bekesting 0.4000 lt - -
8.33 Besi Beton Polos Dia. 10 mm 122.6222 kg - -
4.13 Besi Beton Polos Dia. 8 mm 59.2593 kg - -
Kawat Beton 2.2500 kg - -
Semen PC (50 kg) 6.4600 zak - -
Pasir Beton 0.5200 m³ - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Jumlah Bahan -
UPAH :
Tukang Batu 0.3500 org 500,000.00 175,000.00
Tukang Kayu 1.0400 org 500,000.00 520,000.00
Tukang Besi 1.0500 org 500,000.00 525,000.00
Kepala Tukang 0.2450 org 500,000.00 122,500.00
Pekerja 3.0000 org 500,000.00 1,500,000.00
Mandor 0.1225 org - -
Jumlah Pekerja 2,842,500.00
Jumlah Bahan + Pekerja 2,842,500.00
Dibulatkan 2,842,500.00
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen PC (50 kg) 232.0000 kg - -
Pasir Beton 0.5200 lbr - -
Batu Kerikil / Split 2/3 cm 0.7800 m³ - -
Besi Beton Polos Dia. 10 mm 137.3610 Kg - -
Kawat Beton 1.9623 Kg - -
Kayu Kelas III Bekesting 0.2450 m³ - -
Paku Biasa 0.1500 kg - -
Minyak Bekisting 1.4000 Ltr - -

Page 207 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kayu Kelas III Balok 0.0700 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 6.4697 Oh 500,000.00 3,234,870.00
Tukang Batu 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 4.0260 Oh 500,000.00 2,013,000.00
Tukang Besi 1.0073 Oh 500,000.00 503,657.00
Kepala Tukang 0.5192 Oh 500,000.00 259,587.00
Mandor 0.1924 Oh - -
Jumlah Pekerja 6,136,114.00
Jumlah Bahan + Pekerja 6,136,114.00
Dibulatkan 6,136,110.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH
BAHAN :
Genteng Tanah 25.0000 buah - -
Jumlah Bahan -
UPAH :
Pekerja 0.1500 Oh 500,000.00 75,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 116,500.00
Jumlah Bahan + Pekerja 116,500.00
A001 Dibulatkan 116,500.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm
BAHAN :
Atap Spandek/Galvalyum 1.0200 Lbr - -
Paku Seng +seal 0.2000 Kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1200 Oh 500,000.00 60,000.00
Tukang Kayu 0.0600 Oh 500,000.00 30,000.00
P PK05 Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 93,000.00
Jumlah Bahan + Pekerja 93,000.00
A001 Dibulatkan 93,000.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH
BAHAN :
Bubungan Genteng Tanah 5.0000 Bh - -
Semen PC (50 kg) 0.1600 zak - -
Pasir Pasang 0.0320 m3 - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
P PK05 Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 207,500.00
Jumlah Bahan + Pekerja 207,500.00
A001 Dibulatkan 207,500.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL
BAHAN :
Nok Genteng Metal 1.1000 buah - -
Paku Seng + karet seal 0.0500 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
P PK05 Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 207,500.00
Jumlah Bahan + Pekerja 207,500.00
A001 Dibulatkan 207,500.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm
BAHAN :
Seng Gelombang BJLS 0,3 0.7000 lbr - -
Paku Seng 0.0200 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1200 Oh 500,000.00 60,000.00
Tukang Kayu 0.0600 Oh 500,000.00 30,000.00
P PK05 Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 93,000.00
Jumlah Bahan + Pekerja 93,000.00
A001 Dibulatkan 93,000.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm
BAHAN :
Atap Spandex Zyncalum 1.0200 lbr - -
Paku Seng + karet seal 0.2000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1200 Oh 500,000.00 60,000.00
Tukang Kayu 0.0600 Oh 500,000.00 30,000.00
P PK05 Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 93,000.00
Jumlah Bahan + Pekerja 93,000.00
A001 Dibulatkan 93,000.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm
BAHAN :
Genteng Metal/metal roof 1.6200 lbr - -
Paku Seng + karet seal 0.2000 kg - -

Page 208 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan -
UPAH :
Pekerja 0.1200 Oh 500,000.00 60,000.00
Tukang Kayu 0.0600 Oh 500,000.00 30,000.00
P PK05 Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 93,000.00
Jumlah Bahan + Pekerja 93,000.00
A001 Dibulatkan 93,000.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm
BAHAN :
Seng Plat Polos 0.3000 lbr - -
Paku Seng + karet seal 0.0400 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0150 Oh 500,000.00 7,500.00
Tukang Kayu 0.0700 Oh 500,000.00 35,000.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 46,500.00
Jumlah Bahan + Pekerja 46,500.00
A001 Dibulatkan 46,500.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG
BAHAN :
Nok Tepi Seng Gelombang 1.0000 m¹ - -
Paku Seng + karet seal 0.0450 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 166,500.00
Jumlah Bahan + Pekerja 166,500.00
A001 Dibulatkan 166,500.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM
BAHAN :
Nok Tepi Zyncalum 1.0000 Bh - -
Paku Seng + karet seal 0.0450 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 166,500.00
Jumlah Bahan + Pekerja 166,500.00
A001 Dibulatkan 166,500.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Paku Seng + karet seal 0.0450 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 166,500.00
Jumlah Bahan + Pekerja 166,500.00
A001 Dibulatkan 166,500.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Semen PC (50 kg) 0.1600 zak - -
Pasir Pasang 0.0320 m3 - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 166,500.00
Jumlah Bahan + Pekerja 166,500.00
A001 Dibulatkan 166,500.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM
BAHAN :
Nok Tepi Atap Spandek 1.0000 Bh - -
Paku Seng 0.0450 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 500,000.00 125,000.00
Tukang Kayu 0.0750 Oh 500,000.00 37,500.00
P PK05 Kepala Tukang 0.0080 Oh 500,000.00 4,000.00
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 166,500.00
Jumlah Bahan + Pekerja 166,500.00
A001 Dibulatkan 166,500.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 4 mm
BAHAN :
Tripleks 4 mm 0.3750 lbr - -
Paku Biasa 0.0300 kg - -
Jumlah Bahan -
UPAH :

Page 209 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Pekerja 0.1000 Oh 500,000.00 50,000.00
Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
P PK05 Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 105,000.00
Jumlah Bahan + Pekerja 105,000.00
A001 Dibulatkan 105,000.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK
BAHAN :
Kloset Duduk 1.0000 bh - -
Perlengkapan 0.0600 harga kloset - -
Jumlah Bahan -
UPAH :
P PK05 Pekerja 2.1000 Oh 500,000.00 1,050,000.00
P PK05 Tukang Batu 0.9600 Oh 500,000.00 480,000.00
Kepala Tukang 0.0010 Oh 500,000.00 500.00
Mandor 0.1600 Oh - -
Jumlah Pekerja 1,530,500.00
Jumlah Bahan + Pekerja 1,530,500.00
Dibulatkan 1,530,500.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN :
Kloset Jongkok 1.0000 bh - -
Semen PC (50 kg) 6.0000 kg - -
Pasir Pasang 0.0100 m³ - -
Jumlah Bahan -
P PK05 UPAH :
P PK05 Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.3000 Oh 500,000.00 150,000.00
Kepala Tukang 0.1500 Oh 500,000.00 75,000.00
Mandor 0.0800 Oh - -
Jumlah Pekerja 525,000.00
A001 Jumlah Bahan + Pekerja 525,000.00
Dibulatkan 525,000.00
A.10.04 MEMASANG 1 BUAH URINOIR
BAHAN :
Urinoir 1.0000 bh - -
P PK05 Perlengkapan 0.3000 hrg urinoir - -
P PK05 Semen PC (50 kg) 6.0000 kg - -
Pasir Pasang 0.0100 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 1.0000 Oh 500,000.00 500,000.00
A001 Tukang Batu 0.9000 Oh 500,000.00 450,000.00
Kepala Tukang 0.1000 Oh 500,000.00 50,000.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 1,000,000.00
Jumlah Bahan + Pekerja 1,000,000.00
Dibulatkan 1,000,000.00
A.10.05 MEMASANG 1 BUAH WASTAFEL
P PK05 BAHAN :
P PK05 Wastafel 1.0000 bh - -
Perlengkapan 0.1200 hrg kloset - -
Semen PC (50 kg) 6.0000 kg - -
Pasir Pasang 0.0100 m³ - -
Jumlah Bahan -
A001 UPAH :
Pekerja 1.2000 Oh 500,000.00 600,000.00
Tukang Batu 1.4500 Oh 500,000.00 725,000.00
Kepala Tukang 0.1500 Oh 500,000.00 75,000.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 1,400,000.00
Jumlah Bahan + Pekerja 1,400,000.00
P PK05 Dibulatkan 1,400,000.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3
BAHAN :
Bak Fibreglass 1.0000 bh - -
Perlengkapan 0.1800 hrg bak - -
A001 Jumlah Bahan -
UPAH :
Pekerja 1.8000 Oh 500,000.00 900,000.00
Tukang Batu 0.6000 Oh 500,000.00 300,000.00
Kepala Tukang 0.5400 Oh 500,000.00 270,000.00
Mandor 0.1100 Oh - -
Jumlah Pekerja 1,470,000.00
Jumlah Bahan + Pekerja 1,470,000.00
P PK05 Dibulatkan 1,470,000.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3
BAHAN :
Bata Merah Bakar Kelas I 110.0000 bh - -
Semen PC (50 kg) 80.0000 kg - -
A001 Pasir Pasang 0.3000 m³ - -
Keramik 20 x 20 cm 216.0000 bh - -
Semen Warna 6.0000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 2.0000 Oh 500,000.00 1,000,000.00
Tukang Batu 1.0000 Oh 500,000.00 500,000.00
Kepala Tukang 0.3000 Oh 500,000.00 150,000.00
Mandor 0.1500 Oh - -
P PK05 Jumlah Pekerja 1,650,000.00
P PK05 Jumlah Bahan + Pekerja 1,650,000.00
Dibulatkan 1,650,000.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM

Page 210 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Bata Merah Bakar Kelas I 0.1450 bh - -
P PK05 Semen PC (50 kg) 44.0000 kg - -
P PK05 Pasir Pasang 0.0700 m3 - -
Batu Kerikil / Split 2/3 cm 0.0700 m³ - -
Besi Beton Polos Dia. 10 mm 1.6000 kg - -
Pasir Beton 0.0600 m3 - -
Jumlah Bahan -
A001 UPAH :
Pekerja 3.2000 Oh 500,000.00 1,600,000.00
Tukang Batu 1.0150 Oh 500,000.00 507,500.00
Kepala Tukang 0.0015 Oh 500,000.00 750.00
Mandor 0.0160 Oh - -
Jumlah Pekerja 2,108,250.00
Jumlah Bahan + Pekerja 2,108,250.00
Dibulatkan 2,108,250.00
P PK05 A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM
P PK05 BAHAN :
Bata Merah Bakar Kelas I 0.2500 m3 - -
Semen PC (50 kg) 77.0000 kg - -
Pasir Pasang 0.1300 m3 - -
Batu Kerikil / Split 2/3 cm 0.0200 m³ - -
A001 Besi Beton Polos Dia. 10 mm 2.6000 kg - -
Pasir Beton 0.0900 m3 - -
Jumlah Bahan -
UPAH :
Pekerja 1.4200 Oh 500,000.00 710,000.00
Tukang Batu 0.4730 Oh 500,000.00 236,500.00
Kepala Tukang 0.0470 Oh 500,000.00 23,500.00
Mandor 0.0710 Oh - -
Jumlah Pekerja 970,000.00
Jumlah Bahan + Pekerja 970,000.00
Dibulatkan - 970,000.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM
BAHAN :
Bata Merah Bakar Kelas I 0.3710 m3 - -
A001 Semen PC (50 kg) 114.0000 kg - -
Pasir Pasang 0.1840 m3 - -
Batu Kerikil / Split 2/3 cm 0.0330 m³ - -
Besi Beton Polos Dia. 10 mm 4.8500 kg - -
Pasir Beton 0.1200 m3 - -
Jumlah Bahan -
UPAH :
Pekerja 2.1600 Oh 500,000.00 1,080,000.00
Tukang 0.1000 Oh 500,000.00 50,000.00
Tukang Batu 0.7200 Oh 500,000.00 360,000.00
P PK05 Kepala Tukang 0.0720 Oh 500,000.00 36,000.00
P PK05 Mandor 0.1080 Oh - -
Jumlah Pekerja 1,526,000.00
Jumlah Bahan + Pekerja 1,526,000.00
A001 Dibulatkan 1,526,000.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"
BAHAN :
Pipa Galvanis 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 500,000.00 27,000.00
Tukang Batu 0.0900 Oh 500,000.00 45,000.00
P PK05 Kepala Tukang 0.0090 Oh 500,000.00 4,500.00
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 76,500.00
Jumlah Bahan + Pekerja 76,500.00
A001 Dibulatkan 76,500.00
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"
BAHAN :
Pipa Galvanis 0,75" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 500,000.00 27,000.00
Tukang Batu 0.0900 Oh 500,000.00 45,000.00
Kepala Tukang 0.0090 Oh 500,000.00 4,500.00
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 76,500.00
Jumlah Bahan + Pekerja 76,500.00
A001 Dibulatkan 76,500.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"
BAHAN :
Pipa Galvanis 1" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 500,000.00 27,000.00
Tukang Batu 0.0900 Oh 500,000.00 45,000.00
Kepala Tukang 0.0090 Oh 500,000.00 4,500.00
Mandor 0.0270 Oh - -
P PK05 Jumlah Pekerja 76,500.00
Jumlah Bahan + Pekerja 76,500.00
Dibulatkan 76,500.00
A001 A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"
BAHAN :
Pipa Galvanis 1,5" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -

Page 211 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 500,000.00 54,000.00
Tukang Batu 0.1800 Oh 500,000.00 90,000.00
Kepala Tukang 0.0180 Oh 500,000.00 9,000.00
Mandor 0.0054 Oh - -
Jumlah Pekerja 153,000.00
Jumlah Bahan + Pekerja 153,000.00
Dibulatkan 153,000.00
A001 A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2"
BAHAN :
Pipa Galvanis 2" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 500,000.00 54,000.00
Tukang Batu 0.1800 Oh 500,000.00 90,000.00
Kepala Tukang 0.0180 Oh 500,000.00 9,000.00
Mandor 0.0054 Oh - -
Jumlah Pekerja 153,000.00
Jumlah Bahan + Pekerja 153,000.00
Dibulatkan 153,000.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"
BAHAN :
A001 Pipa Galvanis 3" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 500,000.00 54,000.00
Tukang Batu 0.1800 Oh 500,000.00 90,000.00
Kepala Tukang 0.0180 Oh 500,000.00 9,000.00
Mandor 0.0054 Oh - -
Jumlah Pekerja 153,000.00
Jumlah Bahan + Pekerja 153,000.00
P PK05 Dibulatkan 153,000.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"
BAHAN :
Pipa Galvanis 4" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
A001 Jumlah Bahan -
UPAH :
Pekerja 0.1350 Oh 500,000.00 67,500.00
Tukang Batu 0.2250 Oh 500,000.00 112,500.00
Kepala Tukang 0.0225 Oh 500,000.00 11,250.00
Mandor 0.0068 Oh - -
Jumlah Pekerja 191,250.00
Jumlah Bahan + Pekerja 191,250.00
Dibulatkan 191,250.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"
P PK05 BAHAN :
Pipa PVC AW 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0360 Oh 500,000.00 18,000.00
Tukang Batu 0.0600 Oh 500,000.00 30,000.00
Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0018 Oh - -
Jumlah Pekerja 51,000.00
Jumlah Bahan + Pekerja 51,000.00
Dibulatkan 51,000.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"
BAHAN :
P PK05 Pipa PVC AW 0,75" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 500,000.00 18,000.00
A001 Tukang Batu 0.0600 Oh 500,000.00 30,000.00
Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0018 Oh - -
Jumlah Pekerja 51,000.00
Jumlah Bahan + Pekerja 51,000.00
Dibulatkan 51,000.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"
BAHAN :
P PK05 Pipa PVC AW 1" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 500,000.00 18,000.00
A001 Tukang Batu 0.0600 Oh 500,000.00 30,000.00
Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0018 Oh - -
Jumlah Pekerja 51,000.00
Jumlah Bahan + Pekerja 51,000.00
Dibulatkan 51,000.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"
BAHAN :
Pipa PVC AW 1,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0360 Oh 500,000.00 18,000.00

Page 212 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Tukang Batu 0.0600 Oh 500,000.00 30,000.00
Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0018 Oh - -
A001 Jumlah Pekerja 51,000.00
Jumlah Bahan + Pekerja 51,000.00
Dibulatkan 51,000.00
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"
BAHAN :
Pipa PVC AW 2" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0540 Oh 500,000.00 27,000.00
Tukang Batu 0.0900 Oh 500,000.00 45,000.00
Kepala Tukang 0.0090 Oh 500,000.00 4,500.00
Mandor 0.0027 Oh - -
A001 Jumlah Pekerja 76,500.00
Jumlah Bahan + Pekerja 76,500.00
Dibulatkan 76,500.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"
BAHAN :
Pipa PVC AW 2,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 500,000.00 18,000.00
Tukang Batu 0.0600 Oh 500,000.00 30,000.00
P PK05 Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0018 Oh - -
Jumlah Pekerja 51,000.00
Jumlah Bahan + Pekerja 51,000.00
Dibulatkan 51,000.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"
BAHAN :
Pipa PVC AW 3" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0810 Oh 500,000.00 40,500.00
Tukang Batu 0.1350 Oh 500,000.00 67,500.00
P PK05 Kepala Tukang 0.0135 Oh 500,000.00 6,750.00
Mandor 0.0041 Oh - -
Jumlah Pekerja 114,750.00
Jumlah Bahan + Pekerja 114,750.00
Dibulatkan 114,750.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC AW 4" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0810 Oh 500,000.00 40,500.00
Tukang Batu 0.1350 Oh 500,000.00 67,500.00
Kepala Tukang 0.0135 Oh 500,000.00 6,750.00
Mandor 0.0041 Oh - -
P PK05 Jumlah Pekerja 114,750.00
Jumlah Bahan + Pekerja 114,750.00
Dibulatkan 114,750.00
A001 A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL
BAHAN :
Bak Cuci Stainless Steel 1.0000 bh - -
Water Drain + asesories 1.0000 Set - -
Jumlah Bahan -
UPAH :
Pekerja 0.0300 Oh 500,000.00 15,000.00
Tukang Batu 0.3000 Oh 500,000.00 150,000.00
Kepala Tukang 0.0300 Oh 500,000.00 15,000.00
Mandor 0.0015 Oh - -
Jumlah Pekerja 180,000.00
Jumlah Bahan + Pekerja 180,000.00
Dibulatkan 180,000.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
BAHAN :
Kran Air 1.0000 bh - -
A001 Seal tape 0.0250 bh - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 500,000.00 5,000.00
Tukang Batu - Oh 500,000.00 -
Kepala Tukang 0.0010 Oh 500,000.00 500.00
Mandor 0.0005 Oh - -
Jumlah Pekerja 5,500.00
Jumlah Bahan + Pekerja 5,500.00
Dibulatkan 5,500.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN
P PK05 BAHAN :
Floor Drain 1.0000 bh - -

Jumlah Bahan -
UPAH :
A001 Pekerja 0.0100 Oh 500,000.00 5,000.00
Tukang Batu - Oh 500,000.00 -
Kepala Tukang 0.0010 Oh 500,000.00 500.00
Mandor 0.0005 Oh - -

Page 213 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 5,500.00
Jumlah Bahan + Pekerja 5,500.00
Dibulatkan 5,500.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA
Galian tanah 17.1360 m³ 263,000.00 4,506,768.00
Pasir Urug 0.5600 m³ - -
Lantai kerja 3.7500 m³ 962,500.00 3,609,375.00
Pas. bata 1 PC : 2 PS + Plesteran 60.0000 m² 215,000.00 12,900,000.00
Plasteran Dinding 60.0000 m² 260,000.00 15,600,000.00
P PK05 Plat beton penutup 0.5000 m³ 6,136,110.00 3,068,055.00
Pipa PVC AW 4" 9.0000 m' - -
Pipa GIP 2" 2.0000 m1 - -
Galian tanah untuk rembesan 5.6250 m³ 263,000.00 1,479,375.00
Pas. injuk 20.0000 m² - -
A001 Urugan kerikil 3,5 cm 2.5000 m³ - -
Pipa PVC AW 4" 10.0000 m' - -
Urugan kembali perataan tanah 1.8750 m³ 96,000.00 180,000.00
Jumlah Bahan 41,343,573.00
UPAH :
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Jumlah -
Jumlah 41,343,573.00
Dibulatkan 41,343,570.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN
BAHAN :
A001 Baja Ringan 1.1000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 500,000.00 30,000.00
Tukang Besi 0.0060 Oh 500,000.00 3,000.00
Kepala Tukang 0.0060 Oh 500,000.00 3,000.00
Mandor 0.0003 Oh - -
Jumlah Pekerja 36,000.00
Jumlah Bahan + Pekerja 36,000.00
Dibulatkan 36,000.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM
BAHAN :
Pintu Alluminium 1.0000 m2 - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 1.0500 Oh 500,000.00 525,000.00
Tukang Besi 1.0500 Oh 500,000.00 525,000.00
Kepala Tukang 0.1050 Oh 500,000.00 52,500.00
Mandor 0.0052 Oh - -
A001 Jumlah Pekerja 1,102,500.00
Jumlah Bahan + Pekerja 1,102,500.00
Dibulatkan 1,102,500.00
A.11.12 1 M2 PASANG TERALIS BESI
BAHAN :
Besi Plat 2x3 1.0000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 1.2000 Oh 500,000.00 600,000.00
Tukang Kayu 1.2000 Oh 500,000.00 600,000.00
P PK05 Kepala Tukang 0.0120 Oh 500,000.00 6,000.00
Mandor 0.0006 Oh - -
Jumlah Pekerja 1,206,000.00
Jumlah Bahan + Pekerja 1,206,000.00
Dibulatkan 1,206,000.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 30
LL64 BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg - -
Kayu Kelas II Papan 0.0096 m3 - -
LL65 Meni Besi/Flincote 0.2500 kg - -
LL66 Jumlah Bahan -
BT67 UPAH :
Pekerja 0.1500 Oh 500,000.00 75,000.00
Tukang Kayu 0.4000 Oh 500,000.00 200,000.00
Kepala Tukang 0.0250 Oh 500,000.00 12,500.00
Mandor 0.0013 Oh - -
A080 Jumlah Pekerja 287,500.00
Jumlah Bahan + Pekerja 287,500.00
Dibulatkan 287,500.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28
BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg - -
Kayu Kelas II Papan 0.0190 m3 - -
Meni Besi/Flincote 0.3000 kg - -
Jumlah Bahan -
BT67 UPAH :
Pekerja 0.0400 Oh 500,000.00 20,000.00
Tukang Kayu 0.4000 Oh 500,000.00 200,000.00
Kepala Tukang 0.0250 Oh 500,000.00 12,500.00
Mandor 0.0013 Oh - -
A081 Jumlah Pekerja 232,500.00
Jumlah Bahan + Pekerja 232,500.00
Dibulatkan 232,500.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28
BAHAN :

Page 214 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BT64 Seng Plat 3 x 6 bjls 28 0.3000 lbr - -
BT18 Paku Biasa Tripleks 0.1000 kg - -
Kayu Kelas II Papan 0.0190 m3 - -
Besi Strip 0.5000 kg - -
Jumlah Bahan -
BT67 UPAH :
Pekerja 0.1500 Oh 500,000.00 75,000.00
Tukang Kayu 0.2500 Oh 500,000.00 125,000.00
Kepala Tukang 0.0250 Oh 500,000.00 12,500.00
Mandor 0.0013 Oh - -
A082 Jumlah Pekerja 212,500.00
Jumlah Bahan + Pekerja 212,500.00
Dibulatkan 212,500.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING
BAHAN :
Teer/residu 0.0300 ltr - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0080 Oh 500,000.00 4,000.00
Tukang Kayu 0.0060 Oh 500,000.00 3,000.00
LL99 Kepala Tukang 0.0120 Oh 500,000.00 6,000.00
BN02 Mandor 0.0060 Oh - -
Jumlah Pekerja 13,000.00
Jumlah Bahan + Pekerja 13,000.00
LLL01 Dibulatkan 13,000.00
P PK05 A.12.02 1 BUAH PASANG KUNCI TANAM BIASA
BAHAN :
Kunci Tanam biasa 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0100 Oh 500,000.00 5,000.00
Tukang Kayu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
Mandor 0.0050 Oh - -
Jumlah Pekerja 260,000.00
Jumlah Bahan + Pekerja 260,000.00
Dibulatkan 260,000.00
P PK05 A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI
BAHAN :
Kunci Tanam Kamar Mandi 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0050 Oh 500,000.00 2,500.00
Tukang Kayu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0050 Oh 500,000.00 2,500.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 255,000.00
Jumlah Bahan + Pekerja 255,000.00
Dibulatkan 255,000.00
P PK05 A.12.04 1 BUAH PASANG KUNCI BULAT
BAHAN :
Kunci Bulat 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0050 Oh 500,000.00 2,500.00
Tukang Kayu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0050 Oh 500,000.00 2,500.00
Mandor 0.0003 Oh - -
Jumlah Pekerja 255,000.00
Jumlah Bahan + Pekerja 255,000.00
Dibulatkan 255,000.00
P PK05 A.12.05 1 BUAH PASANG ENGSEL PINTU
BAHAN :
Engsel Pintu 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0150 Oh 500,000.00 7,500.00
Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
Mandor 0.0008 Oh - -
Jumlah Pekerja 65,000.00
Jumlah Bahan + Pekerja 65,000.00
Dibulatkan 65,000.00
P PK05 A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN :
Engsel Jendela 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0100 Oh 500,000.00 5,000.00
Tukang Kayu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00 5,000.00
Mandor 0.0005 Oh - -
Jumlah Pekerja 60,000.00
Jumlah Bahan + Pekerja 60,000.00
Dibulatkan 60,000.00
P PK05 A.12.09 1 BUAH PASANG KAIT ANGIN
BAHAN :
Kait Angin 1.0000 ps - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0150 Oh 500,000.00 7,500.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
Mandor 0.0008 Oh - -

Page 215 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 90,000.00
Jumlah Bahan + Pekerja 90,000.00
Dibulatkan 90,000.00
P PK05 A.12.10 1 BUAH PASANG SLOOT TANAM
BAHAN :
Sloot Tanam 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0200 Oh 500,000.00 10,000.00
Tukang Kayu 0.2000 Oh 500,000.00 100,000.00
Kepala Tukang 0.0500 Oh 500,000.00 25,000.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 135,000.00
Jumlah Bahan + Pekerja 135,000.00
Dibulatkan 135,000.00
P PK05 A.12.11 1 BUAH PASANG GRENDEL JENDELA
BAHAN :
Grendel Jendela/Spring Knob 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0200 Oh 500,000.00 10,000.00
Tukang Kayu 0.2000 Oh 500,000.00 100,000.00
Kepala Tukang 0.0200 Oh 500,000.00 10,000.00
Mandor 0.0010 Oh - -
Jumlah Pekerja 120,000.00
Jumlah Bahan + Pekerja 120,000.00
Dibulatkan 120,000.00
P PK05 A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR
BAHAN :
Kunci Tanam 2 x Putar 1.0000 bh - -
Pegangan/Handle Pintu 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0500 Oh 500,000.00 25,000.00
Tukang Kayu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0500 Oh 500,000.00 25,000.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 300,000.00
Jumlah Bahan + Pekerja 300,000.00
Dibulatkan 300,000.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle )
BAHAN :
P PK05 Kunci Pintu 2 x Putar ( lever handle ) 1.0000 bh - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 500,000.00 5,000.00
Tukang Kayu 0.5000 Oh 500,000.00 250,000.00
A001 Kepala Tukang 0.0600 Oh 500,000.00 30,000.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 285,000.00
Jumlah Bahan + Pekerja 285,000.00
Dibulatkan 285,000.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca Polos 5 mm 1.1000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 0.0150 Oh 500,000.00 7,500.00
Tukang Kayu 0.1500 Oh 500,000.00 75,000.00
Kepala Tukang 0.0150 Oh 500,000.00 7,500.00
P PK05 Mandor 0.0008 Oh - -
Jumlah Pekerja 90,000.00
Jumlah Bahan + Pekerja 90,000.00
A001 Dibulatkan 90,000.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU
BAHAN :
P PK05 Besi Siku 50.50.5 panjang 6 m 1.0000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 500,000.00 30,000.00
A001 Tukang Besi 0.0040 org 500,000.00 2,000.00
Kepala tukang besi profil 0.0010 org 500,000.00 500.00
Mandor 0.0002 org - -
Peralatan ( Alat las, dll) 0.1250 lot 32,500.00 4,062.50
Jumlah Pekerja 36,562.50
Jumlah Bahan + Pekerja 36,562.50
Dibulatkan 36,560.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI
Galian Tanah 0.4500 m³ 200,000.00 90,000.00
P PK05 Urugan Pasir 10 cm' 0.0080 m³ 150,000.00 1,200.00

Beton Tumbuk 0.0433 m³ 962,500.00 41,708.33


A001 Besi Siku 50.50.5 panjang 6 m 0.1000 btg - -
Kawat Duri 8.0000 m1 - -
Pengecatan 0.3333 m² 145,000.00 48,333.33
Jumlah 181,241.67
Jumlah 181,241.67
Dibulatkan 181,240.00
A.12.34a 1 M1 Pagar BRC Ø 6 mm, lengkap dengan tiang
Galian Tanah 0.0433 m³ 200,000.00 8,666.67
Beton Tumbuk 0.0433 m³ 962,500.00 41,708.33

Page 216 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BRC lengkap dengan tiang + klem pengikat. 0.4340 lbr - -

Pekerja 0.0750 Oh 500,000.00 37,500.00


Tukang Batu 0.0250 Oh 500,000.00 12,500.00

Jumlah 100,375.00
Dibulatkan 100,370.00

A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM


BAHAN :
P PK05 LantaiKeramik 10 x 20 cm 50.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
BAHAN :
P PK05 Lantai Keramik 20 x 20 cm 25.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.45 1 M2 PASANG LANTAI KERAMIK 20 X 25 CM
BAHAN :
P PK05 Lantai Keramik 20 x 25 cm 20.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM
BAHAN :
P PK05 Ubin Keramik 15 x 20 cm 35.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.47 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
BAHAN :
P PK05 Keramik 30 x 30 cm 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP
BAHAN :
P PK05 Ubin Keramik 30 x 30 cm Antislip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00

Page 217 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH
BAHAN :
Keramik Porselen 11 x 11 cm 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
P PK05 Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0500 Oh 500,000.00 25,000.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 585,000.00
A001 Jumlah Bahan + Pekerja 585,000.00
Dibulatkan 585,000.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA
BAHAN :
Keramik Porselen 11 x 11 cm, Warna 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
P PK05 Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.5000 Oh 500,000.00 250,000.00
Kepala Tukang 0.0500 Oh 500,000.00 25,000.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 585,000.00
A001 Jumlah Bahan + Pekerja 585,000.00
Dibulatkan 585,000.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA
BAHAN :
Keramik Porselen 10 x 20 cm, Warna 50.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
P PK05 Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.4500 Oh 500,000.00 225,000.00
Kepala Tukang 0.0450 Oh 500,000.00 22,500.00
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 547,500.00
Jumlah Bahan + Pekerja 547,500.00
Dibulatkan 547,500.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA
BAHAN :
Keramik Porselen 20 x 20 cm, Warna 25.0000 bh - -
Semen Abu-abu 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
P PK05 Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.4500 Oh 500,000.00 225,000.00
Kepala Tukang 0.0450 Oh 500,000.00 22,500.00
A001 Mandor 0.0300 Oh - -
Jumlah Pekerja 547,500.00
Jumlah Bahan + Pekerja 547,500.00
Dibulatkan 547,500.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
P PK05 Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.4500 Oh 500,000.00 225,000.00
Kepala Tukang 0.0450 Oh 500,000.00 22,500.00
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 547,500.00
Jumlah Bahan + Pekerja 547,500.00
Dibulatkan 547,500.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM,
BAHAN :
Keramik 20 x 20 cm 25.0000 bh - -
Semen Abu-abu 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
P PK05 Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0450 Oh 500,000.00 22,500.00
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 372,500.00
Jumlah Bahan + Pekerja 372,500.00
Dibulatkan 372,500.00

Page 218 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
P PK05 Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.1250 Oh 500,000.00 62,500.00
Kepala Tukang 0.0125 Oh 500,000.00 6,250.00
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 368,750.00
Jumlah Bahan + Pekerja 368,750.00
Dibulatkan 368,750.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL
P PK05 BAHAN :
Batu Tempel 1.0500 m2 - -
Semen Abu-abu 11.7500 kg - -
Pasir Pasang 0.0350 m3 - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A001 A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS
BAHAN :
Lantai Keramik 30 x 30 cm 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A001 A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP
BAHAN :
Lantai Keramik 30 x 30 cm Warna/Corak/Anti Slip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A001 A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Keramik 40 x 40 cm 6.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0420 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.6200 Oh 500,000.00 310,000.00
Tukang Batu 0.3500 Oh 500,000.00 175,000.00
Kepala Tukang 0.0350 Oh 500,000.00 17,500.00
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 502,500.00
Jumlah Bahan + Pekerja 502,500.00
Dibulatkan 502,500.00
A001 A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM,
BAHAN :
Keramik 20 x 25 cm 20.0000 bh - -
Semen PC (50 kg) 8.4000 kg - -
Pasir Pasang 0.0180 m3 - -
Semen Warna 0.5000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.6000 Oh 500,000.00 300,000.00
Tukang Batu 0.4500 Oh 500,000.00 225,000.00
Kepala Tukang 0.0450 Oh 500,000.00 22,500.00
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 547,500.00
Jumlah Bahan + Pekerja 547,500.00
Dibulatkan 547,500.00
P PK05 A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)
BAHAN :
Paving Block Warna 6 cm 1.0100 m2 - -
Pasir Beton 0.1000 m³ - -
Jumlah Bahan -

Page 219 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A001 UPAH :
Pekerja 0.2500 org 500,000.00 125,000.00
Tukang Batu 0.5000 org 500,000.00 250,000.00
Kepala Tukang Batu 0.0250 org 500,000.00 12,500.00
Mandor 0.0030 org - -
Jumlah Pekerja 387,500.00
Jumlah Bahan + Pekerja 387,500.00
Jumlah 387,500.00
Dibulatkan 387,500.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)
BAHAN :
P PK05 Paving Block Warna 8 cm 1.0100 m2 - -
Pasir Beton 0.1000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 org 500,000.00 125,000.00
A001 Tukang Batu 0.5000 org 500,000.00 250,000.00
Kepala Tukang Batu 0.0250 org 500,000.00 12,500.00
Mandor 0.0030 org - -
Jumlah Pekerja 387,500.00
Jumlah Bahan + Pekerja 387,500.00
Jumlah 387,500.00
Dibulatkan 387,500.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)
BAHAN :
Paving Block Natural 6 cm 1.0100 m² - -
Pasir Beton 0.1000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 org 500,000.00 125,000.00
P PK05 Tukang Batu 0.5000 org 500,000.00 250,000.00
Kepala Tukang Batu 0.0250 org 500,000.00 12,500.00
Mandor 0.0030 org - -
Jumlah Pekerja 387,500.00
Jumlah Bahan + Pekerja 387,500.00
Jumlah 387,500.00
Dibulatkan 387,500.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)
BAHAN :
Paving Block Natural 8 cm 1.0100 m² - -
Pasir Beton 0.1000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.2500 org 500,000.00 125,000.00
Tukang Batu 0.5000 org 500,000.00 250,000.00
P PK05 Kepala Tukang Batu 0.0250 org 500,000.00 12,500.00
Mandor 0.0030 org - -
Jumlah Pekerja 387,500.00
Jumlah Bahan + Pekerja 387,500.00
A001 Jumlah 387,500.00
Dibulatkan 387,500.00
A.14.12 1 M2 MENI KAYU
BAHAN :
Cat Meni Kayu 0.3500 Kg - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.1000 Oh 500,000.00 50,000.00
Tukang Cat - Oh 500,000.00 -
Kepala Tukang - Oh 500,000.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.14.13 1 M2 MENI BESI
BAHAN :
Cat Meni BESI 0.3500 Kg - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.1000 Oh 500,000.00 50,000.00
Tukang Cat - Oh 500,000.00 -
Kepala Tukang - Oh 500,000.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.14.14 1 M2 PLAMUR TEMBOK
BAHAN :
Plamir Tembok 0.1000 ltr - -
Jumlah Bahan -
UPAH :
P PK05 Pekerja 0.0200 Oh 500,000.00 10,000.00
Tukang Cat 0.0630 Oh 500,000.00 31,500.00
Kepala Tukang 0.0063 Oh 500,000.00 3,150.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 44,650.00
A001 Jumlah Bahan + Pekerja 44,650.00
Dibulatkan 44,650.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)
BAHAN :
P PK05 Cat Tembok 0.1750 kg - -
Plamir Tembok 0.1600 kg - -
Kuas Roll 0.0100 bh - -
Ampelas 0.5000 lbr - -
Jumlah Bahan -

Page 220 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A001 UPAH :
Pekerja 0.1040 org 500,000.00 52,000.00
Tukang Cat 0.0182 org 500,000.00 9,100.00
Kepala Tukang cat 0.0090 org 500,000.00 4,500.00
Mandor 0.0045 org - -
Jumlah Pekerja 65,600.00
Jumlah Bahan + Pekerja 65,600.00
Jumlah 65,600.00
Dibulatkan 65,600.00
P PK05 A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)
BAHAN :
Cat Tembok 0.2000 kg - -
Plamir Tembok 0.1600 kg - -
Kuas Roll 0.0100 bh - -
A001 Ampelas 0.5000 lbr - -
Jumlah Bahan -
UPAH :
Pekerja 0.2000 org 500,000.00 100,000.00
Tukang Cat 0.0280 org 500,000.00 14,000.00
Kepala Tukang cat 0.0150 org 500,000.00 7,500.00
Mandor 0.0090 org - -
Jumlah Pekerja 121,500.00
P PK05 Jumlah Bahan + Pekerja 121,500.00
Jumlah 121,500.00
Dibulatkan 121,500.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg - -
Plamir kayu 0.0830 kg - -
P PK05 Cat Kayu 0.2000 kg - -
Ampelas 0.4000 lbr - -
Minyak cat / Thinner 0.1500 ltr - -
Kwas 0.0500 bh - -
Jumlah Bahan -
A001 UPAH :
Pekerja 0.2000 org 500,000.00 100,000.00
Tukang Cat 0.0600 org 500,000.00 30,000.00
Kepala Tukang cat 0.0300 org 500,000.00 15,000.00
Mandor 0.0100 org - -
Jumlah Pekerja 145,000.00
Jumlah Bahan + Pekerja 145,000.00
Jumlah 145,000.00
Dibulatkan 145,000.00
A.14.30'' 1 M2 PENGECATAN BIDANG DINDING ( PLINT )
BAHAN :
Cat Kayu / Besi / Cat minyak 0.2000 kg 0 -
Ampelas 0.4000 lbr 0 -
Minyak Thinner 0.1500 ltr 0 -
Kwas 0.0500 bh 0 -
Jumlah Bahan -
UPAH :
Pekerja 0.2000 org 500000 100,000.00
Tukang Cat 0.0600 org 500000 30,000.00
Kepala Tukang cat 0.0300 org 500000 15,000.00
Mandor 0.0100 org 0 -
Jumlah Pekerja 145,000.00
Jumlah Bahan + Pekerja 145,000.00
Jumlah 145,000.00
Dibulatkan 145,000.00
A.14.31 1 M2 PENGECATAN BESI (3X)
BAHAN :
P PK05 Meni Besi/Flincote 0.1670 kg - -
Cat Besi 0.2000 kg - -
Ampelas 0.4000 lbr - -
Minyak cat / Thinner 0.1500 ltr - -
Kwas 0.0500 bh - -
A001 Jumlah Bahan -
UPAH :
Pekerja 0.2000 org 500,000.00 100,000.00
Tukang Cat 0.0600 org 500,000.00 30,000.00
Kepala Tukang cat 0.0300 org 500,000.00 15,000.00
Mandor 0.0100 org - -
Jumlah Pekerja 145,000.00
Jumlah Bahan + Pekerja 145,000.00
Jumlah 145,000.00
P PK05 Dibulatkan 145,000.00
B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA
Tanaman Keras 1.0000 btg - -
Bambu 1.0000 btg - -
Pekerja 0.4000 org 500,000.00 200,000.00
Mandor 0.0050 org - -
Jumlah 200,000.00
Jumlah 200,000.00
Dibulatkan 200,000.00
E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK
Tukang Kayu 0.0400 org 500,000.00 20,000.00
Kepala Tukang 0.0040 org 500,000.00 2,000.00
Pekerja 1.8000 org 500,000.00 900,000.00
Mandor 0.0430 org - -
Untuk tanah biasa dihitung = 1, 25 x analis E. 13
Untuk tanah biasa dihitung = 1, 50x analis E. 13
Untuk tanah biasa dihitung = 2, 00 x analis E. 13
Jumlah -

Page 221 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah -
Dibulatkan -
M.01 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG)
Kayu Bulat f 30 cm 7.5000 btg -
Paku Biasa 0.5600 kg - -
Pasak Besi f 12 mm 2.8000 kg - -
Tukang Kayu 1.2000 org 500,000.00 600,000.00
Kepala Tukang Kayu 0.1200 org 500,000.00 60,000.00
Pekerja 4.8000 org 500,000.00 2,400,000.00
Mandor 0.0120 org - -
Alat Bantu 0.0100 ls 15,000.00 150.00
Jumlah 150.00
Jumlah 150.00
Dibulatkan 150.00
M.02 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 18.0000 btg -
Paku Biasa 1.1200 kg - -
Pasak Besi f 12 mm 5.6000 kg - -
Tukang Kayu 1.4000 org 500,000.00 700,000.00
Kepala Tukang Kayu 0.1400 org 500,000.00 70,000.00
Pekerja 5.3000 org 500,000.00 2,650,000.00
Mandor 0.0140 org - -
Alat Bantu 0.0100 ls 15,000.00 150.00
Jumlah 150.00
Jumlah 150.00
Dibulatkan 150.00
M.03 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 28.5000 btg -
Paku Biasa 1.6800 kg - -
Pasak Besi f 12 mm 8.4000 kg - -
Tukang Kayu 1.7000 org 500,000.00 850,000.00
Kepala Tukang Kayu 7.0000 org 500,000.00 3,500,000.00
Pekerja 5.9000 org 500,000.00 2,950,000.00
Mandor 0.0170 org - -
Alat Bantu 0.0100 ls 15,000.00 150.00
Jumlah 150.00
Jumlah 150.00
Dibulatkan 150.00
M.04 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 39.0000 btg -
Paku Biasa 1.6800 kg - -
Pasak Besi f 12 mm 11.2000 kg - -
Tukang Kayu 2.1000 org 500,000.00 1,050,000.00
Kepala Tukang Kayu 0.2100 org 500,000.00 105,000.00
Pekerja 6.3000 org 500,000.00 3,150,000.00
Mandor 0.0210 org - -
Alat Bantu 0.0100 ls 15,000.00 150.00
Jumlah 150.00
Jumlah 150.00
Dibulatkan 150.00
A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )

Jumlah -
Jumlah -
Dibulatkan -
A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )
Sejauh 30 meter
Pekerja 0.3300 org 500,000.00 165,000.00
Mandor 0.0100 org -
Lebih dari 30 meter

Jumlah -
Jumlah -
Dibulatkan -
A. R 1 M2 PEK. ANTI RAYAP
BAHAN :
Bahan Anti Rayap 0.0900 Ltr - -
Alat Semprot 0.0500 lsm - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 500,000.00 5,000.00
Jumlah Pekerja 5,000.00
Jumlah Bahan + Pekerja 5,000.00
A001 Dibulatkan 5,000.00
A. B 1 M1 PEK. ANGKUR BESI Dia. 10 - 45 cm
BAHAN :
Besi Beton Polos Dia. 10 mm 0.2667 M1 - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 500,000.00 5,000.00
Jumlah Pekerja 5,000.00
Jumlah Bahan + Pekerja 5,000.00
Dibulatkan 5,000.00
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh - -
Semen PC (50 kg) 18.9500 kg - -
Pasir Pasang 0.0430 m3 -
Jumlah Bahan -
UPAH :
Pekerja 0.3200 Oh 500,000.00 160,000.00
Tukang Batu 0.1000 Oh 500,000.00 50,000.00
Kepala Tukang 0.0100 Oh 500,000.00
Mandor 0.0050 Oh -

Page 222 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 210,000.00
Jumlah Bahan + Pekerja 210,000.00
Dibulatkan 210,000.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM
BAHAN :
Kabel 3x2,5mm NYM 1.0000 m' - -
Pipa konduit dia 5/8 inch 1.0000 m' - -
Klem kabel 3.0000 bh - -
Isolasi 0.0500 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM
BAHAN :
Kabel 2x2,5mm NYM 3.5000 m' - -
Pipa konduit dia 5/8 inch 4.0000 m' - -
Klem kabel 16.0000 bh - -
Isolasi 0.0500 bh - -
Tedoos 1.0000 bh -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM
BAHAN :
Saklar Tunggal 1.0000 bh - -
Kabel 2x2,5mm NYM 2.5000 m' - -
Pipa konduit dia 5/8 inch 4.0000 m' - -
Isolasi 0.0500 bh - -
Inbouwdoos 1.0000 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM
BAHAN :
Saklar Double 1.0000 bh - -
Kabel 3x2,5mm NYM 1.5000 m' - -
Pipa konduit dia 5/8 inch 4.0000 m' - -
Isolasi 0.0500 bh - -
Inbouwdoos 1.0000 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM
BAHAN :
Stop Kontak 1.0000 bh -
Kabel 3x2,5mm NYM 1.5000 m' - -
Pipa konduit dia 5/8 inch 4.0000 m' - -
Isolasi 0.0500 bh - -
Inbouwdoos 1.0000 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar
BAHAN :
Lampu Pijar 1.0000 bh - -
Kabel 1x2,5mm NYM 6.5000 m' - -
Pipa konduit dia 5/8 inch 6.0000 m' - -
Isolasi 0.0500 bh - -
Klem kabel 3.0000 bh - -
Tedoos 1.0000 bh -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting
BAHAN :
Lampu TL 2x40 Watt + fitting 1.0000 bh - -
Kabel 1x2,5mm NYM 4.5000 m' - -
Pipa konduit dia 5/8 inch 4.0000 m' - -
Isolasi 0.0500 bh - -
Klem kabel 3.0000 bh - -
Tedoos 1.0000 bh -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00

Page 223 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Dibulatkan 80,000.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring
BAHAN :
MCB 4.0000 bh - -
Kabel 1x2,5mm NYM 4.5000 m' - -
Pipa konduit dia 5/8 inch 10.0000 m' - -
Isolasi 0.0500 bh - -
Box Sekring 1.0000 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY
BAHAN :
Kabel 3x4mm NYY 10.0000 m' - -
Isolasi 0.0500 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.8000 Oh 500,000.00 400,000.00
Jumlah Pekerja 400,000.00
Jumlah Bahan + Pekerja 400,000.00
Dibulatkan 400,000.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB
BAHAN :
Panel Box Utama 1.0000 bh - -
MCB 6.0000 bh - -
Kabel 3x2,5mm NYM 5.0000 m' - -
Isolasi 0.0500 bh - -
Jumlah Bahan -
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Jumlah Pekerja 80,000.00
Jumlah Bahan + Pekerja 80,000.00
Dibulatkan 80,000.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA
BAHAN :
Batu kali 0.5000 m3 - -
Plesteran 3.0000 m² 260,000.00 780,000.00
Kabel 3x2,5mm NYM 5.0000 m' - -
Isolasi 0.0500 bh - -
Jumlah Bahan 780,000.00
UPAH :
Tukang 0.1600 Oh 500,000.00 80,000.00
Pekerja 0.2500 Oh 500,000.00 125,000.00
Jumlah Pekerja 205,000.00
Jumlah Bahan + Pekerja 985,000.00
Dibulatkan 985,000.00
A.02.23 1 M2 PASANG GEBALAN RUMPUT
BAHAN :
LL42 Lempengan Rumput 1.0000 m² - -
Pupuk Kandang 1.0000 ls - -
Tanah Urug (Tebal 20 cm) 0.2000 m3 - -
Jumlah Bahan -
UPAH :
P PK02 Upah Pasang 1.0000 org 500,000.00 500,000.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 500,000.00
Jumlah Bahan + Pekerja 500,000.00
A052 Dibulatkan 500,000.00
A.01.P.01 1 BH TANAM POHON PELINDUNG
BAHAN :
LL42 Pohon Pelindung 1.0000 btg - -
Pupuk kandang 1.0000 ls - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 500,000.00 500,000.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 500,000.00
Jumlah Bahan + Pekerja 500,000.00
A052 Dibulatkan 500,000.00
A.01.P.02 1 M2 PEMBUATAN TAMAN
BAHAN :
LL42 Pembentukan Lahan Taman 1.0000 Unit - -
Pupuk Kandang 1.0000 ls - -
Pohon Perdu/Bunga dll 1.0000 btg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 500,000.00 500,000.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 500,000.00
Jumlah Bahan + Pekerja 500,000.00
A052 Dibulatkan 500,000.00
A.01.P.03 1 BH PENANAMAN POHON HIAS
BAHAN :
LL42 Pohon Hias 1.0000 btg - -
Pupuk Kandang 1.0000 krg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 500,000.00 500,000.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 500,000.00
Jumlah Bahan + Pekerja 500,000.00

Page 224 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A052 Dibulatkan 500,000.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP
BAHAN :
LL42 Kayu Kelas II Balok (Selasar Penghubung) 0.0459 m3 - -
Seng Gelombang BJLS 0,3 3.3000 lbr - -
Seng Plat BJLS 30 lebar 90 cm 0.3000 lbr - -
Rabat Beton 0.0230 m3 962,500.00 22,137.50
Paku Seng 0.0200 kg - -
Mur - Baut dia 10 mm panjang 30 cm 1.6700 bh - -
Jumlah Bahan 22,137.50
UPAH :
P PK02 Pekerja 0.7500 oh 500,000.00 375,000.00
P PK19 Tukang Kayu 0.5000 oh 500,000.00 250,000.00
Jumlah Pekerja 625,000.00
Jumlah Bahan + Pekerja 647,137.50
A052 Dibulatkan 647,130.00
A.01.P.05 1 M' PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
LL42 Bambu 1.0000 m¹ - -
-
-
-
-
-
Jumlah Bahan -
UPAH :
P PK02 Pekerja 1.4286 oh 500,000.00 714,300.00
P PK19 Tukang Kayu oh -
Jumlah Pekerja 714,300.00
Jumlah Bahan + Pekerja 714,300.00
A052 Dibulatkan 714,300.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm
BAHAN :
LL42 Besi Beton Polos Dia. 10 mm 0.3085 kg - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja 0.1000 oh 500,000.00 50,000.00
P PK19 Tukang Kayu oh -
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
A052 Dibulatkan 50,000.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Polos Dia. 12mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 500,000.00 -
P PK19 Tukang Kayu 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
A052 Dibulatkan 50,000.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 500,000.00 -
P PK19 Tukang Kayu 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
A052 Dibulatkan 50,000.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
Pekerja oh 500,000.00 -
Tukang Kayu 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik
BAHAN :
Baut Dia. 10mm 2.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 500,000.00 -
P PK19 Tukang Kayu 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
A052 Dibulatkan 50,000.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA
BAHAN :
LL42 Beghel U (Plat Baja U 4.40mm) 3.0000 bh - -
Beghel U (Besi Polos 12mm) 2.0000 bh - -
Plat Baja 4.40mm 8.0000 bh - -
Baut Dia. 10mm (25-30cm) 22.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 500,000.00 -
P PK19 Tukang Kayu 0.1000 oh 500,000.00 50,000.00

Page 225 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
A052 Dibulatkan 50,000.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT
BAHAN :
Galian tanah 1.2000 m3 200,000.00 240,000.00
Cor beton tumbuk Ad 1:3:5 0.5000 m3 962,500.00 481,250.00
Tiang pipa galvanis dia 3" 1.0000 btg - -
Papan plank komplit rangka 1.0000 bh - -
Ring Basket 1.0000 Set - -
Jumlah Bahan 721,250.00
UPAH :
Pekerja oh 500,000.00 -
Tukang 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 771,250.00
Dibulatkan 771,250.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING
BAHAN :
Cor beton tumbuk Ad 1:3:5 0.0120 m3 1,192,500.00 14,310.00
Pipa Stainless Steel Dia. 1,5" 1.3200 m¹ - -
Jumlah Bahan 14,310.00
UPAH :
Pekerja 1.0000 oh 500,000.00 500,000.00
Tukang oh 500,000.00 -
Jumlah Pekerja 500,000.00
Jumlah Bahan + Pekerja 514,310.00
Dibulatkan 514,310.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
Bambu 0.5000 btg - -
Kayu Kelas III Papan 0.0033 m3 - -
Kawat Beton (Pengikat) 0.0150 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1000 oh 500,000.00 50,000.00
Tukang oh 500,000.00 -
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN
BAHAN :
Kayu Dolken Dia. 8 cm 0.5000 btg - -
Kayu Kelas III Papan 0.0033 m3 - -
Kawat Beton (Pengikat) 0.0150 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.1000 oh 500,000.00 50,000.00
Tukang oh 500,000.00 -
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja oh 500,000.00 -
Tukang 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU
BAHAN :
Kayu Kls. II Balok 1.1000 m³ - -
Paku Biasa 0.0500 kg - -
Jumlah Bahan -
UPAH :
Pekerja oh 500,000.00 -
Tukang 0.1000 oh 500,000.00 50,000.00
Jumlah Pekerja 50,000.00
Jumlah Bahan + Pekerja 50,000.00
Dibulatkan 50,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI
BAHAN :
Pintu Gerbang Besi 1.0000 m1 - -
Jumlah Bahan -
UPAH :
Pekerja oh 500,000.00 -
Tukang oh 500,000.00 -
Jumlah Pekerja -
Jumlah Bahan + Pekerja -
Dibulatkan -

PE M B UATAN PART I S I MATE R IAL KAYU

1 M3 PEKERJAAN KUSEN PINTU

Bahan

1.2 M3 Kayu Kls. II - -

1.25 Kg Paku 10 cm - -

1 Kg Lem kayu - -

Page 226 of 254


Analisa Satuan Pekerjaan
Kode1K Kode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)

Upah

18 Org/Tukang kayu 500,000.00 9,000,000.00

1.8 Org/Kepala Tukang 500,000.00 900,000.00

6 Org/Pekerja 500,000.00 3,000,000.00

0.3 Org/Mandor Rp Rp -

Alat bantu Rp -

Total Rp 12,900,000.00

1 UNIT PEK. KUSEN PINTU (L=3.00 cm)

0.111328 M3 Pek. Kusen pintu & jendela Rp12,900,000.00 Rp 1,436,131.20

Dibulatkan 1,436,130.00

1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II

BAHAN :

Kayu Kls. II Balok 0.0196 m³ - -

Paku Biasa Tripleks 0.03 kg - -

Lem Kayu 0.3 kg - -

Tripleks 6 mm 2 lbr - -
Jumlah Bahan -

UPAH :

Pekerja 0.6 Oh 500,000.00 300,000.00

Tukang Kayu 2 Oh 500,000.00 1,000,000.00

Kepala Tukang 0.2 Oh 0 0

Mandor 0.03 Oh 0 0
Jumlah Pekerja 1,300,000.00

Jumlah Bahan + Pekerja 1,300,000.00


Dibulatkan 1,300,000.00

1 BH PASANGAN DAUN PINTU TRIPLEKS 6 mm

BAHAN :

Pintu Tripleks 1.8760 m2 1,300,000.00 2,438,800.00

Jumlah Bahan 2,438,800.00

Dibulatkan 2,438,800.00

1 M2 MENGECAT KAYU

A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

BAHAN :

Meni kayu 0.167 kg 0 -

Plamir kayu 0.083 kg 0 -

Cat Kayu 0.2 kg 0 -

Ampelas 0.4 lbr 0 -

Minyak cat / Thinner 0.15 ltr 0 -

Kwas 0.05 bh 0 -

Jumlah Bahan -

UPAH :

Pekerja 0.2 org 500000 100,000.00

Tukang Cat 0.06 org 500000 30,000.00

Kepala Tukang cat 0.03 org 500000 15,000.00


Mandor 0.0100 org 0 -

Jumlah Pekerja 145,000.00

Jumlah Bahan + Pekerja 145,000.00

Jumlah 145,000.00

Dibulatkan 145,000.00

Page 227 of 254


Analisa Harga Satuan Furniture

ANALISA HARGA SATUAN FURNITURE

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
M-1 1 UNIT MEJA SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0500 m3 - -
Paku Ulir 12.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.0500 kg - -
Politur 0.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-3 1 UNIT MEJA BACA INDIVIDU
BAHAN :
Kayu Kelas II 0.0708 m3 - -
Paku Ulir 36.0000 bh - -
Amplas 3.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1500 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-4 1 UNIT MEJA BACA KELOMPOK
BAHAN :
Kayu Kelas II 0.0263 m3 - -
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-5 1 UNIT MEJA BACA SERBAGUNA
BAHAN :
Kayu Kelas II 0.0312 m3 - -
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-6 1 UNIT MEJA PIMPINAN
BAHAN :
Kayu Kelas II 0.1700 m3 - -
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 228 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
M-7 1 UNIT MEJA KERJA
BAHAN :
Kayu Kelas II 0.1200 m3 - -
Paku Ulir 20.0000 bh - -
Amplas 4.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.0500 kg - -
Politur 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-8 1 UNIT MEJA GURU
BAHAN :
Kayu Kelas II 0.0432 m3 - -
Paku Ulir 12.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.0500 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-10 1 UNIT MEJA SIRKULASI
BAHAN :
Kayu Kelas II 0.1800 m3 - -
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1000 kg - -
Politur 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-11 1 UNIT MEJA PERAGA / DEMONSTRASI
BAHAN :
Kayu Kelas II 0.1720 m3 - -
Knop Tarikan 3.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.2000 kg - -
Lem Kayu 0.1000 kg - -
Politur 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
M-12 1 UNIT MEJA KETIK
BAHAN :
Kayu Kelas II 0.0500 m3 - -
Knop Tarikan 1.0000 bh - -
Paku Ulir 24.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1500 kg - -
Politur 0.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 229 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
K-1 1 UNIT KURSI SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0200 m3 - -
Paku Ulir 25.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.0300 kg - -
Politur 0.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
K-2 1 UNIT KURSI BULAT TINGGI
BAHAN :
Kayu Kelas II 0.0027 m3 - -
Besi Pipa Galvanis 1/2" 4.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr - -
Dempul besi 0.0500 kg - -
Lem Kayu 0.0200 kg - -
Politur 0.1000 kg - -
Cat besi 0.2000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
K-3 1 UNIT KURSI BULAT PENDEK
BAHAN :
Kayu Kelas II 0.0027 m3 - -
Besi Pipa Galvanis 1/2" 3.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr - -
Dempul besi 0.0500 kg - -
Lem Kayu 0.0200 kg - -
Politur 0.1000 kg - -
Cat besi 0.2000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
K-5 1 UNIT KURSI KERJA
BAHAN :
Kayu Kelas II 0.0134 m3 - -
Paku Ulir 20.0000 bh - -
Amplas 2.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.0300 kg - -
Politur 0.2500 kg - -
Tripleks 4mm 0.5000 lbr - -
Karet Busa 1.0000 bh - -
Imitatie Lear 1.0000 unit - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 230 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-1 1 UNIT LEMARI BUKU
BAHAN :
Kayu Kelas II 0.1190 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 - -
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-2 1 UNIT LEMARI KACA GESER
BAHAN :
Kayu Kelas II 0.2176 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.7000 m2 - -
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-3 1 UNIT LEMARI ARSIP
BAHAN :
Kayu Kelas II 0.1800 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-4 1 UNIT LEMARI PEMBATAS
BAHAN :
Kayu Kelas II 0.1048 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Engsel Pita 4.0000 psg - -
Grendel 2.0000 bh - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00

Page 231 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-5 1 UNIT LEMARI ADMINISTRASI
BAHAN :
Kayu Kelas II 0.1190 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 - -
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-6 1 UNIT LEMARI ALAT PERAGA
BAHAN :
Kayu Kelas II 0.2925 m3 - -
Knop Tarikan 3.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 50.0000 bh - -
Besi dia 8 mm 15.0000 m1 - -
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-7 1 UNIT LEMARI OBAT
BAHAN :
Kayu Kelas II 0.2788 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.3200 m2 - -
Engsel Pita 4.0000 psg - -
Tripleks 4mm 0.5000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-10 1 UNIT LEMARI KERTAS KERJA
BAHAN :
Kayu Kelas II 0.2925 m3 - -
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 100.0000 bh - -
Besi dia 8 mm 15.0000 m1 - -
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00

Page 232 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 233 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-11 1 UNIT LEMARI KATALOK
BAHAN :
Kayu Kelas II 0.2925 m3 - -
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 80.0000 bh - -
Besi dia 8 mm 15.0000 m1 - -
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-12 1 UNIT LEMARI KARDEK
BAHAN :
Kayu Kelas II 0.1000 m3 - -
Knop Tarikan 8.0000 bh - -
Paku Ulir 25.0000 bh - -
sekrup 5 cm 25.0000 bh - -
Tripleks 4mm 0.5000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.0500 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-13 1 UNIT LEMARI KACA TINGGI
BAHAN :
Kayu Kelas II 0.2588 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.5300 m2 - -
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-14 1 UNIT LEMARI GANTUNG/P3K
BAHAN :
Kayu Kelas II 0.1075 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 0.4800 m2 - -
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 1.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 234 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-15 1 UNIT LEMARI KUNCI
BAHAN :
Kayu Kelas II 0.1075 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Sekrup Penggantung 12.0000 bh - -
Kaca 3mm 0.4800 m2 - -
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 1.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-16 1 UNIT LEMARI LOCKER
BAHAN :
Kayu Kelas II 0.1392 m3 - -
Knop Tarikan 12.0000 bh - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 24.0000 bh - -
Kunci Lemari 2.0000 bh - -
Engsel Pita 24.0000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-17/19 1 UNIT LEMARI PAKAIAN
BAHAN :
Kayu Kelas II 0.1800 m3 - -
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh - -
Tripleks 4mm 2.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
L-20 1 UNIT LEMARI ASAM
BAHAN :
Kayu Kelas II 0.1075 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Pipa PVC AW 4" 1.0000 m1 - -
Elbow PVC 4" 1.0000 bh - -
Engsel pita 4.0000 psg - -
Aluminium 1.0000 m2 - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00

Page 235 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Dibulatkan 500,000.00

Page 236 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
P-1 1 UNIT PAPAN TULIS GANTUNG
BAHAN :
Kayu Kelas II 0.0300 m3 - -
Paku Biasa 0.2500 kg - -
Amplas 2.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
P-4 1 UNIT WHITE BOARD GANTUNG/STANDAR
BAHAN :
Kayu Kelas II 0.0300 m3 - -
Paku Biasa 0.2500 kg - -
Amplas 2.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
P-6 1 UNIT PAPAN STATISTIK
BAHAN :
Kayu Kelas II 0.0300 m3 - -
Paku Biasa 0.2000 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
P-7 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0250 m3 - -
Paku Biasa 0.1500 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
P-8 1 UNIT PAPAN PAMERAN
BAHAN :
Kayu Kelas II 0.0300 m3 - -
Paku Biasa 0.2200 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 237 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
P-9 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0220 m3 - -
Paku Biasa 0.1300 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
P-10 1 UNIT PAPAN ABSENSI
BAHAN :
Kayu Kelas II 0.0230 m3 - -
Paku Biasa 0.1250 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Cat Minyak 1.0000 kg - -
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-1 1 UNIT RAK TAS DAN BUKU
BAHAN :
Kayu Kelas II 0.1256 m3 - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-2 1 UNIT RAK BUKU SATU MUKA
BAHAN :
Kayu Kelas II 0.1072 m3 - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-3 1 UNIT RAK BUKU DUA MUKA
BAHAN :
Kayu Kelas II 0.1504 m3 - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr - -
Amplas 2.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00

Page 238 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 239 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
R-4 1 UNIT RAK GUDANG
BAHAN :
Kayu Kelas II 0.1504 m3 - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 lbr - -
Tripleks 4mm 1.0000 lbr - -
Amplas 2.0000 kg - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-6 1 UNIT RAK MAJALAH
BAHAN :
Kayu Kelas II 0.0780 m3 - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1500 kg - -
Politur 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-7 1 UNIT RAK ATLAS
BAHAN :
Kayu Kelas II 0.1100 m3 - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1500 kg - -
Politur 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-8 1 UNIT RAK ENSIKLOPEDIA
BAHAN :
Kayu Kelas II 0.0273 m3 - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.7500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
R-9 1 UNIT RAK KORAN
BAHAN :
Kayu Kelas II 0.0528 m3 - -
Baut dia.10 cm 1.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.7500 kg - -
Cat besi 0.1500 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00

Page 240 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 241 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
R-10 1 UNIT RAK DORONG
BAHAN :
Kayu Kelas II 0.2176 m3 - -
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr - -
Amplas 3.0000 lbr - -
Dempul kayu 0.3000 kg - -
Lem Kayu 0.3000 kg - -
Politur 1.5000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
U-6 1 UNIT DIPAN DIPERIKSA
BAHAN :
Besi Pipa Galvanis dia. 1" 4.5000 m' - -
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr - -
Cat besi 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
U-7 1 UNIT DIPAN TIDUR TUNGGAL
BAHAN :
Kayu Kelas II 0.2176 m3 - -
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr - -
Cat Kayu 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
U-8 1 UNIT DIPAN TIDUR GANDA
BAHAN :
Kayu Kelas II 0.4352 m3 - -
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr - -
Cat Kayu 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 242 of 254


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
U-9 1 UNIT DIPAN TIDUR TINGKAT
BAHAN :
Kayu Kelas II 0.6000 m3 - -
Multiplex 12 mm 2.0000 lbr - -
Kasur Busa 2.0000 bh - -
Amplas 5.0000 lbr - -
Cat Kayu 2.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00
KS 1 UNIT KOTAK SAMPAH
BAHAN :
Kayu Kelas II 0.0300 m3 - -
Paku Biasa 0.1000 kg - -
Amplas 1.0000 lbr - -
Dempul kayu 0.1000 kg - -
Lem Kayu 0.1000 kg - -
Politur 0.3000 kg - -
Cat Kayu 1.0000 kg - -
Jumlah Bahan -
UPAH :
Tukang Kayu 1.0000 Oh 500,000.00 500,000.00
Jumlah Upah 500,000.00
Jumlah Bahan + Upah 500,000.00
Dibulatkan 500,000.00

Page 243 of 254


Harga Satuan Pekerjaan

HARGA SATUAN PEKERJAAN

KODE URAIAN JUMLAH

1 2 3

A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK 105,000.00


A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M 200,000.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M 263,000.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M 367,500.00
A.02.11 1 M3 URUGAN TANAH KEMBALI 96,000.00
A.02.12 1 M3 URUGAN TANAH DIPADATKAN 150,000.00
A.02.13 1 M3 URUGAN PASIR 150,000.00
A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR) 225,000.00
A.02.23 1 M2 PASANG GEBALAN RUMPUT 500,000.00
A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps 1,080,000.00
A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps 1,080,000.00
A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps 1,080,000.00
A.03.05 1 M3 PASANG PONDASI BATU KARANG MATI 1 Pc : 4 Ps 1,080,000.00
A.03.13 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KALI 604,500.00
A.03.13.a 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KARANG MATI 604,500.00
A.04.09 1 M2 PASANGAN DINDING BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps 215,000.00
A.04.10 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 2 Ps 215,000.00
A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps 215,000.00
A.04.12 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 4 Ps 215,000.00
A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM 260,000.00
A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM 260,000.00
A.05.36 1 M2 ACIAN DINDING 130,250.00
A.06.01 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II 12,000,000.00
A.06.02 1 UNIT PEK. KUSEN PINTU P1 (L=170 cm) + JALUZI 811,200.00
A.06.03 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm) + JALUZI 600,000.00
A.06.03a 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm), antar ruang kelas 492,000.00
A.06.04 1 UNIT PEK. KUSEN PINTU P3 (L=70 cm) 348,000.00
A.06.05 1 UNIT PEK. KUSEN PINTU P5 (L=100 cm) 612,000.00
A.06.06 1 UNIT PEK. KUSEN PINTU JENDELA PJ1/PJ1A + JALUZI 1,212,000.00
A.06.07 1 UNIT PEK. KUSEN PINTU JENDELA PJ2 + JALUZI 1,212,000.00
A.06.08 1 UNIT PEK. KUSEN PINTU JENDELA PJ3 + JALUZI 1,956,000.00
A.06.09 1 UNIT PEK. KUSEN JENDELA J2 + JALUZI 828,000.00
A.06.10 1 UNIT PEK. KUSEN JENDELA J3 + JALUZI 1,140,000.00
A.06.10a 1 UNIT PEK. KUSEN JENDELA J3a + JALUZI (KUSEN DEPAN RKB/RBL) 1,015,200.00
A.06.11 1 UNIT PEK. KUSEN JENDELA J4 + JALUZI 1,764,000.00
A.06.12 1 UNIT PEK. KUSEN JENDELA J 360,000.00
A.06.13 1 UNIT PEK. KUSEN BOUVENLICH BV1 288,000.00
A.06.14 1 UNIT PEK. KUSEN BOUVENLICH BV2 516,000.00
A.06.15 1 UNIT PEK. KUSEN BOUVENLICH BV3 732,000.00
A.06.16 1 UNIT PEK. KUSEN ANGIN-ANGIN LA-LB + JALUZI 408,000.00
A.06.17 1 M2 PEKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS II 1,875,000.00
A.06.18 1 BH PASANGAN DAUN PINTU PANIL 3,150,000.00
A.06.19 1 BH PASANGAN DAUN PINTU PANIL P5 3,543,750.00
A.06.20 1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II 1,400,000.00
A.06.21 1 BH PASANGAN DAUN PINTU TRIPLEKS P3 1,764,000.00
A.06.22 1 M2 PEKERJAAN DAUN JENDELA + KACA 1,500,000.00
A.06.23 1 BH PASANGAN DAUN JENDELA + KACA (PJ1 dan PJ2) 760,500.00
A.06.24 1 BH PASANGAN DAUN JENDELA + KACA PJ3 1,872,000.00
A.06.25 1 BH PASANGAN DAUN PINTU + KACA PJ3 2,520,000.00
A.06.26 1 BH PASANGAN DAUN JENDELA + KACA J2 760,500.00
A.06.27 1 BH PASANGAN DAUN JENDELA + KACA J3 887,250.00
A.06.27a 1 BH PASANGAN DAUN JENDELA + KACA J3a 709,800.00
A.06.28 1 BH PASANGAN DAUN JENDELA + KACA J4 1,872,000.00
A.06.29 1 BH PASANGAN DAUN JENDELA + KACA J5 1,207,500.00
A.06.30 1 BH PASANGAN DAUN JENDELA + KACA J6 897,000.00
A.06.31 1 UNIT PEK. KUSEN JENDELA J5 372,000.00
A.06.32 1 UNIT PEK. KUSEN JENDELA J6 588,000.00
A.06.32.a 1 M2 PASANG KACA TEBAL 5 MM 90,000.00
A.06.33 1 M1 PASANG KONSTRUKSI NOK BUBUNGAN 6/12 KAYU KLS II 207,500.00
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II 8,600,000.00

Page 244 of 254


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II 8,600,000.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II 8,600,000.00

Page 245 of 254


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II 105,000.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II 105,000.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II 207,500.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II 240,000.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II 176,000.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 52,500.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 962,500.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr 1,192,500.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 7,350.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI 293,000.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF 293,000.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM 331,500.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK 341,500.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI 341,500.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING 341,500.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.50 1 M3 MEMBUAT SLOOF 15/20 (274,22 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3 2,842,500.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting) 2,842,500.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm 6,136,110.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH 116,500.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm 93,000.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH 207,500.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL 207,500.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm 93,000.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm 93,000.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm 93,000.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm 46,500.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG 166,500.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM 166,500.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL 166,500.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH 166,500.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM 166,500.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 4 mm 105,000.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK 1,530,500.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 525,000.00
A.10.04 MEMASANG 1 BUAH URINOIR 1,000,000.00
A.10.05 MEMASANG 1 BUAH WASTAFEL 1,400,000.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 1,470,000.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 1,650,000.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM 2,108,250.00
A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM 970,000.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM 1,526,000.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" -
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" 76,500.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" 76,500.00
A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" 153,000.00
A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2" 153,000.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 153,000.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" 191,250.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" 51,000.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 51,000.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" 51,000.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" 51,000.00

Page 246 of 254


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" 76,500.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" 51,000.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 114,750.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 114,750.00
A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL 180,000.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 5,500.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN 5,500.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA 41,343,570.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN 36,000.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM 1,102,500.00
A.11.12 1 M2 PASANG TERALIS BESI 1,206,000.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28 287,500.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28 232,500.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28 212,500.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING 13,000.00
A.12.02 1 BUAH PASANG KUNCI TANAM BIASA 260,000.00
A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI 255,000.00
A.12.04 1 BUAH PASANG KUNCI BULAT 255,000.00
A.12.05 1 BUAH PASANG ENGSEL PINTU 65,000.00
A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 60,000.00
A.12.09 1 BUAH PASANG KAIT ANGIN 90,000.00
A.12.10 1 BUAH PASANG SLOOT TANAM 135,000.00
A.12.11 1 BUAH PASANG GRENDEL JENDELA 120,000.00
A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR 300,000.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle ) 285,000.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM 90,000.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU 36,560.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI 181,240.00
A.12.34a 1 M1 PEK.PAGAR BRC Ø 6 mm 100,370.00
A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 502,500.00
A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 502,500.00
A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 502,500.00
A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 502,500.00
A.13.47 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 502,500.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP 502,500.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH 585,000.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA 585,000.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA 547,500.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA 547,500.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 547,500.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, 372,500.00
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 368,750.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL 502,500.00
A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS 502,500.00
A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP 502,500.00
A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 502,500.00
A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, 547,500.00
A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) 387,500.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) 387,500.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 387,500.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) 387,500.00
A.14.12 1 M2 MENI KAYU 50,000.00
A.14.13 1 M2 MENI BESI 50,000.00
A.14.14 1 M2 PLAMUR TEMBOK 44,650.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) 121,500.00
A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 121,500.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 145,000.00
A.14.31 1 M2 PENGECATAN BESI (2X) 145,000.00
A. R 1 M2 PEK. ANTI RAYAP 5,000.00

Page 247 of 254


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4 210,000.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM 80,000.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM 80,000.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM 80,000.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM 80,000.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM 80,000.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 80,000.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting 80,000.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring 80,000.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY 400,000.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB 80,000.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA 985,000.00
A.01.P.01 1 BH TANAM POHON PELINDUNG 500,000.00
A.01.P.02 1 M2 PEMBUATAN TAMAN 500,000.00
A.01.P.03 1 BH PENANAMAN POHON HIAS 500,000.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP 647,130.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm 50,000.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10 50,000.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10 50,000.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik 50,000.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA 50,000.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT ### 771,250.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING 514,310.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU 50,000.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN 50,000.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT 50,000.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU 50,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI -

Page 248 of 254


PROGRAM BLOCK GRANT PEMBANGUNAN
UNIT SEKOLAH BARU SMP NEGERI
Dengan Mekanisme Partisipasi Masyarakat

Kode Sekolah :
Sekolah : 0.000
Desa : 0.000
Kecamatan : 0.000
Kabupaten : Kab. Kolaka
Propinsi : 0

Pekerjaan : Gedung Kantor

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 m' 105,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.69 m3 150,000 553,305.00
Total II 553,305.00
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m 2
5,000 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 50,000 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 50,000 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 6,136,110 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.37 m 3
604,500 4,456,011.30
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 35.37 m3 1,080,000 38,200,680.00
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 7.37 m3 604,500 4,456,011.30
9 Pas. Pondasi Batu Karang A.03.05 35.37 m3 1,080,000 38,200,680.00
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 btg 50,000 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m 3
962,500 -
Total III 85,313,382.60
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.09 m3 2,842,500 11,625,825.00
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 1.02 m3 2,842,500 2,910,720.00
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 3.60 m3 2,842,500 10,233,000.00
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.56 m3 2,842,500 1,591,800.00
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 2,842,500 1,432,620.00
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.50 1.68 m3 2,842,500 4,775,400.00
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48 1.21 m3 2,842,500 3,428,055.00
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.96 m3 2,842,500 5,576,985.00
9 Pek. Beton Plat Lantai Meja A.07.51 m3 2,842,500 -
10 Pek. Beton Canopy A.07.51 m3 2,842,500 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 2.57 m3 2,842,500 7,316,595.00
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 m3 50,000 -
Total IV 48,891,000.00
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 219.20 m2 215,000 47,128,215.00
2 Pas. Dinding Batubata 1:2 A.04.09 m2 215,000 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 215,000 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 215,000 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 260,000 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 438.40 m2 260,000 113,984,520.00
7 Pek. Acian Dinding 1: 2 A.05.36 m2 130,250 -
8 Pek. Acian Dinding 1 : 4 A.05.36 438.40 m2 130,250 57,101,860.50
Total V 218,214,595.50
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ1 / PJ1A kantor A.06.06 3.00 Unit 1,212,000 3,636,000.00
2 Kusen Pintu P2 kantor A.06.03 3.00 Unit 600,000 1,800,000.00
3 Kusen Pintu P3 kantor A.06.04 5.00 Unit 348,000 1,740,000.00
4 Kusen Jendela J3 kantor A.06.10 5.00 Unit 1,140,000 5,700,000.00
5 Daun Pintu PJ1 / PJ1A kantor A.06.18 3.00 Buah 3,150,000 9,450,000.00
6 Daun Jendela PJ1 / PJ1A kantor A.06.23 3.00 Buah 760,500 2,281,500.00
7 Daun Pintu P2 kantor A.06.18 3.00 Buah 3,150,000 9,450,000.00
8 Daun Pintu P3 kantor A.06.18 5.00 Buah 3,150,000 15,750,000.00
9 Daun Jendela J3 kantor A.06.27 10.00 Buah 887,250 8,872,500.00
10 BV1 kantor A.06.13 6.00 Buah 288,000 1,728,000.00
11 BV2 kantor A.06.14 1.00 Buah 516,000 516,000.00
12 Angin-Angin LA-LB kantor A.06.16 4.00 Buah 408,000 1,632,000.00
13 Kaca Mati kantor A.06.32.a 15.21 m2 90,000 1,368,900.00
1 Kusen Pintu P1 Kelas A.06.02 3.00 Unit 811,200 2,433,600.00
2 Kusen Jendela J3 Kelas A.06.10 15.00 Unit 1,140,000 17,100,000.00
3 Daun Pintu P1 Kelas A.06.18 6.00 Buah 3,150,000 18,900,000.00
4 Daun Jendela J3 Kelas A.06.27 30.00 Buah 887,250 26,617,500.00
5 Angin-Angin LA-LB Kelas A.06.16 4.00 Buah 408,000 1,632,000.00
6 Kaca Mati Kelas A.06.32.a 7.61 m2 90,000 684,450.00
1 Kusen Pintu P1 perpus A.06.02 1.00 Unit 811,200 811,200.00
2 Kusen Pintu P2 perpus A.06.03 3.00 Unit 600,000 1,800,000.00
3 Kusen Jendela J3 perpus A.06.10 5.00 Unit 1,140,000 5,700,000.00
4 Daun Pintu P1 perpus A.06.18 2.00 Buah 3,150,000 6,300,000.00
5 Daun Pintu P2 perpus A.06.18 3.00 Buah 3,150,000 9,450,000.00
6 Daun Jendela J3 perpus A.06.27 10.00 Buah 887,250 8,872,500.00
7 BV2 perpus A.06.14 1.00 Buah 516,000 516,000.00
8 BV3 perpus A.06.15 1.00 Buah 732,000 732,000.00
9 Angin-Angin LA-LB perpus A.06.16 4.00 Buah 408,000 1,632,000.00
10 Kaca Mati perpus A.06.32.a 2.54 m2 90,000 228,150.00
1 Kusen Pintu P1 lab bahasa A.06.02 1.00 Unit 811,200 811,200.00
2 Kusen Pintu P2 lab bahasa A.06.03 2.00 Unit 600,000 1,200,000.00
3 Kusen Jendela J lab bahasa A.06.12 2.00 Unit 360,000 720,000.00
4 Kusen Jendela J3 lab bahasa A.06.10 7.00 Unit 1,140,000 7,980,000.00
5 Daun Pintu P1 lab bahasa A.06.18 2.00 Buah 3,150,000 6,300,000.00
6 Daun Pintu P2 lab bahasa A.06.18 2.00 Buah 3,150,000 6,300,000.00
7 Daun Jendela J3 lab bahasa A.06.27 14.00 Buah 887,250 12,421,500.00
8 BV2 lab bahasa A.06.14 1.00 Buah 516,000 516,000.00
9 BV3 lab bahasa A.06.15 1.00 Buah 732,000 732,000.00
10 Angin-Angin LA-LB lab bahasa A.06.16 4.00 Buah 408,000 1,632,000.00
11 Kaca Mati lab bahasa A.06.32.a 4.68 m2 90,000 421,200.00
1 Kusen Pintu P1 lab ipa A.06.02 1.00 Unit 811,200 811,200.00
2 Kusen Pintu P2 lab ipa A.06.03 2.00 Unit 600,000 1,200,000.00
3 Kusen Jendela J3 lab ipa A.06.10 7.00 Unit 1,140,000 7,980,000.00
4 Daun Pintu P1 lab ipa A.06.18 2.00 Buah 3,150,000 6,300,000.00
5 Daun Pintu P2 lab ipa A.06.18 2.00 Buah 3,150,000 6,300,000.00
6 Daun Jendela J3 lab ipa A.06.27 14.00 Buah 887,250 12,421,500.00
7 BV2 lab ipa A.06.14 1.00 Buah 516,000 516,000.00
8 BV3 lab ipa A.06.15 1.00 Buah 732,000 732,000.00
9 Angin-Angin LA-LB lab ipa A.06.16 4.00 Buah 408,000 1,632,000.00
10 Kaca Mati lab ipa A.06.32.a 3.55 m2 90,000 319,410.00
Kusen & Daun Pintu P1 kesenian/ketrampilan -
Kusen & Daun Pintu P2 / P2A kesenian/ketrampilan -
Jendela J3 kesenian/ketrampilan -
BV2 kesenian/ketrampilan A.06.14 516,000 -
BV3 kesenian/ketrampilan A.06.15 732,000 -
LA-LB kesenian/ketrampilan A.06.16 408,000 -
Kusen & Daun Pintu Jendela PJ2 / PJ2A uks -
Jendela J3 uks -
LA-LB uks A.06.16 408,000 -
1 Kusen Pintu Jendela PJ3 / PJ3A mushola A.06.08 2.00 Unit 1,956,000 3,912,000.00
2 Kusen Jendela J4 mushola A.06.11 4.00 Unit 1,764,000 7,056,000.00
3 Daun Pintu PJ3 / PJ3A mushola A.06.25 4.00 Buah 2,520,000 10,080,000.00
4 Daun Jendela PJ3 / PJ3A mushola A.06.24 4.00 Buah 1,872,000 7,488,000.00
5 Daun Jendela J4 mushola A.06.28 8.00 Buah 1,872,000 14,976,000.00
6 Kaca Mati mushola A.06.32.a 27.39 m2 90,000 2,464,704.00
Kusen & Daun Pintu Jendela PJ2 / PJ2A Gudang Kantin Kop -
Jendela J3 Gudang Kantin Kop -
LA-LB Gudang Kantin Kop A.06.16 408,000 -
1 Kusen Pintu P2 kmwc A.06.03 4.00 Unit 600,000 2,400,000.00
2 Kusen Pintu P3 kmwc A.06.04 4.00 Unit 348,000 1,392,000.00
3 Kusen Pintu P5 kmwc A.06.05 1.00 Unit 612,000 612,000.00
4 Daun Pintu P2 kmwc A.06.18 4.00 Buah 3,150,000 12,600,000.00
5 Daun Pintu P3 kmwc A.06.18 4.00 Buah 3,150,000 12,600,000.00
6 Daun Pintu P5 kmwc A.06.19 1.00 Buah 3,543,750 3,543,750.00
7 BV1 kmwc A.06.13 2.00 Buah 288,000 576,000.00
8 BV2 kmwc A.06.14 2.00 Buah 516,000 1,032,000.00
9 0 kmwc A.06.15 - Buah 732,000 -
10 ### kmwc A.06.16 #REF! Buah 408,000 #REF!
Kusen & Daun Pintu Jendela PJ2A r.dinas kepsek -
Kusen & Daun Pintu P2 / P2A r.dinas kepsek -
Kusen & Daun Pintu P3 r.dinas kepsek -
Jendela J5 r.dinas kepsek -
Jendela J6 r.dinas kepsek -
BV1 r.dinas kepsek -
Kusen & Daun Pintu Jendela PJ2A r.dinas guru / mess guru -
Kusen & Daun Pintu P2 / P2A r.dinas guru / mess guru -
Kusen & Daun Pintu P3 r.dinas guru / mess guru -
LA-LB r.dinas guru / mess guru A.06.16 408,000 -
Jendela J5 r.penjaga -
BV1 r.penjaga -
Kusen & Daun Pintu P2 / P2A r.penjaga -
Kusen & Daun Pintu P3 r.penjaga -
Kusen & Daun Pintu Jendela PJ1 / PJ1A asrama -
Kusen & Daun Pintu P2 / P2A asrama -
Kusen & Daun Pintu P3 asrama -
Jendela J2 asrama -
BV1 asrama -
LA-LB asrama A.06.16 408,000 -
Total VI #REF!
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.62 m3 8,600,000 13,897,600.00
2 Pas. Balok Gapit 6/12 A.01.P.14 0.35 m3 50,000 17,600.00
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.21 m3 207,500 43,367.50
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.35 m3 8,600,000 3,010,000.00
5 Pek. Gording 5/10 kayu klas II A.06.36 2.03 m 3 8,600,000 17,458,000.00
6 Pek. Kaso 5/7 A.06.37 2.18 m3 105,000 228,585.00
7 Pek. Reng 3/4 A.06.38 1.22 m3 105,000 128,100.00
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.09 m3 207,500 18,052.50
9 Pek. List Plank 3/30 Papan Klas II A.06.50 83.00 m3 176,000 14,608,000.00
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.52 m 3
207,500 107,900.00
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 50,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.14 m3 207,500 29,050.00
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 Unit 50,000 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 367.69 lbr 93,000 34,194,984.00
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 lbr 93,000 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 lbr 93,000 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 bh 116,500 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 lbr 93,000 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 29.20 lbr 46,500 1,357,800.00
20 Pek. Nok Zyncalum 0,3mm A.08.14 lbr 46,500 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 207,500 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 207,500 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 46,500 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 166,500 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 bh 166,500 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 166,500 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 bh 166,500 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 166,500 -
29 Pek. Talang Jurai A.11.20 m¹ 212,500 -
30 Pek. Residu Kayu A.11.22 ltr 13,000 -
31 Pek. Rangka Atap Baja Ringan A.11.01 m2 36,000 -
Total VII 85,099,039.00
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 3.40 m3 240,000 816,960.00
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 300.70 m2 105,000 31,573,080.00
3 Pek. List Plafond 4/4 A.06.60 316.41 m' 52,500 16,611,682.50
Total VIII 49,001,722.50
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 m3 150,000 -
2 Pek. Urugan Pasir bawah lantai A.02.13 m3 150,000 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 962,500 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 502,500 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 502,500 -
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 502,500 -
7 Pek. Lantai keramik exterior 40x40 cm A.13.77 m2 502,500 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 372,500 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 547,500 -
10 Pek. Panggung : -
- Pasangan Bata A.04.11 m2 215,000 -
- Pasangan Batako A.04.12 m2 215,000 -
- Urugan Tanah A.02.11 m3 96,000 -
- Urugan Pasir A.02.13 m3 150,000 -
- Beton Lantai Kerja A.07.01 m3 962,500 -
- Pek. Kuku Keramik -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Plamur Tembok A.14.14 m2 44,650 -
2 Pek. Cat Dinding A.14.25 m2 121,500 -
3 Pek. Cat Plafond A.14.26 m2 121,500 -
4 Pek. Meni Kayu A.14.12 m2 50,000 -
5 Pek. Cat Kayu A.14.30 m2 145,000 -
6 Pek. Meni Besi A.14.13 m2 50,000 -
7 Pek. Cat Besi A.14.31 m2 145,000 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 55.52 m' 80,000 4,441,600.00
2 Pas. Instalasi Titik Lampu 2x1,5 NYM L. 01. 02 m' 80,000 -
3 Pas. Instalasi Titik Saklar Tunggal 2x1,5 NYM L. 01. 03 ttk 80,000 -
4 Pas. Instalasi Titik Saklar Double 3x1,5 NYM L. 01. 04 ttk 80,000 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 ttk 80,000 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 bh 80,000 -
7 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 bh 80,000 -
8 Pas. MCB + Box Sekring L. 01. 08 bh 80,000 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 m' 400,000 -
10 Pas. Panel Box Utama +MCB L. 01. 10 bh 80,000 -
Total XI 4,441,600.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 51,000 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 51,000 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 114,750 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 m' 114,750 -
5 Pas. Kran air 1/2" A.10.35 bh 5,500 -
6 Pas. Klosed Jongkok A.10.02 bh 525,000 -
7 Pas. Klosed Duduk A.10.01 bh 1,530,500 -
8 Pas. Jet Washer ls bh 60,000 -
9 Pas. Urinoir A.10.04 bh 1,000,000 -
10 Pas. Wastafel A.10.05 bh 1,400,000 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 bh 180,000 -
12 Pek. Floordrain A.10.36 bh 5,500 -
13 Pas. Grabbed Bar ls bh 600,000 -
14 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 bh 1,650,000 -
15 Pek. Septictank + Rembesan A.10.37 1.00 Unit 41,343,570 41,343,570.00
16 Pas. Kaca Muka ls bh 200,000 -
Total XII 41,343,570.00
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 bh 65,000 -
2 Pas. Engsel Pintu 3" (3bh/pintu) A.12.06 bh 60,000 -
3 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 bh 60,000 -
4 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 bh 90,000 -
5 Pas. Slot Tanam Pintu (2 bh/pintu) A.12.10 bh 135,000 -
6 Pas. Grendel Jendela model Spring Knob A.12.11 bh 120,000 -
7 Pas. Kunci Pintu 2 X Putar A.12.14 bh 285,000 -
8 Pas. Handel Pintu (2 bh/pintu) A.12.12 bh 300,000
9 Pas. Kunci Bulat Km/wc A.12.04 bh 255,000 -
10 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh 50,000 50,000.00
Total XIII 50,000.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 52.25 m' 210,000 10,973,130.00
2 Pek. Plesteran Saluran A.05.19 84.73 m2 260,000 22,029,800.00
3 Pek. Urugan Tanah dibawah Rabat Beton A.02.12 m3 150,000 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 215,000 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 215,000 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 6.16 m 3
962,500 5,933,331.25
7 Pek. Plank Nama Ruang ls 1.00 Set 200,000 200,000.00
Total XIV 39,136,261.25
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 200,000 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 96,000 -
3 Pek. Urugan Pasir A.02.13 m3 150,000.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 1,080,000 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 150,000.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 962,500.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 215,000.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 215,000.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 387,500.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 387,500.00 -
12 Pek. Pemasangan Hand Railing A.01.P.11 m' 514,310.00 -
Total XV -
Grand Total #REF!
CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Beton Kolom Praktis 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
Panjang 1 m3 ukuran 12 x 15 cm = 1 : 0,12 : 0,15 = 55.56 m1
Besi 4 batang dia. 10 = 4 x 55,56 x 0,62 kg = 152.66 kg ( A)
Besi beugel dia. 6 jarak 15 cm = ( 55,56 : 0,15 ) x ( 0,08+0,08+0,1+0,1+0,1) x 0, 22 kg = 37.48 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 15 CM1 DALAM 1 M3 = 190.14 kg/m3 ( A + B )

2. Beton Kolom Selasar 15 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 15 cm = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 10 = 4 x 44,44 x 0,62 kg = 122.62 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 44,44 : 0,15 ) x( ( 4 x 0,10 )+0,1) x 0, 40 kg = 59.26 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 181.88 kg/m3 ( A + B )

3. Beton Sloof Selasar 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 132.91 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,10 ) + ( 2 x 0,15 ) x 0, 40 kg = 53.33 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 = 186.24 kg/m3 ( A + B )

4. Beton Sloof Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,20 ) x 0, 40 kg = 42.67 kg ( B )

BERAT BESI BETON UNTUK 20 x 25 CM1 DALAM 1 M3 = 165.49 kg/m3 ( A + B )

5. Beton Kolom Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0.15 ) x (( 2 x 0.15 ) + ( 2 X 0,20 )) X 0,40 kg = 42.67 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 25 CM DALAM 1 M3 = 165.49 kg/m3 ( A + B + C )

6. Beton Balok Linetel 12 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 12 x 20 cm = ( 1 : 0.12 : 0.20 ) = 41.67 m1
Besi 4 batang dia. 10 = 4 x 41,67 x 0,62 kg = 115.73 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 41,67 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 62.22 kg ( C )
BERAT BESI BETON UNTUK UKURAN 12 x 20 CM DALAM 1 M3 = 177.96 kg/m3 ( A + B + C )

7. Beton Ring Balok 15 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 10 = 4 x 33,33 x 0,62 kg = 92.59 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0.15 ) x (( 2 x 0.1 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 53.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 15 x 20 CM DALAM 1 M3 = 145.92 kg/m3 ( A + B )

8. Beton Sofi-Sofi 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
Panjang 1 m3 ukuran 12 x 15 cm = ( 1 : 0.12 : 0.15 ) = 55.56 m1
Besi 4 batang dia. 10 = 4 x 55,56 x 0,62 kg = 152.66 kg ( A)
Besi beugel dia. 6 jarak 15 mm = ( 55,56 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,10 )+0,1) X 0,22 kg = 37.48 kg ( C )

BERAT BESI BETON UNTUK UKURAN 12 x 15 CM DALAM 1 M3 = 190.14 kg/m3 ( A + B )