Hume pipe Culvert 1200 mm dia Single Row.

MP PWD
S.No. SOR (B&R) Description of Item Unit Nos Length Width Depth Quantity Rate Amount
2017

Excavation for Structures (Earth work in excavation of


foundation of structures as per drawing and technical
specification, including setting out, construction of shoring
and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and backfilling with
1 12.1-A (i) Cum 2 6.7 1.5 1.5 30.15
approved material.)as per relevant clauses of section 300 & 66.00 3494.70
2100 in
B. Mechanical means
(ii) Depth up to 3 meter

(ii) Excavation for Hume Pipe 1200 Dia NP4 Laying Cum 1.00 12.00 1.90 1.00 22.8

PCC M-15 in Foundation- Plain cement concrete M-15 mix


with crushed stone aggregate 40 mm nominal size
2 9.1 mechanically mixed, placed in foundation and compacted by -
vibration including curing for 14 days. as per MORT&H
Specification 409.

For Abutment Bottom/ Head wall Cum 2 6.55 1.5 0.15 2.95
For Pipe Bedding Cum 1 13 1.9 0.15 3.71
Total : Cum 6.653 3,409.00 22,678.37
Providing concrete craddle bedding in M-15 grade concrete
3 9.6
as per clause 2900 and as per section 1700 and 2900.
For Encasing of Pipe Cum 1 13.40 1.9 1.8 45.83
Deduction for Pipe 1 15.15
Total : Cum 30.681 4,115.00 126,250.83
Providing and laying Plain/Reinforced cement concrete in
open foundation including form work shuttering etc.
4 12.8(B) complete as per drawing and technical specifications and as
per relevant clauses of sections 1500, 1700 & 2100 with .PCC
GRADE M20
For Head wall Cum 2 6.5 0.70 2.9 26.39
Deduction for pipe Cum 2 1.00 1.77 0.8 2.83
Total : Cum 23.564 5,025.00 118,409.10
MP PWD
S.No. SOR (B&R) Description of Item Unit Nos Length Width Depth Quantity Rate Amount
2017

Laying Reinforced Cement Concrete Pipe NP4/prestrssed


concrete pipe on first class bedding in single row.
Providing and Laying Reinforced cement concrete pipe
NP4/prestrssed concrete pipe for culverts on first class
5 9.2 bedding
of granular material (cost of bedding included) in single row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets

B 1200 mm dia Meter 1 15.00 15 7,713.00 115695.00


6 14.14 Painting two coats on new concrete surfaces 2.00 6.55 1.9 24.89

Paining two coats after filling the surface with synthetic Sq M 1 48.00 1425.888
2.00 6.55 0.40 0
enamel paint in all shades on new plastered concrete
surfaces
1 4.00 0.60 1.90 4.56
1 4.00 0.16 0.40 0.256

Providing and laying pitching on slopes laid over prepared


7 15.4 filter media including boulder apron laid dry in front of toe of Cum 4 5.00 3.00 0.20 12 2,033.00 24396
embarkment complete as per drawing and technical
specification.
Stone/Boulder
Total- 412,349.89
SAY 0.0412 Cr