DATE: 25.08.2016
No. of APRIL-16 (03) MAY-16 (4) JUNE-16 (5) JULY-16 (6) AUGUST-16 (7) SEPTEMBER-16 (8) OCTOBER-16 (9) NOVEMBER-16 (10) DECEMEBR-16 (11) JANUARY-17 (12) FEBRUARY-17 (13) MARCH-17 (14) APRIL-17(15) MAY-17(16) JUNE-17(17) Cumulative
LOI Length Actual
Circle Length Loc.
Sl. No. Name Of Line Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg
Office
Km. Km. Nos Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km.
L2 20 0 0 20 20 0 20 20 0 10 10 0 10 10 0 25 25 5 25 25 10 25 25 10 25 25 10 6 20 10 0 6 10 0 0 5 186 186 60
1 220 kv DC Fatehpur (PGCIL) 60 75 242 PLAN 10 25 0 10 0 8 10 14 10 27 30 8 31 30 8 17 20 8 35 20 6 34 50 17 35 52 17 30 11 242 242 75
765 -Sadh (Kanpur)
ACT 13 30 6 49 0 0
Kanpur
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
2 132 kv DC Sikandra 35 43.5 162 PLAN 10 15 19 15 10 10 10 25 25 8 25 20 8 18 17 6 34 20 6 30 40 10 30 5.5 162 162 43.5
Kanpur(220)- Umari
ACT 3 10 7 1 21 0 0
L2 10 0 0 20 20 0 20 20 0 5 5 0 5 5 0 25 20 10 24 20 10 0 19 10 0 0 5 109 109 35
3 220 kv DC Neebkarori - 35 35.36 121 PLAN 10 0 0 20 0 15 0 11 10 11 10 30 31 6 21 21 8 21 25 9 20 34 12.36 121 121 35.36
Bhagaon - Mainpuri(400) PGCIL
ACT 5 13 18 0 0
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
4 132 kv DC Sirsagnj(220)- Ubati 35 19.423 64 PLAN 10 10 10 4 0 0 5 0 0 7 15 0 6 15 5 25 19 10 0 15 4.423 64 64 19.423
Farrukhabad
ACT 8 11 2 1 5 22 5 0
L2 15 0 0 25 15 0 25 25 0 5 10 0 5 10 0 25 25 15 24 25 15 0 14 10 0 0 0 124 124 40
5 132 kv SC Neebkarori- 40 28.38 90 PLAN 15 10 15 7 7 0 7 7 0 14 7 0 15 15 8 20 21 10 12 20 10.38 90 90 28.38
Kayamganj on Tower
ACT 18 4 20 22 20 0
L2 15 0 0 25 15 0 25 25 0 10 10 0 10 10 0 30 30 10 30 30 10 30 30 10 27 30 10 0 22 10 0 0 10 0 0 5 202 202 65
6 132 kv SC Neebkarori- Kannuj 65 62.19 195 PLAN 15 15 13 6 5 0 6 5 0 8 5 0 8 5 0 10 10 0 15 5 0 25 18 8 25 25 10 25 25 12 30 35 10 35 35 10 0 20 12.19 195 195 62.19
on DC Tower
ACT 2 6 7 6 14 7 0
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
7 132 kv Hathras (220) - Biruni 35 30.72 102 PLAN 10 10 15 10 10 0 10 10 0 22 17 5 20 20 8 18 30 8 8 17 9.72 102 102 30.72
ACT 4 15 5 8 9 33 8 0
Aligarh
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 4 25 10 0 4 10 0 0 0 0 0 0 0 0 0 0 0 0 94 94 30
8 132 kv DC Boner(220)- 30 17.59 66 PLAN 10 10 15 8 5 0 8 5 0 12 13 0 12 15 5 17 16 5 0 15 7.59 66 66 17.59
Ibrahimpur
ACT 8 9 2 5 5 22 7 0
L2 12 15 10 5 5 5 5 7 10 10 4 5 5 4 44 44 14
Panwari
L2 15 25 10 25 15 10 15 10 5 30 5 10 26 25 15 31 17 6 141 106 48
12 132 kv Sadh (220)- Ghatampur 46 PLAN 15 15 0 0
ACT 0 0 0
L2
13 Unientified 220KV SC Line(To 25 PLAN
be alloted in future)
Unidentfed
ACT
L2
14 Unientified 220KV DC Line(To 50 PLAN
be alloted in future)
ACT
445 325.903 1092 L2 154 0 0 275 150 0 265 230 0 75 85 0 77 80 0 260 265 100 222 286 130 55 207 127 52 55 60 6 42 20 0 6 20 0 0 10 1441 1406 467
PLAN 132 0 0 148 0 0 129 47 13.42 76 65 2.97 73 59 0.2 145 143 27 138 141 50 146 158 56 124 146 56.473 89 108 35 60 107 32.5 25 55 23 1092 1092 325.912
TOTAL
ACT 11 0 0 80 0 0 111 42 10.77 25 43 2.779 24 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 251 97 13.549
Stock in Kanpur Store Stock in Farrukhabad Store Stock in Aligarh Store Stock in Panwari Store Store Security Details PKG-3
Stock As Stock As Stock As on Stock As DATE 25.08.2016
Qty. on Qty. Qty. on Qty. Qty. Qty. Qty. on
Sl No Material UOM Received Qty. Issued 25.08.2 Remarks Sl No Material UOM Receive Issued Remarks Sl No Material UOM Receive Issued Remarks Sl No Material UOM Received Issued 25.08.20 Remarks
d 25.08.2 d Gun
016 016 25.08.2016 16 Store Name Day Night man Total
1 Cement Bags 9849 7348 2501 585 bags additonal 1 Cement Bags 9085 6344 2741 1 Cement Bags 6600 4505 2095 1 Cement Bags 3161 2713 448 Kanpur Store 2 2 1 5
2 Steel 6mm full length MT 4.321 1.594 2.727 2 Steel 6mm full MT 2.82 1.445 1.375 2 Steel 6mm full MT 3.345 1.309 2.036 2 Steel 6mm full KGS 410.8 259.27 151.53 Farrukhabad Store 2 2 1 5
length length length
Steel 12mm full Steel 12mm full Steel 12mm full
3 Steel 12mm full length MT 4.506 3.544 0.962 215 kg scrap 3 length MT 7.415 4.968 2.447 3 length MT 7.2 2.745 4.455 3 length KGS 3692.8 1348.265 2344.535 Aligarh Store 2 2 1 5
4 Steel 16mm Full Length MT 8.16 0.33074 7.82926 4 Steel 16mm Full MT 9.151 0.661 8.49 4 Steel 16mm Full MT 8.133 1.174 6.959 .183kg was local purchase 4 Steel 16mm Full KGS 2787.409 2226.811 560.598 Panwari Store 3 2 5
Length Length Length
4 132kV DA Stub Set 30 30 0 4 132kV DA Stub Set 140 47 93 4 132kV DA Stub Set 69 59 10 1 Set Incomplete 4 132kV DA Stub Set 29 28 1 Labour Details of PKG-3
5 132kV DB Stub Set 23 5 18 5 132kV DB Stub Set 42 11 31 5 132kV DB Stub Set 23 7 16 5 132kV DB Stub Set 7 7 0 DATE 25.08.2016
6 132kV DC Stub Set 21 14 6 132kV DC Stub Set 37 5 32 6 132kV DC Stub Set 48 16 32 6 132kV DC Stub Set 11 11 0 Store Name Nos Remarks
7 220kV DA Stub Set 100 50 50 7 220kV DA Stub Set 100 14 86 7 220kV DA Stub Set 0 7 220kV DA Stub Set 0 Kanpur Store 11 As on 22.08.2016
8 220kV DB Stub Set 30 30 8 220kV DB Stub Set 20 2 18 8 220kV DB Stub Set 0 8 220kV DB Stub Set 0 Farrukhabad Store 15 As on 22.08.2016
9 220kV DC Stub Set 12 2 10 9 220kV DC Stub Set 12 2 10 9 220kV DC Stub Set 0 9 220kV DC Stub Set 0 Aligarh Store 7 As on 22.08.2016
10 132kV DA Template Set 6 4 2 10 132kV DA Template Set 10 4 6 10 132kV DA Template Set 5 5 0 10 132kV DA Template Set 2 1 1 1 pc sent to kanpur, 1 is available
11 132kV DB Template Set 5 5 11 132kV DB Template Set 6 6 11 132kV DB Template Set 1 1 0 11 132kV DB Template Set 1 0 1
12 132kV DC Template Set 5 5 12 132kV DC Template Set 6 1 5 12 132kV DC Template Set 3 1 2 12 132kV DC Template Set 2 0 2
13 220kV DA Template Set 14 4 10 13 220kV DA Template Set 6 0 6 13 220kV DA Template Set 0 13 220kV DA Template Set 0
14 220kV DB Template Set 4 4 14 220kV DB Template Set 2 0 2 14 220kV DB Template Set 0 14 220kV DB Template Set 0
15 220kV DC Template Set 6 1 5 15 220kV DC Template Set 3 0 3 15 220kV DC Template Set 0 15 220kV DC Template Set 0
16 Template Jack Nos 87 64 23 16 Template Jack Nos 64 32 32 16 Template Jack Nos 32 32 0 16 Template Jack Nos 24 8 16 8 sent to kanpur
Form Box 0 Form Box Form Box 0 Form Box 0 1 pc sent to kanpur
17 132kV DA Form Box Set 6 4 2 17 132kV DA Form Box Set 8 3 5 17 132kV DA Form Box Set 4 2 2 17 132kV DA Form Box Set 2 1 1 1 pc sent to kanpur, 1 is available
18 132kV DB Form Box Set 2 1 1 18 132kV DB Form Box Set 4 1 3 18 132kV DB Form Box Set 2 1 1 18 132kV DB Form Box Set 1 0 1
19 132kV DC Form Box Set 2 1 1 19 132kV DC Form Box Set 5 1 4 19 132kV DC Form Box Set 2 0.5 1.5 19 132kV DC Form Box Set 2 0 2
20 220kV DA Form Box Set 7 4 3 20 220kV DA Form Box Set 3 0 3 20 220kV DA Form Box Set 0 20 220kV DA Form Box Set 0
21 220kV DB Form Box Set 2 0 2 21 220kV DB Form Box Set 2 0 2 21 220kV DB Form Box Set 0 21 220kV DB Form Box Set 0
22 220kV DC Form Box Set 2 0.75 1.25 22 220kV DC Form Box Set 2 0 2 22 220kV DC Form Box Set 0 22 220kV DC Form Box Set 0
SKIPPER LIMITED
Survey Status UPPTCL-PKG-3 Details as on 25.08.2016
TOTAL 540.00 325.11 0.00 325.11 325.11 325.11 325.11 316.36 209.879
M/S Skipper Ltd, Kolkata
TD-400/15 (Package-3) Foundation Contractor detail as on 25.08.2016
S.No Contractor Region Name Of Line Mobile Number Location No No of Gangs Remarks
6 Md asif Farukhabad 0 0
Left Site due to increase in
Bhagaon Mainpuri 9917078495
price of aggregates
7 Dev Associates Farukhabad Neebhkarori-Kannauj 9984363727 6/1 1 Template Setting
TOTAL 7
M/S Skipper Ltd, Kolkata
TD-400/15 (Package-3) Erection Contractor detail as on 25.08.2016
S.No Contractor Region Name Of Line Mobile Numbers Location No No of Gangs Remarks
TOTAL 2
SKIPPER LIMITED
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016
10 Suresh Mahato Supervisor Panwari (Solar Plant) 9466713152 Leave due to malaria
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016
14 Hemant Kr Barman Asst. Store Keeper Aligarh (PKG-3) 7170927910 Store Work
32 Mr. Akkaraju Satsh Chandra Asst. Manager Panwari (Solar Plant) 7080813531 Monitoring in Panwari section
33 Sudhir Singh Surveyor Panwari (Solar Plant) 7755076910 Went to Kanpur office
34 Rameswar Singh Sr. Surveyor Panwari (Solar Plant) 8400900213 Went to Kanpur office
35 Mr. Shilawant Kumar Singh Supervisor Panwari (Solar Plant) 7839290410 Line Checking
36 Mr. Lal Mohan Sahani Supervisor Panwari (Solar Plant) 9559954357 Earthibg in Loc 1, 1A,1B,1C
37 Niraj Kumar Store Keeper Panwari (Solar Plant) 9897532954 Store Work
38 Mr.Pursotham Burnawal Supervisor Panwari (Solar Plant) 8353963140 Went to Kanpur office