No. of APRIL-16 (03) MAY-16 (4) JUNE-16 (5) JULY-16 (6) AUGUST-16 (7) SEPTEMBER-16 (8) OCTOBER-16 (9) NOVEMBER-16 (10) DECEMEBR-16 (11) JANUARY-17 (12) FEBRUARY-17 (13) MARCH-17 (14) APRIL-17(15) MAY-17(16) JUNE-17(17) Cumulative
LOI Length Actual
Circle Length Loc.
Sl. No. Name Of Line Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg Fdn TE Strg
Office
Km. Km. Nos Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km. Nos. Nos. Km.

L2 20 0 0 20 20 0 20 20 0 10 10 0 10 10 0 25 25 5 25 25 10 25 25 10 25 25 10 6 20 10 0 6 10 0 0 5 186 186 60
1 220 kv DC Fatehpur (PGCIL) 60 75 242 PLAN 10 25 0 10 0 8 10 14 10 27 30 8 31 30 8 17 20 8 35 20 6 34 50 17 35 52 17 30 11 242 242 75
765 -Sadh (Kanpur)
ACT 13 30 6 49 0 0

Kanpur
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
2 132 kv DC Sikandra 35 43.5 162 PLAN 10 15 19 15 10 10 10 25 25 8 25 20 8 18 17 6 34 20 6 30 40 10 30 5.5 162 162 43.5
Kanpur(220)- Umari
ACT 3 10 7 1 21 0 0
L2 10 0 0 20 20 0 20 20 0 5 5 0 5 5 0 25 20 10 24 20 10 0 19 10 0 0 5 109 109 35
3 220 kv DC Neebkarori - 35 35.36 121 PLAN 10 0 0 20 0 15 0 11 10 11 10 30 31 6 21 21 8 21 25 9 20 34 12.36 121 121 35.36
Bhagaon - Mainpuri(400) PGCIL
ACT 5 13 18 0 0
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
4 132 kv DC Sirsagnj(220)- Ubati 35 19.423 64 PLAN 10 10 10 4 0 0 5 0 0 7 15 0 6 15 5 25 19 10 0 15 4.423 64 64 19.423
Farrukhabad

ACT 8 11 2 1 5 22 5 0
L2 15 0 0 25 15 0 25 25 0 5 10 0 5 10 0 25 25 15 24 25 15 0 14 10 0 0 0 124 124 40
5 132 kv SC Neebkarori- 40 28.38 90 PLAN 15 10 15 7 7 0 7 7 0 14 7 0 15 15 8 20 21 10 12 20 10.38 90 90 28.38
Kayamganj on Tower
ACT 18 4 20 22 20 0
L2 15 0 0 25 15 0 25 25 0 10 10 0 10 10 0 30 30 10 30 30 10 30 30 10 27 30 10 0 22 10 0 0 10 0 0 5 202 202 65
6 132 kv SC Neebkarori- Kannuj 65 62.19 195 PLAN 15 15 13 6 5 0 6 5 0 8 5 0 8 5 0 10 10 0 15 5 0 25 18 8 25 25 10 25 25 12 30 35 10 35 35 10 0 20 12.19 195 195 62.19
on DC Tower
ACT 2 6 7 6 14 7 0
L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 18 25 10 0 18 10 0 0 5 0 0 0 0 0 0 0 0 0 108 108 35
7 132 kv Hathras (220) - Biruni 35 30.72 102 PLAN 10 10 15 10 10 0 10 10 0 22 17 5 20 20 8 18 30 8 8 17 9.72 102 102 30.72
ACT 4 15 5 8 9 33 8 0
Aligarh

L2 10 0 0 25 10 0 25 20 0 5 5 0 5 5 0 20 25 10 4 25 10 0 4 10 0 0 0 0 0 0 0 0 0 0 0 0 94 94 30
8 132 kv DC Boner(220)- 30 17.59 66 PLAN 10 10 15 8 5 0 8 5 0 12 13 0 12 15 5 17 16 5 0 15 7.59 66 66 17.59
Ibrahimpur
ACT 8 9 2 5 5 22 7 0
L2 12 15 10 5 5 5 5 7 10 10 4 5 5 4 44 44 14
Panwari

9 132KV SC Universal (Solar 14 13.74 50 PLAN 33 17 47 13.42 7 8 2.97 2 2 0.2 50 50 13.749


Plant) – Panwari Line
ACT 11 19 13 42 10.77 5 6 2.779 2 2 50 50 13.549
L2 20 30 15 30 25 5 5 5 5 30 35 10 35 40 15 30 15 10 155 155 50
HOLD

10 220 kv DC Unnao(400)- 50 PLAN 20 20 0 0


Phoolbagh(Kanpur)
ACT 0 0 0
L2 7 15 5 15 15 5 5 5 5 15 15 17 10 10 62 62 20
11 Lilo of 132 kv Naubasta- Baidki 20 PLAN 7 7 0 0
at Sadh
ACT 0 0 0
Cancel

L2 15 25 10 25 15 10 15 10 5 30 5 10 26 25 15 31 17 6 141 106 48
12 132 kv Sadh (220)- Ghatampur 46 PLAN 15 15 0 0
ACT 0 0 0
L2
13 Unientified 220KV SC Line(To 25 PLAN
be alloted in future)
Unidentfed

ACT
L2
14 Unientified 220KV DC Line(To 50 PLAN
be alloted in future)
ACT
445 325.903 1092 L2 154 0 0 275 150 0 265 230 0 75 85 0 77 80 0 260 265 100 222 286 130 55 207 127 52 55 60 6 42 20 0 6 20 0 0 10 1441 1406 467
PLAN 132 0 0 148 0 0 129 47 13.42 76 65 2.97 73 59 0.2 145 143 27 138 141 50 146 158 56 124 146 56.473 89 108 35 60 107 32.5 25 55 23 1092 1092 325.912
TOTAL
ACT 11 0 0 80 0 0 111 42 10.77 25 43 2.779 24 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 251 97 13.549

Stock in Kanpur Store Stock in Farrukhabad Store Stock in Aligarh Store Stock in Panwari Store Store Security Details PKG-3
Stock As Stock As Stock As on Stock As DATE 25.08.2016
Qty. on Qty. Qty. on Qty. Qty. Qty. Qty. on
Sl No Material UOM Received Qty. Issued 25.08.2 Remarks Sl No Material UOM Receive Issued Remarks Sl No Material UOM Receive Issued Remarks Sl No Material UOM Received Issued 25.08.20 Remarks
d 25.08.2 d Gun
016 016 25.08.2016 16 Store Name Day Night man Total

1 Cement Bags 9849 7348 2501 585 bags additonal 1 Cement Bags 9085 6344 2741 1 Cement Bags 6600 4505 2095 1 Cement Bags 3161 2713 448 Kanpur Store 2 2 1 5

2 Steel 6mm full length MT 4.321 1.594 2.727 2 Steel 6mm full MT 2.82 1.445 1.375 2 Steel 6mm full MT 3.345 1.309 2.036 2 Steel 6mm full KGS 410.8 259.27 151.53 Farrukhabad Store 2 2 1 5
length length length
Steel 12mm full Steel 12mm full Steel 12mm full
3 Steel 12mm full length MT 4.506 3.544 0.962 215 kg scrap 3 length MT 7.415 4.968 2.447 3 length MT 7.2 2.745 4.455 3 length KGS 3692.8 1348.265 2344.535 Aligarh Store 2 2 1 5

4 Steel 16mm Full Length MT 8.16 0.33074 7.82926 4 Steel 16mm Full MT 9.151 0.661 8.49 4 Steel 16mm Full MT 8.133 1.174 6.959 .183kg was local purchase 4 Steel 16mm Full KGS 2787.409 2226.811 560.598 Panwari Store 3 2 5
Length Length Length

STUB 0 STUB STUB 0 STUB 0

4 132kV DA Stub Set 30 30 0 4 132kV DA Stub Set 140 47 93 4 132kV DA Stub Set 69 59 10 1 Set Incomplete 4 132kV DA Stub Set 29 28 1 Labour Details of PKG-3

5 132kV DB Stub Set 23 5 18 5 132kV DB Stub Set 42 11 31 5 132kV DB Stub Set 23 7 16 5 132kV DB Stub Set 7 7 0 DATE 25.08.2016

6 132kV DC Stub Set 21 14 6 132kV DC Stub Set 37 5 32 6 132kV DC Stub Set 48 16 32 6 132kV DC Stub Set 11 11 0 Store Name Nos Remarks

7 220kV DA Stub Set 100 50 50 7 220kV DA Stub Set 100 14 86 7 220kV DA Stub Set 0 7 220kV DA Stub Set 0 Kanpur Store 11 As on 22.08.2016

8 220kV DB Stub Set 30 30 8 220kV DB Stub Set 20 2 18 8 220kV DB Stub Set 0 8 220kV DB Stub Set 0 Farrukhabad Store 15 As on 22.08.2016

9 220kV DC Stub Set 12 2 10 9 220kV DC Stub Set 12 2 10 9 220kV DC Stub Set 0 9 220kV DC Stub Set 0 Aligarh Store 7 As on 22.08.2016

Template 0 Template Template 0 Template 0 1 pc sent to kanpur Panwari Store 0 As on 22.08.2016

10 132kV DA Template Set 6 4 2 10 132kV DA Template Set 10 4 6 10 132kV DA Template Set 5 5 0 10 132kV DA Template Set 2 1 1 1 pc sent to kanpur, 1 is available

11 132kV DB Template Set 5 5 11 132kV DB Template Set 6 6 11 132kV DB Template Set 1 1 0 11 132kV DB Template Set 1 0 1

12 132kV DC Template Set 5 5 12 132kV DC Template Set 6 1 5 12 132kV DC Template Set 3 1 2 12 132kV DC Template Set 2 0 2

13 220kV DA Template Set 14 4 10 13 220kV DA Template Set 6 0 6 13 220kV DA Template Set 0 13 220kV DA Template Set 0

14 220kV DB Template Set 4 4 14 220kV DB Template Set 2 0 2 14 220kV DB Template Set 0 14 220kV DB Template Set 0

15 220kV DC Template Set 6 1 5 15 220kV DC Template Set 3 0 3 15 220kV DC Template Set 0 15 220kV DC Template Set 0

16 Template Jack Nos 87 64 23 16 Template Jack Nos 64 32 32 16 Template Jack Nos 32 32 0 16 Template Jack Nos 24 8 16 8 sent to kanpur

Form Box 0 Form Box Form Box 0 Form Box 0 1 pc sent to kanpur

17 132kV DA Form Box Set 6 4 2 17 132kV DA Form Box Set 8 3 5 17 132kV DA Form Box Set 4 2 2 17 132kV DA Form Box Set 2 1 1 1 pc sent to kanpur, 1 is available

18 132kV DB Form Box Set 2 1 1 18 132kV DB Form Box Set 4 1 3 18 132kV DB Form Box Set 2 1 1 18 132kV DB Form Box Set 1 0 1

19 132kV DC Form Box Set 2 1 1 19 132kV DC Form Box Set 5 1 4 19 132kV DC Form Box Set 2 0.5 1.5 19 132kV DC Form Box Set 2 0 2

20 220kV DA Form Box Set 7 4 3 20 220kV DA Form Box Set 3 0 3 20 220kV DA Form Box Set 0 20 220kV DA Form Box Set 0

21 220kV DB Form Box Set 2 0 2 21 220kV DB Form Box Set 2 0 2 21 220kV DB Form Box Set 0 21 220kV DB Form Box Set 0

22 220kV DC Form Box Set 2 0.75 1.25 22 220kV DC Form Box Set 2 0 2 22 220kV DC Form Box Set 0 22 220kV DC Form Box Set 0
SKIPPER LIMITED
Survey Status UPPTCL-PKG-3 Details as on 25.08.2016

Details Survey Check Survey


SL.NO LINE LOI As Per LOI Route Allignment Route Allignment Details Survey Details Survey
LINE NAME Store Actual Length CON. Name Completed Til Completed till Remarks
. NO. length Submitted Approval Submited Til date Approved Til date
date date

220 kv DC Neebkarori - Bhagaon - Route Allignment approval done And Detail


1 1 Farukkabad 35 35.36 35.36 35.36 35.36 35.36 35.36 29.718
Mainpuri(400) PGCIL Survey In completed
132 kv SC Neebkarori- Kayamganj on
2 2 Farukkabad 40 28.38 28.38 28.38 28.38 28.38 28.38 28.38 Check Survey AP 13- Ap 15
Tower
132 kv SC Neebkarori- Kannuj on DC Precision Route Allignment approval done And Detail
3 3 Farukkabad 65 62.19 62.19 62.19 62.19 62.19 62.20 26.02
Tower Survey Survey Completed
Consultancy
Route Allignment approval done And Detail
4 8 132 kv Hathras (220) - Biruni Aligarh 35 30.50 30.50 30.50 30.50 30.50 30.50 29.83
Survey approved,
Route Allignment approval done And Detail
5 11 132 kv DC Boner(220)- Ibrahimpur Aligarh 30 17.59 17.59 17.59 17.59 17.59 17.59 17.59 Survey approved,Check survey donr AP17
to AP18
Route Allignment Approved And Detail
6 9 132 kv DC Sikandra Kanpur(220)- Umari Kanpur 35 43.50 43.50 43.50 43.50 43.50 34.73 22.789
Survey under progress
Route Allignment approval done And Detail
7 10 132 kv DC Sirsagnj(220)- Ubati Farukkabad 35 19.42 19.42 19.42 19.42 19.42 19.42 19.42 Survey Approved. Check Survey
Completed
220 kv DC Unnao(400)-
8 4 50 Gupta 0.00 Hold
Phoolbagh(Kanpur)
Enterprises
220 kv DC Fatehpur (PGCIL) 765 -Sadh
9 5 Kanpur 60 74.747 74.75 74.747 74.75 74.75 74.75 22.702 AP 60- AP 61
(Kanpur)

10 6 Lilo of 132 kv Naubasta- Baidki at Sadh 20 0.00 0.00 Cancel

11 7 132 kv Sadh (220)- Ghatampur 46 0.00 0.00 Cancel

132KV SC Universal (Solar Plant) – Route Allignment approved And Detail


12 14 Panwari 14 13.42 D Mukharjee 13.42 13.42 13.42 13.42 13.42 13.42
Panwari Line Survey Approved
Unientified 220KV SC Line(To be alloted
13 12 25
in future)
Unientified 220KV DC Line(To be alloted
14 13 50
in future)

TOTAL 540.00 325.11 0.00 325.11 325.11 325.11 325.11 316.36 209.879
M/S Skipper Ltd, Kolkata
TD-400/15 (Package-3) Foundation Contractor detail as on 25.08.2016

S.No Contractor Region Name Of Line Mobile Number Location No No of Gangs Remarks

1 Yogendra Singh Kanpur Fatehpur Sadh 9721480737 48 A/0 1 Excavaton Started

2 Om jay Jay Kanpur Fatehpur Sadh 9453670241 0 0 Locaton to be Identfed

3 Gayatri Solution Kanpur 0 0


Stopped Due to Increase in
Sikandra Umari 9784775567
Price of Sand

4 Jai Shree Construction Kanpur 0 0


Stopped Due to Increase in
Sikandra Umari 9198989662
Price of Sand

5 Vivek Singh Construction Farukhabad Neenkarori - Kayamgunj 8/1 1 Excavaton Started

6 Md asif Farukhabad 0 0
Left Site due to increase in
Bhagaon Mainpuri 9917078495
price of aggregates
7 Dev Associates Farukhabad Neebhkarori-Kannauj 9984363727 6/1 1 Template Setting

8 Mahadev Construction Farukhabad Sirsaganj-Ubat 9410461394 39 1 Material Shifting

9 Superior Structure Aligarh Hathras-Biruni 9561488275 22/10 1 Template Setting


10 Superior Structure Aligarh Hathras-Biruni 9561488275 22/9 1 Template Setting
11 Devi Singh Aligarh Boner Ibrahimpur
7055342376 21/0 1 Template Setting
12 Ram Kishor Aligarh Boner Ibrahimpur

TOTAL 7
M/S Skipper Ltd, Kolkata
TD-400/15 (Package-3) Erection Contractor detail as on 25.08.2016

S.No Contractor Region Name Of Line Mobile Numbers Location No No of Gangs Remarks

1 Rakesh Kumar Roshan Kanpur 0 1


Shall Commence after
Fatehpur Sadh 7458912873
completon of JVR

2 Mithilesh Kumar Farukhabad Neebhkarori-kayamgunj 0 0


Has left site temporarily.
9801575964
Will Join after intmaton

3 Tridev Construction Farukhabad Neebhkarori-Kannauj 9199273811 0 1 Transfer to Farukhabad

4 Tiwari Construction Aligarh 0


Left Site Due to Labour
Boner Ibrahimpur 9650569502
Problems
5

TOTAL 2
SKIPPER LIMITED
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016

Sl No. Name Designation Location Contact no. 10.08.16


1 CHARAN SINGH Dy.General Manager Kanpur (PKG-3) 7318552785 Official work
2 Lalit Sharma
3 Sunil Kumar yadav Asst. manager Kanpur (PKG-3) 8874172927 Tour to Hathras
4 Anupam Chakraborty Asst. manager Kanpur (PKG-3) 9903390476 Official work

5 Manas maity Project Accountant Aligarh (PKG-3) 8972767483 Official work

6 Mukul Rajan Storekeeper Aligarh (PKG-3) 9568723044


Store Work

Erecton complate of Loc No.


16/1, meet to Land Owner
regarding EREcton ROW of Loc
7 Satya prakash mishra Engineer Aligarh (PKG-3) 8171826289 No. 19/2, 19/3 & 20/1, meet
to SE of Boner for collecton of
Crop compensaton Cheque.

Locaton fxed of 5/0 and 4/0


9126174138 of 132 Kv D/c Boner
8 Jibitesh Das Asst. Surveyor Aligarh (PKG-3) Ibrahimpur. Slow progress due
to rain

Erecton complate of Loc No.


16/1, meet to Land Owner
regarding EREcton ROW of Loc
9 Praveen kumar singh Supervisor Aligarh (PKG-3) 9455556302 No. 19/2, 19/3 & 20/1, meet
to SE of Boner for collecton of
Crop compensaton Cheque.

10 Suresh Mahato Supervisor Panwari (Solar Plant) 9466713152 Leave due to malaria
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016

Sl No. Name Designation Location Contact no. 10.08.16

11 Mr. Dinesh Gope Supervisor Aligarh (PKG-3) 9997370485 Leave

12 Mr. Surya Karan Singh Asst. Store Aligarh (PKG-3) 9670324515


Store Work

Excavaton of Loc No. 19/0 132


13 Mr. Amit Chandra Engineer Aligarh (PKG-3) 9641433644 kv d/c hathras to biruni. No
custng due to rain

14 Hemant Kr Barman Asst. Store Keeper Aligarh (PKG-3) 7170927910 Store Work

Went to Kanpur Office


15 Mr. Chanchal Sarkar Asst Surveyor Aligarh (PKG-3) 8445094749 regarding collecton of DGM
signature and SAG Template

Excavaton of Loc No. 19/0 132


16 Mr. Kalaiyasaran Engineer Aligarh (PKG-3) 9629403016 kv d/c hathras to biruni.
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016

Sl No. Name Designation Location Contact no. 10.08.16

Locaton fxed of 5/0 and 4/0


8968004139 of 132 Kv D/c Boner
17 Mr. Lokenath Mahato Supervisor Aligarh (PKG-3) Ibrahimpur. Slow progress due
to rain

Foundaton of Loc No. 19/0 of


18 Pawan Kumar Yadav Supervisor Aligarh (PKG-3) 9503293518 132 Kv D/c Boner to
Ibrahimpur.

Locaton fxed of 5/0 and 4/0


of 132 Kv D/c Boner
19 Suku Tudu Surveyor Aligarh (PKG-3) 8116359010 Ibrahimpur. Slow progress due
to rain

ROW Loc No.6/5,6/6 at


20 NIRAJ KUMAR Engineer Farrukhabad (PKG-3) 9430857500 Kannauj Line

21 SOUMYA MANNA Surveyor Farrukhabad (PKG-3) 9839711881


On Leave

8420455685 UPPTCL for Work


Form38 & Office
22 Mr. Nimmana somasekha Project Accountant Farrukhabad (PKG-3)

Kayamganj Line 8/1,8/2


23 Mr.Soumen Maity Asst. Surveyor Farrukhabad (PKG-3) 8948448635 Mispeg, Kannauj Line 6/2,6/5
Pit Marking

9781414522 Foundaton 6/3 at Kannauj Line


24 Mr. Ranjit Singh Supervisor Farrukhabad (PKG-3)
WIP

25 Prasann Kumar Mullick Storekeeper Farrukhabad (PKG-3) 9849181870


Store Work
Kayamganj Line 8/1,8/2
26 Mr. Ankush Pandey Supervisor Farrukhabad (PKG-3) 8808334191 Mispeg, Kannauj Line 6/2,6/5
Pit Marking
UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016

Sl No. Name Designation Location Contact no. 10.08.16

ROW solving loc no.


27 Mr. tanay Chal Asst. Surveyor Farrukhabad (PKG-3) 8101815130 18/3,19/1 & 19/2

28 Subhas chandra Bose Store ASST. Farrukhabad (PKG-3) 918006321 On Leave


Kayamganj Line 8/1,8/2
29 Kailash Mahato Supervisor Farrukhabad (PKG-3) 9565602427 Mispeg, Kannauj Line 6/2,6/5
Pit Marking

30 Mr. Dharmendra Chauhan Site Officer Kanpur (PKG-3)


UPPTCL for Discussion
31 Lakshmipada Ghosh Supervisor Farrukhabad (PKG-3) 7724020730 New Joinee

32 Mr. Akkaraju Satsh Chandra Asst. Manager Panwari (Solar Plant) 7080813531 Monitoring in Panwari section

33 Sudhir Singh Surveyor Panwari (Solar Plant) 7755076910 Went to Kanpur office

34 Rameswar Singh Sr. Surveyor Panwari (Solar Plant) 8400900213 Went to Kanpur office

35 Mr. Shilawant Kumar Singh Supervisor Panwari (Solar Plant) 7839290410 Line Checking

36 Mr. Lal Mohan Sahani Supervisor Panwari (Solar Plant) 9559954357 Earthibg in Loc 1, 1A,1B,1C
37 Niraj Kumar Store Keeper Panwari (Solar Plant) 9897532954 Store Work
38 Mr.Pursotham Burnawal Supervisor Panwari (Solar Plant) 8353963140 Went to Kanpur office

39 Mr. Alak Samanta Engineer Fatehpur(PKG-3) 7602070120 Store Work

Visit to Sikandra for


40 Mr. Kamlesh Singh Sr. Engineer sikandra (PKG-3) 7055301843 confirming casting material
rate

41 Mr. SoumyaKanta Das Surveyor sikandra (PKG-3) 9559274043 Leave


UPPTCL PROJECT PKG-03-132KV/220KV TRANSMISSION LINES
Manpower Tracking on Daily Basis Date:25.08.2016

Sl No. Name Designation Location Contact no. 10.08.16

9018908103 Check Survey Loc 21/0 to


42 Mr. Tapas Mondal Surveyor sikandra (PKG-3) 23/0

43 Mr. Girija Shankar Supervisor Fatehpur(PKG-3) 8009468925 Leave


44 Mr. Vimlesh Shrivastava ROW Executive Fatehpur(PKG-3) 9305593108 official work
45 Mr. Ravi Ranjan Asst. Store Fatehpur(PKG-3) 9696841440 Store Work
46 Mr. Chandan Singh Sr. Store Keeper Fatehpur(PKG-3) 8092316597 Store Work

ROW solving loc no.


47 Mr. Dipesh Das Sr. Engineer Sirsaganj(PKG-3) 8981624918
18/3,19/1 & 19/2

48 Mr. Saheb Pakrey Surveyor Sirsaganj(PKG-3) 9732986688 Leave