Perform function test of Line thrower.

Perform Maintenance Procedure after each use and General maintenance according to Line thrower
user manual.

Check that the following equipment is present together with the PLT launching unit

- 4 standard projectiles/R230 Projectile (single use projectile)

- 1 heavy duty projectile/150 projectile (reusable projectile)

- 1 pick-up grapple, to be used for line pick up from the sea

- 1 line box containing 100 m of a 5 mm line with minimum break load of 1900 kg.