You are on page 1of 18
SCADA — Monitoring & Controlling of Sub-Stations “STANDARD OPERATING PROCEDURE SOP No. [_NiW/OPS/STN/SCA/SOP/O1S6/00_— Revision No! 90 Last Review/Revision Date! ‘Implementation Date: 2 , : (Sahil Bhasat (Adana 23 [1/0 Mumbai Monorail Engineering Grolier Name ‘Binal Bhattacharya Designation: | > ‘COO ‘Approved By: [is signature _|\ eS | © SCADA — Operation & Monitoring of Sub-stations 4. PURPOSE The purpose of this. SOP is:te-explain the procedures involved inthe handling of ASS & TSS from OCC through SCADA. 2. SCOPE This procedure is applicable to the Engineering Controller. 3. PRE-REQUISITES: NIL 4, RESPONSIBILITIES A. Handover of the charge after the completion of shift; B. Charging ON & OFF of 750VDC; C. Switching the load to other supply & reporting to maintenance team of uneven tripping in ASS or TSS; SOP No. / Revision: MM/OPS/STW/SCA/SOP/0156/00 < Page 1/17 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations 5, PROCEDURES ‘A. Handover of the charge after the completion of shift; > Take a note of work permits issued during the previous shift. Make a note of the on-going work permits and when they have to be cancelled. The list should also contain the phone numbers of the persons whom the permit is issued. > Note the failures occurred during the period. List according in two 1, Unattended, 2. Attended but still under surveillance. a > Check that every circuit breaker in ASS and TSS is in ON condition except for those under maintenance or failed. > Check for the Depot isolators. B. Charging ON & OFF of 750VDC; NOTE : Refer to ring main diagram and sectioning diagram. (i) Charging ON; >For charging ON sectors it should be ensured thet traction transformer from each 2 substation are charged. List of transformers to be in charged position: Wadala TSS: TTR-41(VCB 223 ON) & TTR-42(VCB 224 ON). Mysore TSS: TTR-51(VCB 229 ON) & TTR-52(VCB 230 ON). Fertilizer TSS: TTR-61(VCB 235 ON) & TTR-62(VCB 236 ON). In case of maintenance the required transformer is in OFF position, then the charging of rectifier can be done by the other transformer which is in charged position. >Switch ON the rectifier HSCB (preferably in order 41, 51, 61 or 42,52,62) of which transformer is charged. SOP No. / Revision: MM/OPS/STN/SCAYSOP/01S6/00 7 aera Scomi SCADA ~ Monitoring & Controlling of Sub-Stations Wadala TSS : HSCB-41 or HSCB -42. Mysore TSS : HSCB -51 or HSCB -52. Fertilizer TSS : HSCB -61 or HSCB -62. > NORTH SIDE DEPOT : CLOSE HSCB DP 2(Wadala TSS) > SOUTH SIDE DEPOT : CLOSE HSCB DP 3(Wadala TSS) > DEPOT MAINTENANCE AREA : CLOSE HSCB DP 1(Wadala TSS) > SECTOR 1: Wadala TSS : CLOSE HSCB 403 & HSCB 404, Mysore TSS : CLOSE HSCB501 & HSCB 502. > SECTOR 2: Mysore TSS : CLOSE HSCB 503 & HSCB 504, Fertilizer TSS : CLOSE HSCB 601 & HSCB-602. > SECTOR 3: Fertilizer TSS : CLOSE HSCB 603 & HSCB 604. > SECTOR 4: Wadala TSS : CLOSE HSCB 401 & HSCB-402, > AARU of all the three TSS must be Ci after turningion the main line feeders NOTE : Always ensure that the earthing. panel Voltage is +375 & -375. This voltage should be equal on both positive and negetive'side and should preferably be within tolerable limits upto +400 & -400 DC. (ii) Charging OFF; >For charging OFF sectors > NORTH SIDE DEPOT: OPEN HSCB DP 2(Wadala TSS) > SOUTH SIDE DEPOT: OPEN HSCB DP 3(Wadala TSS) ‘SOP No. / Revision: MM/OPS/STN/SCA/SOP/0155/00 5 eens © Scomi SCADA ~ Monitoring & Controlling of Sub-Stations > DEPOT MAINTENANCE AREA: OPEN HSCB DP 1(Wadala TSS) > SECTOR 1: Wadala TSS: OPEN HSCB 403 & HSCB 404 PEN HSCB 501 & HSCB 502. > SECTOR 2: Mysore TSS: OPEN HSCB 503 & HSCB 504 Fertilizer TSS: OPEN HSCB 601 & HSCB 602. > SECTOR 3: Fertilizer TSS: OPEN HSCB 603 & HSCB 604. > SECTOR 4: Wadala TSS: OPEN HSCB 401 & HSCB 402. >Switch OFF the rectifier HSCB (preferably in order 41, 51, 61 or 42, 52, 62) whichever was closed. Wadala TSS: OPEN HSCB-41 or HSCB -42. Mysore TSS: OPEN HSCB -51 or HSCB -52. Fertilizer TSS: OPEN HSCB -61 or HSCB -62. €. Uneven tripping in ASS or TSS; ‘As both the rings will remain in charged condition, both the transformers of ASS and TSS will remain charged. >Tripping of the transformer VCB or MDB ACB will occur due to two kind of nature of faults; >CASE 1: Sudden transients occur either on LV side or on HV side. >CASE 2: Permanent fault. In ASS: >LV side (MDB): SOP No. / Revision: MM/OPS/STN/SCA/SOP/0156/00 = pase 4/17 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations -If fault is of type CASE 1 then ACB charging the bus will tripand automatically ACB of other ring will charge. Bus coupler will always remain in closed position. -If this automatic operation does not occur then the ACB should not be turned ON. Maintenance team must be informed to clear the fault and resume the supply. -if the bus coupler has tripped then the maintenance team must be informed to resume the supply. -In case both the transformers fail then DG.will turn ON: Check if the indication of DG Supply ON has come. >HV side (VCB): -If the fault is of type CASE 4 then the Transformer VCB will trip and the load on LV side will get shifted to the other ring transformer. -If both the transformer got tripped then the maintenance team must be informed. NOTE - In case of any tripping, even if the-system has resumed the maintenance team must be informed. In TSS: CASE 1: Main line feeder will trip CASE 2: Traction transformer VCB\will trip. CASE 3: Failure-of the main ringand simultaneously failure of the other ring transformer >In CASE I there is an auto re-closure-setting.in which HSCB will turn on if sudden transient occurs; Ifthe transient persiste-then the HSCB will not close. Maintenance team has to be informed for resuming the-supply. >In CASE 2 to restore the supply from other charged transformer should be used under the guidance of maintenance-team. >While closing the HSCB check for the:Wegative Disconnector is also closed. if not closed then OPEN HSCB and again CLOSE it. Ifagain the Negative Disconnector is in OPEN state, then OPEN HSCB-and inform the maintenance team about the event. >in CASE 3; SOP No. / Revision: MMyOPS/STN/SCA/SOF/0156/00 mi Page 5/17 Sco SCADA ~ Monitoring & Controlling of Sub-Stations Wadala TSS; TTR 41 has failed and fault occurred in Ring 2 VCB 228 in MYC feeding WAD at VCB 226 has tripped. VCB 225 is ON, switch OFF VCB 224, switch ON TBX-4 to charge the BUS B on which TTR 42 is tapped out. Switch ON TTR 42 (VCB 224). >TTR 42 has failed and fault occurred in Ring 1 VCB 227 in MYC feeding WAD at VCB 225 has tripped. VCB 226 is ON, switch OFF VCB 223, switch ON TBX-4 to charge the BUS A on which TTR 41 is tapped out. Switch ON TTR 41 (VCB 223). Mysore TSS; >TTR 51 has failed and fault occurred in Ring 2 VCB T-4 have tripped in MYC ASS feeding MYC TSS VCB 204. VCB 203 is ON, switch OFF VCB TBX-5 to charge the BUS A on which TTR 52 is tapped out. Switch ON TTR 52(VCB 229). >TTR 52 has failed and fault occurred in Ring 1 VCB T-3 have tripped in MYC ASS feeding MYC TSS VCB 203. VCB 204 is ON, switch OFF VCB TBX-5 to charge the BUS B on which TTR 51 is tapped out. Switch ON TTR 54(VCB 230). Fertilizer TSS; >TTR 61 has failed and fault occurred in Ring 2 VCB 232 have tripped in MYC TSS feeding FET TSS VCB 234, VCB 233 is ON, switch OFF VCB TBX-6 to charge the BUS B on which TTR 62 is tapped out. Switch ON TTR 62(VCB 236). >TTR 62 has failed and fault occurred in Ring 1 VCB 231 have tripped in MYC TSS feeding FET TSS VCB 233. VCB 234 is ON, switch OFF VCB TBX-6 to charge the BUS A on which TTR 61 is tapped out. Switch ON TTR 61(VCB 229). The failure of power supply in ASS will be due to following reasons; Case A. Transformer failure; Case B, Ring Main 1 or Ring Main 2 failures; Case C. Fault on LV side; SOP No. / Revision: MM/OPS/STN/SCAYSOP/0156/00 s Page 6/7 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations Case D. Failure of the Main Ring and simultaneously failure of other Ring transformer of ASS; Case E. Failure of both the transformers or both the MOB tripped; The above mentioned cases are taken for each Station ASS. 1. CHEMBUR ASS; Case A; If transformer TR-35 trips due to fault on HV-side then the load on LV side will shift from 552 ACB automatically to 554 ACB'as TR-36 is kept charged. Bus coupler ACB is in close position. The shifting and'stabilizing of load will take around 30 to 40 Seconds. If transformer TR-36 trips due to-fault on HV’side them the load on LV side will shi from 554 ACB to 552 ACB automatically-as TR-35 is kept charged. Bus coupler ACE is in close position: Case B; VCB 403 will trip if there is fault inmtransformer TR-35-or there is @ fault in the Bus Section which will cause loss.of supply in TR-35.and the: load will automatically transfer to TR-36. VCB 404 will trip if there is fault intransformer TR-36 or there is a fault in Bus Section which will cause loss of supply in TR-36. and the load will automatically transfer to TR-35. Case C; If MDB ACB 552 trips due to transient on Bus Athen ACB 554 will close, but in case of fault in bus section 1 or 2 of MOB: no-ACBAwill close-unless fault has been rectified, In such a Situation on reflection on SACADA the Engineering controller has to immediately inform the Power supply maintenance team to rectify the fault. If MDB ACB 554 trips due to transient on Bus B then ACB will 552 will close, but in case of fault in-bus sections of MDB no ACB will close.unless fault has been rectified. In such a Situation on reflection on SACADA the Engineering controller has to immediately inform the Power supply maintenance team to rectify the fault. SOP No. / Revisi cinereus ; ae © Scomi SCADA ~ Monitoring & Controlling of Sub-Stations Case D; if ring! fails i.e. fault has occurred anywhere between Mysore Colony and Chembur ring 1 and transformer TR-36 of ring 2 fails, then the supply has to extended from ring 2 to ring 1. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB 404 is in Close position and is receiving 22kV supply and VCB 403 Open position. {i) Close VCB 408, {ii)Close VcB 407, (iil) Close VCB 405, TR-35 will charged. Note: Before closing VCB 408 and 407 Engineering control to ensure that 403 is in Open position. If ring 2 fails and transformer TR-35 of ring 1 fails, then the supply has to extend from ring 1 to ring 2. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB 403 is in Close position and is receiving 22kV supply and VCB 404 Open position. {i) Close VCB 407, (ii)Close VCB 408, (iii) Close VCB 406, TR-36 will charged. Note: Before closing VCB 408 and 407 Engineering control to ensure that 404 is in Open position. Case E; If both the transformers (TR-35, VCB 405 & TR-36, VCB 406) or ACBs(ACB 552 & ACB 554) of MDB(incomer 1 and incomer 2) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-B will turn off and then the DG will start automatically and feed the essential loads of Chembur station. ‘As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored. Note :If DG ON is reflected on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply. If DG ON is not reflected upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. SO? ho, Revisor: HNGRSEWSCASOR ASSO ¢ page 6/17 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations 2. VP & RC MARG ASS; Case A; if transformer TR-33 trips due to fault on HY side then the load on LV side will shift from 549 ACB to 551 ACB as TR-34 is kept charged. If transformer TR-34 trips due to fault on HV side then the load on LV side will shift from 551 ACB to 549 ACB as TR-33 is kept charged. If ring 1 fails then VCB 397 willtrip on fault between VNP & RC Marg ASS and Chembur ASS or wil lose supply if faultoccur in other section that will cause loss of supply in TR-33; so:the load will automatically transfer to TR-34. If ring 2 fails ther’ VCB 398 will trip. on fault. between VNP & RC Marg ASS and Chembur ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-34, so the load will automatically transfer to TR-33. Case C; If MDB ACB 549 trips due-to transient-on Bus A then ACB will 554 will close, but in case of fault inany bus then no.ACB will close unless fault has been resolved. If MDB ACB'55i trips due-to transient on bus.B'then ACB will 549 will close; but in case of fault inmany-bus then no ACB will close unless fault has been resolved. In such a Situation or reflection on SCADA the Engineering controller has to. immediately inform the Power supply maintenance:team to rectify the-feult: Case D; Ifring 1 fails ie. fault has occurred anywhere between Mysore Colony and VNP & RC Marg and transformer TR-34 of ring 2 fails, then the supply has to extended from ring 2 to ring 1. The procedure for extending the supply.is as follows from chembur to NP RC Marg via ring.2; INITIAL CONDITION: VCB-404 is in Close position and is receiving 22kV supply and VCB 397 Open position. (i) Close vcs 408, (ii) Close VCB 407, (iii) Close Ves 403, (iv) Close VcB 401, (v) Close VB 399, TR-33 will be charged. SOP No. / Revision: mm/ors/stI/SCA/SOP/0156/00 . ons Scomi SCADA — Monitoring & Controlling of Sub-Stations If ring 2 fails and transformer TR-33 of ring 1 fails, then the supply has to extend from ring 1 to ring 2. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB 403 is in Close position and is receiving 22kV supply and VCB 398 Open position. (i) Close cB 407, ) Close VCB 408, (iii) Close VB 404, (iv) Close vB 402, (v) Close VCB 400, TR-34 will charged. Case E; if both the transformers(TR-35, VCB 405 & TR-36, VCB 406) or ACBs(ACB 552 & ACB 554) of MDB(incomer 1 and incomer 2) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-B will turn off and then the DG will start automatically. ‘As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored. Note : If DG ON is reflected on SCADA Engineering controller is to inform the maintenance team about failure of the (Main Supply. If DG ON is not reflected upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. 3, FERTILIZER ASS; Case A; if transformer TR-31 trips due to fault on HV side then the load on LV side will shift from 546 ACB to 548 ACB of MDB as TR-32 is kept charged. If transformer TR-32 trips due to fault on HV side then the load on LV side will shift from 548 ACB to 546 ACB as TR-31 is kept charged. Case B; If Ring 1 fails then VCB 391 will trip on fault between Fertilizer ASS and VNP & RC ‘Marg ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-31, so the load will automatically transfer to TR-32. If ring 2 fails then VCB 392 will trip on fault between Fertilizer ASS and VNP & RC Marg ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-32, so the load will automatically transfer to TR-31. SOP No. / Revision: MMY/OPS/STN/SCA/SOP/0156/00 + age 10/17 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations Case C; if MDB ACB 546 trips due to transient on Bus A then ACB will 548 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. If MDB ACB 548 trips due to transient on bus B then ACB will 546 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. In such a Situation on reflection on SCADA the Engineering controller has to immediately inform the Power supply maintenance team to rectify the fault. Case D; If Ring 7 fails i.e. faulthas occurred anywhere between Mysore Colony and Fertilizer and transformer TR-32 of Ring 2 fails, then the supply has to extended from Ring 2 to Ring 1. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB'404is in Close position andisreceiving 22kV supply and VCB 391 Open position. (i) Close vee 408, (if) Close ves 407, (iii) Close VCB 403, (iv) Close VCR 401, (v) Close VB 397, (vi) Close VCR 395, (vii) Close VCB 393, TR-31.will charged. If Ring 2 fails and:transformer TR-31 of ring 1 fails, then the supply has to extend from ring 1 to ring 2. The procedure-for extending the supply is as follows; INITIAL CONDITION: VCB:403:is in Close position andis.receiving 22kV supply and VCB 392 Open position. (i) Close vee 407, (ii) Close VCB 408, (iil) Close ves 404, (iv) Close VeB 402, (v) Close VCB 398, (vi) Close VCB 396, (vii) Close VCB 394, TR-32 will charged. Case E; If both the transformers(TR-35, VCB 405 & TR-36, VCB 406) or ACBs(ACB 552 & ACB 554) MDB(incomer 1 and incomer 2) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-B will turn off and then the DG will start automatically. SOP No. / Revision: M¥/OPS/STN/SCA/SOP/0156/00 + rer @Scomi SCADA - Monitoring & Controlling of Sub-Stations ‘As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored. Note : If DG ON is reflected on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply. If DG ON is not reflected upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. 3. BPCL ASS; Case A; If transformer TR-29 trips due to fault on HV side then the load on LV side will shift from 543 ACB to 545 ACB as TR-30 is kept charged. If transformer TR-30 trips due to fault on HV side then the load on LV side will shift from 545 ACB to 543 ACB as TR-29 is kept charged. Case B; If Ring 1 fails then VCB 385 will trip on fault between BPCL ASS and Fertilizer ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-29, so the load will automatically transfer to TR-30. If Ring 2 fails then VCB 386 will trip on fault between BPCL ASS and Fertilizer ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-30, so the load will automatically transfer to TR-25. Case C; If MDB ACB 543 trips due to transient on Bus A then ACB will 545 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. If MDB ACB 545 trips due to transient on bus B then ACB will 543 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. In such a Situation on reflection on SCADA the Engineering controller has to immediately inform the Power supply maintenance team to rectify the fault. Case D; if Ring 1 fails ie. fault has occurred anywhere between Mysore Colony and BPCL and transformer TR-30 of Ring 2 fails, then the supply has to extended from Ring 2 to Ring 1. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB 404 is in Close position and is receiving 22kV supply and VCB 385 Open position. {i) Close VCB 408, (ii) Close VcB 407, (iii) Close VcB 403, ‘SOP No. / Revision: MM/OPS/STN/SCA’SOP/0156/00 7 age 12 /17 Scomi SCADA ~ Monitoring & Controtling of Sub-Stations (iv) Close VCB 401, (v) Close vce 397, {vi) Close VCB 395, (vii) Close VCB 391, (viii) Close VcB 389, (ix) Close VCB 387, TR-29 will charged. If Ring 2 fails and transformer TR-29 of ring 1 fails, thenthe supply has to extend from Ring 1 to Ring 2. The procedure for extending the supply is as follows; INITIAL CONDITION: VCB 403-is in Close position and is receiving 22kV supply and VCB 386 Open position. (i) Close ves 407, (ii) Close veB 408, (iii) Close vep-404;, {iv) Close veB.402, {v} Close VCB 398, (vi) Close VCB 396, (vii) Close VB 392, (viii) Close VCB 390, (ix) Close VCB 388, TR-32 will charged Case E; If both the transformers(TR-35, VCB-405 & TR-36, VEB-406) or ACBs(incomer, ACB 552 & incomer2, ACB 554) of MDB{incomer 1 and incomer 2) are tripped then the supply will notbe aveilableon- MDB; Both EPP-A and!EPP-B'will turn off and then the DG will start automatically. As soonas the supply comes on-any.one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored Note : If DG-ON. is reflected-on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply: If DG.ON is not reflected upon failure of both the: Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. 4, Mysore Colony. ASS; Case A; If transformer TR-27 trips due to fault on HV side then the load on LV side will shift from 540.ACB to 542 ACB as TR-28 is kept charged. f transformer TR-28 trips due to fault on HV side then the load on LV side will shift from 542 ACB to 540 ACB as TR-27 is kept charged. SOP No. / Revision: smyorsistwySCNSOP/0156/00 @ Scomi Page 13/17 SCADA ~ Monitoring & Controlling of Sub-Stations Case B; In Mysore Colony ASS their will not be effect if ring fails as the transformers are directly connected to the Main Bus of Switching station which is fed by main TATA incomers 303 and 304. Case C; If MDB ACB 540 trips due to transient on Bus A then ACB will 542 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. If MDB ACB 542 trips due to transient on bus B then ACB will 540 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. In such a Situation on reflection on SCADA the Engineering controller has to immediately inform the Power supply maintenance team to rectify the fault. Case D; In Mysore Colony ASS their will not be effect if ring fails as the transformers are directly connected to Bus which is feed by main TATA incomers 303 and 304. Case E; If both the transformers(TR-35, VCB 405 & TR-36, VCB 406) or ACBs(incomer1, ACB 552 & incomer2, ACB 554) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-B will turn off and then the DG will start automatically. ‘As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored. Note : If DG ON is reflected on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply. If DG ON is not reflected upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. 5. Bhakti Park ASS; Case A; If transformer TR-25 trips due to fault on HV side then the load on LV side will shift from 537 ACB to 539 ACB as TR-26 is kept charged. If transformer TR-26 trips due to fault on HV side then the load on LV side will shift from 539 ACB to 537 ACB as TR-25 is kept charged. Case B; SOP No. / Revision: MM/OPS/STN/SCA/SOP/0156/00 5 Page 1417 Scomi SCADA ~ Monitoring & Controlling of Sub-Stations If Ring 2 fails then VCB 379 will trip if fault is between Mysore Colony ASS and Bhakti Park ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-29, so the load will automatically transfer to TR-30. If Ring 2 fails then VCB 380 will trip if fault is between Mysore Colony ASS and Bhakti Park ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-26, so the load will automatically transfer to TR-25. Case CG; if MDB ACB 537 trips due to transient on Bus.A then ACB\will 539 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved, If MDB ACB 539 trips due to transient on bus B then ACB will 537 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. Case D; Maintenance teem has to informed. Case E; {f both the transformers(TR-35, VEB-405 & TR-36, VCB 406) or ACBs(incomer1, ACB 552 & incomer2, ACB 554) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-6 will turn off'and then the DG willstart automatically. As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON-and supply will be restored. Note : If DG ON is reflected'on SCADA Engineering controller is to inform the maintenance team sbout failure of the iviain Supply. If DG ON is not reflected upon failure of both the Main supplies the alarnvs criticatim nature and engineering controller should inform anielert the maintenance team to resolve the fault. 6. Wadala Station ASS; Case A; If transformer TR-21 trips due to fault on HY side thenthe load on LV side will shift rom 531. ACB to'533 ACB as TR-22 is kept charged: Bus'coupler ACB is in close position. If transformer TR+22 trips due to fault on HV side then the load on LV side will shift from 533 ACB to $31 ACB as TR-21 is kept charged. Bus coupler ACB is in close position, Case B; ‘SOP No. / Revision: t4/oPs/STIYSCA’SO?/0156/00 + toes Scomi SCADA ~ Monitoring & Controlling of Sub-Stations If Ring 1 fails then VCB 373 will trip if fault is between Bhakti Park ASS and Wadala Station ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-21, so the load will automatically transfer to TR-22. If Ring 2 fails then VCB 374 will trip if fault is between Bhakti Park ASS and Wadala Station ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-22, so the load will automatically transfer to TR-21. case CG; IF MDB ACB 531 trips due to transient on Bus A then ACB will 533 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. If MDB ACB 533 trips due to transient on Bus B then ACB will 531 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. Case D; Maintenance team has to informed. Case E; if both the transformers(TR-35, VCB 405 & TR-36, VCB 406) or MDB ACBs(incomer1, ‘ACB 552 & incomer2, ACB 554) are tripped then the supply will not be available on MOB. Both EPP-A and EPP-B will turn off and then the DG will start automatically. ‘As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer will turn ON and supply will be restored. Note : ff 1G ON is reflected on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply. If DG ON is not reflected upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. 6. Wadala Depot ASS; Case A; If transformer TR-23 trips due to fault on HV side then the load on LV side will shift from 534 ACB to 536 ACB as TR-24 is kept charged. Bus coupler ACB is in close position. if transformer TR-24 trips due to fault on HV side then the load on LV side will shift from 536 ACB to 534 ACB as TR-23 is kept charged. Bus coupler ACB is in close position. SOP No. / Revision: mMjOPS/STA/SCASOP/O1S5/00 comi Page 16 /17 S SCADA ~ Monitoring & Controlling of Sub-Stations Case B; If Ring 1 fails-then VCB-367 will trip if fault is-between Wadala Depot ASS and Wadala Station ASS or will lose supply if fault occur in other section that will cause loss of supply int TR-23, so:the load will automatically transfer to TR-24. If Ring 2 fails then VCB 368 will trip if fault is between Wadala Depot ASS and Wadala ‘Station ASS or will lose supply if fault occur in other section that will cause loss of supply in TR-24, so the load will automatically transfer to TR-23. CaseC; If MDB ACB 53%:trips due to transient'on Bus A then-ACB-will 536 will close, but in case of fault in any bus then no ACB will close unless fault has been resolved. if MD® ACB 536 trips due to transient on Bus B then ACB will 534 will close, but in case-of fault in any bus then no ACB will close unless fault has been resolved. Case; if both the transformers(TR-35, VCB 405 & TR-36, VCB 406) or MDB ACBs(incomer 1, ACB 552 & incomer2, ACB 554) are tripped then the supply will not be available on MDB. Both EPP-A and EPP-B will turn off and then the DG will start automatically. As soon as the supply comes on any one of the incomer, DG will turn OFF automatically and then incomer willturn ON and supply will be restored. Note : IFDG ON js reflected on SCADA Engineering controller is to inform the maintenance team about failure of the Main Supply. If DG ON is not reflected.upon failure of both the Main supplies the alarm is critical in nature and engineering controller should inform and alert the maintenance team to resolve the fault. NOTE: The main feeder af Mysore colony 303 is turned:OFF or has a fault then the ring 1 is required to be charged’, which can be charged by closing the BX-2(Bus Coupler) to charge the ring. if main feeder of Mysore colony 304 is turned OFF or has fault then the ring 1 is required to be charged by closing the BX-2(Bus Coupler) to charge the ring. 10. / Revision: mm/OPs/STW/SCA/SOP/0156/00 - ois @Scomi

You might also like