FABRICATION MATERIALS

PT PMRC PART & DESCRIPTION N.S. (INS) QTY WEIGHT


NO.
1 PAATFPZBEEX4A3G Pipe, ASME B36.10M, BE, ASTM 4 9038MM 145.32
A106-B, Seamless, S-40

2 FLALDCERFZZ4A3G WN Flg., ASME B16.5, CL 150, 4 5 0.00


RFFE, ASTM A105, S-40
z
y x END-CONNECTION-PIPELINE TOTAL FABRICATION WEIGHT 145.32
PL-6900-00107
E 6724060
N 5071911 PIPE SUPPORTS
EL 107757

PT PMRC PART & DESCRIPTION N.S. (INS) QTY


NO.
3 SS1-A-300-CS Pipe Support 4 3
SPOOL1
5
4 G1-B Pipe Support 4 1

SPINDLE DIRECTION UP
20
95 ERECTION MATERIALS
PT COMPONENT DESCRIPTION N.S. (INS) QTY WEIGHT PMRC
F2 G8 B7 F2 G8 B7 NO.
SW01
1 5 Gate Vlv FB, API 600, CL 150, RFBolted (Non-Extended) 4 x 4 2 0.00 VQBHBKERFBBEHR
F2 G8 B7 Bonnet, Extension Stem, Handwheel, ASTM A216-W HF4A
79
6
6 Swing Chk Vlv, BS 1868, CL 150, RF, Bltd Bonnet, ASTM 4x4 1 0.00 LNBBBKERFAJHRH
3 A216-WCB, AISI 410 Trim, Graphite Seals, ASTM C4A
7 Std Blt & 2 Hex Nut, BS 4882, ASTM A193-B7 48 0.00 BAAAAAZZ0G1C
Bolts/Studs/ASTM A194-2H Nuts - 110 mm Length
SS1-A-300-CS
23
17 8 Spiral Wound Gskt, ASME B16.20, CL 150, RF, AISI 316, 4 6 0.00 GEASDUERFDJ4A0
ASME B16.5, Graphite CS Centring-/SS Inner Rin D
SW02 6 SPOOL2
TOTAL ERECTION WEIGHT 0.00

1 F2 G8 B7
TOTAL WEIGHT 145.32
SW03
11
09 CUT PIPE LENGTH
4
CUT N.S.
3 ITEM-CODE PIECE NO LENGTH (INS) REMARKS END PREP.
50
07
SS1-A-300-CS
PAATFPZBEE 3 -4 2164MM 4 BE / BE
F2 G8 B7
SW04
PAATFPZBEE 1 -2 1943MM 4 BE / BE
G1-B 5 PAATFPZBEE 5 - End 4930MM 4 BE / BE
SW05

JOINT INFORMATION
SPINDLE DIRECTION UP SPOOL3
3
23
50 S/NO SIZE WELD F/S SPOOL DIA-INCH
1 4.00 BW SW SP1 4
2 4.00 BW SW SP1 4
1 3 4.00 BW SW SP2 4
4 4.00 BW SW SP2 4
SS1-A-300-CS
5 4.00 BW SW SP3 4

DIA-INCH SHOP 20 DIA-INCH FIELD 0 TOTAL 20

END-CONNECTION-PIPELINE
PL-5900-00564-02
E 6724060
N 5032124
EL 107757

100-PL-5900-00564-1C114CQ-N 1C114CQ

LINE NUMBER SIZE LINE SPEC. INSUL INSUL THK

SERVICE: PL CODE: B31.3


OPERATING 2.00 44
Barg °C
DESIGN 7.00 75
OWNER: PROJECT TITLE:
PETRONAS RAPID PROJECT,PENGERANG
NOTES: 8) FOR ALL SMALL BORE TAPPINGS xxxx & ABOVE, SMALL BORE TAPPING
1) ALL DIMENSIONS, ELEVATIONS & CO-ORDINATES ARE IN MM. NEAR PSVS. CONTROL VALVE, ALL ORIFICE TAPPING VIBRATION PRONE (P0022)
2) FIELD WELDS TO BE DECIDED BY THE FABRICATOR/CONTRACTOR. LINES. STIFFNERS SHALL BE PROVIDED AS PER SIZE, REFER PIPE
3) ALL BOLT HOLES TO STRADDLE NORTH AND/OR VERTICAL CENTERLINE. SUPPORT NO. RAPID-P0022-PUNJ-PIP-SID-5100-1003. P&ID REF:
ISOMETRIC LINE ID:
4) DIMENSIONS FOR LINES 1-1/2" AND BELOW TO BE CHECKED AT SITE BEFORE 9) FOR LINES REQUIRING STRESS RELEIVING, WELDED SUPPORT
0 ISSUED FOR CONSTRUCTION 26.11.2016 Rajib A.Sharma
PL-5900-00564-01
FABRICATION, DIMENSIONS ARE FOR GUIDANCE ONLY. ATTACHMENTS SHALL BE WELDED PRIOR TO STRESS RELEIVING.
5) ALL ELEVATIONS QUOTED ARE PIPE CENTER LINE/FACE OF FLANGE. 10)PAINTING SPECIFICATIONS SHALL BE AS PER DOC NO. 5190-0001
6) SPRING LOOKS TO BE RELEASED POST HYDROTEST. RAPID-P0022-PUNJ-MCI-SPN-5100-0001. CONTRACTOR:
7) FOR REINFORCEMENT PAD AT BRANCHES, PAD THICKNESS. SAME AS HEADER 11)NDT REQUIREMENT SHALL BE AS PER ASME B31.3
REV DESCRIPTION DATE DRAWN STRESS MATL CHKD APPD
PIPE, PAD OD - TWO TIMES DIAMETER OF PIPE UNLESS OTHERWISE MENTIONED. 12)INSULATION SPECIFICATION SHALL BE AS PER DOC NO. JOB NO: PD5026 DWG NO: RAPID-P0022-PUNJ-PIP-ISO-5900-2186
RAPID-P0022-PUNJ-MCI-SPN-5100-0002 STRESS CATEGORY PAINTING SYSTEM PWHT RADIOGRAPH: TEST TYPE: H
13)IF MIS-MATCH FOUND BETWEEN DESIGN PARAMETERS OF ISOMETRIC &
LINE LIST, THEN LINE LIST TO BE CONSIDERED AS FINAL DOCUMENT.
1 1A : No 5% TEST PRESSURE: 75.75 Barg AREA: 5900 UNIT: 5900 SHT. NO. 1 OF 1 REV. NO. 0