You are on page 1of 4

DATA SAMPLE

Kedalaman
No Lokasi Kode Tumpukan Kode Titik Sampling Jumlah Conto
Sampling (meter)
JT 65 (A) 5.00 5
JT 65 (B) 6.00 6
JT 65 (C) 5.00 5
JT 65 (D) 6.00 6
JT 65 (E) 3.00 3

1 Stockyard Jetty JT 65 JT 65 (F)


JT 65 (G)
6.00
6.00
6
6
JT 65 (H) 6.00 6
JT 65 (I) 6.00 6
JT 65 (K) 6.00 6
JT 65 (L) 6.00 6
JT 65 (M) 6.00 6

JT 56 (A) 6.00 6
JT 56 (B) 6.00 6
JT 56 (C) 4.00 4
JT 56 (D) 6.00 6
JT 56 (E) 6.00 6
JT 56 (F) 6.00 6
JT 56 (G) 6.00 6
JT 56 (H) 6.00 6
JT 56 (I) 6.00 6

2
Stockyard Jetty JT 56 JT 56 (J) 6.00 6
JT 56 (K) 6.00 6
JT 56 (L) 6.00 6
JT 56 (M) 6.00 6
JT 56 (N) 6.00 6
JT 56 (O) 6.00 6
JT 56 (P) 6.00 6
JT 56 (Q) 6.00 6
JT 56 (R) 6.00 6
JT 56 (S) 6.00 6

MP 1455 (A) 6.00 6


MP 1455 (B) 6.00 6
MP 1455 (C) 6.00 6
MP 1455 (D) 6.00 6
MP 1455 (E) 6.00 6

3 Stockyard Jetty MP 1455 MP 1455 (F)


MP 1455 (G)
6.00
6.00
6
6
MP 1455 (H) 6.00 6
MP 1455 (I) 6.00 6
MP 1455 (J) 6.00 6
MP 1455 (K) 6.00 6
MP 1455 (L) 6.00 6

MP 1373 (A) 6.00 6


MP 1373 (B) 6.00 6

4 Stockyard Transito
Blok A MP1373 MP 1373 (C)
MP 1373 (D)
6.00
6.00
6
6
MP 1373 (E) 6.00 6
MP 1373 (F) 6.00 6

BT-01 (A) 6.00 6


BT-01 (B) 6.00 6

5 Stockyard Transito Blok B


(Tengah) BT-01 BT-01 (C)
BT-01 (D)
6.00
6.00
6
6
BT-01 (E) 6.00 6
BT-01 (F) 6.00 6
17 BT-02 (A) 6.00 6

18 Stockyard Transito Blok B


(Tengah)
BT-02 BT-02 (B)
BT-02 (C)
6.00
6.00
6
6
BT-02 (D) 6.00 6

TOTAL 347.00 347.00


Jumlah Koli Keterangan

1
Terkirim Ke Lab. Torobulu Tgl.
1 23 Maret 2016
1
1
1
1
1
Rencana kirim Paket 03/MLP-
1 SAMPLING/IV/2016
1
1
1
1

1
1
1
1
Terkirim Ke Lab. Torobulu Tgl.
1 17 Maret 2016
1
1
1
1
1
1 Rencana kirim Paket 03/MLP-
1 SAMPLING/IV/2016
1
1
1
1 Rencana kirim Paket 04/MLP-
1 SAMPLING/IV/2016
1
1

1
1
1
Terkirim Ke Lab. Torobulu Tgl.
1 23 Maret 2016
1
1
1
1
1
Rencana kirim Paket 04/MLP-
1 SAMPLING/IV/2016
Rencana kirim Paket 04/MLP-
SAMPLING/IV/2016
1
1

1 Rencana kirim Paket 04/MLP-


1 SAMPLING/IV/2016
1
1
1
1

1
1
Rencana kirim Paket 05/MLP-
1 SAMPLING/IV/2016
1
1
1
1
1
1
1

59

You might also like