Professional Documents
Culture Documents
Tutorial For Fo
Tutorial For Fo
Gsm architecture
Site down/Failures:
1.Power Outage
2.Transmission problems: Heavy rain fall can affect the microwave link
Function of FO personnel:
Facts:
1. Passive : All activities that deals with Power and its equipments
2. Active: All activities that deals with RF / Transmission and their equipments.
There are BSCs controlling Sites, these BSCs are under Regions.
REGION States
ABJ ABUJA
ASB Asaba
ENG Enugu
IBD Ibadan
KNO Kano
LGS Lagos
PHC Port Harcourt