You are on page 1of 4
DECEMBER 18 , 2017 UKC BUILDERS, INC. Yablon, Cagayan De Oro City jude C, Uy President Engr. Elpedio M. Jerez Thru < Operation manager Subject : 38th billing Re: Binitinan Bridge Project phase I, 17K00326 a gil Bea 2017 is Period covered: Dec, 11 to Dec. 1 : > Fi wsl-3he Good day... to submit our 35th billing for REBARS & CONCRETE POURIN(( amounting, We would like t of TWELVE THOUSAND THREE HUNDRED EIGHTY ONE pesos & 49 centa for the Various work accomplished located @ Balingasag Misamis Oriental. Attachea herewith the computation ana drawings tor pack up. Hoping your kind and immediate approval of this billing. God Bless you all 11 M d by: GGC Spb-contractor Recaved bys BS Cmead & ye 0-1 Seu W DENING OF FINTINAN BRI PROGRESS BILLING NO. 34 For the per od: DEC 04 to DEC. 11,2017 STATEMENT OF WORK CCOMPLISHI:D IGE PROJECT - PHASE IL GGC CONSTRUCTION SERVICES Bo] Besrirnon ore [onr| me [euntns | an | Se ) OG] Gy | rrion(y| acy | PRMOUS tHsnate] Toa zs on (l6mm@ below) _| kgs 3.48] T5472 457 0 352.4284 159355 7] _SLOsaD smd abe) igs [ — 08 wouter [oe 215 Hae | baie) [ap | 2.04 Es ~ 00 below) | kgs. | 222] 000 sam, 31000 Zan Basan | 73160008 ooo | HORSE z eum] 170.00 36333 000 | 000 2200787] — 40538 eum] 49.00 TH oc00 | 00 000 000 5 mo | 000 000 | 000 oe ae spa [ 0 a0] 000 can} 0.000 000 0.00 000 | com 4008 0.000 000 0.00 0.00 3m. a 0,000 000 = com [ 2000 zi we 8 a im. | 3.00 ~ at Toone im | Bis00 a or Seema ‘RAND TOTAL, ieee = jed in thi projectare in cenformity quantities ire correct formed to dace and the mater als ap g ee Checked by: (Operation Manager {fabication only) 7 Z 9 1.00 BORED PILE ADDITIONAL REBARS ( ABUT. A) GAR MARA] SIZE [QUANTITY] LENGTH] TOTAL LENGTH 1 [6 | or | as0-| 288.00 2 | | [0.00 oy | [0.00 re t cs = {st — ae s 2 | | eee 71s [0.00 grade 60 | zaoigr|(ga query oe ‘ (s . a urn whole INA bag 6904) f PIDSF FO | ymin F colar “a GO| 0B lag. « (El xO-W) “HANNE IMAKY CUMPUIAUN: ___ Scope of works Quantity Unit | Unit Price [Amount | L.1Fabrication (4gmm & below) ae 7 kes. 3.48 1.2Fabrication (46mm @ & Above) _| kgs. 3.06 : |___4.sinstailation ee @ & veiow) kgs. ea = Ainstallation (2emm 6 & Above) kgs. 2.04 : 2.Grouted Riprap Me 3.Handlaid rock Me 5. Concreting (RMC) (2-7, _4834| MP Li 5, Formworks Me gop — Fiaari- a4 bnl F 1,294. Fa4 FIER 2 COPING ADUIIONAL KEBAKS 7 ¢ Ze [SSE SRT | Sa we a4 79 3270) 799fF —s 4 79 BAe 79920 ao be Pa wo [797 91 2.466" f ! Saas a7, 587 a 8 re a | [Grade 40 |srade 60 [or (lop) Doin abv CONCRE ING (RM) asm

You might also like