DECEMBER 18 , 2017
UKC BUILDERS, INC.
Yablon, Cagayan De Oro City
jude C, Uy
President
Engr. Elpedio M. Jerez
Thru <
Operation manager
Subject : 38th billing
Re: Binitinan Bridge Project phase I, 17K00326 a gil Bea
2017 is
Period covered: Dec, 11 to Dec. 1
: > Fi wsl-3he
Good day...
to submit our 35th billing for REBARS & CONCRETE POURIN(( amounting,
We would like t
of TWELVE THOUSAND THREE HUNDRED EIGHTY ONE pesos & 49 centa
for the Various work accomplished located @ Balingasag Misamis Oriental.
Attachea herewith the computation ana drawings tor pack up.
Hoping your kind and immediate approval of this billing. God Bless you all 11
M d by:
GGC Spb-contractor
Recaved bys BS Cmead &
ye 0-1 SeuW DENING OF FINTINAN BRI
PROGRESS BILLING NO. 34
For the per od: DEC 04 to DEC. 11,2017
STATEMENT OF WORK CCOMPLISHI:D
IGE PROJECT - PHASE IL
GGC CONSTRUCTION SERVICES
Bo] Besrirnon ore [onr| me [euntns | an | Se
) OG] Gy | rrion(y| acy | PRMOUS tHsnate] Toa zs
on (l6mm@ below) _| kgs 3.48] T5472 457 0 352.4284 159355 7] _SLOsaD
smd abe) igs [ — 08 wouter [oe 215 Hae |
baie) [ap | 2.04 Es ~ 00
below) | kgs. | 222] 000
sam, 31000 Zan Basan | 73160008 ooo | HORSE z
eum] 170.00 36333 000 | 000 2200787] — 40538
eum] 49.00 TH oc00 | 00 000 000
5 mo | 000 000 | 000
oe ae spa [ 0 a0] 000
can} 0.000 000 0.00 000 |
com 4008 0.000 000 0.00 0.00
3m. a 0,000 000 =
com [ 2000 zi we 8 a
im. | 3.00 ~ at Toone
im | Bis00 a or Seema
‘RAND TOTAL, ieee =
jed in thi projectare in cenformity
quantities ire correct
formed to dace and the mater als ap g
ee
Checked by:
(Operation Manager{fabication only)
7
Z
9 1.00 BORED PILE ADDITIONAL REBARS ( ABUT. A)
GAR MARA] SIZE [QUANTITY] LENGTH] TOTAL LENGTH
1 [6 | or | as0-| 288.00
2 | | [0.00
oy | [0.00
re t cs
= {st — ae
s 2 | | eee
71s [0.00
grade 60 | zaoigr|(ga
query
oe ‘ (s . a
urn whole INA bag 6904) f PIDSF
FO | ymin F colar “a
GO| 0B lag. « (El xO-W) “HANNE
IMAKY CUMPUIAUN:
___ Scope of works Quantity Unit | Unit Price [Amount |
L.1Fabrication (4gmm & below) ae 7 kes. 3.48
1.2Fabrication (46mm @ & Above) _| kgs. 3.06 :
|___4.sinstailation ee @ & veiow) kgs. ea =
Ainstallation (2emm 6 & Above) kgs. 2.04 :
2.Grouted Riprap Me
3.Handlaid rock Me
5. Concreting (RMC) (2-7, _4834| MP
Li 5, Formworks Me
gop — Fiaari- a4
bnl F 1,294. Fa4FIER 2 COPING ADUIIONAL KEBAKS
7 ¢ Ze
[SSE SRT | Sa
we a4 79 3270) 799fF
—s 4 79 BAe 79920
ao be Pa wo [797 91 2.466"
f
! Saas a7, 587 a 8
re a
|
[Grade 40
|srade 60
[or
(lop) Doin abv
CONCRE ING (RM)
asm