ADDENDUM TO THE REQUEST FOR QUOTE
for the
Juneau Douglas Wastewater treatment Plant
ee ‘Ash Pond Closure, Phase |
RFQ No. £13-115
ADDENDUM NO.: Two CURRENT QUOTE DUE DATE:
‘September 26, 2012
PREVIOUS ADDENDA: ONE
ISSUED BY: City and Borough of Juneau
ENGINEERING DEPARTMENT
155 South Seward Street
Juneau, Alaska 99801
DATE ADDENDUM ISSUED: September 24, 2012
The following item of the Request for Quote is modified as herein indicated. All other items remain the
same. This addendum has been issued and is posted online. Please refer to the CBJ Engineering
Contracts Division webpage at: http://www. juneau.ora/engineering_fto/contracts/Contracts. php
tem No.1 New Information: Since this project was advertised additional fill materials have
been, and may continue to be, delivered to the JDWWTP. The source of these
materials is Alaska Department of Transportation & Public Facilities (ADOT&PF) ditch
and landslide cleanup activities and they will also be incorporated into the Ash Pond
Closure Project. The CBJ may also deliver additional approved fill materials to the
site for placement in the ash pond. The final quantity of the additional fill materials will
be measured after the bid opening for this project and the Contractor will be paid for
their placement in the ash pond as noted below:
Additional Payment = L.S. Bid for Original Scope of Work X Qty. of DOT&PF Fill (CY)
4,300 CY
Item No.2 Geotextile Fabric Placement: Add the following: “The Contractor will overlap
adjacent pieces of geotextile fabric by 3 feet or as directed by the Project Manager”