You are on page 1of 1
ADDENDUM TO THE REQUEST FOR QUOTE for the Juneau Douglas Wastewater treatment Plant ee ‘Ash Pond Closure, Phase | RFQ No. £13-115 ADDENDUM NO.: Two CURRENT QUOTE DUE DATE: ‘September 26, 2012 PREVIOUS ADDENDA: ONE ISSUED BY: City and Borough of Juneau ENGINEERING DEPARTMENT 155 South Seward Street Juneau, Alaska 99801 DATE ADDENDUM ISSUED: September 24, 2012 The following item of the Request for Quote is modified as herein indicated. All other items remain the same. This addendum has been issued and is posted online. Please refer to the CBJ Engineering Contracts Division webpage at: http://www. juneau.ora/engineering_fto/contracts/Contracts. php tem No.1 New Information: Since this project was advertised additional fill materials have been, and may continue to be, delivered to the JDWWTP. The source of these materials is Alaska Department of Transportation & Public Facilities (ADOT&PF) ditch and landslide cleanup activities and they will also be incorporated into the Ash Pond Closure Project. The CBJ may also deliver additional approved fill materials to the site for placement in the ash pond. The final quantity of the additional fill materials will be measured after the bid opening for this project and the Contractor will be paid for their placement in the ash pond as noted below: Additional Payment = L.S. Bid for Original Scope of Work X Qty. of DOT&PF Fill (CY) 4,300 CY Item No.2 Geotextile Fabric Placement: Add the following: “The Contractor will overlap adjacent pieces of geotextile fabric by 3 feet or as directed by the Project Manager”

You might also like