You are on page 1of 21

TABLE OFFICE OF THE CITY/MUNICIPAL

ENGINEER/BUILDING OFFICIAL

OF
CONTENTS
DISTRICT/CITY/MUNICIPALITY

LAND USE & ZONING


ARCHITECTURAL

A-1 PERSPECTIVE VIEW & TABLE OF CONTENTS

A-2 GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHES

A-3 FRONT, REAR ELEVATIONS

A-4 RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION

A-5 THIRD FLOOR REFLECTED CEILING & ROOF PLAN

A-6 TOILETS, STAIRS & RAMP DETAIL


LINE & GRADE
A-7 TOILET SECTION DETAILS, FACADE PEDIMENTS

A-8 STAIR, HANDRAIL & MISC. DETAILS

A-9 DOOR & WINDOW SCHEDULE, DETAIL OF STEEL


CASEMENT

ARCHITECTURAL

STRUCTURAL
S-1 FOUNDATION PLAN, DET. OF FOOTING, TIE

BEAM, STAIR ON GRADE & RAMP, ELEV. OF


COL. SCH. FOOTING & COLUMN STRUCTURAL
S-2 2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.

OF BEAM & SLAB, SCH. OF BEAMS & SLABS

S-3 STAIR PLAN & SECTION DETAIL, MISC. DETAILS


1 PERSPECTIVE VIEW S-4 ROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS

A-1 SCALE : N T S OF STEEL CONNECTION

SANITARY

ELECTRICAL
E-1 GENERAL NOTES, SINGLE LINE DIAGRAM,

LOAD SCHEDULE, LEGEND & RISER


DIAGRAM

E-2 GROUND & TYP. 2nd & 3rd FLOOR POWER

LAYOUT ELECTRICAL
E-3 GROUND & TYP. 2nd & 3rd FLOOR LIGHTING

LAYOUT

P-1 DRAINAGE AND SANITARY SYSTEM LAYOUT

P-2 DARINAGE AND SANITARY SYSTEM


ISOMETRIC VIEW
MECHANICAL
P-3 WATER SYSTEM LAYOUT

P-4 WATER SYSTEM ISOMETRIC DIAGRAM

P-5 SEPTIC TANK, CATCH BASIN & COVER


DETAILS, NOTES, LEGEND, DESIGN CRITERIA

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG

A-1
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

PRC NO. :
0010990
TIN :
149 460 161
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
TABLE OF CONTENTS
PERSPECTIVE VIEW, TABLE OF CONTENTS
9
8
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11 12 13
54000

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
200x200mm
VITRIFIED FLOOR
10
3
TILES (UNGLAZED) A-8
425 955 960 960 1200 2075 1000 1000 425
A-4
PIPE CHASE
CONCRETE SUNBREAKER 200x200mm
VITRIFIED UNGLAZED
W W W
FLOOR TILES
3 4 3

A W W W W W W W W W W

1400

1400
WF1 WF1 WF1 WF1 WF1 URINAL
WC WC

2000
STO
1 1 1 1 1 1 1 1 1 1 PIPE CHASE
1
A-7 D-4 D-4 D-4

600 1090
D-4 D-4
D-2
SHE HE
4

600
D-2 D-2
A-4
SINK COUNTER SINK COUNTER
7000

7000
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
LANDING 6 7 8 9 10 LANDING
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
FL1 FL1 FL1 FL1 FL1

WF1 WF1 WF1 WF1 WF1

D W W D D W W D D W W D D W W D D W W D
1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1

163
DN
25mm 25mm 25mm 25mm 25mm 25mm 25mm 25mm 25mm 25mm DN
DEP DEP DEP DEP DEP DEP DEP DEP DEP DEP
1500 1500
2500

2500
C
FL1 O R R I D O R FL1 FL1 C O R R I D O R FL1 FL1

WF2 WF2
WF2

C
1200

2 4
A-6 A-6
LINE OF ROOF FOR
THIRD FLOOR

2 TYPICAL 2nd & 3rd FLOOR PLAN


A-2 SCALE : 1 : 100 METERS

2 3 4 5 6 7 8 9 10 11 12
1 3 13
54000
200x200mm VITRIFIED
A-4
PIPE CHASE
FLOOR TILES 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

(UNGLAZED) 425 650 850 850 1750


LINE OF SUNBREAKER
1700 773 850 425

PIPE CHASE W W W W SCHEDULE OF FINISHES


3 4 4 3

A SS
W W W W W W W W W W LAV FLOORS :
1400

1
WF1 WF1 WF1 WF1 WF1 WC URINAL WC
2000

2000
1 1 1 1 1 1 1 1 1 1
A-7 HCR WF3 NCR
3150

3150
D-4
D-4 HE FL1 - PLAIN CEMENT FLOOR FINISH
4 D-4
1750

D-3
SHE D-3
A-4
D-2
650

SINK COUNTER
SINK
SD
COUNTER
FL2 - PLAIN CEMENT FLOOR ROUGH

7000
WITH GROOVES
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
3625

LANDING 1 2 3 4 5 LANDING
FL3 - 200X200 VITRIFIED FLR TILES
9500

BASE

BASE

BASE

BASE

BASE
FL1 FL1 FL1 FL1 FL1 ( UNGLAZED )
3850

3850
BLACKBOARD

BLACKBOARD

BLACKBOARD

BLACKBOARD

BLACKBOARD
WF1 WF1 WF1 WF1 WF1

WALLS :
STO D D D D D STO
D W W D W W D W W D W W D W W
1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1
WF1
B D-3a
D-3a
- 150 MM THK. CHB W/ PLAIN
1500 1500
UP 25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
UP
CEMENT PLASTER FIN (PAINT)
2500

2500
FL1 FL1 FL1 FL1 FL1 WF2
C O R R I D O R - 100 MM THK. CHB W/ PLAIN
WF2 WF2 CEMENT PLASTER FIN (PAINT)
WF2 50mm G.I. PIPE FOR HANDRAIL
C

1525
WF3 - 200X200 VITRIFIED WALL TILES
1200

1200
RAMP
UP UP RAMP

(GLAZED)
UP UP

1 3
9000
A-6 1700 3600 3600 1700 A-6

1 GROUND FLOOR PLAN


A-2 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-2
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :

27 OCT. 2002
GROUND, 2nd &TABLE OF CONTENTS
3rd TYPICAL FLOOR PLAN, FINISHES
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


13 12 11 10 9 8 7 6 5 4 3 2 1

APEX LINE OF TRUSS

GA#26 CORR. G.I. ROOFING


SHEET (PAINT FIN.)

2500
2985
GA#26 PL. G.I. GUTTER ON
12x300mm FIBER CEMENT

FASCIA BD. (PAINT FINISH) TOP OF ROOF BEAM

F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

3200
W W W
PLAIN CEMENT PLASTER
3 4 3
PAINT FINISH
W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1 THIRD FLOOR LEVEL
CONCRETE SUN BREAKER

(SEE DETAIL)
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

3200

9925
W W W
3 4 3

W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1 SECOND FLOOR LEVEL

F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

3200
W W W W
3 4 4 3

W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1 GROUND FLOOR LEVEL

325
NAT. GRD. LN.

2 REAR ELEVATION
A-3 SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 9 10 11 12 13
815

APEX LINE OF TRUSS

GA. #26 CORR. G.I.


C A ROOFING SHEET (PAINT
FINISH)
2500

R
G M A

E S
GA. #26 PLAIN G.I.
GUTTER ON
TOP OF ROOF BEAM
12x300mm FIBER
CEMENT FASCIA BD.

(PAINT FINISH)
3200

D-2 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-2
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2

100 MM THK. CHB


THIRD FLOOR LEVEL
RAILING W/50mm
G.I. PIPE RAILING
3200
9925

D-2 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-2
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2

SECOND FLOOR LEVEL


3200

D-3A D-2 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-2 D-3A 32mm G.I. PIPE
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 HANDRAIL WITH 32mm
VERT. SUPPORT @ 600mm

O.C. (PAINT FINISH)


GROUND FLOOR LEVEL
325

NAT. GRD. LN.

1 FRONT ELEVATION
A-3 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-3
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE OF CONTENTS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03
FRONT, REAR ELEVATIONS

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11 12 13

600 600

APEX OF TRUSS
2500

SEE STRUCTURAL DETAIL

TOP OF ROOF BEAM TOP OF ROOF BEAM

W W
W
3 4

3225
3

F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
3200

200x200mm
FEMALE
VITRIFIED WALL
TOILET

W W W W W W W W W W
TILES (GLAZED)
MALE

THIRD FLOOR LEVEL 1 CLASSROOM 11 1 1 CLASSROOM 12 1 1 CLASSROOM 13 1 1 CLASSROOM 14 1 1 CLASSROOM 15 1 TOILET 3rd FLOOR TOILET LEVEL
STORAGE
12425

W
3

F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
W W
3 4
200x200mm
3200

3200
VITRIFIED WALL

TILES (GLAZED) FEMALE


MALE
TOILET
TOILET
W W W W W W W W W W
SECOND FLOOR LEVEL 1 CLASSROOM 6 1 1 CLASSROOM 7 1 1 CLASSROOM 8 1 1 CLASSROOM 9 1 1 CLASSROOM 10 1 2nd FLOOR TOILET LEVEL
STORAGE
6mm THK. MARINE PLYWOOD
CEILING FOR ALL TOILET ON 3mm THK. FASCIAL

50x50mm CEILING JOIST F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F


MIRROR ON AL.
W
W
@600mm ON CENTER 3
4
W W FRAME
3200

3200
3

BOTHWAYS w/10mm BAR MALE


HANGER @1200mm OC. TOILET
FEMALE
BOTHWAYS EMBEDDED ON TOILET LAV
W W W W W CS
CONC. SLAB W W W W W WC WC
1 CLASSROOM 1 1 1 CLASSROOM 2 1 1 CLASSROOM 3 1 1 CLASSROOM 4 1 1 CLASSROOM 5 1
GROUND FLOOR LEVEL GROUND FLOOR TOILET
325

300
NAT. GRD. LN. LEVEL

EXPOSED CEILING UNDER


SLAB PAINT FIN.

4 LONGITUDINAL SECTION
A-4 SCALE : 1 : 100 METERS

C B A A B C
A B C
1000 9500
1100 200
7000 2500 1100 200
200 1100

840
815

APEX LINE OF TRUSS TOP OF TRUSS TOP OF TRUSS


GA#26 CORR. G.I. GA#26 CORR. G.I.
ROOFING SHEET 1000 ROOFING SHEET GA#26 CORR. G.I.
ROOFING SHEET
1000 (PAINT FIN.) (PAINT FIN.)
2500

2500

2500
(PAINT FIN.)
SEE TRUSS DETAIL

TOP OF ROOF BEAM


GA#26 PLAIN G.I. GUTTER TOP OF ROOF BEAM GA#26 G.I. GUTTER TOP OF ROOF BEAM
ON 12x300mm
ON 12x300mm FIBER
FIBER CEMENT
CEMENT FASCIA BOARD
FASCIA BOARD
(PAINT FIN.)
(PAINT FIN.)
3200

3200

3200
PLAIN CEMENT PLASTER W-1 D-1
PLAIN CEMENT PLASTER
WALL PAINT FIN.
WALL PAINT FIN.

900
THIRD FLR. LVL. THIRD FLOOR LEVEL THIRD FLOOR LEVEL CLASSROOM 10 CORRIDOR

CONCRETE

SUNBREAKER (SEE
DETAIL) 50mm G.I. PIPE
3200

3200

3200
9925

9925

9925
CONCRETE RAILING PAINT FIN. CONCRETE
10 W-1 D-1
SUNBREAKER (SEE SUNBREAKER
A-8
DETAIL) (SEE DETAIL)

900
SECOND FLR. LVL. SECOND FLOOR LEVEL SECOND FLOOR LEVEL CLASSROOM 6 CORRIDOR

38mm G.I. PIPE


32mm GI PIPE HANDRAIL HANDRAIL

w/32mm VERT. SUPPORT w/32mm VERT.


3200

3200

3200
SUPPORT @600mm
@600mm O.C. (PAINT FIN.)
O.C. (PAINT FIN.) W-1 D-1

900
GROUND FLR. LVL. GROUND FLOOR LEVEL GROUND FLOOR LEVEL CLASSROOM 1 CORRIDOR
325

325

325
NAT. GRD. LN. NAT. GRD. LN. NAT. GRD. LN.

1 RIGHT SIDE ELEVATION 2 LEFT SIDE ELEVATION


3 CROSS SECTION
A-4 SCALE : 1 : 100 METERS
A-4 SCALE : 1 : 100 METERS
EXPOSED CEILING UNDER
SLAB PAINT FIN. A-4 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-4
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
RIGHT & LEFT SIDE ELEV.,OF CONTENTS
LONGITUDINAL & CROSS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : SECTION
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11 12 13
600 4500 9000 9000 9000 9000 9000 4500 600

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

GA#26 G.I. GUTTER ON GA#26 CORR. G.I. SHEET


12x300mm FIBER CEMENT ROOFING (PAINT FIN.)
FASCIA BOARD (PAINT FIN.)
RD RD RD RD RD RD RD RD RD RD RD RD RD

1000
A

7000
SLOPE SLOPE

SLOPE SLOPE

B
2500

C
1000

LN. OF STRUCTURE
200

RD RD RD RD RD RD RD RD RD RD RD RD

GA#26 G.I. GUTTER ON


CONCRETE PARAPET GA#26 PLAIN G.I. RIDGE 12x300mm FIBER CEMENT GA#26 PLAIN G.I. FLASHING
ROLL (PAINT FIN.) FASCIA BOARD (PAINT FIN.) (PAINT FIN.)
2 ROOF PLAN
A-5 SCALE : 1 : 100 METERS

6mm THK. ORD. PLYWOOD CEILING ON


50x50mm CEILING JOIST @600mm OC

BOTH WAYS (PAINT FIN.)

1 2 3 4 5 6 7 8 9 10 11 12 13
9000 LIGHTING FIXTURES
9000 9000 9000 9000

600 4500 4500 4500 4500 600


4500 4500 4500 4500 4500 4500 4500 4500

7
A-7
1000

MANHOLE MANHOLE
7000

b
2500

c
1000

6mm THK. MARINE PLYWOOD


CONCRETE PARAPET CEILING ON 50x50mm CEILING CEILING VENTILATION (SEE GA#26 PLAIN GI GUTTER ON
A-8
12x300mm FIBER CEMENT FASCIA
JOIST @600mm OC BOTH WAYS DETAIL)
1 THIRD FLOOR REFLECTED CEILING PLAN (PAINT FIN.) BOARD (PAINT FIN.)

A-5 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-5
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
THIRD REFLECTED OF CONTENTS
CEILING, ROOF PLAN
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


32mm G.I. PIPE HANDRAIL
WITH 32mm VERT. SUPPORT @

600mm O.C. (PAINT FINISH) 32mm G.I. PIPE 100


HANDRAIL WITH 32mm
5b

200
NONSKID PLAIN CEMENT FLOOR VERT. SUPPORT @600mm

FINISH W/ GROOVE LINES


5a 100
100 12
O.C. (PAINT FINISH) 100X100 CONCRETE
A-6 TYPICAL A-8 SKIRTING
A-6 5b1

200

6mm
6mm
6mm
A-6

200

900
32 mm G.I PIPE

700

900
1200
FINISH VERTICAL SUPPORT
MEMNT
OOR CE

900
MENT FL @600mm ON CENTER

100
PLAIN CE

700
- SK ID 32 mm G.I PIPE
NON PROVIDE 12mm STEEL

300

700

150
VERTICAL SUPPORT @
DOWELS (PAINT FIN.) 600mm ON CENTER
PROVIDE 12mm STEEL
3600 1700
DOWELS (PAINT FIN.)
NONSKID PLAIN CEMENT

100
FLOOR FINISH W/
5 DET. ELEVATION OF RAMP 5a SPOT DETAIL GROOVE LINES

A-6 SCALE 1:50 M


A-6 SCALE 1:50 M
5b1 SPOT DETAIL
A-6 SCALE 1:5 M

1 2 1 2 5b DETAIL SECTION
4500 4500 A-6 SCALE 1:10 M

200x200mm VITRIFIED
FLOOR TILES 1075 850 850 1725
13 12 13
200x200mm
(UNGLAZED)
12
38mm STAINLESS VITRIFIED FLOOR 425 955 960 960 1200
425 STEEL GRAB BAR TILES (UNGLAZED) 4500
W W 4500
W W 4
3 38mm STAINLESS 2100 1000 1300
3 4 1025 888
STEEL GRAB BAR 1700

A A
200x200mm 200x200mm
CLEAR W
W VITRIFIED UNGLAZED VITRIFIED UNGLAZED
WC WC
WC
WC WC WC
W 3
LAV 3 FLOOR TILES FLOOR TILES
4
1400

1400
WC
STO

2000

2000
LAV URINAL WC

WF3 WC

1400
WC

1500
URINAL

D-4 D-4 D-4 D-4

2000
3150

D-4
NCR

1090
D-2
HE

3150
D-3
SHE SHE
1750

D-4
D-4 D-4
D-2 D-2
HE

600
600

SINK COUNTER SINK COUNTER


SD D-3
D-2
SINK COUNTER D-2 SINK COUNTER

600
7000
5 9
1337

1337
A-8 A-8

7000

7000
10
10
9500

9500
9 11 9 11

8-STEPS@300mm = 2400
2700

10 10
8 8

5000
3850

12 12

9500
11 9 11 9
7 13 7 13
9-STEPS@300mm =

8 8

3850
6 6 12 12
14 14

13 7 13 7
5 15 5 15

14 6 14 6
4 16 16

15 5 15 5
3 17
STO.

16 4 16 4
2 18

STO.
B 1

D-3a
B 19
DN
3 17

2 18

UP
1 19
D-3a
1 1 1500
1500
UP
A-8 A-8 DN 1574
2500

2500

1500 3000
1360 1359 1500

2500

2500
C C
1200

RAMP

TYP. 2nd & 3rd FLOOR


UP

1200
RAMP
FEMALE TOILET PLAN UP
TYP. 2nd & 3rd FLOOR
DETAIL
1700 3600
2 4 MALE TOILET PLAN DETAIL
A-6 SCALE : 1:50 M 3600 1700
A-6 SCALE : 1:50 M

GROUND FLOOR
FEMALE TOILET PLAN GROUND FLOOR
1 DETAIL 3 MALE TOILET PLAN DETAIL
A-6 SCALE : 1:50 M
A-6 SCALE : 1:50 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-6
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
TOILETS, STAIR & OF CONTENTS
RAMP PLAN AND
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : RAMP DETAIL
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


PLAIN CEM. PLASTERED
PAINT FIN. PLAIN CEM. PLASTER

3mm THK. FASCIAL


PAINT FIN. 12 13
MIRROR ON AL. FRAMING
1900
4549
450 500 500 450

1000 PLAIN CEMENT PLASTER


200 200 200x200mm GLAZED
WALL TILES PAINT FINISH

200x200mm VITRIFIED 200x200mm VITRIFIED


2ND FLR. LVL.
GLAZED TILES WALL TILES (GLAZED)

PIPE CHASE

600
600 W

1650
3
150
200x200mm
SD VITRIFIED WALL
600

200 60 200
TILES ( GLAZED )

3200

3250
2695
100

200
1600

1500

183 100
CONC. COUNTER

1500

284

1600
300

100

±780
URINAL

70
WC WC

800
800
100

150
CLASSROOM LVL. CORRIDOR LVL.
COUNTER SINK DET. PLAN

50

25
600

300
15 TOILET LVL. TOILET LVL.
FIN. GRADE LN.

FFL 6 MOUNTING FIXTURES OF MALE TOILET


FFL
100
3 A-7 SCALE 1:50 M
DETAIL OF COUNTER SINK 4 DETAIL SECTION 1800
6a 200

A-7 SCALE 1:20 M


A-7
A-7 SCALE 1:20 M
4175
5 DETAIL SECTION

783
1 2 2 1 A-7 SCALE 1:20 M

6" THK CHB PEDIMENT

3919
4500 CEM. PLASTERED FIN.
4500
C A

0
650

65
650

3315
80
TOP OF ROOF BEAM TOP OF BEAM LVL.

R
M A
URINAL
80

392
W W W

E S
3 4 3

654

654
200 50 300

G
TOP OF ROOF BEAM

1452

500 268
3200
3225

R
150

802

74
6
FEMALE
TOILET
1600

1600
7a

1000

1000
MALE 6a DET. SECTION

3200
WC WC WC

TOILET 150mm CHB A-7


STORAGE
3rd FLOOR 3RD FLR. LVL. A-7 SCALE 1:20 M

TOILET LVL. 650

1000

1000
350 150
W W W
3 4 3
PIPE CHASE

1000

1000
3200
3200

13195
CONCRETE COLUMN 7b
FEMALE A-7
TOILET MALE
1600
1625

PIPE CHASE
TOILET

1000

1000
1525

3200
WC WC WC

STORAGE 150mm THK. CHB


2nd FLOOR 2ND FLR. LVL.
100

PLASTERED PAINT FIN. 150mM THK. CHB


TOILET LVL.
6mm THK. MARINE PLASTER FIN. w/40mm

9425
1000

1000
PLYWOOD CEILING ON GROOVE @1040mm OC &
50x50mm CEILING JOIST 10mm REINF. BAR
@600mm OC BW. @600mm OC. BW.
1525

w/10mm BAR HANGER PLASTERED PAINT FIN.


W W EMBEDDED ON SLAB W MALE
3 4 @1200mm OC. BW. 3
TOILET

1000

1000
(PROVIDE MANHOLE)
3200
3200

3200

W
200x200mm VITRIFIED 3 650
GLAZED WALL TILES

FEMALE 7 DET. OF FACADE PEDIMENT


7b DET. SECTION
1625

TOILET LAV
38 STAINLESS STEEL
A-7 SCALE 1:50 M

1000

1000
GRAB BAR

A-7 SCALE 1:20 M

3200
900

WC

GROUND FLOOR CLASSROOM LVL. CORRIDOR LVL.


50

50

325
300

300

300

TOILET LVL. TOILET LVL. TOILET LVL.


7a DET. SECTION

1000

1000
FIN. GRD. LN. FIN. GRD. LN.

8 A-7 SCALE 1:50 M

A-8

40

40
650
1 DET. SECTION OF FEMALE TOILETS 2 DET. SECTION OF MALE TOILETS

1000

1000
FFL
A-7 SCALE 1:50 M
A-7 SCALE 1:50 M

300

300
1525
9000

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-7
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
TOILET SECTION OF
DETAILS CONTENTS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


CONCRETE SLAB
GA 26 CORR. G.I.
ROOFING SHT. PAINT FIN.
POLYETHYLENE SHEET SEE TRUSS DET.
DAMP PROOFING 1000 6mm THK. MARINE
PLYWOOD CEILING ON
GRAVEL BEDDING TOP CHORD SEE
50x50mm CEILING
STRUCTURAL DETAIL
JOIST @600mm BW
10mm @250mm 38mm TEKSCREW 38mm TEKSCREW
ON CENTER
C-PURLIN (SEE STRUC'L GA 26 GI STRAP
DETAIL) COPPER RIVET
SAG ROD SEE
12x300mm FIBER CEMENT
8 DAMP PROOFING DET. STRUCTURAL DETAIL

100100
6mm THK. ORD.
FASCIA BOARD FIX W/METAL PLYWD. CEILING
BEAM REBARS SEE 6mm THK. MARINE
SCREW ON STL. FRAME PAINT
A-8 NOT TO SCALE STRUCTURAL DETAIL PLYWOOD
50x50mm CEILING
CEILING ON
FINISH (PAINT) ON 50x50mm
CLG. JST. @600mm
CONC. BEAM
GA 26 GI GUTTER
JOIST @600mm BW PAINT FIN. OC BW

50mm B.I. PIPE


C 12x12mm GROOVE
6mm THK. ORD. GA 26 GI STRAP 20x20X2mm ANGULAR

C SCHED. 40 RAILING
PLYWOOD CEILING W/
6mm GROOVE ON
5A
ROOF
BEAM GA 26 GI GUTTER
BAR
FRAME
FOR
COATED
FASCIA BOARD
WITH
QUARTER ROUND
MOULDING
W/ 25mm SQ. BAR 5
0
50x50mm CEILING
A-4
PAINT FIN. PRIMER
STEEL BRACKET @ 1
JOIST @600mm BW
EVERY 1200mm BASKET STRAINER

PAINT FINISH
(PAINT FIN.)
BASKET STRAINER 6mm THK. MARINE PLYWD.
200

675 CEILING (PAINT) ON 50x50mm


100mm CHB CONC. 75mm PVC CLG. JST. @600mm OC BW
RAILING W/ PLAIN CEM. DOWNSPOUT PAINT
700

PLASTER PAINT FIN.


FINISH 75mm PVC

50 CEILING VENT (SEE DOWNSPOUT PAINT


SPOT DETAIL
THIRD FLOOR LEVEL

DETAIL)
FINISH 12
A-8 SCALE 1 : 10 M
5 EAVES SECTION
SECTION SPOT DET. 10 SUN BREAKER DETAIL A-4 SCALE 1 : 20 M 1150

SCALE 1:50 M SCALE 1:20 M


575 575
A-8
TYPICAL DETAIL OF
SCALE : 1:20 M
50 325 50
25x25 mm

9 BALCONY RAILING WOOD


PROVIDE INSECT
VENT

SCREEN
A-8 SCALE AS SHOWN

275
B C
A FR. 25x75mm
WD.FRAME S4S KD
275

7000 2500 TANG.

6mm THK. MARINE PLYWOOD


CEILING ON 50x50mm CEILING.
25x25mm WOOD VENT
TOP OF ROOF BEAM 14 PLAN PROVIDE INSECT SCREEN JOISTS @600mm O.C. B/W
A-8 (PAINT FIN.)

13 CEILING VENT DETAIL


50mm G.I. PIPE 200
A-8 SCALE : 1 : 10 M
SPOT DETAIL
(CEILING VENT.)
SCHEDULE 40

W-4
(PAINT FINISH) 14
50mm G.G. PIPE SCH. 50
50mm G.I. PIPE
40 (PAINT FIN.) A-8 SCALE : 1 : 10 M
3200

SCHEDULE 40
200x200mm VITRIFIED
GLAZED WALL TILES
19mm SQUARE BAR (PAINT FINISH)
RAILING @150mm O.C. 50mm G.I. PIPE

WELDED TO G.I. PIPE SCHEDULE 40 PAIN. FIN.

19mm SQUARE BAR 175

150 150 150


D @150mm O.C. WELDED
4 TO G.I. PIPE HANDRAIL 50
19mm SQUARE BAR

L
900
CS
(PAINT FIN.)

900
WC WELDED TO G.I. PIPE

A L
50mm G.I. PIPE
HANDRAIL @150mm O.C.
THIRD FLOOR
CORRIDOR SCHEDULE 40
19

W
PAINT FINISH
9-RISERS@168mm

TOILET FIN. LINE 18


17
=1512mm

16

100
15 19 mm SQUARE BAR

50
14 ANCHORED TO THE

13 WALL (PAINT FIN.)


5 12
W-4
A-8 LANDING 11 150
10 ANCHORED @ R.C. STAIR
3200

200x200mm VITRIFIED 9
50mm % G.I. PIPE
10-RISERS@168mm

GLAZED WALL TILES 8


7
SCHEDULE 40 PAIN. FIN.
5 CRASH RAILING 6 SPOT DETAIL
=1680mm

D
5 A-8 SCALE 1:20 M
A-8 SCALE 1:20 M
SPOT DETAIL
4
4

(CRASH RAILING)
3
CS
2 7
WC
1 50mm G.I. PIPE
SECOND FLOOR CORRIDOR
TOILET FIN. LINE
19
SCHEDULE 40
A-8 SCALE 1:5 M

(PAINT FINISH)
9-RISERS@168mm

18
3
17
A-8
=1512mm

16
175
15
6mm THK. MARINE PLYWOOD 14 50mm G.I. PIPE
CEILING ON 50x50mm CEILING 50
13 SCHEDULE 40
38mm STAINLESS JOIST @600mm 0N CENTER 12
STL. GRAB BAR W-4
LANDING
19mm SQUARE BAR @150mm (PAINT FINISH)
BOTHWAYS W/ 10mm BAR 11
O.C. WELDED TO G.I. PIPE
HANGER @1200mm OC. BW. 10
3200

50mm% G.I. PIPE


9
50mm % G.I. PIPE
HANDRAIL (PAINT FIN.)
8 SCHEDULE 40
SCHEDULE 40 PAIN. FIN.

900
200x200mm VITRIFIED
7 (PAINT FINISH)
1125 6
GLAZED WALL TILES

50
5
1625

D 4
LAV
19 mm SQUARE BAR
3 2 3 ANCHORED TO THE
950

CS
900

2
WC A-8 LANDING F.F.L. WALL (PAINT FIN.)
1
FEMALE STORAGE CORRIDOR 19mm SQUARE BAR
168

GROUND FLOOR WELDED TO G.I. PIPE

168
325

TOILET FIN. LINE 50 300


HANDRAIL @150mm O.C.

25x25x2mm THK. ANCHORED @ R.C. STAIR

168
FINISHED GRADE LINE ANGULAR BAR
1200 NOSING
2000 3800

7000
50 300
25x25x2mm THK.
ANGULAR BAR
2 DETAIL SECTION 3 4 SPOT DETAIL
1
NOSING
HANDRAIL DETAIL
SECTION OF STAIR
A-8 SCALE 1:20 M
A-8 SCALE 1:5 M
A-8 SCALE 1:5 M

A-8 SCALE 1:50 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-8
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :

27 OCT. 2002
STAIR, HANDRAILTABLE
& MISC. OF CONTENTS
DETAILS
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


900

800 900

800

300

20
600
4EQ. PARTS= PVC PIPE
4000
1000 1000 1000 1000
9
2400

2100

2100

2100

2100

1200
STAINLESS STL.
800

1500
KICKING PLATE

300
1 F F 2 F F 3
10mm BAR

300

300

60
FFL

D-1 CLASSROOM D-2 TOILET


D-3 TOILET (DISABLED) D-3a D-4 TOILET (CUBICLE) 8
BEAM SEALANT
TANGUILE PANEL DOOR ON 50X150 HOLLOW CORE FLUSH TYPE SWING HOLLOW CORE FLUSH TYPE SWING LOUVER DOOR ON 50X100 SWING DOOR ON 50X100

1500

20
mm YACAL/GUIJO JAMB W/ FIXED DOOR ON 50x50mm YACAL GUIJO
DOOR ON 50x150mm GUIJO/YACAL YACAL/GUIJO DOOR JAMB YACAL/GUIJO DOOR JAMB
CLEAR GLASS TRANSOM COMPLETE JAMB W/ MARINE PLYWOOD FACING JAMB w/MARINE PLYWOOD FACING COMPLETE WITH HARDWARE COMPLETE WITH HARDWARE

1200
WITH HARDWARE AND ACCESSORIES INSIDE AND ORDINARY OUTSIDE INSIDE AND ORDINARY OUTSIDE ACCESSORIES ACCESSORIES

COMPLETE W/ HARDWARE AND

2
COMPLETE W/ HARDWARE AND
ACCESSORIES ACCESSORIES PROVIDE KICK PLATE

3 EQUAL PARTS = 2000


4EQ. PARTS SEALANT

20
4000 2 EQUAL PARTS = ±950
1000
2000

4 5 7 6
300

F F F F

600

600
600
MANUAL LOCK 3x25mm Z-BAR
9 FRAME
1200

1100

2400

2400
2400

2400

2000

1800
PUTTY

2 TYP. STEEL CASEMENT TYPE (W-1)


300 400
900

A-9 SCALE : 1 : 20 METERS

CLEAR GLASS
W-1 CLASSROOM W-2 CLASSROOM W-3 TOILET W-4 TOILET

RQD: 30 SETS JALOUSIE WINDOWS WITH CLEAR GLASS STEEL AWNING WINDOW STEEL AWNING WINDOW
LOC: REAR ELEVATION BLADES ON STANDARD ALUMINUM CASING

STEEL CASEMENT WINDOW ON 50X150mm YACAL/GUIJO JAMB


WITH FIX GLASS COMPLETE WITH HARDWARE AND
ACCESSORIES & STEEL GRILLS ON 300mm 1.6x35mm CONT.
FROM FLOOR FIN. 60 20 WEATHERING

1 SCHEDULE OF DOORS & WINDOWS 25

ANGLE PIN
A-9 SCALE : 1 : 50 METERS HINGES
TRANSOM
SEALANT
Z-BAR Z-BAR FRAME BAR

I-BAR MULLION
3x25mm Z-BAR 8

GLAZING PIN
CHB GROUT

25
2 PUTTY

3 1

WINDOW JAMB
SPOT WELD CLEAR GLASS
FULL WELD
PVC PIPE CLEAR GLASS
25 PUTTY

10mm BAR
20 2 20

WINDOW JAMB

60 20

16

3x35mm Z-BAR
25 7
PUTTY

SPOT WELD
FRAME CLEAR GLASS
MEETING RAIL MULLION

VENT
HINGE
7
FRAME

6 5 4
10
35

WELD GROUT
3

PVC PIPE
25

HINGE
25 SILL
ANGLE PIN WINDOW
FULL WELD
GLAZING CLIP 1.
6
10mm BAR

35
SEALANT
ANGLE PIN
3 VERTICAL DETAIL SECTION 20 2 20
32 CHB

A-9 SCALE : 1 : 10 METERS WINDOW JAMB

4 HORIZONTAL DETAIL SECTION


A-9 SCALE : 1 : 10 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-9
F O RC E

ALBERT Z. DE BELEN
FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
9
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
DOOR & WINDOW OF DETAIL
SCHEDULE, CONTENTS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : OF STEEL CASEMENT
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


GENERAL NOTES  LOAD SCHEDULE
SYMBOL DESCRIPTION
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH PANELBOARD: LP
THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS - CEILING LIGHT OUTLET
MOUNTING: FLUSH TYPE: BOLT-ON MAIN : 150AT, 225AF, 2P, 230V
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). 2 - 2 x 40 WATTS FLUORESCENT LAMP

THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY - CEILING FAN OUTLET CIRCUIT BREAKER
 CKT. VA WIRE & CONDUIT SIZE
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. NO. DESCRIPTION LOAD
S/S a - ONE GANG DEVICE SWITCH VOLT POLE AT AF
THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE 2
S ab - TWO GANG DEVICE SWITCH 1 LIGHTING OUTLET 1860 230 2 20 50 3-3.5mm THW IN 15mm C
SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
2
Scde - THREE GANG DEVICE SWITCH 2 LIGHTING OUTLET 1500 230 2 20 50 3-3.5mm THW IN 15mm C
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE,
230 V AC, 60 Hz. S 3W - THREE WAY DEVICE SWITCH 3 LIGHTING OUTLET 1000 230 2 20 50
2
3-3.5mm THW IN 15mm C
2
3. WIRING METHOD SHALL BE AS FOLLOWS : Sf - FAN CONTROL SWITCH 4 CONVENIENCE OUTLET 1260 230 2 20 50 3-3.5mm THW IN 15mm C
a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT S EF - EXHAUST FAN SWITCH 5 CONVENIENCE OUTLET 1260 230 2 20 50
2
3-3.5mm THW IN 15mm C
2
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT - RACEWAY CONDUIT CONCEALED IN CEILING 6 LIGHTING OUTLET 1760 230 2 20 50 3-3.5mm THW IN 15mm C
BRANCH CKT., & AUXILIARY SCH. 40
2
- RACEWAY CONDUIT CONCEALED UNDER FLOOR 7 LIGHTING OUTLET 1500 230 2 20 50 3-3.5mm THW IN 15mm C
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE 2
8 LIGHTING OUTLET 1000 230 2 20 50 3-3.5mm THW IN 15mm C
"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
- PANELBOARD 2 2
9 CONVENIENCE OUTLET 1260 230 20 50 3-3.5mm THW IN 15mm C
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE
- CKT. BREAKER, RATING AS INDICATED
3.5mm 2AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL
2
10 CONVENIENCE OUTLET 1260 230 2 20 50 3-3.5mm THW IN 15mm C
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
BE 15mm I TRADE/NOMINAL
O SIZE. 11 LIGHTING OUTLET 1760 230 2 20 50
2
3-3.5mm THW IN 15mm C
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
2
5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP 12 LIGHTING OUTLET 1500 230 2 20 50 3-3.5mm THW IN 15mm C
TYPE WITH FACTORY KNOCKOUTS. EF
- EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE
2
10 AMPS, 250 VOLT WITH MODERN PLATE COVER 13 LIGHTING OUTLET 1000 230 2 20 50 3-3.5mm THW IN 15mm C
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED LP 230 2 2
3-3.5mm THW IN 15mm C
- HOMERUN DIRECT TO PANELBOARD 14 CONVENIENCE OUTLET 1260 20 50
TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.
2
15 CONVENIENCE OUTLET 1260 230 2 20 50 3-3.5mm THW IN 15mm C
- PUSH BUTTON
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT. - ENCLOSED AIR CIRCUIT BREAKER 16 S P A R E 1500 230 2 20 50

FA - FIRE ALARM CONTROL PANEL TOTAL 21940


8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
F - FIRE ALARM STATION OUTLET
2
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR IL @ 80% D.F. = 21940 x 80% x 1.25 = 95.4 A FEEDER: 2-50mm THW IN 40mm C
B
- VIBRATING BELL OUTLET
230 V PROTECTION: 150 AT, 225 AF, 2P, 230 V
b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR. B - FIRE ALARM BELL
c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR M - SERVICE METER
OVERHEAD SERVICE ENTRANCE
CONNECTED TO 220V AC, 1O,
- SERVICE ENTRANCE 2 WIRE, 60 Hz FITTED WITH
40mm O TYPE "F" CONDULET
d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR

BUILDING WALL
e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR TO SIMILAR OUTLET
@ SECOND FLOOR
& THIRD FLOOR
2ND FLOOR LINE
f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

PANEL LP
2-50mm 2 THW B B B
IN 40MMORSC

150AT, 225AF, 2P, 230V AC TO LINE SIDE OF LP 2-2.0mm 2 TW


IN 15MMOC
1 2
20 20
F F
4-2.0mm TW
3 4
20 20 METERING CONDUIT IN 15MMOC
3-3.5mm THW
2

5 6
KWHR METER IN 15MMORSC
20 20

FA
7 8
20 20

9 10
20 20 2-2.0mm 2 TW
ENCLOSED ACB IN 15MMOC
11 12 RATING: 20AT, 50AF,
20 20
230V, 2P

1500 mm
TO NEAREST C.O.

1800 mm
13 14
20 20

15 16
20 20

GROUND TERMINAL
ELECTRICAL FIRE ALARM VIBRATING BELL FIRE ALARM
GROUND FLOOR LINE

2
#14mm BARE COPPER WIRE FIN. GRADE LINE
2
1-8.0mm BARE COPPER WIRE
16mm O x 2.40m IN 15mmO C
I

COPPERWELD
GROUND ROD 16MMO x 240MM LENGTH
GROUNDING ROD COPPERWELD

SINGLE LINE DIAGRAM RISER DIAGRAM


NOT TO SCALE
NOT TO SCALE

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A
VENERANDO D. SAHAGUN

DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M
L

E-1
PP
UB

DepED
TA

N ITO R I NG
I

ENGINEER III FE M. BARRIENTOS


REP

NES

SK

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI



F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN

3
T O F ED

MERALCO AVENUE, PASIG CITY CHIEF, ELECTRICAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: LOAD SCHEDULE
PRC NO. : TIN :
GENERAL NOTES LEGEND
PTR NO. : DATE : LOCATION : DATE : 01 03 SINGLE LINE DIAGRAM RISER DIAGRAM
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT NOTE:
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
OF THE SAME DUE TO FAULTY DESIGN. MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
            
4500 9000 9000 9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

 SEF SEF
EF EF
STO 3.0000

S c b a c b a c b a c b a c b a
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

SHE HE
S S
SINK COUNTER
CLASSROOM CLASSROOM

2 2

S S
9500

  


c b a c b a c b a c b a c b a

CHALKBOARD

CHALKBOARD
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

   

Sabc Sab
Sabc Sabc Sabc SF Sabc 
 S S
Shi Sfg Sde DN
DN

i i h h g g f f e e d d
2 1 1 1 1 1 1 1 1 1 1 2


SCALE : 1 : 100 METERS

            
9000 9000 9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

 SEF F F F F F
SEF
EF EF
NCR
c b a c b a c b a c b a c b a HE
S 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 S
SHE
S S
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
SD

S S S S
c b a
c
b a c b a c b a c b a
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

  

Sabc F
Sabc SF F
Sabc F
Sabc F
Sabc F

 1500

UP
i i
Shi
h h
Sfg f f
Sde
d d
UP
g g e e
2 1 1 1 1 1 1 1 1 1 1 2


RAMP
UP UP UP RAMP
UP


SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A
VENERANDO D. SAHAGUN

DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T

E-2
M
L

PP
UB

DepED
TA

N ITO R I NG
I

ENGINEER III FE M. BARRIENTOS


REP

NES

SK

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI



F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

CHIEF, ELECTRICAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


3
MERALCO AVENUE, PASIG CITY UNDERSECRETARY
SHEET CONTENTS :
PRC NO. : TIN :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

PTR NO. : DATE : LOCATION : DATE : 01 03


LIGHTING LAYOUT

THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT NOTE:
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
OF THE SAME DUE TO FAULTY DESIGN. MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
            
4500 9000 9000 9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

 Sf F Sf F Sf F Sf F Sf F

STO

SHE HE
SINK COUNTER

 


9500



DPB/DBC
Sf F Sf F Sf F Sf F Sf F

 DN
TO C.O.
DN

C O R R I D O R C O R R I D O R

TO FA
B B B
TO FA TO FA


SCALE : 1 : 100 METERS

            
9000 9000 9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

 Sf F Sf F Sf F Sf F Sf F
M


NCR
HE

SHE

SD

 





DPA
ENCLOSED AIR CIRCUIT BREAKER
RATING: 220 V, 2P, 20AT, 50AF

Sf Sf Sf Sf Sf
TO LINE SIDE OF DP
F F F F F

FA
 UP 1500 UP
TO C.O.

TO FA
B B B
TO FA TO FA

 M

RAMP
UP UP UP RAMP
UP

ECNARTNE ECIVRES DAEHREVO


MARGAID RESIR OT REFER


SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A
VENERANDO D. SAHAGUN

DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M

E-3
L

PP
UB

DepED
TA

N ITO R I NG
I

ENGINEER III FE M. BARRIENTOS


REP

NES

SK

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI



F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN

3
T O F ED

MERALCO AVENUE, PASIG CITY CHIEF, ELECTRICAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY
SHEET CONTENTS :
PRC NO. : TIN :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

PTR NO. : DATE : POWER LAYOUT


LOCATION : DATE : 01 03

THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT NOTE:
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
OF THE SAME DUE TO FAULTY DESIGN. MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
100mmØ PVC MAIN
UR SOIL STACK
WC FD FD FD WC FD WC FD
WC WC CO CO
100mmØ PVCSP 100mmØ PVCSP
75mmØ PVC MAIN VENT PIPE 75mmØ PVC MAIN
CO CO
75mmØ PVCWP 75mmØ PVCWP VENT STACK

75mmØ PVCWP
75mmØ PVCWP
SHE FD
FD 100mmØ PVC MAIN
75mmØ PVCWP
CO CO 75mmØ PVCWP
WASTE STACK
CSF CSF CSF CSF CSF CSF
CO CO

DN
DN

2 
P-1 SCALE : 1 : 100 METERS

100mmØ
TO SEWER 100mmØ PVCSP CO SEPTIC
LINE TANK
100mmØ
8850 CO 100mmØ
CO

150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2%
CB CB CB CB CB CB CB
100mmØ PVCWP CO 100mmØ PVCWP
CO CO
100mmØ PVCSP 100mmØ PVCSP 100mmØ PVCSP 100mmØ PVCSP CO
CO
CO OC 100mmØ PVC MAIN SOIL STACK PIPE

150 mmØ CDP sloped @ 2%


150 mmØ CDP sloped @ 2%

100mmØ PVCWP
100mmØ PVCWP

CO LAV UR CO
FD FD LAV FD
SS WC WC FD WC WC FD WC 75mmØ PVC MAIN VENT STACK
FD
NCR
HE 100mmØ PVC MAIN WASTE STACK
PIPE

FD
75mmØ PVCWP CO CSF CSF
CO
CO CSF CSF SD CO

CB CB

150 mmØ CDP sloped @ 2%


150 mmØ CDP sloped @ 2%

UP UP

C O R R I D O R

RAMP
UP UP UP RAMP
UP

150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2% 150 mmØ CDP sloped @ 2%
CB CB CB CB CB CB CB CB
200 mmØ CDP sloped @ 2%

200 mmØ CDP sloped @ 2%


1 
P-1 SCALE : 1 : 100 METERS

TO MAIN DRAIN
SYSTEM

TO MAIN DRAIN
SYSTEM

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: mmC
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T

P-1
M
L

PP
UB

DepED
TA

N ITO R I NG
I
REP

NES

SK

ELIAS MELQUIADES EMEL B. CUBA II EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: Max C


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY

5
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
PRC NO. : TIN :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

DRAINAGE AND SANITARY SYSTEM LAYOUT


PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
REP
DE
UB
PA
R L

IC

TM
EN
of
t he PH
I

T O F ED
LI

UC
A
T
PP
I
IO
N
NES

C
B

2
P-2
1
5 PI PI
0 PE PE
C 2N C 3R
H H
m
m 1 AS D AS D
E FL E FL
Ø
C R R
0
C 0 O
5 5
D
0 0
m
m
P
m
m
m m
R Ø Ø
sl Ø
IS R R
P P
op
IS IS
V V
P ER
C

REPUBLIC OF THE PHILIPPINES


C
ER ER

MERALCO AVENUE, PASIG CITY


ed V
B B 5
V 0
C
V
@ SS
m
W
m
P
2
D 1 1 Ø

DEPARTMENT OF EDUCATION (DepED)


P FD FD
H 0 W 0
%
C 0 C 0 P
C V 7 V 7 V
O P m P m C
C W 5 m 5 m W B
B Ø m Ø Ø m Ø V

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


C m m C
m Ø P m Ø P
1
PI PI
C m V m V
O 5 C 5 C
FD FD FD
EN
F O RC E
TA
SK
0
5
PE PE 7 P P
G C C V S V S

IN
T
H 2N H 3R 5 775 775

EE
m
D D CC P C P

F
m
5

RI N
AS AS m m
Ø 1
E FL E FL m 5 W W W
C

E
0
R R
O 50 0

MCMXCIX
C 0 O m 0 C m P W m P W
5

A
m m

G , A S SE S S
5
D
0 0 Ø m C SØ C SØ

ME
m

N
M
m
P
T
&
MO
m m
m m m I F C m C O I F C
N ITO R I NG P NP NP
R Ø Ø
sl Ø FD C mØ
IS R R S
FD O KV D S Ø KV D
P P V
op
IS IS
V V C Ø
e P ER
C
ER C ER C C P CC P
d V C L
FD FD
B B 5 S P V V
V 0 W OW
C OW A
V
@ SS C
W m V U C U
m P C NP V C NP C
P
2
D 1 1 Ø C
P FD FD B C CB
%
C
H 0
C
W 0 P B T O T O
0 0 V E E
C
S BV S V
V 7 m V 7 m C V
O W P 5 m P 5 m W B
R R
C Ø m Ø Ø m Ø C V
C C
m m m m
Ø P Ø P C O O

PTR NO. :
PRC NO. :
C m V m V C C
O 5 C 5 C
FD FD FD
7 P P S FD
5 775 V S 775 V S
m m C 5 C P m 5 C P C C SS C SS
5 W O 0 W 0 W
m 0 C m P W m P W O W O O
Ø m C SØ m C SØ m
m C C
P FD m I
NP F C Ø
O I
NP F C mØ C H H
V C Ø
FD O KV D S KV D S
C P CC P
C W S P
V
CC L
OW A V
FD
OW V
FD
S
E E
U C U C D
B P C NP V
T
C CB O NP
T
C CB O
B E S V E S V
V R C R C
C C O C O
S

CONSULTANT / DESIGNER
FD
C W C SS C SS
1 O O H O H
5 C E E
S
D
0
m
m
Ø
C
D
P
sl

TIN :
ISOMETRIC PLUMBING LAYOUT - FEMALE TOILET
op

SANITARY ENGINEER

DATE :
ed
@
2 C
% B DS

75mmØ PVCDS
C
B

CO
D
N
1
0
0

ELIAS MELQUIADES EMEL B. CUBA II


C m 1
B m 5
Ø 0
m TO
P m
V Ø S
C C LI EW
S D N E
P
CO

2
1 P E R
5
0 sl
0
0 op
m
m ed D
m
m N

REVIEWED BY:
Ø @
Ø
C
C
D
D 2 1
P
P %

FD
FD
sl
sl 0

CO
op 75mmØ PVCDS
op
ed
ed 0
@
@ 1
0
m 1
2
2 0
m m 5
%
%
0

DS
m
R Ø Ø
A m
U MP
P
PV
C C P m
T B S
O C P V Ø
M
B
DS

S AI
C C
Y N S D
S D
T R 75mmØ PVCDS P P

P-2
E A
M

BUREAU OF DESIGN, DPWH


CO

IN

CHIEF, ARCHITECTURAL DIVISION


sl
op

EMMANUEL P. CUNTAPAY
1
5
ed
0 1
5

NOT TO SCALE
m 0 @
m
Ø m
C m 1
D Ø 2
P C 0
D 0 1 %
sl P m 0
op C m 0
e sl O Ø m
d op C m
@ ed O Ø
2 @
%
2
%
S
FD
FD

CO

75mmØ PVCDS T EP
A T
N IC
K
DS

1
0
C 0
B C m
B C m

RECOMMENDING APPROVAL :
O Ø
DS

C 75mmØ PVCDS
O
CO

OIC, DIRECTOR III


1
5
0
1 m

BUREAU OF DESIGN, DPWH


SOFIA T. SANTIAGO
5 m
0 Ø
m C
m D
Ø P
C sl
D
P op
sl ed
op @
ed
2
@ %
2
%
FD
FD

CO

75mmØ PVCDS
DS

C
B C
B
DS

U
P
75mmØ PVCDS
CO

1 ISOMETRIC PLUMBING LAYOUT

1
5

APPROVED FOR ACCREDITATION :


0
m
m
Ø
C
D
P

OIC, DIRECTOR IV
sl
C op

BUREAU OF DESIGN, DPWH


ed

GILBERTO S. REYES
U @
P 2
O %
1
0
0
m
R m
FD
FD

Ø
CO

75mmØ PVCDS
P
V
R C
S
P
DS

I
C
B C
D B
DS

CONCURRED :

75mmØ PVCDS
O
CO

1
5
0
m R
m
Ø 1
C 5
D 0
P m
sl 1 m
op 0 Ø
0 C
ed m D
@ m P
UNDERSECRETARY

Ø sl
2 op
% P
V ed
RAMON C. BACANI

C @
S
P C 2
O %
DEPATMENT OF EDUCATION (DepED)
FD
FD

CO

75mmØ PVCDS 1
0
W 0
C m
m 5
0
FD LA Ø m
m
DS

N V Ø
C P P
R V V U U
1 C C R R
C W B C C
5 V O O
0 B P C C
O O
5 5
U 0 0
m R W m W m
FD C m C m
1 m Ø Ø
1 P 1 P
0 Ø 0 V 0 V
0 0
FD
C C C
7 m B 7 m B
0 B 5 m W V 5 m W V
C C m Ø C m Ø C
W O m m
m Ø P Ø P
LOCATION :

D 1 C V
C
V
C
P 5 P P
m V S V S
0 C P C P
W W
Ø m C C P C P
O O
PROJECT TITLE :

m O
sl
o Ø R R FD R
IS IS IS
P C C E R
FD C E C E
D S 5
S R S R
pe
V 0
d P m P 5 P 5
C
m C W 0 0
C sl S
Ø S C m C CW m
@ V m S V m
P P P
op Ø Ø
S ed V
C Ø 5 P PI Ø 5 P PI
C B m 0 V P[
E m 0 V P[
E
@ S V m m C m m C
P C 2 5 m B C 5 m B C
O % 7 Ø V H 7 Ø V H
2 P
AS
P
AS
% C V EC V E
C O C O C
O B B
V V

1
0
FD
FD

CO

W R D 75mmØ PVCDS
A
0 U MP N
C m P
5


m 0 C


FD m B
DS

LA Ø m
DS

N V Ø


C P P C
R V V U U B
C C R R
W B C C 1
V O O 5
P 0 1
C C m 5
O O m 0
5 5 Ø m
0 0 C m
U W m W m D Ø
R m m P C
FD C Ø
C Ø sl
op P
D
DATE :

1 1
3

P P ed
sl
0 V 0 V
P-2

op
FD 0 0 @
C C
ed
C 7 m B 7 m B 2
%
@
5 m 5 m
CHECKED BY:

B W V W V
C m Ø C m Ø C %
2
O m m
NOTE:

W Ø P Ø P
C V V
DESIGNED BY: AZB

P C P C
ENCODED BY: Max C

01 03

V S V S
PROJECT NO: 01-002

C P C P
W W C
C C P C P B
O O O
R R FD R 2
IS IS IS 0
C 0
S
ER 5 FD C C
0 S ER S ER
m
m
OWNER :

m P 5 P 5 Ø
C
m C W 0
C W 0 D
C
S
Ø S C m m P
V m S VC m
P P
P sl
V Ø Ø op
Ø 5 Ø 5
C P PI P PI ed
SHEET CONTENTS :

C B m 0 V P[
E m 0 V P[
E @
S V m m C m m C
5 m B C 5 m B C %
2
7 Ø V H 7 Ø V H
T
AS AS
P P E O
C V EC V
C O C O C M
O B B S AI
V V Y N
S D
T R
E A
M
IN
DepED

ISOMETRIC VIEW
FD

D 75mmØ PVCDS
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

N
C
B
DS

DEPARTMENT OF EDUCATION

DRANAIGE & SANITARY SYSTEM


SHEET NO:
ISOMETRIC PLUMBING LAYOUT - MALE TOILET

5
P-2

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

REP. ACT 545


MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
1 2 3 4 4 3 1 2 7 5 6 8
SCHEDULE OF FINISHES
1 2 3 3 2 1
1 19mmØ GICWL RISER

25mmØ GICWL
25mmØ GICWL 25mmØ GICWL
2 19mmØ GATE VALVE
19mmØ GICWL UR 19mmØ GICWL
19mmØ GICWL 19mmØ GICWL WC WC 3 19mmØ GICWL

19mmØ GICWL
UP GV WC WC WC

19mmØ GICWL
GV SS WC WC LAV WC STO

19mmØ GICWL
WC LAV UR WC 4 25mmØ GICWL
25mmØ GICWL
RISER
19mmØ GICWL NCR RISER
RISER 5 STAINLESS WATER TANK (125 GAL CAPACITY)
RISER

FROM WATER SOURCE


HE GV 6 64 GAL CAP. STAINLESS PRESSURE TANK

CV CV SHE 7 1.5 HP BOOSTER PUMP


UP
GV
8 IMAGINARY LINE OF PUMP HOUSING
CS F
SINK COUNTER
F F CS
SINK COUNTER 19mmØ GICWL
F F 19mmØ GICWL
SD 19mmØ GICWL

GROUND FLOOR FEMALE TOILET GROUND FLOOR MALE TOILET


3  SEC. & 3RD FEMALE TOILET SEC. & 3RD MALE TOILET

1 2 3 P-3 SCALE : 1 : 20 METERS


3 2 1

19mmØ GICWL UR 19mmØ GICWL


WC WC WC WC WC

19mmØ GICWL
19mmØ GICWL

STO
RISER RISER

SHE
SINK COUNTER
F F F CS
19mmØ GICWL
19mmØ GICWL

DN
DN

2 
P-3 SCALE : 1 : 100 METERS

1 2 3 4 4 3 1 2 7 5 6 8

25mmØ GICWL
25mmØ GICWL 25mmØ GICWL

19mmØ GICWL 19mmØ GICWL UP GV


GV SS WC WC LAV WC

19mmØ GICWL
WC LAV UR WC
25mmØ GICWL

19mmØ GICWL

RISER NCR RISER

FROM WATER SOURCE


HE GV
CV CV
UP
GV
CS
SINK COUNTER
F F SD 19mmØ GICWL

UP UP

C O R R I D O R

RAMP
UP UP UP RAMP
UP

1 
P-3 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: AZB
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M
L

PP
UB

DepED
TA

N ITO R I NG
I
REP

NES

SK

EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


ELIAS MELQUIADES EMEL B. CUBA II  
F O RC E

ENCODED BY: Max C


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

MERALCO AVENUE, PASIG CITY SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY


SHEET CONTENTS :
PRC NO. : TIN :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

WATER SYSTEM LAYOUT


PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
19
mm
Ø
GI
CW
L
U
R
19
F

mm

W
C
Ø
GI
F

CW

L
L

C
RIS

CW
ER

GI
19
mm
L

Ø
CW

mm
F

GI

GI
C

CW
Ø

19
F

mm

19
L
19

W
C
F

mm
19mmØ GICWL

Ø
W
19

S
I

C
N
mm

GI U
C
Ø

O
U
N
GI
T
E

CW R
R
CW
L

19
L
H

T
RIS

mm
ER

Ø
1
19

GI
mm
L
CW

Ø
GI

CW
W
F

GI
C

CW
Ø
mm

L
F

L
19mmØ GICWL
19

W
C
F

W
19

S
I

W
N
mm

K
C

C
Ø

O
U
N
GI
T
E
R
CW
F

S
H

T
E

L
C
19

CW
25
F

mm
CW

GV

mm
Ø
GI

GI
GI
L

SS
Ø

CW

Ø
CW
mm
F

LA
GI

L
25

Ø
RI
F

GI
V

mm
F

SE

19
mm

mm

FR
W
19

CW
19
F

OM
Ø

19
GI

PR

L
CW

mm
ES
W

W
C

SU

C
RE

Ø
LA

TA
V

GI
NK
W

CW
N
C

25
S
D

19 RI
L

mm
R

mm SE

Ø
Ø R

GI
GI UR

CW
CW

L
L
H
F

E
F

W
C
F

RI
L

L
CW

CW
SE
S

GI

R
I

GI
N
K

CS
19

Ø
O
mm

mm
U

mm
N
T
Ø

19

25
R
R UP
A

GI
M
P

UP
CW

CV
L

GV

GV
CV
GV

UP
2 FEMALE TOILET ISOMETRIC WATERLINE DIAG.
P-4 NOT TO SCALE

CE
UR
SO
RIS

R
TE
4
ER

WA
OM
19

FR
mm
L
CW

F
GI

GI
C

2 MALE TOILET ISOMETRIC WATERLINE DIAG.


CW
Ø

F
mm

P-4
19

NOT TO SCALE
C

F
19mmØ GICWL

W
19

S
I

C
N
mm

K
C
Ø

O
U
N
GI
T
E
R
CW
L

19
P
H

mm
T

Ø
RIS
E

GI
CW
L
ER

25
C

mm
1

Ø
GI
19

CW
P

U
R
L
O
mm
L
CW

R
GI

F
GI

19
C

mm
R

W
C
Ø
CW
Ø

GI
F
mm

CW
F
L

W
19mmØ GICWL

L
L

C
CW
19

GI
C

Ø
D

mm
F

19
19
mm
Ø
O

GI U
CW R
19
L
W
19

mm
R
I

Ø
N
mm

GI
K

CW
C

L
Ø

O
U
N

F
GI
T

W
C
E
R

F
CW

L
C
19

CW
F
L

mm
S

GI
S

Ø
LA
H

Ø
T

GI
V

mmCW
19
E

19
O

L
mm
W
C

Ø
GI
ISOMETRIC WATERLINE DIAGRAM

CW
N

25
C

19 RI
L

mm
R

mm SE
1
25

Ø
Ø

GI
L

GI UR

CW
mm
CW

CW
R

L
P-4

L
GV

Ø
GI

NOT TO SCALE

H
F

E
GI
L

F
SS

W
Ø

CW

C
CW
mm

F
F
GI

RI
L

L
CW

CW
SE
L
25

GI

R
I

GI
N
RI

CS
19

Ø
O
Ø

mm

mm
U

mm
F

N
SE

T
Ø
19
mm

19

25
R
GI
R

UP
CW

CV
mm

FR
W
19

GV
C

GV
CV
F
OM
Ø

GV

UP
GI

PR

CE
CW

R UP

UR
A
ES
W

M
P

SO
C

SU

R
TE
WA
RE

OM
FR
LA

TA
V

N K
W
C
S
D

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: AZB
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M


L

PP
UB

DepED
TA

N ITO R I NG
I
REP

NES

SK

ELIAS MELQUIADES EMEL B. CUBA II EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: Max C


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

MERALCO AVENUE, PASIG CITY SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY


SHEET CONTENTS :
PRC NO. : TIN :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

WATER SYSTEM ISOMETRIC DIAGRAM


PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
LEGEND:
100mm THK. + FIN. SLAB W/
10mm REBARS AT 200mm O.C.
CB CATCH BASIN
BENT UP 2 OUT OF 3 AT L/4
FROM FACE SUPPORT. BOTH WAYS 100mm THK CHB W/ CDP CONCRETE DRAIN PIPE

10mm VERT/HOR BAR 100mm THK. + FIN. SLAB W/ CO CLEAN OUT


150X300mm RC BEAM W/2-16mm @600mm O.C. EW
10mm BENT UP 2 OUT OF 3 AT L/4 FROM
600 TOP AND BOT. REBARS & 10mm STIRRUPS
FACE SUPPORT BW
1@50,3@100, REST @300mm O.C. CV CHECK VALVE
1000
AIR SPACE

HB HOSE BIBB

MH MH
AIR SPACE

VAR.
FD FLOOR DRAIN
INLET
AIR SPACE
UP UNION PATENTE

100
INLET

100
NGL GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)
300 NGL
MH

300
WATER

50
WATER LEVEL GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)
LEVEL
150 700 150
PLASTERED W/ WATERPROOFING PLASTERED W/WATERPROOFING COMPOUND OR GV GATE VALVE
COMPOUND OR APPLY ONE APPLY ONE FACE BITUMEN TAR
LEACHING FACE BITUMEN TAR
WALLS REINFORCEMENT
2150

MH MANHOLE
CHAMBER

1900
10mm VERT. & HOR. BAR
1600

@200mm OC BW
PVCDS POLYVINYL CHLORIDE DOWNSPOUT
GRAVEL BED

DIGESTIVE CHAMBER 10mm REINF. VERT & HOR.


PVCDP POLYVINYL CHLORIDE DRAIN PIPE
@200mm O.C BWAYS

1SLOPE PVCDS POLYVINYL CHLORIDE DOWNSPOUT


150

150
PVCSP POLYVINYL CHLORIDE SOIL PIPE

150 2500 150


150 1000 150 5000 150 PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
2800
6450
PVCVP POLYVINYL CHLORIDE VENT. PIPE

150mm THK. SLAB W/ 150mm THK. + FIM. SLAB W/


10mm REBARS @ 10mm REBARS @300mm O.C. BW PVCVS POLYVINYL CHLORIDE VENT STACK
300mm BOTH WAYS

3 CROSS SECTION DETAIL PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL

2 LONGTUDINAL SECTION DETAIL P-3 SCALE : 1 : 40 METERS


PVCWP POLYVINYL CHLORIDE WASTE PIPE

P-2 SCALE : 1 : 40 METERS PVCWS POLYVINYL CHLORIDE WASTE STACK

700 PVCSPR POLYVINYL CHLORIDE SOIL PIPE RISER

150 400 150 RD ROOF DRAIN

UD URINAL DRAIN

WC WATER CLOSET

150
DRAINAGE PIPE LAV LAVATORY

2-10mm EXTRA BARS CS COUNTER SINK


S-1a 100mm THK. + FIN. SLAB W/

700

400
TOP/BOT. ON TWO PARALLEL INLET OUTLET
10mm REBARS @ 300mm O.C.
SIDE
BENT UP 2 OUT OF 3 AT L/4 PLUMBING NOTES:
FROM FACE OF SUPPORT B.W.

150
6450 1. GRADES OF HORIZONTAL PIPINGS

1000 5000 RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2
150 150 150

2. CHANGE IN DIRECTION
200 600 200 2000 150 700 150 2000
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP
QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A
SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE
LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
150

3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING
700
900

OUTLET OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.
150MM THK. CHB W/ 10mm
REBARS HOR. EVERY 2-LAYERS
50 (TYP.) 150 400 150
VERT. @600mm O.C.
1.
4. PIPE CLEAN-OUTS
INLET CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:
50

75 75mm a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°).
PVCDS b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
2800

2500

600

MH
S-1a MH
S-1a c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.

100
d) AT THE END OF ANY HORIZONTAL PIPE LINES.
50

CDP
2
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
P-3

(VARIABLE)
50

min.
900

2SLOPE
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
CDP
INLET
10mm BAR HANDLE VAULT ROOF SLAB.
3-10mm (E.W.)

600
2SLOPE
50

7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.


600 OUTLET
150

100
250 100 250 8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING

100
S2 100mm THK. + FIN. SLAB W/ CONTRACTOR.
10mm REBARS @ 300mm O.C.
INLET
BENT UP 2/3 OUT AT L/4
FACE SUPPORT AND SHORT SPAN AND DESIGN CRITERIA
CATCH BASIN DETAIL
100

10mm TEMP BARS @300mm E.W.


3 5
P-3 50 50
P-2 SCALE : 1 : 20 METERS i. LIVE LOAD_________________ 1000Pa
50 50
ii ALLOWABLE STRESSES
1. CONCRETE

a. FOR FOOTING, BEAMS AND SLABS


1 PLAN DET. OF SEPTIC TANK 4 COVER DETAIL fc'' = 20 MPa
2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)
P-2 SCALE : 1 : 40 METERS P-2 SCALE : 1 : 10 METERS
fm' =6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
FOR BARS SMALLER THAN 16mm

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


DEPARTMENT OF EDUCATION
mmc

THREE STOREY
E A
f the PH F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED)


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED P-5
F O RC E

ELIAS MELQUIADES EMEL B. CUBA II


FIFTEEN CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

SCHOOL BUILDING
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


FO

SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

5
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : TIN :
SEPTIC TANK, CATCH BASIN & COVER DETAIL, LEGEND,
PTR NO. : DATE : LOCATION : DATE : NOTES & DESIGN CRITERIA
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


            
2950 2950
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3
C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3

1400
TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

WF

WF

WF

WF
WF WF

PC-1 PC-1

7000

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2
PC-1 TG-3 PC-1 TG-3
100mm THICK
SLAB ON FILL

9500
WITH Ø10mm

3800
SPACED AT 400
BOTHWAYS

WF

WF

WF
WF
F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2

 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3
1525 2500

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1

1525
TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

1300

1300
RAMP RAMP

WF

WF
5301 5301

A 
S-1 SCALE : 1:100 M.
LEVEL C-1 C-2 C-3
NGL
350 350 350
100

L
500

NGL

(SEE SCHEDULE)
1150

350

350

350
TIE BEAM
1500

300

D
Y-BARS

3RD FLOOR LEVEL TO


X-BARS

ROOF DECKLEVEL
Y-BARS

t
100
250

X-BARS MAIN BAR: MAIN BAR: MAIN BAR:


L 100 mm THICK
6-Ø16mm 8-Ø20mm 8-Ø20mm
GRAVEL BEDDING TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm
PLAN SECTION 1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

C  B  350 350 350


S-1 SCALE 1:25 M
S-1 SCALE NTS



350

350

350
 

2ND FLOOR LEVEL TO


A. CONCRETE f'c = 20.685 Mpa (3000psi), minimum compresive strength of concrete a 28 days
unless otherwise specified.

3RD FLOOR LEVEL


B. REBAR fy = 275.8 Mpa (40,000 psi), minimum yield strength of reinforcing bars
unless otherwise specified. MAIN BAR: MAIN BAR: MAIN BAR:
TOP BARS 6-Ø16mm 12-Ø20mm 12-Ø20mm
C. FOUNDATION SBP = 95.706 Kpa (2000psf) was used in the design for all footings. TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm
2ND FLOOR LEVEL 2ND FLOOR LEVEL
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
10mmØ STIRRUPS
No footing shall rest on fill. 150mm TO CENTER 150mm TO CENTER 150mm TO CENTER
1@50, 6@100, REST@200
REFERENCES NSCP 2001, ACI 318-89, AISC ((th Edition)
350 350 350
G-4/G-6
SEE DEV'T G-5/G-7 G-5/G-7
SEE DEV'T

300
LENGTH

LENGTH
NOTE:
BOTTOM BARS


350

400

400
SEE SCHEDULE FOR
REINFORCEMENT OF
FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS

FOUNDATION LEVEL TO
MEMBERS.
FOOTING
MARK LENGTH WIDTH DEPTH Thickness

2ND FLOOR LEVEL


BAR X BAR Y
C-3 C-4 (L) (W) (D) (t)
F-1 1500 1500 1500 250 8 - 16mmØ 8 - 16mmØ SQUARE FOOTING MAIN BAR: MAIN BAR: MAIN BAR:
8-Ø16mm 14-Ø20mm 12-Ø20mm
D  F-2 2600 2600 1500 350 11 - 20mmØ 11 - 20mmØ SQUARE FOOTING
TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm
SCALE : 1 : 25 M 1@50, 8@75, REST @ 1@50, 10@75, REST @ 1@50, 10@75, REST @
S-1 F-3 2400 2400 1500 300 11 - 20mmØ 11 - 20mmØ SQUARE FOOTING 150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M
L

PP
UB

DepED 
TA

N ITO R I NG
I
REP

NES

SK

BERNADETTE N. AQUINO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

OIC, DIRECTOR III OIC, DIRECTOR IV



MERALCO AVENUE, PASIG CITY ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY
SHEET CONTENTS :
PRC NO. : 0074495 TIN : 199-674-196 BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
FOUNDATION PLAN, DET. OF FOOTING, TIE BEAM,
PTR NO. : DATE : ELEV. OF COL. SCH. FOOTING & COLUMN
LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
            
4525 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
2950 2950
G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

PC-1 B-2 PC-1 PC-1 B-2 PC-1


7000

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7

G - 7
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1

G-5
G-5

3800
3800

B-3

B-3
STAIR WELL S-3 S-3 STAIR WELL
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2

925 2500

S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2
G-4

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-4
G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1

CG-1
CG-1
A 
S-2 SCALE : 1:100 M.
B E A M S C H E D U L E

2500 3500 3500 BEAM S T E E L R E I N F O R C E M E N T S


FLOOR BEAM
DIMENSIONS S T I R R U P S
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT Ø10mm
(mm Ø) (UNLESS NOTED OTHERWISE)
L1 L2 L3 b h TOP BOTTOM TOP BOTTOM TOP BOTTOM

L1/3 L2/3 L2/3 L3/3 L3/3 G-1 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200
b b 2D1 2D1 2D2 LAP SPLICES ARE
ALLOWED ONLY IN
THIS PORTION
2D2 2D2 LAP SPLICES ARE
ALLOWED ONLY IN
THIS PORTION
2D2 b b G-2 200 400 Ø20mm 4 3 2 2 4 3 1@50, 6@100, REST@200
G-3 200 400 Ø20mm 3 3 2 2 3 3 1@50, 6@100, REST@200
6-20mm∅ 2-20mm∅ 6-20mm∅ 6-20mm∅
D1

500
G-4 200 400 Ø20mm 3 2 2 2 6 4 1@50, 6@100, REST@200

440
2-12mm∅

2ND FLOOR LEVEL


h

2-12mm∅ 2-12mm∅ 2-12mm∅

h
6-20mm∅
4-20mm∅
G-5 250 500 Ø20mm 6 4 2 4 6 4 1@50, 8@100, REST@200
4-20mm∅ 4-20mm∅

L2/5 L2/5 L3/5 L3/5


300

G-6 200 400 Ø20mm 4 3 2 2 6 4 1@50, 6@100, REST@200

300
2-12mm∅ STIFFENER
END MID
END MID G-7 250 500 Ø20mm 6 4 2 6 6 4 1@50, 8@100, REST@200
CG-1 200 400 Ø20mm 4 3 4 3 4 3 1@50, 6@100, REST@200
B-1 200 400 Ø16mm 4 2 2 2 4 2 1@50, 6@100, REST@200
B  B-2 200 400 Ø16mm 2 2 2 5 2 2 1@50, 6@100, REST@200

S-2 B-3 200 400 Ø16mm 2 2 2 4 2 2 1@50, 6@100, REST@200


G-1 200 400 Ø20mm 2 2 2 2 2 2 1@50, 6@100, REST@200
G-2 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200
L1 L2 G-3 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200
L1/3 TOP BAR L1/3 L2/3 TOP BAR
G-4 200 400 Ø20mm 3 2 2 2 5 3 1@50, 6@100, REST@200

3RD FLOOR LEVEL


G-5 250 500 Ø20mm 5 3 2 4 5 3 1@50, 8@100, REST@200
G-6 200 400 Ø20mm 3 2 2 2 6 4 1@50, 6@100, REST@200
L1/6
G-7 250 500 Ø20mm 6 4 2 6 6 4 1@50, 8@100, REST@200
CG-1 200 400 Ø20mm 3 2 3 2 3 2 1@50, 6@100, REST@200

C  B-1 200 400 Ø16mm 4 2 2 2 4 2 1@50, 6@100, REST@200

S-2 B-2 200 400 Ø16mm 3 3 3 5 3 3 1@50, 6@100, REST@200


B-3 200 400 Ø16mm 2 2 2 3 2 2 1@50, 6@100, REST@200
RG-1 200 400 Ø16mm 2 2 2 2 2 2 1@50, 6@100, REST@200



ROOF
LEVEL
RG-2 200 500 Ø16mm 3 3 3
2 3 3 3 1@50, 8@100, REST@200
REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION RCG-1 200 500 Ø16mm 2 2 2 2 2 2 1@50, 8@100, REST@200
in mm in mm
FLOOR SLAB THICK- RB-1 200 400 Ø16mm 2 2 2 3 3 2 1@50, 8@100, REST@200
NESS LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
LEVEL MARK REBAR REBAR
in mm SIZE SIZE TG-1 300 500 Ø20mm 5 4 2 2 6 4 1@50, 8@100, REST@200
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.

BEAM
TIE
TG-2 300 500 Ø20mm 6 4 2 3 6 4 1@50, 8@100, REST@200
LEVEL
SECOND

TG-3 300 500 Ø20mm 3 3 2 2 3 3 1@50, 6@100, REST@200


S-1 100 10Ø 200 300 - 300 200 300 10Ø 250 300 - 300 250 300 TWO-WAY
1@50, 6@100, REST@200

BEAM
LB-1 200 400 Ø16mm 2 2 2 4 2 2

STAIR
S-2 100 10Ø 300 300 - 300 300 300 10Ø 300 300 - 300 300 300 TWO-WAY

S-3 100 10Ø 200 200 - 200 200 200 10Ø 300 300 - 300 300 300 ONE-WAY

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M


L

PP
UB

DepED
TA

N ITO R I NG
I
REP

NES

SK

BERNADETTE N. AQUINO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

MERALCO AVENUE, PASIG CITY ENGINEER III OIC, STRUCTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV UNDERSECRETARY


SHEET CONTENTS :
PRC NO. : 0074495 TIN : 199-674-196 BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.
PTR NO. : DATE : LOCATION : DATE : 01 03 OF BEAM & SLAB, SCH. OF BEAMS & SLABS
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545
 
Ø10 @250
CUT BARS
Ø10 SPACED
MAIN BARS 1-Ø10
200 350 NOSING BAR
Ø10 @250
3543 1600

125125
125
Ø10 300mm TEMP

200
BARS BOTHWAYS

500
5

300
12

125

125
MAIN BAR:
4-Ø16mm

100
TIES : Ø10 mm
1@50, 8@75, REST @
150mm TO CENTER
400 Ø10mm

PC-1 4-Ø10 CONT. BARS


(FROM TIE BEAM UP TO LANDING LEVEL/
FROM 2ND FLR BEAM UP TO LANDING LEVEL) Ø10 @250
CUT BARS
D 
S-3
B  C 
S-3 SCALE 1 : 25 M
S-3

A B C
7000 2500

 
4500
1550 2950


G-3

1-Ø10 Ø16 @ 150


THIRD FLOOR LINE NOSING BAR
3RD FLOOR LEVEL
3200

S-1
B-2 Ø10 @300 G-2 G-1
1
S-3 Ø16 @ 150 SEE SCHEDULE OF S-1 (2ND/3RD
LVL) FOR DETAIL OF REIN.

3200
Ø10 @300
LANDING
Ø16 @ 150
MAIN BAR
G-7

B-2
G-5

LB-1
7000

PC-1 PC-1
Ø10 @300

SECOND FLOOR LINE


2ND FLOOR LEVEL

S-3 B-2 G-2 G-1


3800

B-3

Ø16 @ 150
3200

LANDING
Ø10 @300
LB-1 1-Ø10
NOSING BAR

Ø16 @ 150
Ø10 @300
G-2
150mm
 Ø16 @ 150
GROUND FLOOR LINE MAIN BAR
GROUND FLOOR LEVEL
325

NATURAL GRADE LINE Ø10 @300


Ø10 @250

A 
TG-3
S-3 SCALE 1:50 M
7000

1 SECTION OF STAIR
S-3 SCALE 1:50 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M
L

PP
UB

DepED 
TA

N ITO R I NG
I
REP

NES

SK

BERNADETTE N. AQUINO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

OIC, DIRECTOR III OIC, DIRECTOR IV



MERALCO AVENUE, PASIG CITY ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY
SHEET CONTENTS :
PRC NO. : 0074495 TIN : 199-674-196 BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:

STAIR PLAN & SECTION DETAIL, DETAIL OF


PTR NO. : DATE : LOCATION : DATE : 01 03 RAMP & STAIR ON GRADE, MISC. DETAILS
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545

            
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 MARK DESCRIPTION QTY SIZE

W-1 TOP & BOT. CHORDS 2L 2"x2"x1/4"

1200 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 W-2 WEB MEMBERS 2L 2"x2"x3/16"
 7000

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2
T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1
 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

4862
1200 2500

RG-1

RG-1

RG-1

RG-1

RG-1
RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 HT-1 HT-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

RCG-1
RCG-1

RCG-1
RB-1 RB-1

Ø12mm CROSS LC-150x50x15x2.0 PURLINS 4862 4862 250


BRACINGS SPACED @ 750 mm O.C
WITH Ø10 SAGRODS @ MIDSPAN
29 30 25 50 50 25 30 29
6mm GUSSET PLATE
A 
S-4 SCALE : 1:100 M. BOTTOM CHORD

50
S-4 4-Ø12x300mm LONG
BENT ANCHOR BOLTS
6mm GUSSET PLATE (TYP.)

200

100
TO
D P
D R CH D 250x200x10mm
HO OR OR
S-4
P
C D CH BASE PLATE
TO OP 6mm GUSSET

50
T
PLATE (TYP.)
2500

FULL WELD
PLAN
W-2

W-
1 1
W-
W-

2
W-2

W-2
W-
2

G FULL WELD 250


W

2
W-2

W-2
-

S-4
2

W- 2 29 30 25 38 38 25 30 29
2 W- KING POST
W-2

W-2

6mm GUSSET PLATE

W-1 BOTTOM CHORD


W-2

W-2

F
2L-2x2x1/4 STRUT (FULLY WELDED
1000
W-2 2 SPANS @ 1250
= 2500
2 SPANS @ 1125
= 2250
S-4
4 SPANS @ 1187.5 = 4750 1000
W-2
C  D  TO BASE PLATE)
SCALE 1 : 50 M SCALE 1 : 50 M
S-4 S-4 4-Ø12x300mm LONG

9500 BENT ANCHOR BOLTS

250x200x10mm
BASE PLATE

B  SEE TRUSS ANCHORAGE DETAIL


SCALE 1 : 25 M
S-4 W-
1 150x50x15x2.0mm
STEEL C-PURLINS COLUMN OR BEAM
±750mm O.C.
10mmØ SAG ROD WITH
STANDARD NUTS &
150 ±75WASHERS @ EACH END
0

W-2
LC-150x50x15x2.0
PURLINS 6-Ø10x200mm LONG
1-Ø10mm A-307
150

MACHINEBOLT L-2.5x2.5x1/4
FULL WELD
W-2

6mm GUSSET PLATE (TYP.) SECTION

BOTTOM CHORD
 
E  F  G  H  I 
SCALE 1 : 50 M SCALE 1 : 50 M 1 : 10 M SCALE 1 : 10 M
S-4 S-4 S-4
SCALE
S-4 S-4 SCALE 1:5 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES


t he PH
E A


DESIGNED BY: BNA
DEPARTMENT OF EDUCATION
DEPARTMENT OF EDUCATION (DepED)
F
of I LI
IC T
M
L

PP
UB

DepED 
TA

N ITO R I NG
I
REP

NES

SK

BERNADETTE N. AQUINO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI

F O RC E

ENCODED BY: BNA


TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING
MO
N
DE

IO

EN

MCMXCIX
&

IN
G
PA

N
T

EE
T

TM RI N ME
A

UC G , A S SE S S
R


EN
T O F ED

OIC, DIRECTOR III OIC, DIRECTOR IV



MERALCO AVENUE, PASIG CITY ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY
SHEET CONTENTS :
PRC NO. : 0074495 TIN : 199-674-196 BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
TRUSS DIAGRAM DETAILS OF STEEL
PTR NO. : DATE : LOCATION : DATE : 01 03 CONNECTION
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
REP. ACT 545

You might also like