You are on page 1of 3
Clemson University Glenn Department of Civil Engineering CE 3SI- Civil Engineering Materials - Quiz #3 February 14,2014 Friday 10:15-11:00 am (45 min) {Waris pozolaic easton) Name wo pozzlan@ pois) oa Mlags react with waley and cal civas Coy peseslan a melfy #CH —o Col as Fle Pidase CSM “Thi action (b> Fy ash » Slay, Sibee fone, Called pozeslanit reactin 2. From the following graph, determine the inital set time of the cement under the Vicat test. (1 point) Penetration (ml Time (min) 340 min 3. Asa materials engineerin charge of designing concrete mix and facing the following problems, which admixture would you used in each ease during mixing or atthe jobsite? (I points) (9 Mees an cpced sb ned rb ozs Retardey ((b) The structure is subjected to freezing Air -entraine— Page 1 of 3 Student Name. IDNo. 4. Explain the reason of having Peak Cin the curve of rate of heat (hydration reaction) 1 a function of time for an ordinary portland cement. (1 point) Transfirmalin 2 the this ite a ie i Guses peak Cin he gg H io. 5. Wat epoch yon of wih waar Hapa te lfc peers) Css + Heo = CH +CSH 4 4 Ad juss pH Pewides shou 6. Draw a graph to show the general relationship between the compressive strength of the conerete and the water-to-cement ratio (label all axes). (point) “hy Page 2 0f 3 Student Name, IDNo. 7. Imorder to evaluate the suitability of non-potable water available at the job site for ‘mixing conerete, seven standard mortar cubes were made using that waier and six others using potable water. The cubes were tested for compressive strength after 7 days of curing and produced the following loads to failure, ‘Cubes made wih non-potable water Based on these result only, would you accept that water for mixing concrete?” Why? (point) +t 6200+! [4160+ WlOoWS >70 ee ee — 4160+ (6looriS > ae (5294.23 Uyx00t 6536416320 4 Eezor IEWEIEEO + [S726 - «= pilable watiy = Bz. = VHES-H ay f 8 =!546414 a> ASX 8 —~ Teefre, ths waer canst le accepted tor mining Page 3 of 3

You might also like