You are on page 1of 18

Jw = 1000

Jc = 2400
Jumlah Batako per m2
Berat Dinding per m2 (Batako+Plesteran)
Beban Hidup fungsi perkantoran

Tinggi Bangunan / NAMA TRIBULARY AREA


NO lantai TITIK (m2)
Lantai
P L P*L

1 4 A1 11.40 7.60 6.00 45.60


2 4 A2 45.60 7.60 6.00 45.60
3 4 A3 45.60 7.60 6.00 45.60
4 4 A4 45.60 7.60 6.00 45.60
5 4 A5 45.60 7.60 6.00 45.60
6 4 A6 45.60 7.60 6.00 45.60
7 4 B1 45.60 7.60 6.00 45.60
8 4 B2 45.60 7.60 6.00 45.60
9 4 B3 45.60 7.60 6.00 45.60
10 4 B4 45.60 7.60 6.00 45.60
11 4 B5 45.60 7.60 6.00 45.60
12 4 B6 45.60 7.60 6.00 45.60
13 4 C1 45.60 7.60 6.00 45.60
14 4 C2 45.60 7.60 6.00 45.60
15 4 C3 45.60 7.60 6.00 45.60
16 4 C4 45.60 7.60 6.00 45.60
17 4 C5 45.60 7.60 6.00 45.60
18 4 C6 45.60 7.60 6.00 45.60
19 4 D1 43.70 7.60 5.50 41.80
20 4 D2 41.80 7.60 5.50 41.80
21 4 D3 41.80 7.60 5.50 41.80
22 4 D4 41.80 7.60 5.50 41.80
23 4 D5 41.80 7.60 5.50 41.80
24 4 D6 41.80 7.60 5.50 41.80
25 4 E1 43.70 7.60 6.00 45.60
26 4 E2 45.60 7.60 6.00 45.60
27 4 E3 45.60 7.60 6.00 45.60
28 4 E4 45.60 7.60 6.00 45.60
29 4 E5 45.60 7.60 6.00 45.60
30 4 E6 45.60 7.60 6.00 45.60
31 4 F1 45.60 7.60 6.00 45.60
32 4 F2 45.60 7.60 6.00 45.60
33 4 F3 45.60 7.60 6.00 45.60
34 4 F4 45.60 7.60 6.00 45.60
35 4 F5 45.60 7.60 6.00 45.60
36 4 F6 45.60 7.60 6.00 45.60
37 4 G1 45.60 7.60 6.00 45.60
38 4 G2 45.60 7.60 6.00 45.60
39 4 G3 45.60 7.60 6.00 45.60
40 4 G4 45.60 7.60 6.00 45.60
41 4 G5 45.60 7.60 6.00 45.60
42 4 G6 45.60 7.60 6.00 45.60
43 4 H1 45.60 7.60 6.00 45.60
44 4 H2 45.60 7.60 6.00 45.60
45 4 H3 45.60 7.60 6.00 45.60
46 4 H4 45.60 7.60 6.00 45.60
47 4 H5 45.60 7.60 6.00 45.60
48 4 H6 45.60 7.60 6.00 45.60
49 4 45.60 7.60 6.00 45.60
50 4 45.60 7.60 6.00 45.60
51 4 D5 45.60 7.60 6.00 45.60
52 4 D6 45.60 7.60 6.00 45.60

A. TEBAL PLAT LANTAI


- Mutu baja tulangan yang hendak digunakan
- ln
- β
Tebal Minimum
h min ≥ ln (0.8 + fy/1500)
36 + 9 β

h max ≤ ln (0.8 + fy/1500)


36
PERHITUNGAN BEBAN PADA BANGUNAN
Kg/m3 = 1 Ton/m3 (Gama/Berat Air dalam 1m3 Beton)
Kg/m3 = 2.4 Ton/m3 (Gama/berat Beton dalam 1m3 )
= 12.5 Bh
= 100 Kg/m2
= 250 Kg/m2

BEBAN MATI
Lantai Kolom
1/2 P 1/2 L T V B h b T V

3.80 3.00 0.19 2.12 5087.96 0.45 0.45 4.00 0.81


7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 5.75 0.19 8.13 19503.84 0.45 0.45 4.00 0.81
7.60 5.50 0.19 7.77 18655.85 0.45 0.45 4.00 0.81
7.60 5.50 0.19 7.77 18655.85 0.45 0.45 4.00 0.81
7.60 5.50 0.19 7.77 18655.85 0.45 0.45 4.00 0.81
7.60 5.50 0.19 7.77 18655.85 0.45 0.45 4.00 0.81
7.60 5.50 0.19 7.77 18655.85 0.45 0.45 4.00 0.81
7.60 5.75 0.19 8.13 19503.84 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 0.45 0.45 4.00 0.81
7.60 6.00 0.19 8.48 20351.83 4.00 0.00
7.60 6.00 0.19 8.48 20351.83 4.00 0.00
7.60 6.00 0.19 8.48 20351.83 4.00 0.00
7.60 6.00 0.19 8.48 20351.83 4.00 0.00

240 Mpa (Besi Polos)


= bentang terpanjang
= lx/ly = 0.7894737
ly
= 169.26 mm 0.17 m 7.6
7600

= 202.667 mm 0.20 m
= 185.963 mm 0.19 m
PADA BANGUNAN
KETERANGAN : : Jangan di ganti

MATI
Balok Dinding Batako
B t l T V B T T V B

1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
1944.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
0.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
0.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
0.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00
0.00 0.65 0.35 3.80 2074.80 4149.60 4.00 3.80 15.20 1520.00

lx
6 = 6000

PLAT LANTAI BETON


1,2.BEBAN
BEBAN HIDUP MATI + 1,6 JUMLAH BEBAN
BEBAN HIDUP
BEBAN MATI
Kg Kg (MATI+HIDUP)

12701.56 250.00 15641.87 3910.47


27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27117.44 250.00 32940.93 8235.23
26269.45 250.00 31923.33 7980.83
26269.45 250.00 31923.33 7980.83
26269.45 250.00 31923.33 7980.83
26269.45 250.00 31923.33 7980.83
26269.45 250.00 31923.33 7980.83
27117.44 250.00 32940.93 8235.23
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
27965.43 250.00 33958.52 8489.63
26021.43 250.00 31625.72 7906.43
26021.43 250.00 31625.72 7906.43
26021.43 250.00 31625.72 7906.43
26021.43 250.00 31625.72 7906.43
PERHITUNGAN JUMLAH PONDASI/ KOLOM
Beban Total per m2 3910.47 Kg
Beban Hidup Perkantoran 250 Kg/m2
Pile 40 cm

Trbulary Area Pu
Titik Jumlah Jumlah
No Pondasi Lantai Beban Beban Pile (Bh)
per Titik per Titik
(Kg) (Ton)
Panjang Lebar Luas

1 A1 3.80 3.00 11.40 7 312055.3 312.0553 4


2 A2 7.60 6.00 45.60 7 1248221 1248.221 17
3 A3 7.60 6.00 45.60 7 1248221 1248.221 17
4 A4 7.60 6.00 45.60 7 1248221 1248.221 17
5 A5 7.60 6.00 45.60 7 1248221 1248.221 17
6 A6 7.60 6.00 45.60 7 1248221 1248.221 17
7 B1 7.60 6.00 45.60 7 1248221 1248.221 17
8 B2 7.60 6.00 45.60 7 1248221 1248.221 17
9 B3 7.60 6.00 45.60 7 1248221 1248.221 17
10 B4 7.60 6.00 45.60 7 1248221 1248.221 17
11 B5 7.60 6.00 45.60 7 1248221 1248.221 17
12 B6 7.60 6.00 45.60 7 1248221 1248.221 17
13 C1 7.60 6.00 45.60 7 1248221 1248.221 17
14 C2 7.60 6.00 45.60 7 1248221 1248.221 17
15 C3 7.60 6.00 45.60 7 1248221 1248.221 17
16 C4 7.60 6.00 45.60 7 1248221 1248.221 17
17 C5 7.60 6.00 45.60 7 1248221 1248.221 17
18 C6 7.60 6.00 45.60 7 1248221 1248.221 17
19 D1 7.60 5.75 43.70 7 1196212 1196.212 16
20 D2 7.60 5.50 41.80 7 1144203 1144.203 15
21 D3 7.60 5.50 41.80 7 1144203 1144.203 15
22 D4 7.60 5.50 41.80 7 1144203 1144.203 15
23 D5 7.60 5.50 41.80 7 1144203 1144.203 15
24 D6 7.60 5.50 41.80 7 1144203 1144.203 15
28449041 28449.04 384

Daya Dukung = ( qc x Ap ) + ( Tf x As )
3 5

qc = 250 Kg/cm2 (Daya dukung ujung tiang/ konus, Kedalaman 30 m, lihat d


Ap = 582 cm2 (Luas Penampang Tiang, lihat tabel spun pile)
Tf = 2000 Kg/cm2 (Daya dukung selimut tiang, kedalaman 30 m, lihat data so
As = ᴨD = 3.14 x 40 (keliling tiang)
= 125.6 cm

Daya Dukung 1 Pile


= 250 x 582 + 2000 x
3 5

= 98740 Kg x Faktor Efisiensi

= 74055 Kg

Jarak Minimum dan Maksimum Antar Pile


Rumus Hitung 1.5 D sd 2.5 D
1.5 30 sd 2.5 30
Min 45 sd 75 Max

Tebal Poer/Pile Cap


Hp ≤ 550 mm, h = ( 2 hp + 100 ) mm
Hp > 550, h = 8 (hp - 100 )/3 mm

h= ( 2.300 + 100 ) mm
= 900 mm
SI/ KOLOM PERHITUNGAN BESAR KOLOM DAN BALOK "MENG

balok induk
panjang bentang
tinggi balok

8.1 0.68
5.75 0.48
8.5 0.71
5.73 0.48
6.08 0.51
4.43 0.37
7.7 0.64
5.5 0.46
0.00
0.00
0.00

us, Kedalaman 30 m, lihat data sondir)


abel spun pile)
dalaman 30 m, lihat data sondir)
(keliling tiang)
125.6

75.00%
OM DAN BALOK "MENGACU PADA PANJANG BENTANG"

Ag = Pu/0,4(fc'+fy.p

Pu (Kg) fc'
1248221 12482212 24.3
anak balok induk anak

tinggi lebar balok lebar kolom

0.54 0.34 0.36 0.44 0.64


0.38 0.24 0.26 0.34 0.54
0.57 0.35 0.38 0.45 0.65
0.38 0.24 0.25 0.34 0.54
0.41 0.25 0.27 0.35 0.55
0.30 0.18 0.20 0.28 0.48
0.51 0.32 0.34 0.42 0.62
0.37 0.23 0.24 0.33 0.53
0.00 0.00 0.00 0.10 0.30
0.00 0.00 0.00 0.10 0.30
0.00 0.00 0.00 0.10 0.30

0.56974
s2 s= akar s2
fy p = 1%-8%
450 0.01 11.52 1083525 1040.9252257684

9 3

You might also like