1-Marble: 10.33+1.98+14.75+2.53+15.69+0.88+2.49+8.89=57.54m2(80$)=4603$
2-Wood:
5.04+5.92+5.92+7.36+31.6+12+3.54+0.63+2.84+2.4+0.9+1.8+0.9+1.14+2.4+1.49+3.53+4.31+0.58+0.21+
0.21=94.73m2(150$)=14209$
4-Gate: 1.8m2=250$
7-FlinCoat+Paint: 48.62m2(9,500IQD)=370$
8-Plaster+Paint: 18.81+18.81+8.61+13.1+12.55=71.88(6.8$)=488.7$
11-Escalators: 800$(3months)
12-Entrance Gate:200$
13-Lighting: 2500$
14-Garden: 2500$