PROGJECT NAME: AUTOMATIC RAILWAY CROSSING

GROUP MEMBERS:

1. Maria Mathew of s5, EEE

2. Hrudya Mathew of s1, EC

PROJECT CATEGORY: Working Model

ABSTRACT

Main objective involve designing an intelligent railway gate system which acquire data
from arduino. Data acquired from transducer initiate micro controller to control gate and
alert the closer by about the status gate. The system has been so designed such that gate
is closed. When train is at a predesigned distance from gate, gate is opened after the train
cross the safe predesigned distance from gate. After this project we conclude several
accident at railway gate crossing occur due to impatience at closer by to waiting for the
train could be avoided.