ROOFING

Material Description Qty Unit unit cost


Roof Sheet @ 8f 6 sheets
Roof sheet @ 12f 12 sheets
umbrella nails/tekscrems 4 kgs

CR, SALA #2
Material Description Qty Unit
4" CHB 906 PCS
# OF CEMENT 37 BAGS
VOL. OF SCREENED SAND 4 CU.M
VERTICAL AND HORIZONTAL
BARS 50 PCS @6M
#16 TIE WIRES 3.3 KGS

STONES OUTSIDE
Material Description Qty Unit
RIVER STONES 19 CU.M
LUPA PANGTAMBAK 19 CU.M
BAMBOO
Material Description Qty Unit
BUHO 680 PCS
PROJECT NI RALPH
MATERIAL
ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT TOTAL AMOUNT
CEMENT SACK 3 300 ₱ 900.00
LUPA TRUCK 1 800 ₱ 800.00
SAND TRUCK 0.5 800 ₱ 400.00
GRAVEL TRUCK 0.5 800 ₱ 400.00
CHB PCS 20 15 ₱ 300.00
TILES PCS 334 20 ₱ 6,680.00
₱ 9,480.00

MATERIAL
ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT TOTAL AMOUNT
6" PVC PIPE LGHT 5 ₱ -
4" PVC PIPE LGHT 1 ₱ -
2" PVC PIPE LGHT 1 ₱ -
₱ -
₱ -
₱ -