Eee =~ JOB SAFETY ANALYSIS: SITE 02.00 [JOBITASK: INSTALLATION & MAINTENANCE OF JGLASSWOOL BATTS DATE: 02/04/2013, [REPLACES JSA No.: Ref: 04 31/08/2010 PREPARED BY: John Payne, Joe Siilitano LOCATION / DEPARTMENT: Sites PERMITS / LICENSESE REQUIRED: Construction Safety Awareness egress Park tuck at jo site (a) Ensure park brake is applied and tuck tumed off, (b) DO NOT leave keys in onion (6) place warning cones around tuck so that pedestrians and {raf are aware of your presence (6) Ensure locaton of material on ste wil not block access or ‘egress for athers at ste JEQUIPMENTITOOLS REQUIRED: PERSONAL PROTECTIVE EQUIPMENT REQUIRED: MOBILE PHONE LADDER UTILITY KNIFE FIRST AID KIT PAD&PEN LADDER STEP LADDER All PPE is compulsory RISK LEVEL H_= high med L = low NN =negligible No] JOB/TASK STEP POTENTIAL HAZARDS | TAL ‘SAFE WORK / CONTROL MEASURES nal nse mk 7 arrival on Sita “Parking on public roads 7. As far as posible dono parc on busy oad, concentrate on eaely fccescing ste when out of vehige 2. Root not complete 2. Bonet enor st, aces BGC Supervisor 3. Broach of te safely 53. PPE to be wom as per ste signage or safety plan Hard hats to be requirement ‘wom on eonsiricton ses 4, Mobile plant, vehicle 4. Doct approach mob plant vehice unless evr sgnais OK morement 5 Laie wih ter ages 1 seroaecton 8: Plan task be aware ofthe forecast and check for approaching 6. Weather conditions change in weather m_ | 7 Youre workers aged under 18 years or inexperienced workers to | 2. Young workara be supervised ata mes aeons 8. Irunexpectealy working lone contact BGC Office as per Werking 8. Blocking Access or ‘Alone procedure Cee) JOB SAFETY ANALYSIS: SITE 02.00 JOBITASK: INSTALLATION & MAINTENANCE OF GLASSWOOL BATTS DATE: 0210412013 7 | Setting up 7. Sie Hazaras~ 7 hepoat eo ently hzaras ad complete the Ste Salty Lacerations Report JSA Variation For tobe completed azar nak Bruising Cente by ths SA. Conels rude Object ‘horeughfores tobe let ear above estan der zones for workers impalement Sheck spite, stakes pike eves | Taper sips Sosy tp hazard and mark win tape or cores Tide untae Usise vith ote vases conser barcades or Electrical sgrage Rect ieee [2H $384 Vaiation Form tobe used if adational hazards Fall from heights ‘re identiied , | poneaks Ensure property's RCD protected Seating ‘Ay saffoing over 4 metres must be erected by asics ‘enced scafoser ‘Angry wo Inspect condion of scafoing, do not use if damages, ncomplee or nstoad/~ edie Buber Fequest pet ower fo secure petits otvet, Bo engage in contontation win port, eave immediately 7 [Unioading materats on | 1. Manual Handing 7. Ensure you ie the core ing method site ‘ {©} Keep the tem case to your body {@) Keep your back as stright as posse though he craton of ff thet Faling Bags during ransport process. Sige Tnpe {d) Move your fest 00 NOT twist (6) Establish any esting points along the pathway. Ensure when opening rear of truck you keep clear in order to allow aislodges bage to ‘all Remove trp hazards before carrying materials TES] ven, JOB SAFETY ANALYSIS: 2. Damage to roof 3. Sprainisirain SITE 02.00 [SOBITASK: INSTALLATION & MAINTENANCE OF GLASSWOOL BATTS esneaeeeaee __ 4 |Access to Roof Spaceto| 1. Fale 1. A complete inspection of the root shallincude a record of any Install batts via man hole| orroot broken tes, idge capping, seging er any other damage prior to installation Ladder isto be used for access and earess ONLY “Three point contact must be Kept at all times Ladder is fo extend 800mm above acoesslegress point for safe platform entrance Ladder iso be eecured a ll time Ladder to conform to Aust Standard Ladder ta be at 4 ratio Refer to Code of Practice for additonal 2. Where nity into a tle roo" be required, i shall be made away from #idge capping to avoid damage 13, Srtehing recommended before manual haneling troutsson JOB SAFETY ANALYSIS: SITE 02.00 JOBITASK: INSTALLATION & MAINTENANCE OF DATE: 02/04/2013 eetabsot ants Mabsain tee points contact onthe ladder. Pror to removal of roo es or fn an nepection of the entire roofs needed as in Step 8 (required) Ensure removal of roof tle and tn i done in a correct manner to prevent breakage or bending [EGS sen JOB SAFETY ANALYSIS: SITE 02.00 "JOBITASK: INSTALLATION & MAINTENANCE OF [GLASSWOOL BATTS DATE: 02/04/2013, 7 [installation 1. Restricted breathing 7. Operator must wear dust mask and avoid toughing wires oF 4. Manual hanging potently Ive structures. 2 Reettcted work area 1 | 2 Gutarcund and lave a minimum 50mm clearance around all 3 cus Fecessed ight tings, celing fans, & fume vents 4. Falls from ladder {3 Ensure all transformers have a minimum 50mm clearance forall 5._Slpsivps recessed ight iting. @ [Completion of Job 7. Manual handing 7 After insulation is intalled, retuen manhole covert fs original postion, andi required roof materials to orginal state 2. Damage to ceiling and 2. any outa viaual nepecion ofthe whole roof area ensuring that no batts ™ ‘reas are laf open, 3, Inaccurate records 2. Check? quantiles and No, of bags are entered onthe job sheet 4 Fall fom ladder Place BGC Identification sticker inside the meter box 5. Slipstiips 4, Maintain 3 points ofcantact on ladder 7 [Housekeeping 1 SlipsTiips 7 Ensure ll PPE is kept on untl the end of the job 2 Spraistran 2. Pack up all equipment and leave site dy 3. je tation H | 3. Ensure alrubbish has boon placed in designated areas 4 Skin tation ‘4. Regular cleanups occur throughout the werking day and atthe 53_Airbore fores conausion of dally Work Deeg 4Jomn Payne! OHS Manager bY l2e13 ate ®2 R822 \ hereby confirm that | have read and been instructed onthe Job Safety Analysis number SITE 02.00 and Understand how the safe work! control measures are used inthis task Signed: Date:

You might also like