Head Loss for Chiller System

Yoshino Gypsum Project

. 𝐻𝑡 = 𝐻𝑝 + 𝐻𝑓 + 𝐻𝑠 + 𝐻𝑒
𝐻𝑡 = Head Total (𝑚)
𝐻𝑝 = Head Major (Pipe Length) (𝑚)
𝐻𝑓 = Head Minor (Fitting) (𝑚)
𝐻𝑠 = Head Statis (𝑚)
𝐻𝑒 = Head Equipment (𝑚)
Explain.

𝜎 ×𝑙 𝑥 𝑣 2
. 𝐻𝑝 = . 𝐻𝑠 = 3.5 𝑚
𝐷×2𝑔

𝜎 = 0.02 + 0.0005/𝐷𝑚 = 0.02 . 2 Unit Chiller


𝑙 = 𝐿𝑒𝑛𝑔ℎ𝑡 𝑝𝑖𝑝𝑒 2𝐻𝑒 = 2 × 56 𝐾𝑝𝑎 = 11.2 𝑚
𝑣2 = 2 𝑚/𝑠
𝐷 = 𝐷𝑖𝑎𝑚𝑒𝑡𝑒𝑟 𝑃𝑖𝑝𝑒
𝑔 = 𝐺𝑟𝑎𝑣𝑖𝑡𝑦
. 𝐻𝑡 = 𝐻𝑝 + 𝐻𝑓 + 𝐻𝑠 + 𝐻𝑒
0.025 ×116 𝑥 22
= 𝐻𝑝 (0.1×2×9.8) = 5.9 + 2 + 3.5 + 11.2
11.6
= 1.96 = 22.9 𝑚

= 5.9 (𝑚)

. 𝐻𝑓 = 2 𝑚