For Company Code 1099 we need to create a new WS to TSE in Madeira.
This new WS must follow:
- Working days - From Tuesday to Saturday (Tuesday to Thursday from 09,00 am to 17,30 pm, 1 hour for lunch
between 11,30 am to 15,00 pm) and (Friday and Saturday from 18,00 pm to 02,30 am, 1 hour to dinner from 20,00 pm
to 22,00 pm).
- For this WS July 1st and August 21st must be considered non-working days.
ACTION 15
Performed by Francisco Ruiz on 27/06/2011 9:29
Description: Custom action
Time Spent: Hours:0 Minutes:0
Privacy: None Change privacy settings
HRO Information request (notify child/parent)
Hi Joao.
In order to complete the CR I need to know since when the new WSR should be able to be used and the previous
cuestions, What whould be the holiday calendar used, P2 or P3? and the cuestions in the Action 38 and 39 of the parent
ticket.
BR,
Elisabete Jacinto
CoCd PA PSubarea EEGrp ESgrp New WSR
1099 PT04 2 1 1A
1099 PT04 1 9 9A
1099 PT04 1 8 8A
1099 PT04 1 7 7A
1099 PT04 1 6 6A
1099 PT04 1 5 IH
1099 PT04 1 4 4C
1099 PT04 1 4 4B
1099 PT04 1 4 4A
1099 PT04 1 2 2J
1099 PT04 1 2 2E
1099 PT04 1 2 2A
1099 PT04 1 1 1B
1099 PT04 1 1 1A
Determine Break Schedules (V_T550P)
Break, 1 hour for lunch between 11,30 am to 15,00 pm:
Break, 1 hour to dinner from 20,00 pm to 22,00 pm: There’s no any break defined like this. We will need to create a new
one.
New:
Determine Daily work schedules (V_T550A)
Tuesday to Thursday from 09,00 am to 17,30 pm:
Friday and Saturday from 18,00 pm to 02,30 am: There’s no any daily work schedule defined for this time. We will need
to create a new one.
Sunday and Monday non-working days:
Determine Period work schedules (V_T551A) (Tables to review: V_T551C, V_551C_B, V_T510S)
As we need a new Daily Work Schedule with a new Break Schedule there’s no any Period Work Schedule that we can
use to create the Work Schedule Rule so we will need to create a new PWS.
New:
Table T553A:
It is possible that we need in this table a new Rule for Day Types. This had been created by Global team Rule for Day
Type 47
Determine Day Types for Special Days (T553S)
Table T553S:
In this table we will need to update the days 01/07/2011 – 9999 and 21/08/2011 – 9999 to be considered as requested.
The entries for 2011 had been created by Global Team for the new Rule for Day Type 47.
Determine Work Schedule Rule (V_T508A)
Once all this customizing is done we are able to create the new WSR in the next path: