You are on page 1of 3
Children Cancer Hospital E¢ 57357 - Expansion & Renovation Project ae ie “A ACG DOCUMENTS SUBMITTAL (DS) be caniaaniisios Package # : 001 Contractor Arab Contraction Company Contract :__ Expansion and Renovation Phase 1 Package 1 Foundation and Superstructure IDS - Ref.# |P1P1-AC-SH-OT-0516 Rev. # if |From: ACC To: Projacs Location / Building: OC Building |SPEC. / B.Q. Ref. ae Subnied for "SM - Sample Material ‘SCE- Program / Schedule TH Aoprovat St. Gorence arte hat: Openn 8 loca Cae DR Dengr Rope Grp Gay Para home eto Repeat nether toe Suey Pag Pecan Ws teh gutonet (CAL - Galeton OT - Otvers (CRT -Caltration/ Cerca ooooog) Discitine © cwi/ Structure Electrical TO Mechanical is C1 Infra. & Roads 1 other: Document Description: Revised time schedule attached: 2 hard copeis & 2 C.D Soft copy We cory that his submit eccurate and n strict conformance with all contrac requirements, has en thorcughlycaoninated and cross checked agains other appleabe isiplina. t's completo and suficient io alow ready determination of compliance with cantroc! requirements bythe Constant Contractor ACC : Engineer omnes Sanh Project Manager: Halvamecl Aladel Signature: Oney Sax\, Date: 13/11/2017. Signature Date: — 13/11/2017 aon Ie Appraved as ndteck, See us. Comets (1Payts). Revisit Ares 2-ACC Com ProGead with upelating tne Projiaund after complitin he abqe Commaesk . 5 3> the revisteel complet. late of OC is IS Aev.201§ a8 of 1 Jun 201 and SLE Fel. 20/4 a8 of | AU9- 2017. © A-Approved 13 C-Revise and Resubmit 1 E-For information B - Approved As Noted OC D-Rejected Consultant : Engineer Project Manager Signature Date Engineer for information (PROJACS): Signature Disiibuion CJccHe: DS-Refit P1P1-AC-SH-OT-0516 Rev.1 - “Revised Programme” Date:13 November 2017 Comments Narrative ‘© Include Major Equipment with numbers and productivity (especially DW machine, Anchoring Machines) Logic & Sequence General * Soil Replacement Activities as per tender drawings. Dates of Geotechnical Report Act are not correct, please apply actual start & actual finish for these activities, please revisit. Outpatient Building * Consider Contractor Pouring Capacity, Schedule currently shows Raft of parts 1,2,3,4& 5 will be casted on the same day (29 July 2017) with an amount of (7,191 M?), please reschedule, © Unnecessary Lag between Activities CHSMWTS2-16 and CHSMWTS2-17. © There are no slabs on S1 level for portions 108: 11, please revisit. Smart Building ‘© Ensure that when Schedule is run with Data Date 1/8/2017 the completion date is 28 Feb 2019, The run as 1 August 2017 showing the projected completion date is 13 March 2019, please correct it © Review Timeframe & Sequence for Anchoring (allow time between anchor grouting & stressing, consider subcontractor productivity) * Please review the logic, there are out of sequence activities such as casting date concrete of diaphragm wall is earlier than its reinforcement activity (zone #2) ‘* Roof pouring concrete activities have to be completed before mid February 2019 to ‘enable completing snagging by 28 February 2019. Engineering Works ‘¢ Link Concrete Dimensions and Steel! RFMT Drawings. Dates of Shop drawing of cores steel reinforcement shall be earlier and linked with first core. © Activity 1D#OCPC1710 has actual start without actual finish, please check. + Revisit engineering items has actual starting since November 2016 and not yet completed such as linear accelerator shop drawing. © Pilling system of bridge is not applicable, please remove shop drawing of pilling system. Pe. Procurement © Separate WBS/Activities for OC and Smart Building when applicable (such as mechanical works and metals) © Link HDPE Pipes delivery with MEP in Raft © Make sure no activities are missing (such as Oil Interceptor 17 m2/hr in Smart Building) Resources * Total Budgeted Cost should be equal to the Contract Amount and Approved VOs & VES * Total Budgeted Cost should be Equal to the Total at Completion Cost Activity Codes Several Activities are not coded such as activity ID SMSD-1421. Make sure Activity Codes are applied for all activities. Pe.2

You might also like