LAMPIRAN

BOQ Dan RAB Hal |LAMPIRAN 1


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
Tabel 1 Rincian Perhitungan Volume Pekerjaan di Lokasi Tanjung Merindu
Jarak Antar Retaining Wall Pembesian Bekisting Galian Timbunan Dolken Geotextile
Cross Section Cross Section Luas Penampang Volume Per Luas Penampang Volume Per Luas Penampang Volume Luas Penampang Volume Luas Penampang Volume Per Luas Penampang Volume Per Luas Penampang Volume
(m) (m²) (m³) (kg/m') (kg) (m²/m') (m²) (m²) (m³) (m²) (m³) (m/m') (m) (m²/m') (m)
P22 17.8 1955.4 5.3 6.3 2.0 18.0 9.6
25 444.41 48885.00 131.73 156.4 50.2 450.00 240.00
P23 17.8 1955.4 5.3 6.3 2.0 18.0 9.6
25 444.41 48885.00 131.73 131.8 53.8 450.00 240.00
P24 17.8 1955.4 5.3 4.3 2.3 18.0 9.6
25 444.41 48885.00 131.73 111.5 86.8 450.00 240.00
P25 17.8 1955.4 5.3 4.6 4.8 18.0 9.6
25 444.41 48885.00 131.73 133.9 84.4 450.00 240.00
P26 17.8 1955.4 5.3 6.2 2.1 18.0 9.6
25 444.41 48885.00 131.73 159.6 51.4 450.00 240.00
P27 17.8 1955.4 5.3 6.6 2.0 18.0 9.6
25 444.41 48885.00 131.73 178.0 47.7 450.00 240.00
P28 17.8 1955.4 5.3 7.7 1.8 18.0 9.6
25 444.41 48885.00 131.73 213.8 20.7 450.00 240.00
P29 17.8 1955.4 5.3 9.5 0.1 18.0 9.6
25 148.14 16295.00 43.91 79.0 1.2 450.00 240.00
P30 0 0.0 0.0 0.0 0.0 18.0 9.6
TOTAL 200.00 3259.00 358490.00 966.00 1164.00 396.00 3600.00 1920.00

BOQ Dan RAB Hal |LAMPIRAN 2


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten OKI
Tabel 2 Rincian Perhitungan Volume Pekerjaan di Lokasi Muara Baru
Jarak Antar CCSP Galian Timbunan Geotextile Capping Beton Pembesian Bekisting
Cross Section Cross Section Per Luas Penampang Volume Luas Penampang Volume Luas Penampang Volume Per Luas Penampang Volume Luas Penampang Volume Per Luas Penampang Volume Per Luas Penampang Volume
(m) (Buah/m') (Buah) (m²) (m³) (m²) (m³) (m²/m') (m²) (m²) (m²) (kg/m') (m²) (m²/m') (m²)
P24 1.1 2.28 10.3 7.7 0.96 106.07 1.69
50 52.53 111.48 514.25 383.33 48.21 5303.57 84.29
P26 1.1 2.18 10.27 7.7 0.96 106.07 1.69
50 54.89 127.06 358.88 383.33 48.21 5303.57 84.29
P28 1.1 2.92 4.48 7.7 0.96 106.07 1.69
50 54.89 147.87 247.61 383.33 48.21 5303.57 84.29
P30 1.1 3.00 5.44 7.7 0.96 106.07 1.69
50 54.89 149.78 274.11 383.33 48.21 5303.57 84.29
P32 1.1 3.00 5.52 7.7 0.96 106.07 1.69
50 54.89 149.78 270.85 383.33 48.21 5303.57 84.29
P34 1.1 3.00 5.31 7.7 0.96 106.07 1.69
50 54.89 159.86 223.24 383.33 48.21 5303.57 84.29
P36 1.1 3.40 3.67 7.7 0.96 106.07 1.69

P50 1.1 3.10 4.27 7.7 0.96 106.07 1.69


25 27.44 79.60 58.37 191.67 24.11 2651.79 42.14
P51 1.1 3.27 0.84 7.7 0.96 106.07 1.69
25 27.44 91.42 18.05 191.67 24.11 2651.79 42.14
P52 1.1 4.06 0.61 7.7 0.96 106.07 1.69
50 54.89 173.61 91.24 383.33 48.21 5303.57 84.29
P54 1.1 2.92 3.42 7.7 0.96 106.07 1.69
60 21.95 58.39 68.40 153.33 19.29 2121.43 33.71
P56 0 0 0 0 0 0 0
TOTAL 460 460 1250 2125 3220 405 44550 708

BOQ Dan RAB Hal |LAMPIRAN 3


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten OKI
BOQ Desain Muara Baru

+ 9.00
Timbunan
8

24
5
Galian
Sheet Pile
+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
7,027

6,998

6,311

6,327

5,922

5,632

5,192

4,352

3,752

2,272

1,793

2,412

3,412
ELEVASI TANAH ASLI

JARAK (m) 4,00 1,20 6,00 1,00 1,00 1,00 1,00 5,00 5,00 5,80 5,80 5,00

Volume Perkuatan Tebing Muara Baru (P.24)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 7.806 m2 Capping Beton = 0.96 m2
Timbunan = 5.569 m2 Pembesian = 106.7 kg

26
+ 9.00
Timbunan
8

5 Galian
Sheet Pile
+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
7,305

6,687

6,172

5,614

5,454

5,274

4,894

3,814

2,094

1,234
ELEVASI TANAH ASLI

JARAK (m) 24,00 9,00 1,00 1,00 1,00 1,00 4,00 4,00 4,10 4,10

Volume Perkuatan Tebing Muara Baru (P.26)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 2.18 m2 Capping Beton = 0.96 m2
Timbunan = 10.27 m2 Pembesian = 106.7 kg

BOQ Dan RAB Hal |LAMPIRAN 4


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
+ 9.00
Timbunan
8

28
5
Galian
Sheet Pile
+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
7,173

7,488

7,592

5,408

4,368

3,848

3,608

2,948

2,088

1,428

2,148

3,068

3,908

4,118
ELEVASI TANAH ASLI

JARAK (m) 9,00 2,00 1,00 1,00 1,00 1,00 4,00 4,00 4,10 4,10 4,00 4,00 2,00

Volume Perkuatan Tebing Muara Baru (P.28)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 2.92 m2 Capping Beton = 0.96 m2
Timbunan = 4.48 m2 Pembesian = 106.7 kg

Timbunan
8

Seling Angkur 1 inchi

5 Blok Beton Angker 1 x 1 x 2 M Sheet Pile Baja Type IV, L = 12 m


30

Tepi Sungai

Bidang persamaan -1,00


7,377

7,717

7,887

4,499

3,419

2,799

2,139

1,949

1,529

1,339

1,749

2,329

3,139
ELEVASI TANAH ASLI

JARAK (m) 12,00 1,80 1,00 1,00 1,00 1,00 3,50 3,60 4,00 4,00 3,60 3,50

Volume Perkuatan Tebing Muara Baru (P.30)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 3.00 m2 Capping Beton = 0.96 m2
Timbunan = 5.44 m2 Pembesian = 106.7 kg

BOQ Dan RAB Hal |LAMPIRAN 5


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
Timbunan
8

Blok Beton Angker 1 x 1 x 2 M


Seling Angkur 1 inchi
32
5 Sheet Pile Baja Type IV, L = 12 m

Tepi Sungai
Bidang persamaan -1,00
7,338

7,303

7,705

6,190

3,228

1,648

1,448

1,428

1,288

1,628

2,088

3,128

4,508

4,338

6,488
ELEVASI TANAH ASLI

JARAK (m) 1,00 8,00 1,00 1,00 1,00 1,00 4,00 4,00 4,50 4,50 4,00 4,00 2,00 2,00

Volume Perkuatan Tebing Muara Baru (P.32)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 3.00 m2 Capping Beton = 0.96 m2
Timbunan = 5.52 m2 Pembesian = 106.7 kg

Timbunan
8

Blok Beton Angker 1 x 1 x 2 M


Seling Angkur 1 inchi
34
5 Sheet Pile Baja Type IV, L = 12 m

Tepi Sungai

Bidang persamaan -1,00


7,213

7,330

7,256

5,329

4,569

3,589

2,789

2,469

1,969

1,429

1,809

2,629
ELEVASI TANAH ASLI

JARAK (m) 10,00 5,00 1,00 1,00 1,00 1,00 4,00 4,00 4,10 4,10 4,00

Volume Perkuatan Tebing Muara Baru (P.34)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 3.00 m2 Capping Beton = 0.96 m2
Timbunan = 5.31 m2 Pembesian = 106.7 kg

+ 9.00
Timbunan
8

5
Galian
Sheet Pile
36
+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
7,400

7,408

7,449

5,219

4,399

3,459

2,379

1,999

1,779

1,499

ELEVASI TANAH ASLI

JARAK (m) 22,40 3,40 1,00 1,00 1,00 1,00 4,00 4,00 5,30

Volume Perkuatan Tebing Muara Baru (P.36)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 3.40 m2 Capping Beton = 0.96 m2
Timbunan = 3.67 m2 Pembesian = 106.7 kg

BOQ Dan RAB Hal |LAMPIRAN 6


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
Tepi Jalan
9 + 9.00

50
Timbunan

5 Galian
Sheet Pile

+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
8,272
8,190
7,678

6,711

4,842

4,262

3,882

3,192

2,622

2,502

2,242

1,592

2,012

2,662
ELEVASI TANAH ASLI
0,70

JARAK (m) 8,00 1,00 1,00 1,00 1,00 5,00 5,00 5,00 5,20 5,20 5,00

Volume Perkuatan Tebing Muara Baru (P.50)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 27.44 m2 Capping Beton = 0.96 m2
Timbunan = 79.60 m2 Pembesian =
106.7 kg
Tepi Jalan

+ 9.00
9 Timbunan

5
Galian
Sheet Pile 52
+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
8,360

8,212

7,766

5,835

4,594

4,044

3,314

2,964

2,554

2,434

2,154

1,574

1,924

2,354
ELEVASI TANAH ASLI

JARAK (m) 1,70 2,40 2,00 1,00 1,00 1,00 1,00 5,00 5,00 5,00 5,10 5,10 5,00 5,00

Volume Perkuatan Tebing Muara Baru (P.52)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 4.06 m2 Capping Beton = 0.96 m2
Timbunan = 0.61 m2 Pembesian = 106.7 kg
Tepi Jalan

Timbunan
9 + 9.00

5 Galian
54
Sheet Pile

+ 3.20

Tepi Sungai
- 11.80
Bidang persamaan -1,00
7,465
8,177

8,162

8,407

8,394

8,390

6,645

5,432

4,542

4,232

3,992

3,132

2,152

1,542

2,022

2,292

ELEVASI TANAH ASLI


0,60

JARAK (m) 1,00 4,00 1,60 1,00 1,00 1,00 1,00 5,00 5,00 5,00 5,00 5,00 5,00 5,00

Volume Perkuatan Tebing Muara Baru (P.54)


CCSP = 1.1 Buah Geotextile = 7.7 m2 Bekisting = 1.69 m2
Galian = 2.92 m2 Capping Beton = 0.96 m2
Timbunan = 3.42 m2 Pembesian = 106.7 kg

BOQ Dan RAB Hal |LAMPIRAN 7


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
BOQ Desain Tanjung Merindu

20 Pinggir Jalan Timbunan + 20.00


Terluar MAB +19.20
+ 19.20

Retaining
15 Wall

P.22

10

Bidang persamaan + 5.00


19,035

18,885

18,902

18,757

18,636

18,019

18,009
17,082
15,609
14,796
14,582

14,624

13,533
ELEVASI TANAH ASLI
0,60

0,50
0,50
0,50
0,50
JARAK (m) 3,00 3,00 1,20 1,80 24,40 1,00 6,00 6,00

Volume Perkuatan Tanjung Merindu (P.22)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 6.3 m2 Pembesian = 1955.4 kg
Timbunan = 2.0 m2 Bekisting = 5.3 m2

20 Pinggir Jalan Timbunan + 20.00


Terluar MAB +19.20
+ 19.20

Retaining
15 Wall

P.23

10

Tepi Sungai
Bidang persamaan + 5.00
19,035

18,885

18,902

18,757

18,636

18,019

18,009
17,082
15,609
14,796
14,582

14,624

ELEVASI TANAH ASLI


0,60

0,50
0,50
0,50
0,50

JARAK (m) 3,00 3,00 1,20 1,80 24,40 1,00 6,00

Volume Perkuatan Tanjung Merindu (P.23)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 6.3 m2 Pembesian = 1955.4 kg
Timbunan = 2.0 m2 Bekisting = 5.3 m2

BOQ Dan RAB Hal |LAMPIRAN 8


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
20 Timbunan + 20.00
(Jalan) + 19.20 MAB +19.20
19

Retaining
15 Wall

P.24

10

Tepi Sungai
Bidang persamaan + 5.00
18,824

18,925

18,922

18,449

18,081

17,900
17,721
17,431
17,112
16,834
16,679

16,519

16,513
ELEVASI TANAH ASLI
0,60

0,50
0,50
0,50
0,50
0,50
JARAK (m) 1,50 4,00 1,40 11,70 3,00 3,00 3,00

Volume Perkuatan Tanjung Merindu (P.23)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 4.3 m2 Pembesian = 1955.4 kg
Timbunan = 2.3 m2 Bekisting = 5.3 m2

9.27

20 Timbunan + 20.00
(Jalan) + 19.20 MAB +19.20

15 Retaining
Wall

10

P.25/BM14
Tepi Sungai
Bidang persamaan + 5.00
18,988

19,012

18,985

18,236
17,840
16,342
16,148

15,908

15,478

14,804

14,704

14,504

ELEVASI TANAH ASLI


0,50
0,50
0,50

1,00

JARAK (m) 2,00 4,50 5,40 1,00 1,00 3,00 3,00

Volume Perkuatan Tanjung Merindu (P.25)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 4.6 m2 Pembesian = 1955.4 kg
Timbunan = 4.8 m2 Bekisting = 5.3 m2

BOQ Dan RAB Hal |LAMPIRAN 9


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
4.18
20 Timbunan + 20.00
MAB +19.20
Jalan + 19.20

15

retaining
Wall

10

P.26
Tepi Sungai
Bidang persamaan + 5.00
18,999

18,954

18,956
18,184
17,499
17,370
16,201
15,910

15,488

14,602

14,302

13,902
ELEVASI TANAH ASLI
0,50
0,50
0,50
0,50

JARAK (m) 4,50 1,70 1,00 2,00 5,00 5,00 5,00

Volume Perkuatan Tanjung Merindu (P.26)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 6.2 m2 Pembesian = 1955.4 kg
Timbunan = 2.1 m2 Bekisting = 5.3 m2

Timbunan

Pinggir Jalan
20 Terdalam + 20.00
(Jalan Putus) MAB +19.00
+ 19.20

Retaining
15 Wall

10

P.27
Tepi Sungai
Bidang persamaan + 5.00
18,902

18,902
18,048
17,948
17,870
17,427
17,202
15,813
15,392

14,899

14,499

14,099

14,299

ELEVASI TANAH ASLI


0,50
0,50
0,50
0,50
0,50
0,50
0,50

2,80 2,00 3,00 6,00 6,00


JARAK (m)

Volume Perkuatan Teanjung Merindu (P.27)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 6.6 m2 Pembesian = 1955.4 kg
Timbunan = 2.0 m2 Bekisting = 5.3 m2

BOQ Dan RAB Hal |LAMPIRAN 10


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI
2.37
Timbunan + 20.00
20
MAB +19.20
(Jalan) + 19.20

15

retaining
Wall

10

P.28
Tepi Sungai
Bidang persamaan + 5.00
18,915

18,914
18,809
17,919
17,842
17,727
16,426
15,909
14,919

14,619

14,419

14,319
ELEVASI TANAH ASLI
0,50
0,50
0,50
0,50
0,50
0,50
0,50

JARAK (m) 5,10 3,00 3,00 3,00 6,00

Volume Perkuatan Tanjung Merindu (P.28)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 7.7 m2 Pembesian = 1955.4 kg
Timbunan = 1.8 m2 Bekisting = 5.3 m2

Timbunan + 20.00
20 Pinggir Jalan
Terluar MAB +19.20
+ 19.20

Retaining
15 Wall

10

P.29
Tepi Sungai
Bidang persamaan + 5.00
18,987

18,977

18,945

17,897
17,281
16,784
16,437
16,287
16,022
15,642

15,322

14,912

14,712

ELEVASI TANAH ASLI


0,80

0,80

0,50
0,50
0,50
0,50
0,50
0,50

9,80 2,00 2,00 5,00


JARAK (m)

Volume Perkuatan Tanjung Merindu (P.29)


Rertaining Wall = 17.8 m2 Geotextile = 9.6 m2
Galian = 9.5 m2 Pembesian = 1955.4 kg
Timbunan = 0.1 m2 Bekisting = 5.3 m2

BOQ Dan RAB Hal |LAMPIRAN 11


Detail Desain Perkuatan Tebing Sungai Komering Di Muara Baru Kota Kayu Agung, Desa Tanjung Merindu Kabupaten
OKI