DRAWING RELEASE APPROVAL

DRAWING NUMBER: REVISION: A

CHARGE CODE: Project Code: ____________________ Activity ID: ____________________


CHECKLIST (Refer to ENT-EP-11, Mechanical Drawing Generation and Release Process)
SECTION #: DESCRIPTION PRINTED NAME INITIALS DATE

Section 2.2: Drawing Plan Approval:

Drawing Plan Overview:

Section 2.3: Create Draft:

Section 2.4: Engineering Review:

Material Requirements ...........................................................  Acceptable  Not Required


Finish Requirements ..............................................................  Acceptable  Not Required
Welding Requirements ...........................................................  Acceptable  Not Required
Stress Analysis ......................................................................  Acceptable  Not Required
Tolerances/Fits ......................................................................  Acceptable  Not Required
Torque Values .......................................................................  Acceptable  Not Required
BOM Information: Part #s, Descriptions, Material Checks .....  Acceptable  Not Required

Section 2.5: Drawing Check:

Section 2.6: Manufacturing


Engineering Check:

Section 2.7: Drawing Update:

Section 2.8: Checker Back-Check:

Section 2.9: Engineering Final Check:

Section 2.10: Create PDF:

Section 2.11: Final Review and Release:


POSITION PRINTED NAME INITIALS DATE

Responsible Engineer:

Manufacturing Engineer:

Project Engineer:

Engineering Manager or Chief Engineer:

Chief Designer:

Checker:

Configuration Management:

ENT-EP-11 Form A_Rev1 – Drawing Release Approval