BILL OF QUANTITY

Project Development Division


Name : Perapihan area wwtp dan Pemindahan Tandon Air di Fraksinasi
Date : 13 - 06 -2017 (Revisi 1)

Unit Price
No. Item Pekerjaan Sat Volume
Material Jasa
I Pekerjaan Perapihan area WWTP
1 Perapihan area wwtp m2 360
2 Pembuangan keluar area pabrik lot 1
II Pengadaan & Pemindahan Tower air ke Refinery/Fractination elevasi 11 m
1 Pengadaan & Pemasangan Tandon Air dia ±2,5 m, SS Kap 8 M³ unit 2
2 Pemasangan Bundwall t= 30 cm, incl plesteran + ACI m' 18
III Instalasi jalur pipa
1 Pipa 3", GV SCH 20 m 192
2 Pipa 1½", GV SCH 20 m 90
3 Elbow GV SCH 20 , 3" pcs 27
4 Elbow GV SCH 20 , 1½" pcs 6
5 TEE 3" GV SCH 20 pcs 2
6 TEE 3x3x1½" GV SCH 20 pcs 1
7 Butterfly 3" pcs 6
8 Flange 3" pcs 12
9 Gasket lot 1
10 Flexible joint 3" pcs 1
11 Check Valve 3" pcs 1
12 Painting (color by User) lot 1