NORTHERN CONSTRUCTION COMPANY

.
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

PREPARATION OF SHORE PROTECTION MATERIALS

FOR FUTURE OFFSHORE ISLANDS

I N D E X

Section 1. Letter of transmittal.

Section 2. Project description and schedule

Section 3. Equipment list.

Section 4. Cost estimates.

Section 5. Capital costs.

Section 6. Contract Arrangements.

Section 7. Labour Relations.

Section 8. Related experience.

Section 9. Drawings.

Section 10. Brochures of Equipment.

Section 11, Imperial Oil Limited - Purchase Order.


NORTHERNCONSTRUCTION
COMPANY
Division of Morrison-Knudsen Company: Inc.

I304 HORNBY S T R E E T
VANCOUVERII I. CANADA

V6Z 1W6
October 25th, 1974.

Imperial Oil Limited,


10025 Jasper Avenue,
Edmonton, Alberta. T5J 1S6

Attention: Mr. D. C. Wetterberg


Western Arctic Dredging
Preparation of Shore Protection Materials

Dear Sirs:

No. 13 S 612157, we
With reference to your Purchase Order
are pleasedto submit our study of "Preparation of Shore Protection
Materials for Future Off shore .” Islands

Our study contains detailsof cost and procedure for the


preparation ofquarriesrock rip rap and
manufactured concrete modules
i King Pt. area of the Yukon Territory. It should be noted that the
estimates have been prepared as if thequarry operation were carried out
independent of the concrete operation. Significant savings in the costs
of site services, facilities, and overhead could materialize to the Owner
if both operations were carried out concurrently. Further savings could
berealized depending on the type of contractual arrangement entered into
for performance of the work.

We would be pleased to discuss details


of this study at
your convenience.

Yours very truly,

R. Hall,
Vice-president and
Division Manager.

JRH: DW

cc: Mr. J. 5 . A. DeJong, Calgary


Mr. J. G. Riley, Edmonton

"

'\
"
"
2 - 1
NORTHERN CONSTRUCTION COMPANY
-
DIVISION OF MORRISON K N U D S E N COMPANY, INC.

SECTION 2. PROJECT DESCRIPTION AND SCHEDULE.

GENERAL.

The terms o f r e f e r e n c e o f t h i s s t u d y are " t o p r o v i d e a pre-


liminarydesignandcost estimate o f a rock quarrying system and a
c o n c r e t be l o c m
k a n u f a c t u r i n fga fcotrh pe r o d u c t i o n of s h o r e
protection materials f o r f u t u r e o f f - s h o r e i s l a n d s . "

The l o c a t i o n o f t h e work i s a t King P o i n t Yukon T e r r i t o r y


and t h e f u t u r e o f f s h o r e i s l a n d s w i l l belocatedintheBeaufort Sea.

The s c h e d u l e i s based on a c o n t r a c t award i n November 1974,


m o b i l i z a t i o nt h r o u g h1 9 7 5a n dm a n u f a c t u r ea n dt r a n s p o r t a t i o nt o
offshoreislandsofthefinishedproducts in theyears 1976 through
1981

I t e m s which w i l l b e r e q u i r e d f o r c o m p l e t i o n o f t h e p r o j e c t
but which have made p aotrhtf ri es p oirnt c l u dt hef eo l l o w i n g :

a). An o f f s h o r eb r e a k w a t e rr e q u i r e dt op r o t e c tt h eh a r b o u r .

b). A simpledock 300 f e e t l o n g a n d a dredged area f o r b a r g e


t r a f f i ch a v eb e e na l l o w e df o ri nt h ec o s t estimate. However
a more d e t a i l e d i n v e s t i g a t i o n of t h e s i t e is r e q u i r e d t o
provide a basisforcompletedesign.

c). An a i r s t r i p c a p a b l e of h a n d l i n gH e r c u l e sa i r c r a f t ,

d). A s t u d yo ft h eh a n d l i n ga n dp l a c i n g of m a t e r i a l s i n t o
position on the offshore islands.
NORTHERNCONSTRUCTIONCOMPANY 2 - 2
DIVISION OF MORRISON - KNUDSEN COMPANY, INC.

ROCK OPERATION

The study is based on a delivery requirement of 856,700 Tons


of sized rip rap andspalls over a 6 year period from 1976
1981.
to

Scheduled delivery is as follows:

Year Tons delivered


1976 83 ,400
1977 85,200
19 78 85,200
1979 126 ,800
1980 259 ,600
1981 216 ,500

856,700 Tons

Five sizes of rock are required with following


the
quantities of each.

Tons

433,200
127,900
57,000
104,200
134,400

856 ,700 Tons


2-3
NORTHERNCONSTRUCTION COMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.

A quarry location atMt. Sedgwick was specified. This location


is 40 miles from the-King Point dock area and is composed of granite
rock with adjacent limestone.

A satellite camp and shop will be set up at Mt. Sedgwick in th


winter of 1975-76. Fuel and supplies sufficient to complete one year’s
operation willbe hauled in each winter. Personnel will be airlifted
to and from the satellite camp from King Point. Pioneering and drill
2 crawlair CM/ECM 350 drills each with a 1050 cfm
ing is done with
compressor. It is estimated that a solid volume of
603,000 cu. yd.
A powder factor 0.65 lbs/
will be shot to produce the required product.
CU. yd. is estimated using a combination of Powerfrac
75 and Hydromex
M-210 on 35
a ft. bench.

The rock processing plant is set up on a permanent location


downhill from the quarry. 35 Ton capacity witha
Rock haul trucks of
6 cu. yd. loader will haul shotrock from quarry to the processing
plant.

The plant itself is a series4 vibrating


of grizzlies proces-
sing 310 Tons/hr.

The quarrying and processing of rock is scheduledas a summer


operation over the months of July and August
of each year.

Hauling of processed rock to the dock and stockpiling


is
scheduled as a winter operation to obviate the cost of access road
construction. Winter haul will run from December
to April of each season.

A fleet of 50 Ton sleds is used.The uncertain snow conditions


in the9 mile first leg of the haul,
i.e. out of the valley, requires
the use of Cat D7 tractors. Thereafter6 large, transport vehicles
(Husky 8) pulling 3 - 50 Ton sleds each will complete
the remaining
/-
31 mile l e g over open tundra.
2 - 4
NORTHERNCONSTRUCTIONCOMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

An equal quantityof rock is processed and hauled to stock-


pile each year to provide optimum use
of equipment.

Processed rock will be stockpiled 14


on acre
a storage pad in
the immediate proximityof the dock. (see drawing No. IOD-4-3902 for
stockpile location). A 10 cu. yd. front end loader will load from
stockpiles to scows during the summer working season.

Sufficient support and spare equipment has been included to


maintain the necessary production.

7 days is
The work week for rock quarry and hauling operations
a t 12 hrs.
NORTHERN CONSTRUCTION COMPANY
2 - 5
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

CONCRETE MODULES.

is the TRIBAR module.


The concrete shape used in the study
5.3 tons and 3.75 tons; there being
Two sizes are to be manufactured,
of T R I BARS and
an equal number of each. The scheduled total number
the quantity of concrete required are as follows:

TRI BARS. (50% @ 3.75 tons, 50% @ 5.3 tons)

Year No. of TRI BARS Concrete


quantity
CU. yds.

1976 8,600 19,900


1977 9,400 21,500
1978 14,000 32,200
1979 14,000 32 ,200
1980 14,000 . 32,200

To tal 60,000 138,000

of the TRIBARS
The choiceof the plant for the construction
vas based on:

1). Ease of construction.


2). Minimum of winter work.
3). High cost of fuel.
4). Concrete quantities as shown above.

The concrete operation is scheduled for mobilization1975,


in
production of modules in1976-1980, with completionof loading out and
demobilization in 1981.

A simple procedureof natural curing is adopted, based on a


yearly 5 month summer schedule, May
15 - Oct. 15. The batch plant
itself is winterized and facilities are included for ‘heating
of
aggregates. Batch plant capacity is designed for a production rate
of 33 cu. yds/hr.

One hundred a n d twenty insulated s t e e l forms are used on a


twenty- f o u r h o u r schedule. Hoarding, with tarpaulins and mobile
NORTHERNCONSTRUCTIONCOMPANY 2 - 6
DIVISION OF MORRISON - KNUDSEN COMPANY, INC.

space heaters, is provided for cold weather protection at each end of


theseason. Maximum p r o d u c t i o n w i l l b e 120 modules p e r day with an
overall a v e r a g e of 80 modulesperday.

The workweek g e n e r a l l y is 7 days a t 10 h o u r s s i n g l e s h i f t


withtheexceptionoftheroadbuilding crew i n 1975 whichworkson a
7 day a t 12 h o u r s d o u b l e s h i f t p e r dayworkweek.

Cement s u p p l y i s t h e l a r g e s t s i n g l e item i n t h e c o n c r e t e work.


A cement c o n t e n to f 512 l b / c u . yd. i s used as t h e b a s i s f o r t h e esti-
mate. Quoteswerereceivedfrom,anddiscussionsheldwith a number
of t r a n s p o r t a t i o n andhandlingcompanies.Thecoastalroute,the
Mackenzie r o u t e a n d a n o v e r l a n d r o u t e were e a c h s t u d i e d .

On present day standards the Mackenzie route using bagged


cementon p a l l e t s seems t o b e t h e mosteconomical way t o t r a n s p o r t
cement. However i t i s p o s s i b l e t h a t a b e t t e rs y s t e m may havebeen
d e v e l o p e db e f o r et h ey e a r 1980 s o t h a t i t is recommended t h a t t h e
cement s u p p l y a n d d e l i v e r y b e c o n t r a c t e d o n a 2 year basis.

The p a l l e t s are f u l l y w i n t e r i z e d a n d t h e y c a n b e s t o r e d , i n a n
o p e ns t o r a g e area. S u f f i c i e n tq u a n t i t i e s ofcement are s t o c k p i l e d
duringoneshippingseasontocarryconcreteoperationthroughto
s p r i n gb r e a k u p( J u l y 15).

C o n c r e t ea g g r e g a t e s are r e c o v e r e d f r o m g r a v e l d e p o s i t s a l o n g
tchoea s tpalla t eaafnurdot m
he bed of River a t a maxi-
-

mum d i s t a n c e of 12 miles f r o m t h e c o n c r e t e c a s t i n g area.

The a g g r e g a t e s are h a u l e d t o a p r o c e s s i n g p l a n t at the casting


area a l o n g a 24 f t .w i d ea l l - w e a t h e rr o a d .A l t e r n a t i v e l y a coastal
w i n t e rr o a d may b e p r a c t i c a l and t h i s w a r r a n t s f u r t h e r s t u d y i n con-
j u n c t i o nw i t hg r a v e ld e p o s i te x p l o r a t i o n . The p r o c e s s i n gp l a n ti n -
c o r p o r a t e s a c r u s h e r , a 3-deck v i b r a t i n g s c r e e n a n d a sand c l a s s i f i e r
toproduceonesize of a g g r e g a t e a t 11/2" minusandwashedsand. A
s i l t s e t t l i n g pond w i l l p r o v i d e e n v i r o n m e n t a l c o n t r o l o f wash water
2 - 7
NORTHERN CONSTRUCTION COMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

and b a t c h p l a n t d r a i n a g e .

The p l a n t a n d c a s t i n g y a r d o c c u p i e s a p r e p a r e d area of 30
acres.

TRI BARS are t r a n s p o r t e d t o t h e d o c k s i d e o n trailers u s i n g


Cat 966 l o a d e r s ( w i t h f o r k s ) f o r h a n d l i n g .

Scow l o a d i n g is completed using C a t 966 l o a d e r s a t a "drive-


on"ramp on t h e dock.Loadingout of TRI BARS is completed i n t h e
1981season.
2 - 8
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY, INC.

HARBOUR FACILITIES

The study is based on the excavation of navigation chan


through the existing gravel spit near King Point and the const
- 1975.
of a sheetpile dockin the first year of operation

The preparation of a fifteen foot deep Navigation Channel a


turning basin, with a minimum channel width at the toe of ofthe slo
120 feet, is estimatedt o require excavation of183,000 cu. yds. of
gravel. We expect some of this gravel to be frozen.

We have assumed the sheetpile dock to


300be
feet in length x
50 feet wide with the sheets tied back to a deadman using
rods. tie
There is a minimal storage area adjacent to the dock,
3 .
h
." -

8" -

u
01

5""
"_ "_

n""

.p .. . .
.
CONSTRUCTION SCk"EDU[,E

f
f"

l i
i i .

i-
"

t
I i!
i.
I 1
i i i .

I . . ;
I /
! f

. 1
!
, i '

. i
,
. , . '
6
NORTHERN CONSTRUCTION COMPANY 3 - 1
DIVISION -
O F MORRISON KNUDSEN COMPANY, INC.

SECTION 3. EQUIPMENT LIST.

Theequipmentintended f o r use on t h e p r o j e c t is l i s t e d below.


The equipment was s e l e c t e d p r i m a r i l y o n t h e b a s i s of p r o v e n a b i l i t y
t o do t h e j o b a n d on d e l i v e r y s c h e d u l e .

A). Rock quarryequipment.


Description Number

Drill & B l a s t

ECM 350 Crawlair d r i l l s


Compressor1050 cfm
Dozer Cat D 8

Rock Separation

Loader. C a t 988 6 cu.yd. 1


Rear dump t r u c k s C a t 769 35 t o n 2
Rock p l a n t of 4 v i b r a t i gn rgi z z l i e s 1
135 Generator kw. 1

Rock haul

Dozers Cat D7 6
Loader Cat 988 6 cu.yd. 2.
Haul u n i t s Husky 8 6
Trackedvehicle TVS 600 2
S l e d s 50 Ton 30

Rock S t o r a g e & Loading

Loader. Cat 992. 10 cu.yd. 1


S e r v i c e Equipment

Pickup 1
Service truck 1
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

B). Concrete
equipment

Aggregatesystem

Dozer Cat D7 3
Dozer Cat D8 1
Loader Cat 966 31/2 cu.yd 1
Trucks 20 Ton.
Highway 9
Grader Cat 14 1
P o r t a bsl ce r e e n & c r u s h i npgl a n t , 36" 1
I
Sand c l a s s i f i e r 20" x 19" s i n g l e screw 1

Concrete batch & placing

2 cu.
Batch & Mix p l a n t yd. 1
Compressor.
460 cfm e l e c t r i c 1
Generator 312 kw 1
Boiler 80 HP 1
Truck mixers 8 cu.yd. 3
10 Flatrack Ton 1
Loaders Cat 966 2

Formwork h a n d l i n g

Hydraulic mobile crane 1235 Ton 3


crane
Truck 50 Ton 1

Tribar loading onscow

Loaderwithforks Cat 966 3


Tractor 1
Trailers 6
3 - 3
NORTHERN CONSTRUCTIONCOMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY, INC.

Service equipment

Pickups 3 / 4 Ton 11
Ambulance 1
Servicetrucks 2
Busses 3
Flatracks 2

C). Dock construction equipment


Floating

4600 Manitowoc with c lamsh. e l l & draglinle 1


Manitowocspudded scow 1
Dump SCOWS - 300 CY. 2
Tug - 960 HP :1
P i l e hammer 6 leads D - 22 1
F l a t scow 1000 T 1

Land

Dozer Cat D8 1
LoaderCat966 1
End
dump trucks10cu.yd. 3
NORTHERN CONSTRUCTION COMPANY
4 - 1
DIVISION OF MORRISON - KNUDSEN COMPANY. INC.

SECTION 4. COST ESTIMATES.

1. Basis of estimate.

2. Detail cost estimates.

3. Estimated fuel consumption.

4. Labour rates contract.

5. Cost escalation.

6. Manpower.
NORTHERN CONSTRUCTION COMPANY 4 - 2
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

1. Basis of Estimates.

The rock operation,


concreteoperation and harbour
construction are estimated as separate operations, each
self sufficient.

Estimates of cost are based on the following:

a) Labour rates covering wages, working conditions and


1974 season. A
fringe benefits are for the current
4.
copy of these rates is included here in Section

b) Supply items and permanent material costs are based


1974.
on prices in effect October

c) Escalation of costs is not included in the estimates.


This is discussed further in this section.

d) Estimates of cost include normal contractor mark-up


and contingencies.

2. Camp facilities and board costs have been estimated


$ 2 5 .at
00
per man day.

3. Imperial Oil Limited will supply free of charge:

a) FuelOil.
b) Air transportation to and from Edmonton.
c) Government Permits for land use and quarrying fees.
d) Land-line type telephone system at three locations.
e) Helicopter and aircraft service from Bar-C and Inuvik
to the project.
f) Service Boat from Inuvik.
NORTHERNCONSTRUCTIONCOMPANY 4 - 3
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

4. Federal sales tax has been included in equipment supplies


and
purchase. -Present Government rulings are unclear
and every
effort should be made to have the
project tax exempt.

5. No financing costs are included in the


estimates.
NORTHERNCONSTRUCTION COMPANY 4 - 4
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.
e
a
U
00
.
)
N
N
vt vt
c\I rr) a
a U
co d b W
I 0 N m 0 W
rl N
n n n h h
u
u u
0
-
L
0
1 -
u U
0 0
3 3 3 3 3
13 71 Q a a
0 0 0 0 0
&I t.4 t.4
PI
U
h t+
F U
rl 0 '0 0 0 0
U 0 0 0 0 0
s
a
cn
Cll
a
h
a
0. m
00
E
0
rw ..
4
0 U
u
ID
2
a
s
0
c
s E
0
rl
a
0
'd
0
3
0
U U
0 a U U 00 a
rl al
u
a 0
U N Q) E 0
a a rl M 0
Li E rl m rl
al rl d rl a a
a U P 3 a U
0
d 4 a
X s
-"u
0
e: d
. N 0 U rr,
n
a
a -

DETAIL COST ESTIMATE.

b). Concrete Operation.

Estimated cost of the concrete operation is detailed below:

Quantity Rate Amount

1. Mobilization LS - $ 11,165,005
r

2. Cement supply 38,900 Tons 220.00 8,558,000

3. Aggregate recovery
and processing 292,000 Tons (Product) 9.00 2,628.000

4. Concrete module
production 138,000 cu.yds 11,385,000
82.50

5. Tribars transport
and load on scow 271,500 Tons 1,696,8756.25

Total cost 138,000 cu. yds 256.76 $ 35,432,880 ’


NORTHERN CONSTRUCTION COMPANY 4 - 6
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.
e
0 0
o\ 0
0 0
a a
m eo
hl QI
m U
1
d
uz
..
d
Q)
P
a
Q)
d

m
hl
r-
. 0
0
0
.rl \o
a
d
u
h yc
U d
rl
0 0
U 0 0
m
2
0
0
m
*
V eo
d
u
m
0
u
r(
I
Q
u
s
n
U
NORTHERN CONSTRUCTION COMPANY 4 - 7
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.
h
.
W
2
x
VI
x
m
0
U
ma
m m
U N rD
d m U
m m
0 0 0
0 N N
mm Ln 00
m a
0 N N
U 0 U
m hl VI
0 0
' 0 hl
m
aJ
5
.. 0
U
m
L n
hl
0
m
d
m hl
ccc 0)
0 P
0 0 0
B
Q)
m
5:
0
0
CCI
m

hl
Ln
m

N
Eo
a
a 0 N N
U 0 U
m N VI
0 0 0
z hl
m
m

hl
rD
m
d
a
0
U
m
rD
m
0
9
m r) VI
0 0 0
0 co Eo 0 .
m \o m m
a a m 00
0 hl N a
U \o 0 VI
m r) VI d
c3
m
m
0 0 0
h Ln
mm
hl \o co
a m m
hl 0 U h
o\ U m N rl
d m
c r(
0 E 9)
rl 0 3
u r( ccc
0
c a U
k 0 U
rl aJ 3 U
U
a
a & 0)
0 u n
& m 0..
aJ
a
Q)
u c k
0 aJ
0
U
a
.. k d
U
111 U At (D
w G U U
0 0 0
V cl w
0
n
m
F
NORTHERN CONSTRUCTION COMPANY 4 - 8
DIVISION -
OF MORRISON KNUDSEN COMPANY. )NC.

4. Labour rates
.. .
. -

The wage rates, fringe benefits,and conditions in


effect on Western Arctic Dredging work 1974
in have been used
as the basis of labour costs.

Details of these rates areshown on the following


pages 4 - 9 to 4 - 17.

A review of labour escalation follows sub


in section
5.
1

. .
. . t r l 3 T f R N ARCTl DRfDClNC . . . . ..'.J -
..
5. *

Basic
. WAGC RATES, FRINGE'BENEFITS

Hrs. o f
Ah0 COiJDITIONS

Laave
IN EFFECT TEERUARY 18, 1974
lay for Mod. Plal
--
Rocm Shif 1
C l e s s l f i c aH
t ioounr l y Eonua Wor? Por O/T EVnat ci taltei-o n .03ve 'ransport Pensions and Dlffc
"" Rate Day; Week CONGITIUNS Pay mon t lays In Leave e tc. Board en t a j

CO~l~lISSIONINC
AND MOBILIZATION

roreman 7.35 ' 10% of


ell
eornings ' ono 1 Day's Fare paid
- 40
' (f600.0
Kin2 J
Cod r a c t
8 Time and
ono-half
for all
, 6% wesk
a f tor
60 d a y s
Pay
each
way
to point
o f hire i
Canada an
Free N!
Period O/T over O f Qm.- re turn
completed 8/48 ploymsnt

" -
OPERATIONAL smsori
8
NORMALLY J U L Y 1 to CCT, 31
. .
Time and 10 d a y s
one-half a f t e r corn 1 D a y * s
.
I
Fare paid .l5# . . . .
for hrs. p l e t f o n o f pey eac
: .
to point ' p e r hrr
worked 6% 0
.
. - - ,-. way . o f hire i earned Free Nj
beyond 40 d a y s err- Canzda an
208 in a ploymen t re t u r n
month *'

.-*
." z 2 . . .
4 - 10
. .
0
*
oluo ..
a m
. .
m
e
- .
m
z s,
0
w
t-
U
N
n
-I
H
m
0
E
1
. . co ' Q
V Q)
."
CD
n
0 .. 0
9 9
* . t-
0 0
-
0 0
3
o-b
O
WAGE RATES; FRINGE BENEfITS AS0 C0I';DITIONS IN EFFECT FE6RUARY 18, 1974
Basic hove bay for Mad. Plane Room Shift
Hrs. o f
,

Clzssification Hourly
Bonus Work por O/T EVnat ci tal tei-o n &9ave ransport Pensions' and Differ
Rote Rate Day: Irleok COhDITIUtIS Pay men t S n Leave etc. Board en t a 1:

I
COMMISSXONI8JG AND MOBILIZATION
Loverman 7.00 10% o f
ell
. earnings one 1' Day's Farepaid .AS$
($600.00 8 48 Time and * 6% woek Pay to point p e r hr.
min) one-ha1 f after each o f hlre in earned Free , ,
NI:
c o n ir a c t for a l l 60 d a y s way ' Canada'and
Po r i o d O/T over o f am- re t u r n
completed 6/40 . .
' ployment r

. .

OPERATIONAL SEASOlJ
I
NORMALLY JULY 1 t o OCTa 31 . .

Time and 10 d a y s

tsverman 7.00 "


earnings
10% of all
($600.00
Yiin.) if 12 84
Contract
1 one-half
for h r s .
worked
beyond
68
40 days er
;I
a f t o r corn 1 Day's
p l e t i o n o pay.eac 1
-.
-
way
Fare paid
t o point
o f hire ir
Canada anc
*
.IS2
per hr.
earned Free Ni
. ,
Period ploymen
206 in a t re turn
completod . . rronth .. ,.. .. . '

. . '

. . . . . . . . . ,, , . 2.
. . .
... .....
".
' I f.

-. I
WAGE RA'IES, FRfbJCf EfNEfITS APJD CGJDI TIONS IiY EFFECT TEBRUARY 18, 1974
c
52s ic
Closslftcatlon Hourly eonus
Hrs. o f Losvc k d . P1 Room
U!ork Per O/T Vacation Entitle- rransport Pension 9 and
* Rate Day:. kook I, COCD ITIOF!S Pay men t In Loave etc. Boar
"

COR7ISSIONINC kND MOBILIZATION

one Fare pair .l SlC


Time and 6% wesk to p o i n t per hr,I
one-hal f sf tcr of hire j earned h
for a l l 60 days Cznzda ar
O/T over o f em-' re turn
8/48 ploymant

-
. "

.
O E R A T I O 9 A t SEASON
F!O!TIPLLY JULY 1 t o CCT. 31
.
. .
233 3- r a t o r . 6.35 .. 10% o f a l l I T i m e . and 10 d a y s
earnfngs I
Cpsr .
ar.d Crhne
'. ($GOO.OO i
one-ha1 f
for hrs.
a F t e r corn-
p l e t i o n of
Fare p a i d .I5e
to p o i n t 'per hr.
.. Nin,) i f lz' 84 worked 6% .I o f hire i earned N:
Contract I beyond 40 days e Canzda an1
Period 208 i n a ployman t return
complo t e d mcn t h

I
-

i.
I
1
. I
i
. I

F
~~

3y for k d , Plan Room Shift


Basic Hrs. o f Leave
Differ
Entitle- save ransport 'ensions and
C l z : . i?icat:on Hourly Bonus Work Par O/T Vacation entail
3 tc. Board
Rate COKD ITIONS Pay mon t aY s 1 0 'n Leave
- Rote Day: Weok

i
COJVlISSJONING AI40 MOEILIZATION

5.85 10% O f
all Fare p a i d SG
*l
earnings
onB
6% wesk to p o i n t per hr.
($600.00 8 48 Tlme and free Nil
'
o f h i r e if e a r n e d
min) *$' one-ha1 P after
60 days Canadaan(
Contract for a l l
O/T over o f em- return
Po r i o d
complo ted 8/48 ployment

OPERATIONAL SEASON

Sa 85 70% o f a l l
ea rni n gs
(3600e 0 0
Nfn.) if 12 84
1
I
NORMALLY JULY 1 t o CCTa 31

l i m o and
one-half
for h r s .
worksd 68
10 doys
a r t e r cornI
plotion a
4 ..
'I
I 1 Day's
pay eac
Fere paid
t o point
o f hire i
'Canada an
Free N i:
Contract beyond
208 in a ploymen t re turn
Pe r i o d
completed month
I

I
. I
k
. - 4 - 15
0
E D k
o c a '.
0 0 0
a m
I U
UL l4
0)
30)
c*
om
m a
tn ln
bo
bo
m
- . 0
ln . . -.
. .
- / 4
&4
. . 1

eas ic
-
Hrs. o f Loave a y for Esd. Plar Room Shift
Clesslflcatlon Eourly Bonus Work Per O/T Vocation Entitle- eave 'ransport Pensions and Differ
Day: Ir.!ook COiOITIUNS Pay men t aY s In Leave e tc. 8oard entail

C O X ~ ~ I I S S I O N I N CARD M O 8 I L I t A T I O N
Oiler 4.50 lop o f
all
. earnings one Fare paid

PIinJ 1
( $ 6 0.00

Contr c t
8 . 48' Time and
ono-ha1 f
for a l l
65 wssk
after
GO days
to p o i n t
o f hire i
Canada an
Feriod O / f over o f em- re turn
completed 8/48 . ployment

- ~~

OPERATIONAL SEASOiJ
NORMALLY JULY 1 t o OCT, 51
.'
* a.

Oiler 0.50 10% of a l l Time and 10 days


earnings one-half a f t e r corn Fere p e i d .15i
. (i5GOiJ.00 f o r hrs. plotion o t o poln t 'per hr. ..
flin.) i f 1: 84 worked o f hire i earned Free N f1
Contract bsyond Canadaan
Period re turn . .
208 in a
. comploted month .'
. .
. . ..

. . , .

- *

.'I -
.' .
BES i c
"~

ay for Msd. Plar


-
Room
Hrs. o f Leave
lesslfication Hourlj.
Eonus Work Per eave 'ranaport Pensions and
O/T Vacation En ti t l o -
Rate
Rate CONDITIUNS Pay mon t In Lsave e tc. Board
aY S

LaS./Deckhand 4.10 10% o f '.


all
earnings O W 1 Day's Fare paid .15$
(S600.00 8 48 Time and 6% wsek Pay to p o i n t per hr.
[tin.)q
Contract
one-ha1 f
for a l l
e f ter
60 days
each
way
of h i r e 1: earned
Canada an1
Free Nil
Pa r i o d O/T over o f cm- return ,
comploted 814 8 ployment

OPERATIONAL SEASON
NORMALLY JULY 1 t o OCT. 31

Lab./Deckhind de10 10% o f all ,


I Time .and 10 days
a f t e r corn 1 Day's fare paid
. ,
ea r n i n g s
(~~00.00 i one-half
for h r s . Dltitfon o pay . eec t o point
. ,
..
. .. .
Min.) if 13 84
Contract I
Worked
bsyond
of h i r e i
Cenada an'
Free ' Jil*
. .
., Period 208 i n a ' re turn
completed rnon th
. .

I .

.. . . .
. *

c*
I
I-
u .

ri
"4

NORTHERN CONSTRUCTION COMPANY 4 - 18


-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.

5. Cost
Escalation. '- .. . .

A). Labour

A p r o j e c t a t King P o i n t , Yukon T e r r i t o r y , is s u b j e c t
t o t h eg e n e r a le s c a l a t i o nf o r c e sa p p l i c a b l et oC a n a d i a n
constructionindustryandalsoto some f o r c e s p e c u l i a r
t o thejoblocation.

L a b o u re a r n i n g si n c r e a s e si nt h ey e a r s1 9 7 0 - 1974
are shown below. These g i v e a n i n d i c a t i o n of t h e h i s t o r i c a l
trend of e s c a l a t i o n i n l a b o u r c o s t s .

Average Weekly e a r n i n g s

1 ) . A l l i n d u s t r i e s( A l b e r t a )

Percentage
Index weekly
Average
e a r n 1i n9g7s0 = 1
I n. 0c 0r e a s e p e r year

123.53 1970 1.00


133.29 1971 1.08 7.9%
142.70
1 972 1.16 7.1%
155.70 1973 1.26 9.1%
1974 168.05 1.36 7.9%

2).
Construction
Industry
(Canada)

1970 160.48 1.00


172.04
19 71 1.07 7.2%
1972 198.03 1.23 15.1%
220.18 1973 1.37 11.2%
233.27
1 974 1.45 5.9%
NORTHERN CONSTRUCTION COMPANY 4 - 19
DIVISION OF -
MORRISON KNUDSEN COMPANY. INC.

Wage rates.
1). General engineering(Canada).

Percentage
Index weekly
Average
earnings 1970 = 1I. n0 c0r eypaeesarer

1970 3.77 1.00


1971 4.23 1.12 12.2%
1972 4.63 1.23 9.5%
1973 5.12 1.36 10.6%
1974 5.68 1.51 10.9%

LabourorganizationintheMackenzie Delta area h a s b e e n , t o


date,controlledbythe Edmonton " l o c a l s " a n d h a s b e e n s u b j e c t t o t h e
A l b e r t a wage base.KingPointhowever is i n t h e Yukon T e r r i t o r y .
The s o u t h e r n p o r t i o n of t h e Yukon i s a c t i v e l y c o n t r o l l e d b y t h e B r i t i s h
h Columbia "Locals"and this a c t i v e control w i l l no d o a b te x t e n d to t h e
northernportion as t h e t e r r i t o r y i s openedup.

A furtherinfluence onKing P o i n t i s t h e p r o x i m i t y of Prudhoe


Bay a n d t h e p i p e l i n e work i n Alaska (less t h a n 400 miles t o t h e West).

A start of the Mackenzie Valley pipeline would have a major


i n f l u e n c e on b o t h s u p p l y a n d o r g a n i z a t i o n of l a b o u r .

Wage rates i n B.C. andPrudhoe Bay a r e compared t o p r e s e n t day


Mackenzie D e l t a rates as f o l l o w s :

Basic Wage Rates.


Mackenzie Delta NWT B.C. Prudhoe B ay
(Mar. 74-Dec. 74) (1Ju1.74-1Nov.74)(1Jul.74-lJan.75)
Labour 4.10
9.66 6.71
Heavy duty
11.17 mechanic 7.90 6.35
Carpenter 7.00.
11.35 7.97
NORTHERN CONSTRUCTION COMPANY 4 - 20
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

B). Equipment

Firm quotes on equipment were d i f f i c u l t t o o b t a i n w i t h


vendorsadvisingintheorderof 11/2% p e r monthadd-onfrom
the d a t e o f q u o t e t o t h e d a t e o f p u r c h a s e o r d e r .

C). Supplies

It was n o t p o s s i b l e t o g e t f i r m q u o t e s o n cementsupply
over a f i v ey e a rp e r i o d .H o w e v e r , an e s c a l a t i o n of $ 5 / t o n /
y e a r was i n d i c a t e d .

One f r e i g h t q u o t e i n d i c a t e d a total escalation of 40%


from 1975 rates t o 1979 rates. Recentexperienceshows
suppliesescalationrunning a t 15 - 20% p e r y e a r .

I ng e n e r a l ,e s c a l a t i o no fs u p p l i e sa n de q u i p m e n tc o s t s is a
d i f f i c u l ti t e mt op r e d i c t . One method o fa v o i d i n gw i l d' s a f e t y 'f a c t o r s
on escalation is to contract workand supplies on a present - cost basis
w i t h a formula t o h a n d l e e s c a l a t i o n .
NORTHERN CONSTRUCTION COMPANY 4 - 21
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

6. Manpower.

Camp facilities and operations are covered in the cost


of $ 2 5 . 0 0 per man day. A more detailed breakdown
estimates at a rate
of camp requirements for the individual phases of the work
shown is
below. Camp capacity and mandays shown do not include catering
personnel.

a). Rock operation.

The camp requirements for the rock operation is


designed as amain camp operation at King Point with a
satellite camp at Mt. Sedgwick.A small transient camp
will be set up at the transfer 9 point
miles from Mt.
Sedgwick.

Camp capacity is as follows:

Winter
Summer

King Point 12 37
Mt. Sedgwick 31 30
Transfer Point 30 (transient)

Man days estimated for the total rock operation is


approximately 7 5 , 0 0 0 man days, with a distribution
as follows:

King Pt. Mt. Sedgwick Total

19 75 600 1,500 2,100


1976 5,950 6,450 12,400
1977 5,950 6,450 12,400
1978 5,950 6,450 12,400
1979 5,950 6,450 12 ,400
1980 5,950 6,450 12,400
198 1 5,950 4,950 10,900
7 5 , 0 0 0 man d a y s
NORTHERN CONSTRUCTION COMPANY
DIVISION O F MORRISON - KNUDSEN COMPANY, INC.
4 - 22

b). Concrete operation.


The camp requirement for the concrete operation
is a single camp set up immediately close by the casting
yard area.

Concrete work is a summer operationonly and peak


manpower is 156 men. Total estimated man days f o r the
concrete operation is 110,000 man
days with a distribution
as follows:

Man days

1975 9,700
19 76 19,900
1977 19,100
1978 19,100
1979 19,100
1980 19,100
1981 4,000

110,000 mandays

c). Dock construction.

The dock & channel work isto be completed in


the 1975 season. All manpower will be located at King
of 39 men.
Point with a peak number

Total man days on dock


and channel work is estimated
to be 2400 man days.
SECTION 5. CAPITAL COSTS.

C a p i t a l c o s t so fe q u i p m e n ti n t e n d e df o ru s e on t h e p r o j e c t are shown below. Some items


of equipment w i l l b e r e p l a c e d d u r i n g t h e l i f e of t h e p r o j e c t . C o s t s o f r e p l a c e m e n t u n i t s are
included.Federal Sales Tax i s i n c l u d e di nt h ep r i c e shown.

a ) . Rock o p e r a t i o n .
No. New P r i c e Amount

ECM 350 Crawlair d r i l l s 2 60,000 $ 120,000


Compressors1050cfm 2 68,000 136,000
Dozer Cat D8 1 150,000 150,000 P

DozerCat D7 6 108,000 648,000


LoaderCat988 6 cu.yd. 3 172,000 516,000
Loader Cat 992 10 cu.yd. 1 306,000 306,000
Rear dump t r u c k s Cat 769 35 Ton 2 175,000 350,000
Haul u n i t s , Husky 8 6 170,000 1,020,000
Tracked vehicle TVS 600 2 45,000 90,000
Sleds 50 Ton 30 30,000 900,000
Rock P r o c e s s i n g p l a n t 1 208,000 208,000
Generator135 kw. 1 19,000 19,000
Serviceequipment 20,000
4,483,000
b). Concrete operation.

No. New Price Amount

Aggregate plant 1 163,000 $ 163,000


Concrete batch plant 1 97,000 97,000
Concrete ready-mix trucks 3 58,000 174 ,000
Loader Cat 966 6 95,000 570,000
Dozer Cat D8 1 158,000 158,000
Dozer Cat D7 3 98,000 294,000
Haul trucks 20T. 9 43,000 387,000
Grader Cat 14G 1 93 ,000 93,000
Galion 125 hydraulic crane 3 81,000 243,000
p & H 50-ton mobile crane 1 220,000 220 ,000
50-ton tractor RS 797 1 50,000 50,000
Trailer units 6 5 ,000 30,000
Compressor, welders, generators 108,000
Pickups, buses , ambulance, service trucks 127,000

$2,714,000
?

c). Dock construction.

The equipment required for construction of the dock and dredging of the channel is
similar to Northern Construction Company equipment already operating in the MacKenzie
Delta area. The estimate is based on rental of this equipment.

Ln
I
w
6-1
NORTHERNCONSTRUCTIONCOMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

SECTION 6. CONTRACT ARRANGEMENTS

Many different types of contractual arrangements can be used


o r construction/management services
in the procurement of construction
for large-scale projects. Northern Construction Company has performed
successfully in the past under many different types.

For the project described in this study a target type


reimbursable contract is suggested. This type of contract is
discussed below:

TARGET TYPE REIMBURSABLE CONTRACT

This type of contract has been devised for situations in


which a firm bid cannot be made in advance of performance, but in
which it is desired to give greater profit motivation to the con-
tractor than exists in other cost-type contracts.

In this type of contract the owner and contractor at the out


negotiate an estimated target cost estimate, a target fee, (a minimum
and a maximum fee), and a fee adjustment formula. Actual costs of
performing the work are reimbursable. After performance of the
contract the fee payable to the contractor is determined in accordance
with the formula. The formula might typically provide that the
25 percent of the actual cost over-runs
contractor would be penalized
above the target estimate and rewarded 25bypercent of the under-runs
- in both cases, subject to the previous agreed minimum and maximum
Such a contract can also have separate incentive provisions for early
completion.

The principal advantage of this type of contract isit that


permits work to commence early on projects for which the scope and
conditions cannotbe sufficiently defined to permit establishing
firm price tenders.
6 - 2
NORTHERNCONSTRUCTIONCOMPANY
.
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

The "Target Estimate" contract fosters close communication


and cooperation between the owner and the contractor. Both parties
are attempting to accomplish the same ends, i.e. lowest possible
cost within an established time frame.

There still remains, however, a significant incentive


on the
part of the contractor to perform the work as economically as possible.
The contingencies which must be borne by the contractor under firm
price tenders are significantly reduced when establishing the Target
Estimate.

Northern Construction has performed several multi-million


It is o u r
dollar projects on Target Estimate type contracts.
experience that contractsof this type have worked to the mutual
advantage of both parties and have eliminated to a great extent
many of the problems of contract administration inherent in other
contractual arrangements.

It is suggested that a Target Estimate type of contract be


considered for the performance of the work contemplated
in this study.
NORTHERN CONSTRUCTIONCOMPANY 7 - 1
DIVISION O F MORRISON - KNUDSEN COMPANY. INC.

SECTION 7. CANADIAN LABOUR RELATIONS

PERSONNEL, RECRUITING, T R A I N I N G , LABOUR RELATIONS AND SAFETY

I n Canada, t h e N o r t h e r n C o n s t r u c t i o n Company D i v i s i o n o f
Morrison-Knudsen Company, I n c .m a i n t a i n s a f u l l time s t a f f r e s p o n s i b l e
for t h ea b o v e - n o t e dp e r s o n n e lf u n c t i o n s .S i n c e 1957, t h i sg r o u ph a s
b e e nu n d e rt h ed i r e c t i o no f Mr. W . H . M a u n s e l l .S i n c et h a t time,
Mr. M a u n s e l l h a s b e e n r e s p o n s i b l e f o r a l l labourrelationsconcerned
w i t h a l l C a n a d i a nc o n t r a c t s . He m a i n t a i n s a c o n t i n u i n g good
relationship with trade leaders across Canadaandhas a similar
r e l a t i o n s h i pw i t h many g o v e r n m e n tl a b o u ro f f i c e s . T h e areas of
activity of the LabourRelationsDepartment are summarized a s f o l l o w s :

Negotiation and execution of pre-bid job agreements.


N e g o t i a t i o n of l a b o u ra g r e e m e n t si n areas wherenone exist.

C o o r d i n a t i o n w i t h Canada Manpower and o t h e r l a b o u r b o d i e s


for work f o r c e s u p p l y .

Close contact with Provincial and Federal Department of Labour


Officials.

Labourrecruitmentof a l l tradeclassificationsacross Canada.

Closeworkingrelationshipwith a l l l e v e l s of l a b o u r u n i o n o f f i c i a l s .

C o n t i n u o u sr e s e a r c hr e g a r d i n ga v a i l a b l el a b o u rm a r k e t s .S t a t u s
of labour agreements on a Canada-wide b a s i s .

Developmentoflabourescalationformulas€orlong term c o n t r a c t s .

Outlined below is a g e n e r a l breakdown of the o p e r a t i o n s i n


theseareasoverthe p a s t years.
7 - 2
NORTHERN CONSTRUCTION COMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY, INC.

PERSONNEL, RECRUITING, TRAINING.

Northern's personnel staff has carried out extensive recruiting,


traininganddevelopmentprogramsthroughoutCanada.
A

I n t h e l a s t 1 9 5 0 ' sd u r i n gt h ec o n s t r u c t i o n of t h e D i s t a n t
EarlyWarningRadarNetwork b u i l t i n t h e Canadian Arctic, some 2500
workers were r e c r u i t e d d u r i n g e a c h y e a r o f t h e t h r e e - y e a r p r o g r a m .
R e c r u i t i n g was carriedoutthroughoutCanada;however,everyeffort
was made t o r e c r u i t EskimosandNorthernCanadianIndians. An
excellentprogramoftraining was e s t a b l i s h e d by N o r t h e r n i n c o n j u n c t i o n
withtheNorthernAffairsDepartmentoftheCanadianGovernment.
Many n a t i v e s l e a r n e d c o n s t r u c t i o n s k i l l s a n d d e v e l o p e d i n t o g o o d
tradesmen.

Extensiverecruitingprograms were c a r r i e d o u t i n N o r t h e r n
Manitoba i n 1962and1969 among t h e I n d i a n s o f t h e area. A number o f
these workers became e x p e r t s i n d r i l l i n g a n d b l a s t i n g o p e r a t i o n s .
I n a l l areas ofCanada,programs in recruiting have been established.

The s t a f f o v e r t h e y e a r s h a s c a r r i e d o u t e x t e n s i v e s t u d i e s i n
regardtomaintaining work f o r c e s i n r e m o t e areas a n d c o l d climates.
Specialabourcontractshavebeenestablishedto create a n i n c e n t i v e
f o r workmen t o remain i n remote areas. Combined w i t h t h e s e i n c e n t i v e s ,
I
Northernpridesitselfinofferingtheworkersinthese areas s u p e r i o r
l i v i n g a n db o a r dc o n d i t i o n s , combined w i t h f i r s t - c l a s s r e c r e a t i o n
a r r a n g e m e n t sn e c e s s a r yt os t a b i l i z et h e work f o r c e . Good r e l a t i o n s
are m a i n t a i n e d w i t h a l l Canadian camp c a t e r i n g c o n t r a c t o r s .

Northern's staff has been active in associations concerned with


traininganddevelopment. The DirectorofPersonnelandLabour
Relations i s a member o f t h e following:
7 - 3
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY, INC.

A T r u s t e e of t h e O p e r a t i n g E n g i n e e r s J o i n t A p p r e n t i c e s h i p
Boardof B.C. ThisBoard is a j o i n t union-management
g r o u pd e d i c a t e dt ot h et r a i n i n ga n du p g r a d i n go f Heavy
DutyMechanics,Weldersand Heavy EquipmentOperators.

A member o f t h e E d u c a t i o n a l a n d S a f e t y C o m m i t t e e o f t h e
Amalgamated c o n s t r u c t i o nA s s o c i a t i o no f B.C. T h i sg r o u p
is r e s p o n s i b l e f o r e s t a b l i s h i n g s p e c i a l i z e d t r a i n i n g c o u r s e s
forSupervisorsand Foremen i n t h e c o n s t r u c t i o n i n d u s t r y .

A member oftheAdvisoryBoardtoDouglasCollege, a
community c o l l e g e l o c a t e d i n t h e Lower Mainland of B.C.
The Advisory Board has been responsible for the development
andoperationof a new t y p e o f C o n s t r u c t i o n Management
Cours e.

The D i r e c t o r of P e r s o n n e lh a s ,o v e rt h ey e a r s ,d e v e l o p e d a close
relationship with officers of the various Government b o d i e s a c r o s s
Canada i n v o l v e di nr e c r u i t i n g ,t r a i n i n g , etc. TheseincludeCanada
Manpower l o c a l a n d r e g i o n a l o f f i c e r s a n d v a r i o u s a p p r e n t i c e s h i p
branches of t h e P r o v i n c i a l GovernmentsofCanada.

LABOUR RELATIONS

Northern’sDirector of Personnel and Labour Relations has been


responsibleforthenegotiationandadministrationofunioncontracts
i n every area ofCanada. The c o n t r a c t sh a v ei n v o l v e dt h e AFL-CIO
BuildingTrades;MiningoperationsundertheUnitedSteelworkersof
America;and localplantoperationcoveringmanufacturingofplastic
and s t e e l p r o d u c t s .
NORTHERN CONSTRUCTION COMPANY
7 - 4
DIVISION -
O F MORRISON KNUDSEN COMPANY. INC.

Some of t h e l a r g e t y p e c o n t r a c t s were:

Construction agreements covering 2500 workersemployed


on t h e c o n s t r u c t i o n o f t h e D i s t a n t E a r l y WarningRadar
o u t p o s t s’ i nt h eC a n a d i a n Arctic. Eleven s e p a r a t e t r a d e
agreements were e s t a b l i s h e d t o c o v e r o p e r a t i o n o n t h e
twenty-fourremotelocations. An e x c e l l a n tr e l a t i o n s h i p
was m a i n t a i n e d w i t h t h e s e u n i o n s o v e r t h e l i f e of t h e j o b
and no work s t o p p a g e s t o o k p l a c e , a n d t h e r e were very few
day-to-dayproblems.

Duringtheconstructionofthe Alcan P r o j e c t i n British


Columbia,bothNorthernandtheparent company, Morrison-
Knudsen Company, I n c . , n e g o t i a t e d a g r e e m e n t s w i t h t h e B.C.
construction trades ana relationship with the unions was
excellent.

Agreementscoveringremote areas h a v e b e e n n e g o t i a t e d t o
work i n NorthernManitoba,NorthernOntarioandQuebec.
S p e c i a l c l a u s e s were i n c l u d e d i n t h e s e a g r e e m e n t s t o e n s u r e
t h a t workmen were p r o p e r l y l o o k e d a f t e r in regard to climatic
and i s o l a t e d c o n d i t i o n s .

Negotiation of union agreement with the United Steel Workers


of America c o v e r i n g m i n i n g o p e r a t i o n s i n N o r t h e r n M a n i t o b a .

N o r t h e r n ’ sD i r e c t o r of Personnel and Labour Relations is i n v o l v e d


i n v a r i o u s a s s o c i a t i o n work a c r o s s Canadasuch as:

(a) S e n i o r member o ft h en e g o t i a t i n gc o m m i t t e eo ft h e
ConstructionLabourRelationsAssociation of B r i t i s h
h
Columbia. C.L.R.A. n e g o t i a t e sc o n t r a c t sf o ro v e r
600 construction and supply firms in. B.C.
7 - 5
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

Executive Member of t h e C h u r c h i l l F a l l s PowerDevelopment


C o n t r a c t o r sA s s o c i a t i o n .T h i sA s s o c i a t i o nh a sb e e nr e s p o n s i b l e
for t h e n e g o t i a t i o n a n d a d m i n i s t r a t i o n of t h e u n i o n
agreementscoveringover 4000 workmen employed i n t h e
Northern p a r t of Labrador. The Labrador Power P r o j e c t
involvesanexpenditure of a p p r o x i m a t e l y o n e b i l l i o n d o l l a r s .

Involved i n l a b o u r r e l a t i o n s w i t h t h e C a n a d i a n C o n s t r u c t i o n
Association.

A memberoftheLabourRelationsCommittee of the Mechanical


C o n t r a c t o r sA s s o c i a t i o no f B.C. ThisCommitteedeals
e x c l u s i v e l yw i t ht h e "metal t r a d e s " , i.e. P i p e f i t t e r s ,
Boilermakers,Ironworkers,MachinistsandMillwrights.
The prime purpose o f t h e Committee i s to head off s t r i f e
andgenerallyguideemployersintheirdealingswiththese
problem unions.

Duringtheearly p a r t of 1 9 7 1 t h e D i r e c t o r of Labour
Relationshasbeeninvolvedintheestablishment of a
good w o r k i n g r e l a t i o n s h i p w i t h t h e u n i o n s i n t h e P r o v i n c e
of Quebec.Theseunions are i n v o l v e di nt h ec o n s t r u c t i o n
of t h e e x t e n s i o n t o t h e Quebec Cartier Mining Company
Railway.

TheCompany hasmaintainedexcellentlabourrelations
w i t ht h ev a r i o u sc o n s t r u c t i o nl o c a l sa c r o s sC a n a d a .I n
addition,andexcellentrelationshiphasbeenmaintained
betweenthe company a n d t h e I n t e r n a t i o n a l o f f i c e r s l o c a t e d
throughoutCanadaand t h e U.S.
7 - 6
NORTHERN CONSTRUCTIONCOMPANY
DIVISION -
O F MORRISON KNUDSEN COMPANY, INC,

I n a l l t h e areas that Northern has worked, a name f i l e h a s b e e n


k e p t of t h e w o r k e r s f r o m t h a t a r e a a n d t h e y are g r a d e d f o r t h e i r
p r o f i c i e n c y .R e c o r d sh a v eb e e nc o m p i l e do ne x i s t i n gj o b st h a ti n d i c a t e
the l e n g t h o f time t h a t a worker can be expected t o s t a y onthejob
between t r i p st ot h e" o u t s i d e " .O t h e rr e c o r d sg i v ea ni n d i c a t i o no f
the relative productivity of a man i n remote areas as compared t o
thoseintheSouthernportions of Canada, p a r t i c u l a r l y i n t h e f i e l d s
of formwork, c o n c r e t e work andheavydutymechanics. The e v a l u a t i o n
of t h i s i n f o r m a t i o n is a s t r o n g c o n t r i b u t i n g f a c t o r i n t h e p r i c i n g
of c o n s t r u c t i o n work i n t h e v a r i o u s parts of Canada.

SAFETY.

The Company c a r r i e s o u t a n e x t e n s i v e p r o g r a m o f A c c i d e n t
PreventionandSafetythroughout i t s operations. The Company hasbeen
recognized as a l e a d e r i n a c c i d e n t p r e v e n t i o n a c r o s s Canada,having
won awards i n v a r i o u s p a r t s of Canada.

In 1970 t h e Company r e c e i v e d t h e g r e a t e s t number ofawards


p r e s e n t e dt oa n yc o n t r a c t i n g company o p e r a t i n gi n Newfoundland. The
awards were i n r e c o g n i t i o n of t h e e x c e l l e n t s a f e t y p r o g r a m c a r r i e d
o u t by Northern on the vast C h u r c h i l l F a l l s Power Development i n
Labrador,Newfoundland.
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY, INC.

SECTION 8, RELATED EXPERIENCE

I N T R O D U C T I O N

Northern Construction Company has been engaged in business


i n Canada f o r 70 y e a r s . Formed i n Winnipeg i n 1904by Andrew Robert
Mann and Archibald CameronMcKenzie, t h e Company h a s s u c c e s s f u l l y
completed a widerange of c o n s t r u c t i o n p r o j e c t s i n Canadaand in the
U n i t e dS t a t e s .

I n 1911, a p a r t n e r s h i p was formed with the J.W. Stewart


C o n s t r u c t i o n Company, and i n 1931 t h e p a r t n e r s h i p w a s i n c o r p o r a t e d
underthe name o f N o r t h e r n C o n s t r u c t i o n Company and J . W . Stewart
Limited Company h e a d q u a r t e r s r e m a i n e d i n W i n n i p e g u n t i l 1 9 2 4 when
i t was moved t o M o n t r e a l .

Headquarters were t r a n s f e r r e d t o 1 3 0 4 Hornby S t r e e t ,


Vancouver in 1949andhavebeenlocatedatthe same a d d r e s s s i n c e
t h a td a t e .I n1 9 4 5 ,N o r t h e r nC o n s t r u c t i o n Company and J . W . Stewart
became a n a s s o c i a t e of Morrison-Knudsen Company, I n c . ofBoise,Idaho,
and i n 1969, became a m a j o r o p e r a t i n g d i v i s i o n o f M-K.

With 70 y e a r s of c o n t i n u o u s e x p e r i e n c e , N o r t h e r n C o n s t r u c t i o n
Company h a s g a i n e d e x p e r i e n c e t h a t i s e q u a l l e d byfew contractors.
Company p e r s o n n e l h a v e h e l d r e s p o n s i b i l i t i e s f o r many complex
e n g i n e e r i n ga n dc o n s t r u c t i o np r o j e c t s ,a n d a s a p a r to ft h e
Morrison-Knudsen o r g a n i z a t i o n , t h e y h a v e p a r t i c i p a t e d i n v i r t u a l l y
every possible kind of construction project not only in Canada b u t
throughout the world.

Northern Construction Company o f f e r s a s i n g l e s o u r c e of


r e s p o n s i b i l i t y f o r a l l phases of a p r o j e c t a n d c o m p r i s e s a company
t h a t is c a p a b l e of h a n d l i n g a l l m a j o ra s s i g n m e n t s .T h i st o t a l
c a p a b i l i t y is a v a i l a b l e u n d e r a conceptwhich may i n c l u d e a n y o r all
ofthe following s e r v i c e s :
NORTHERN CONSTRUCTIONCOMPANY
8 - 2
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

- Planning
- CostEstimating
- F e a s i b i l i t yS t u d i e s
- Procurement
- Engineering
- C o n s t r u c t i o n Management

CONSTRUCTIONEXPERIENCE I N CANADA

Duringthe 70 y e a r s N o r t h e r n C o n s t r u c t i o n Company h a s b e e n i n
the construction business, projects have been completed for both
p r i v a t ei n d u s t r ya n dg o v e r n m e n t a la g e n c i e s . The v a l u eo ft h e s e
projectsrangesfrom a fewthousanddollarsto several m i l l i o n
dollars. Much o f t h i s work h a sb e e np e r f o r m e du n d e rd i f f i c u l t
c o n d i t i o n s( w e a t h e r ,t e r r a i n , e t c . ) and many o ft h ep r o j e c t sh a v e
beenperformed when time and money have been critical considerations.
N o r t h e r nC o n s t r u c t i o n ,i np e r f o r m i n gu n d e rt h e s ec o n d i t i o n s ,h a sg a i n e d
a r e p u t a t i o nf o cr o m p l e t i n g work on o ar h e a do sf c h e d u l ea n dw i t h i n
the budgeted amounts.

As a r e s u l t o f t h i s e x p e r i e n c e , N o r t h e r n h a s d e v e l o p e d
a h i g h l ye f f e c t i v ec o s tc o n t r o lp r o g r a m . Development of t h i s
p r o g r a mh a sb e e nn e c e s s a r yf o ri n t e r n a lj o bc o n t r o lo nh i g h l y
c o m p e t i t i v ea n dr e l a t i v e l ys i m p l eu n i tc o s tp r o j e c t s . An owner
is e n t i t l e d t o c o m p l e t i o n o f t h e p r o j e c t w i t h i n t h e time l i m i t ,
withintheintentofthetechnicalspecificationsconcerned,
andmostimportantly,withinthecost estimate uponwhich the
owner o r i g i n a l l y b a s e d h i s d e c i s i o n t o p r o c e e d w i t h t h e work.

Planningandscheduling,procurement,personnel,safetyand
equipment are o t h e r i m p o r t a n t c o n s i d e r a t i o n s w h i c h c o n t r i b u t e t o
t h e s u c c e s s f u l completion o f any p r o j e c t . All o f these f a c t o r s
must b e c o n s i d e r e di nt h ed e v e l o p m e n t of a p r o j e c tp l a n .N o r t h e r n
h a se x t e n s i v ee x p e r i e n c ei n a l l of t h e s e areas a n d t h i s e x p e r i e n c e ,
when applied to the monitoring of a project plan, assures that the
8 - 3
NORTHERNCONSTRUCTION COMPANY
DIVISION OF MORRISON - KNUDSEN COMPANY. INC.

besttechniques are e f f e c t i v e l y s c h e d u l e d a n d c o n t r o l l e d .
A v a i l a b l e manpower and materials are u t i l i z e d t o t h e f u l l e s t e x t e n t
and c o s t l y d e l a y s a n d o t h e r e l e m e n t s w h i c h a d d t o t h e c o s t o f t h e
work are minimized.

R a i l r o a d s ,a q u e d u c t s , powerdevelopments,bridgesand
commercial f a c i l i t i e s were among t h e p r o j e c t s c o m p l e t e d d u r i n g t h e
e a r l yy e a r so ft h e Company's h i s t o r y . The v a l u eo f a l l projects
completedduringthefirst 40 y e a r s of o p e r a t i o n s was approximately
$500-million.

Northernhasconstructed more t h a n 8,000 miles o f r a i l r o a d


andhasrecentlycompletedtheconstructionof 9 0 miles of new
r a i l r o a di n Quebec. The new r a i l r o a d ,w h i c h w i l l t r a n s p o r ti r o n ore,
was completed i n 1 9 7 3 a n d r e q u i r e d 1 0 - m i l l i o n c u b i c y a r d s of
excavationandtheplacement of 2 - m i l l i o n c u b i c y a r d s o f f i l l and
ballast plus the construction of four bridges and 90 miles o f
communication l i n e s .

For over 30 y e a r s N o r t h e r n h a s b e e n i n v o l v e d i n t h e c o n s t r u c t i o n
of t u n n e l s , s h a f t s a n d o t h e r u n d e r g r o u n d c o n s t r u c t i o n o p e r a t i o n s
includingminingdevelopmentsandpowerhouses. TheVancouver-Burnaby
r a i l w a yt u n n e l was completed i n 1968and is 1 0 , 7 6 0 f e e t i n l e n g t h .
Other major tunnel projects include North Arm I n t e r c e p t o r S e w e r
Tunnel i n Vancouver,theFernieCoalConveyorTunnelandthePortage
MountainUndergroundPowerhouse access t u n n e l s .

D u r i n gt h ep e r i o df r o mJ a n u a r y1 9 5 5t oJ u n e1 9 5 7 ,N o r t h e r n
Construction Company c o n s t r u c t e d r a d a r b a s e s a n d a i r f i e l d s f o r t h e ,
w e s t e r ns e c t i o no ft h eD i s t a n tE a r l yW a r n i n gL i n e (DEW Line)on
t h es h o r e so ft h e Arctic Ocean f o r t h e U . S . A i r Force.Thismassive
p r o j e c t was C o n s t r u c t e d i n a n u n i n h a b i t e d area under the most
d i f f i c u l tc l i m a t i cc o n d i t i o n s .L o g i s t i c sa l o n er e q u i r e d a major
o r g a n i z a t i o n for a t i t s peak, 2,800 men wereinvolved.
NORTHERN CONSTRUCTION COMPANY
8 - 4
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

ARCTIC CIRCLE DREDGING

The N o r t h e r n C o n s t r u c t i o n D i v i s i o n of M-K i s c u r r e n t l y u n d e r
c o n t r a c tt os u p p l ys p e c i a lm a r i n ee q u i p m e n ta n dp e r f o r md r e d g i n g
operationsintheBeaufort Sea n e a r t h e mouth oftheMackenzie
River. The p u r p o s e o f t h i s p r o j e c t is t o create i s l a n d sw h i c h are
intendedforuse as s t a b l e y e a r - a r o u n d p l a t f o r m s f o r o f f - s h o r e
o i l e x p l o r a t i o n d r i l l i n g and l a t e r as p r o d u c t i o n sites. Work is
performed during the short 80 days when t h e area i s i c e f r e e .

A priorproject,completedin1971,byNortherninvolvedthe
removalof a n a v i g a t i o n a l b o t t l e n e c k on t h e Mackenzie River j u s t
75 miles s o u t h of t h e A r c t i c Circle. Rock a n ds h a l e at thispoint
r e s t r i c t e d a three-milelengthofthenavigablechannelto a width
of 125 f e e t .N o r t h e r ne x c a v a t e dt h ec h a n n e l to a minimum d e p t h of
e i g h tf e e ta n dw i d t h s up t o 600 f e e t .

CHURCHILL FALLS POWER DEVELOPMENT

The C h u r c h i l l F a l l s Power Development is s c h e d u l e d f o r f i n a l


completion i n 1 9 7 5 .U l t i m a t e l y ,w i t ht h ew o r l d ' sl a r g e s tu n d e r g r o u n d
powerhouse, thedevelopment w i l l g e n e r a t e5 , 2 2 5 , 0 0 0k i l o w a t t s of
electricalenergyfrom water impounded h i g h on t h e L a b r a d o r P l a t e a u .

As a p a r t o f t h e o v e r a l l e f f o r t , t h e N o r t h e r n C o n s t r u c t i o n
Company Division of Morrison-Knudsen completed overall construction
in 1971of a massiveintakechannelandninedikeswhichtotal
5 . 4 miles i n l e n g t h . The e f f o r t r e q u i r e d more than2,000,000cubic
y a r d s of excavationand 5,600,000 cubicyardsofzoned embankment f i l l .
8 - 5
NORTHERN CONSTRUCTION COMPANY
-
DIVISION O F MORRISON KNUDSEN COMPANY. INC.

N o r t h e r n ' sp r e s e n to p e r a t i o n si n v o l v ec o n c r e t ep l a c e m e n t
a n d a r c h i t e c t u r a l work within the underground powerhouse, and
constructionoffoundations,roadsandservicelinesfor 45
a d d i t i o n a l h o u s e s a t the permanent townsite of C h u r c h i l l F a l l s .

S c h e d u l e df o rc o m p l e t i o n i n 1974, t h e s e p o r t i o n s of t h e p r o j e c t
r e q u i r e more t h a n 53,000 c u b i c y a r d s of c o n c r e t e , 30,000 y a r d s o f
whichmust be pumped i n t o p l a c e , a l o n g w i t h 2,225,000 pounds of
reinforcing steel. Additionalpowerhouse a c t i v i t i e s s c h e d u l e df o r
completion i n 1975 i n c l u d e i n s t a l l a t i o n of hand rails, d o o r s , f l o o r
t i l e , wall p a n e l s , a n d a l l painting and other finish work.

I
NORTHERN CONSTRUCTION COMPANY
DIVISION -
O F MORRISON KNUDSEN COMPANY. INC.

PIPE LAKE OPENPIT NICKEL MINE DEVELOPMENT


at
THOMPSON, MANITOBA

Workingunderadverseconditionsinthisremotelocation,
Northern Construction Company performed a l l p h a s e s o f t h i s
developmentalconstructionprogramthat w i l l increase nickel
production s t i l l h i g h e r t h a n t h e c u r r e n t a n n u a l o u t p u t of more t h a n
130 m i l l i o n p o u n d s .

This c o n s t r u c t i o n p r o g r a m i n v o l v e d t h e e x c a v a t i o n o f 5,800,000
c u b i cy a r d so fr o c ko v e r b u r d e ni n a p i t 2,100 feet l o n g , 1 , 6 0 0 f e e t
wideand160feetdeep t o exposethe'mainorebody; as w e l l as a
mine s h a f t h e a d f r a m e s t r u c t u r e for undergroundmining,ore-handling
a n ds t o r a g e bin f a c i l i t i e s , p l u s o f f i c e , a u x i l i a r y a n d mine service
buildings.
8 - 7

NORTHERNCONSTRUCTIONCOMPANY
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.

FRASER RIVER BRIDGE PIERS

Nineteenconcretepiers were completed i n 1 9 7 1 f o r a new highway


bridgeacrosstheFraser River a t M i s s i o n C i t y , B r i t i s h C o l u m b i a .
B r i d g ea b u t m e n t sa n de a r t h f i l la p p r o a c h e st ot h ea b u t m e n t s were
i n c l u d e di nt h ep r o j e c t . A minimum of70-feetof vertical clearance
f o r n a v i g a t i o n on t h e r i v e r is provided by t h e new b r i d g e .

Nine of t h e p i e r s are l o c a t e d i n t h e river and the rest are


l a n dp i e r s . A t o t a lo f 29,000 l i n e a l f e e t o f t i m b e r p i l e s , d r i v e n
t od e p t h so f 35 f e e t , p r o v i d e u n d e r p i n n i n g f o r t h e l a n d p i e r s , w h i l e
a totalof 647 s t e e l H - p i l e s ,d r i v e n as deep as 155 f e e t , s u p p o r t
the river piers.

H-piles were d r i v e n i n t o t h e r i v e r b o t t o m a f t e r a "glory hole"


hadbeenexcavated a t eachpier s i t e a n dt h e material (a t o t a l o f
240,000 c u b i c y a r d s ) c a r r i e d away byscow forplacementinthe
. e a r t h f i l la p p r o a c h e st ot h eb r i d g ea b u t m e n t s .S t e e ls h e e tp i l i n g
was used to form a 40 x 6 0 - f o o t c o f f e r d a m e n c l o s u r e f o r e a c h p i e r ,
f o l l o w e db yp l a c e m e n to fi n s t r u s i o ng r a v e l ,t h e ng r o u t ,t of o r m a
f o u n d a t i o ns l a b .C o n c r e t ef o rt h e e l l i p t i c s h a p e ds h a f to fe a c hp i e r
was t h e n p l a c e d , f o l l o w e d by t h e s e g m e n t s o f t h e p i e r .
8 - 8
NORTHERNCONSTRUCTION COMPANY
-
DlVlSlON OF MORRISON KNUDSEN COMPANY. INC.

PORTAGE MOUNTAIN PROJECT

One o f t h e most complex hydroelectric projects in the world


was completed i n 1969by a Northern Construction Company sponsored
j o i n t - v e n t u r ee f f o r t .L o c a t e dn e a rt h e town o f HudsonHope,
approximately 500 a i r miles north of Vancouver, the power p l a n t is
l o c a t e d 500 f e e tu n d e r g r o u n d . An e a r t h f i l l dam, impounding62,000,000
acre feet of water, serves t h e power p l a n t .D e s i g n e df o ra nu l t i m a t e
c a p a c i t y of 2 , 2 7 0 , 0 0 0 k i l o w a t t s , t h e power p l a n t was completed i n
four years.

Undergroundappurtenancesinclude: two t a i l r a c e m a n i f o l d s ,e a c h
330 f e e t l o n ga n d1 1 0f e e th i g h ; two railrace t u n n e l s e a c h 70 f e e t
highand 53 f e e t w i d e ; a n d 10 p e n s t o c k t u n n e l s v a r y i n g f r o m 770
to 900 f e e t i n l e n g t h . The s u b t e r r a n e a n power house i s a chamber
threecityblockslongand as h i g h a s a 17-storeybuilding.,:

To c o m p l e t e t h e P o r t a g e M o u n t a i n P r o j e c t more than 1,000,000


cubic yards of underground excavation and 2,555,000 c u b i c y a r d s o f
s u r f a c ee x c a v a t i o n were r e q u i r e d . More t h a n 330,000 c u b i cy a r d so f
c o n c r e t e were placed underground and 125,000 cubic yards of concrete
were usedaboveground.Over37,000,000poundsofreinforcing steel,
750,000 l i n e a l f e e t o r r o c k b o l t s a n d 1 , 5 0 0 , 0 0 0 p o u n d s o f m i s c e l l a n e o u s
steel were a l s o u s e d .

!
NORTHERN CONSTRUCTION COMPANY
8 - 9
DIVISION -
O F MORRISON KNUDSEN COMPANY, INC.

GRAND RAPIDS GENERATING STATION

Grand Rapids Generating Station is l o c a t e d 250 miles n o r t h o f


Winnipeg,Manitobaand was c o n s t r u c t e d f o r t h e M a n i t o b a Hydro-
Electric Boardby a Northern Construction Company s p o n s o r e d j o i n t
venture.

The p r o j e c t encompassed a t o t a l of 1 6 miles of e a r t h f i l l d i k e s


andthreeprincipalconcretestructures - anintakestructure, a
330 foot-longpowerhouseand a four-gatedspilway.

With a n i n i t i a l o u t p u t of 330,000 k i l o w a t t s , t h e p r o j e c t r e q u i r e d
a totalof11.7-millioncubicyardsofearthandrockexcavationand
7.3-millioncubicyards of f i l l . Over 350,000 c u b i cy a r d s of c o n c r e t e
wereused, more t h a n h a l f o f which were r e q u i r e d for t h e 1 2 5 - f o o t - h i g h
by 2 9 0 - f o o t - l o n gi n t a k es t r u c t u r e . The spilway i s 410 f e e tl o n g ,
70 f e e t h i g h and is c a p a b l e of d i s c h a r g i n g water volumes up t o
140,000 c u b i c f e e t p e r s e c o n d .
NORTHERN CONSTRUCTION COMPANY
8 - 10
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC.

RIPPLE ROCK

A total of 2 , 7 5 6 , 3 2 4 poundsof e x p l o s i v e s were used t o remove


the underwater peaks of Ripple Rock which was l o c a t e d 1 0 0 miles n o r t h -
west ofVancouver, B r i t i s h Columbia i n t h e I n s i d e P a s s a g e s e a - l a n e .

The peaksofRipple Rock were w i t h i n n i n e f e e t o f t h e s u r f a c e


of t h e water a n d h a d r i p p e d t h e b o t t o m o u t o f s c o r e s of s h i p s a n d
caused a t l e a s t 1 1 4 d e a t h s i n a d d i t i o n t o u n t o l d a m o u n t s o f d e l a y s
t o vessels f o r c e d t o wait f o r s l a c k t i d e s b e f o r e p a s s i n g t h r o u g h t h e
t r e a c h e r o u sc u r r e n t sa r o u n dt h er o c k s . The enormous e x p l o s i o n
l o w e r e dt h ep e a k st o 47 f e e t b e l o w t h e s u r f a c e o f t h e water.

During the 30 m o n t h s p r e c e e d i n g t h e b l a s t a 572-foot-deep


s h a f t was sunkon a nearbyislandand a one-half-milelonghorizontal
t u n n e l was d r i v e n u n d e r t h e c h a n n e l t o r e a c h t h e u n d e r w a t e r p e a k s .
Vertical raises were b o r e d upwardfrom thetunnelbranchesintothe
peakswhich were t h e n honeycombed w i t h a t o t a l o f n e a r l y 3,000
f e e to fc o y o t eh o l e s .T h e s eh o l e s became t h e chambers i n t ow h i c h
thousandsof metal c a n n i s t e r s o f t h e e x p l o s i v e s were p l a n t e d .
4

I
I
I

j
i
I

!
I
I

I
. I

I
I
!

! -

t
0% .*. .'.
,'
-"

. . J

f
".
. "

.
".
~ .
- -
-
". ."_
.
-.
I '
. . . .
/I
. "

- .. "

L
\ I .
ab
NORTHERN CONSTRUCTION COMPANY
10 -1
-
DIVISION OF MORRISON KNUDSEN COMPANY. INC. .

SECTION 10. EQUIPMENT BROCHURES.

Extracts from brochuresofthefollowing equipment items


are included i n t h i s s e c t i o n :

Rock d r i l l ECM 350

Compressor DXL 1050

Vibratingfeeder Pioneer

Sled Otaco "Deep Freeze"

Haul u n i t s Husky 8

Tracked v e h i c l e TVS 600

Crushing & Screening


Telesmith plant 36s-G-CC

Concretemixer KoehringJohnson 224

Mobilecrane P & H 50 Ton

125Galion
crane
Mobile

Mixer Challenger
trucks 8 cu.yd.
". ... ._L_I."_ .._.." " " . 1 ". Y ...... "" .... "" .............. .""--l" ..- . "
--
- __.
.
.-

10 - 2

overage /

. COVERAGE PATTERN- CM and ECM350

I T
~~~~

ECM 350 CM 350


I English Metric English Metric
NetWeight(Including URC475A Drill) ...................... 12.900 Ib. 5851 k g 12,000 Ib. 5443 kg
OverallLength(LessBoom & Drill Guide) ................... 11 ft.-1 1YZ in. 3645 rnm 11 ft.-lllh in. 3645 rnm
Overall Length (Boom Raised 45'. Guide Vertical
including URD475A Drill) ............................. 13 ft.-11 Yz in. 4255 rnrn 13 ft.-11 VZ in. 4255 mrn
Overall Length (Boom Raised 45O, Guide Ext.
Mtg. Vertical, less Gulde) ............................. 12 ft.4 in. 3759 rnm 1 2 ft.4 in. 3759 rnrn
Overall Length (Eoom Ei Guide Horizontal, Boom Extended,
Guide Ext. Mtg. Ext., 12 ft. Steel Changs) ................. 29 ft.-8 in. 9042 rnm
Overall Length (Boom Ei GuideHorizontal,Guide Ext.
Mtg. Ext.. 12 ft. SteelChange) ......................... 24 ft.4 in. 7518 mrn
OverallLength(Trackonly) ............................... 9 ft.4 in. 2870 rnm 9 11.4 in. 2870 m m
Overall Width (Track 8 Complete Mtg.) ...................... 8 ft.-0 in. 2438 mrn 8 ft.-0 in. 2438 rnrn
Width of Grousers ....................................... 10 in. 254 rnrn 10 in. 254 mm
Drill Travel (12 ft. SteelChange) ........................... 14 ft.-3Yz in. 4356 rnrn 14 ft.-3% in. 4356 rnrn
'Minimum Height (Boom Lowered below Base Height,
including Drill) ...................................... 4 ft.-1 '/a in. 1257 rnm 4 ft.-l% in. 1257 mrn
*Overall Height (Guide Vertical) .............................. 18 ft.-10% in. 5753 rnrn 18 ft.-10% in. 5753 rnm
'OverallHeight(BoomRaised45O"Guide Horiz. URD475A Drill) 13 ft.-11 Y Z in. 4255 rnrn 13 ft.-11 VZ in. 4255 mrn
*Maximum Drllling Heqirt (Centerline Drill, Boom 4S0,
GuideHorizontal,BoomExtended) ..................... 16 ft.-11 in. 5156 mm
*Maximum Drilling Height (Centerlme Drill, Boom 45O,
Guide Horizontal) .................................... 13 ft.-1 Yz in. 4001 rnrn
*GroundClearance .......................................
*Tow HitchHeight(Centerline)
Max. Horizontal Swmg of Boom: Right..
.............................
......................
8 in.
1 ft.-9%
40'
I in. I 203 rnrn
552 mrn
8 in.
1 ft.-S% in.
40'
203 mrn
552 rnrn

Left ......................... 40° 40'


Max. Vertical Movement of Boom: Above.. ................... 45' 45O
Below ..................... 1so 15'
Max. Guide Dump ........................................ 180' 180°
Max. GuideSwing:Right.. ................................ 35O 35'
Left ................................... soo 50°
Vertical Drill Coverage (Boom Closed):
LeftofLeftTrack .................................... 4 ft.-3 in. 1295 rnrn
-
Riaht of Riaht Track .................................. 511.-5 in. 1651 rnm
TotalCoveraqe ...................................... 1 7 ft.-7 in. 5539 rnm
-Vertical Drill Coverage (Boom Extended): ....................
....................................
c Left of Left Track
Right of Rtqht Track ..................................
Total Covcrane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Vertical Drtll Cov(.r.lqc (Doom Closed):
Left of Left T r x k . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Right of Filrlht Track . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 ft.-4 In.
8 ft.-4 In.
23 f t . 4 in.
2235 rnrn
254U mm
7213 rnm

4 ft.-3 in.
5 ft.-5 in.
TotalCovcraoe ..................................... I
17 ft.-7 in. .-.,

*NOTE:-Dimcnsions taken from tip of grouser-Crawlair on hard surface.


10 - 3

Oil-cooledscrew air end with I - R . ''swept- stringentrequirements of anybearingmanu-


back" rotor design produces 15% more air per facturer. (A 10-micronparticleissmallerthan
gallonoffuelthanordinarycompressors,and some bacteria!) Less wear, longer life.
is r a t e d a t 1 2 5 psig for better performance by
Two-stage separation systemremovesand
air-poweredequipment.
recyclesoilwithminimumcarry-overin the
Double-Safety oil system (patented) employs discharge air.
both discharge pressure and a positive-displace-
m e n t pump, to assure adequate oil flow to com- Air-Glidem regulation c o n t r o l s c o m p r e s s o r
pressor under all conditions. capacity smoothly without steps, from full load
to zero load in response to demand.
Extra-fire oil filtration in compressor system
employs full-flow 25-micron replaceable-cartridge Two-stage dry centrifugal filters for engine
filters. I n addition,alloilforbearingsgoes andcompressorinletairhavereplaceableele-
throughIO-micronfilters,meetingthemost ments, and are easily serviced through rear doors.
(Continued on page 10)

" I .- . . . - . . ."

*'"spec ~ p i p l o - ~ i o DX-733 DXL-Csa h


-
~ ~ ~ ~ : - ~ v
Detroit Diesel 6V-71N Detroit Diesel 8V-71 N
Displacement 426 cu. in. (7 liters) 568 cu. in. (9.3 liters)
(No. cyls.) bore x stroke (6)4% x 5" (8) 4% x 5"
Roted speed 2100 rpm 2100 rpm
Avail. bhp on 70% duty curve 228 bhp 280 bhp '
Fuel injectors 65 cubic mm. 60 cubic mm.

ccc,1?~,zs~.c2
Roted operating pressure 125 psig (8.8 kg./cm.l) 125 psig (8.8 kg./cm.')
Actuol free-air delivery 750 cfm (2 1.25 m3/min.) 900 cfm (25.5 m3/min.)
Operoting ombient temperature range -20 to 125°F (-29 to 52°C) -20 to 125OF (-29 to 52OC)
Oil flow at 125 psi rating 48 gpm ( 1 82 liters/min.) 50 gpm ( 1 89 liters/min.j
Maximum operoting altitude @ 100 psi 13,500 ft. (41 12 m.) 16,000 ft. (4877 m.)
Moximum operating altitude @ 125 'psi 9000 ft. (2743 m.) 10,000 ft. (3048 m.)
,.,,"... .""F r?---------
GZAX
* b U d a b h b m u

Net weight including lube oil 9025 Ibs. (4094 kg.) 9880 Ibs. (4480 kg.)
Gross weight incl. fuel, water 9887 Ibs. (4482 kg.) 11,033 Ibs. (5005kg.)
Overall length, drawbar folded up 13' 2" (400cm.) 13' I " (398 cm.)
Overall length, drawbar extended 19' 4" (589 cm.) 19' 1" (582 Em.)
Overoll width 6' 3" (I91 cm.) 6' 8" (204 Em.)
Overall height incl. mufflers 7' 3" (220 Em.) 7' 1 1 " (241 cm.)
Wheelbase 7' 8" (234 Em.) 7' 4" (224 cm.)
&ck width 5' 4" ( 1 63 Em.) 5' 6" ( 1 68 cm.)
ling radius 13' 10" (427 cm.) 15' 0" (457 cm.)

Lr'Llii L E 5 R i . ; ~ ~ ~ ~f Hi AX i G
Z
N e t weight including lube oil 8345 Ibs. (3785 kg.) 91 10 lbs. (4132 kg.)
Gross weight incl. fuel, water 9207 Ibs. (4176 kg.) 10,263 Ibs. (4655kg.)
c . ':. .
#
I
,I , 7 1 2 ' 3" ( 2 7 2 c,;,.) 12' 7" ( 3 9 2 C l l l . )
Overall width 6' 3" ( 1 91 cm.) 6' 8"(204 cm.) '

8 ~.,..--II L:A. :-A . - . . t t ~ - - - C D I 9.e 11 on _ _1 1 8 *ha* I+vtn \


10 - 4

F.

The Super Spiro-Flo 125-psi line: DXL-750, DXL-900, DXL-1050, DXL-1200;


and on the right is one of their Whisperizedj Counterparts, a DXi-12004.

Cummins V-903
1 Oetroit Diesel 12V-71N Caterpillar D343-TA
903 tu. in. ( 1 4.8 liters) 852 cu. in. (1 4 liters) 893 cu. in. (1 4.6 liters)
(8) 5% x 4%" (12) 4% x 5" (6) 5.4 x 6%"
2600 rprn 2100 rprn 2100 rpm
307 bhp 420 bhp 390 bhp
(integral) 60 cubic mm. (integral)

125 psig (8.8 kg./cm.') 125 psig (8.8 kg./crn.') 125 psig (8.8 kg./cm.')
, 1050 cfm (29.7 rn'/min.) 1200 cfm (34 mS/min.) 1200 cfm (34 m'/min.)
-20 to 125°F {-29 to 52"CI -20 to 125°F (-29 to 52°C) -20 to 125°F (-29 to 52°C)
b
56 gprn (2 1 2 liters/rnin.) 62 gpm (235 liters/rnin.) 6 2 gpm (235 liters/min.)
5000 ft. (1 525 m.) 16,000 ft. (4877 m.) 16,000'ft. (4877 rn.1
1000 ft. (304 m.) 12,000 ft. (3658 m.) 12,000 ft. (3568 m.)

9984 Ibs. (4529 kg.) 13,550 Ibs. (6150 kg.) 14,150 Ibs. (64 18kg.)
10,950 Ibs. (4965 kg.) 15,157 Ibs. (6875 kg.) 15,757 Ibs. (71 4 7 kg.)
13' 1" (398 crn.) 14' 5" (440 cm.) 14' 5" (440 cm.)
19' 1" (582 cm.) 19' 3" (586 cm.) 19' 3" (586 cm.)
6' 8" (204 cm.1 7' 3" (220 crn.) 7' 3" (220 cm.)
7' 11" (241 Em.) 8' 10" (269 crn.) 8' 10" (269 crn.)
7' 4" (224 crn.) 8 ' 11" (271 crn.) 8' 11" (271 cm.)
e 5' 6" (168 Em.) 5' 8" (173 cm.) 5' 8" (173 cm.)
5' 0" (457 crn.) 16' 0" (488 cm.) 16' 0" (488 Em.)

92 14 Ibs. (4 180 kg.) 12,280 Ibs. (5560 kg.)


10,180 Ibs. (4618 kg.) 13,888 Ibs. (6300kg.)
12' 7" ( 3 8 2 cm.) 13' 1 1 " (424 crn.)
6' 8" ( 2 0 4 cm.) 7' 3" (220 CI11.)
A' 1n- 1 x - m ,--,\ 7' 4" 1222 crn.) 9
SPECIFICATIONS FOR VIBRATING FEEDER SPECIFICATIONS FOR VIBRATING FEEDER PAN

Size 42'' x 15' 50" x 20'


. leight, Lb. 8600 12,700
HP Required 25 30
4 %
Speed, RFL! 900 Max. 900 Idax.
Capacity, TPH 200-400 300-500

SPECIFICATIONS FOR VIBRATOR MECHANISM


[Common to all u n i t s
Housing End Plate Thickness ..................... 1-1'4"
Number of Shafts.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Shaft Material. ............................. SAE-4140
Shaf! Dla3eter BetweenBearings
42" X 15'. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8- 1 '4"
50" X 20'. .............................. .9-1 '2"
Shaft Diameter at BeJrings ........................ 4.331
Shaft Dia:neteratDrive Sheave . . . . . . . . . . . . . . . . . . .2-5/16''
t Bearing
Type. .............................. Spherical
Timing Gears
Type .................................... Spur
Lubrica!lon
Beartngs. ............................... Grease
Gears. ................................... .Oil
Drive.. ................................. .Vee-Belt
- . . . .
"" ..- " ""I " ..- --_"
Motor Mount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-- - - . . . . . -.. -
Pivoted
- -. " ""-
"._ _""" _
." _"_ . ""."I"".- ..... _" .._".
"_^__ . .... - " ..... -
10 - 7

MODEL NO. O L 5 5 3 A

These sleds,believedtobethelargestever is putinto motionindependently.Theslidingnose


built,weredesigned to US. Navy specifications for casting on the sled pole gives 9 inches of travel before
Antarcticduty
on"Operation
DeepFreeze."Their front bob weight is felt; the wide platform pocket strad-
job w a s to carry equipment and supplies for the esta- dling the front sled bench permits a similar 9 inches of
blishment. of base camps-on relatively short runs from travel before the rear bob i s s e t inmotion.
ships to coast-linebasesand on the 400-mile-plus
All horizontal pulling strain is taken through the
overlandtrekintotheAntarcticinterior to establish a
poleandtheone-inchchaininterconnectingthesled
station at Marie Byrd Land.
bobs.Runners,benches,bunksandplatformare sub-
Carrying a whopping big load of up to 20 tons per jectedonly to theverticalstrain of supportingthe
sled, with a platform area of12by 24 feet, the "Deep loads carried.
Freeze"sledstillhas a high degree of flotation on
powderysnow because of the design of its skis. Rear
"Operation Deep Freeze" is t h e n a m e g i v e n by
couplers permitjoining sledstogether for travelin the U . S . Navy to their assignment o f providing
trains of two to four units. l o g i s t i c ss u p p o r t t o teams o f U . S . scientists
participating in t h Ae n t a r c t i pc h o s e of the
To ease starting impact, each bob of a sled train I n t e r n a t i o n a lG e o p h y s i c a l Y e a r programme.

"F.

.
10 - 8

OTACO " D E E P FREEZE" SLED MODEL NO. O L 5 5 3 A

Without its platform, the DeepFreeze


..+=y--"t-
"
sled looks likethis. You can see here
". -
" r
the massive
construction of the "run-
ning gear" and thechain arrangement
through which all pulling strain i s trans-
mitted. Notice too the rocker-shaped
bunks chat help maintain loadbalance
in rough travel.
The bob sled's only non-metal parts
Less Platform
m d racks.
sideswith steel.

c
I

SA

OUCTALLOY
PARTS LAMINA TED RUNNERS
MS. p i r c e s above a r r n d r from &CfJf- f i c e p t i o n arl u n n r sr t r m g t h i s obtained To n i n i r i r r snow r e s k t a n r r . errrss
t o y ( r e g i s t e r etdr a d e name f o r Otaco's by l a n i n a t r d c o n s t r u c t i o nB. e f o rier o n - w e l d i s ground fron t h eu n d e r - s i r r o rf
d u r t i l r iron]. m i d c a s t m a t e r i a l hds in9 i s a s s m b l r d t o top. bottom and skis. S k i s a r e made from s p e c i a l shock
t h ei c p a c st t r e n g t ho f s t e e l i n Cob- s i d r s o f runnrrs. l a m i n a t i o n s a r e d r i r d and a b r a s i o n - r r s i s i a n t s t r r l . measurr
b i n a t i o nw i t h s u p r r i o r abrasionreSiS- to a m o i s t u rcr o n t e n t o f I2 t o U I . 13 It. long andhave s u f f i c i r n fw i d t h
i a n c ey.a c i a r r n Knee b o d i r s and c h a i n Runners a r r lo ft.. Ion9 and a r r a s s r r - that 3 16. p.s.i.ground pressure i s
r o n n e r t i n g l i n k s a roct h esrl e d parts b l eidn t o 13-ft. l o n g s k i s . m i r x c e r d r ud n d e r 4 n r t pJyf0.d Of
made i r o rL b c t r l l o y . 4O.W I b s .

SPECIFICATIONS
C H A C I TY - 20 tons
7"ACK - 106 incnes
WNER
'
- l a m i n a t e dw h i t e oak w i t hs t e e sl h o e i n g .s f e e l

I fop b a n d i n a pns
McLarenkneesconnecting
di d e Dla feS. Lenqfh
w i t hb e n c h .
lo ff.

OFFICIAL U.S. N. PHOTO


IN THE ANTARCTIC
Ship secured a l o n g s i d r t hA en t a r c t i c
i c e s h e l fl o w r r so s s o l i n e - f i f l r d drums
to a w a r t i n 9 otaco sled. b y mednr o f
i t s crane. Sleds transported b u ~ fd1.v
m s t e r i a f r . surplier. e t c . f r o - S h i Q s ' J
basr camps a t t h e s r v r r a l U . S . bases
in thr Antarctic.
Two and J o m r t ~ m r s t h r e e r l e d r a r e
haulrd i n t r a r n s t o s n r et d
ransoorf.
10 - 9

7-74

GENERAL DESCRIPTION
A large four track, transport vehicle. Extra high strength components throughout the
frame, powertrain and track
system.

DESIGN DUTY
The Husky 8 is constructedto carry loads up to 40 tons (36.2 tonnes) over ground conditions suchas snow, sand,
muskeg and swamp. It is adaptable as a prime mover to pull wheeled or skid-mounted trailers.

MAIN FEATURES
1. The flexible. belted tracks absorb shock loads and Provides smooth ride for operator and cargo.
conform to uneven terrain while providinghigher 5. Cab: Designed for maximum oDerator liveability
ground speeds than steel tracks. with customer choiceof "Arctic Package" or "Desert
2. All four tracks are powered. Two point steering per- Package" interior. Steel, unit-welded cab with es-
mits front and rear tracks to foilow one another in capehatch at top. Tilt cab for servicingcon-
the same path. Minimum turning radius 45 ft. (13.7 venience.
m). 6. Controls: Steering wheel operation. Full-function in-
3. Undercarriageis sealed anddesigned to operate strument gauges monitor engine, hydraulicand
submersed in mud or water. Drive lines are hanger temperature systems.
bearing supported with splined slip joints that allow 7 . Optional equipment to increase vehicle loading and
front track oscillaition. carrying capacity include:
4. Independent suspension at each wheel is provided Winch, gin pole and live roll arrangement.
bycoilspring andcrank armarrangement. This Hydraulic,
side-mounted, "knuckleboom"
heavy duty system allows almost constant ground loaders. Custom engineering of a variety of
contact for thetrack asit rolls over obstacles. carrier configurations is available upon request.

FOREMOST INTERNATIONAL INDUSTRIES LTD.


Telephone (403)272-3322 Telex 038-22772 1616 Meridian Road N . E . . Calgary. Alberta, Canada T2A 2P1
10 - 10

ENGINE: Cummins NT 855 (335hp at 2100rpm).


Optional - Detroit Diesel 8V71 (318 hp at 2100)
TRANSMISSION: Powershift with torque converter. Transmission provides 6 speeds forward1 speed and
reverse.
DIFFERENTIAL: Rockwell 200 with planetary reduction.
STEERING: Two point system, steering wheel controlled - hydraulic cylinders with equalizing
levers.
BRAKES: Air operated drum-type on drive line.
Optional - Caliper-disc, air/hydraulic on each drive pinion.
TRACK ASSEMBLY: Extra heavy duty fabric cord with rubber covered belting.
Heavy duty springsteel grousers. Special20" (508 mm) smooth crawlertires. Track width
54" (142.2 cm)
SPROCKETS: Urethane
SUSPENSION: Torsional coil springand crank armfor each wheel with oil bathhubs.
FRAME: Integral frame and cargo deck with outside framerails. High tensilesteel.
ELECTRICAL: 12 volt running system. 84 amp alternator.
WINCH: Braden MS20 or equivalent mounted at front of deck. Line pull 45,000 Ib. (20,410 kg.)
Cable size 1" (25.4 mm), length 100' (30.5 m).
WEIGHTS: Vehicle weight 80,000 Ib. 36,280 kg.
Payload 80,000 Ib. 36,280 kg.
Gross weight 160,000 Ib. 72,560 kg.
DECK SIZE: 9' x 33' 2.74
x m 10.05 m
PERFORMANCE: Gradeability - 60% forward 40%
slopeside
DepthFording - 1.83 6'0" m
Maximum
Speed - 10 mph 16 km/h
Radius-
Turning
Inside 13.745 ft. m
Ground Clearance 18 in. 45.6 cm
Ground Pressure:
Tons Load Psi Load
Tonnes Kg/cm'
0 2.3 0 1.6
18.1 20 3.4 2.3
A
36.2 40 4.6 3.1

54 6"
13,868 mm

-7 FOR FURTHER INFORMATION


10 - 11

REF.
TVS-600
7-74

"II
.
"" . "

GENERAL DESCRIPTION
A durable two track carrier and transport vehicle. Reliable powertrain components, a strong chassis and a
proven track system provide economic haulage over a variety of off-highway terrain conditions.

DESIGN DUTY
The TVS 600 is a general purpose tracked vehicle suited to the logistic requirementsof transporting personnel or
cargo over tough terrain areas. The rated payload of this vehicle is 6,000Ibs. (2,721 kg.)

MAIN FEATURES
1. Performance.TheTVS 600 utilizeshighengineforworkinpreviouslyinaccessibleareas,the TVS
torqueplusgreattrackstrength to p r o d u c em a x - 600 reflectsagroundbearingpressureof2.0osi
imum drawbar pull. The heavy dutv frame has been (1.37 Nlcm') even while under a full 3 ton (2.7 tonne)
proven invarietv
a of demanding applications. payload.
2. The size of the TVS 600 enables it to be transported 5. The mechanical, lever actuated steering control
viahighwaytruckoraircraft to remoteoperationalsystemengagesplanetarybrakesforsnortradius
areas. turns.
3. Dual tracks and short overall machine leng?h deliver 6. As an option, the TVS 600 offers the choice of a 2 or
responsivemaneuverabilityanashortturning 4 mancab.Fullyinsulated, t h l s Cab features com-
entation,
plete radius.
4. The undercarriage is fully sealedandenablesthe' hatchattopand
' is d e s i g n e dw i t hm a x t m u m
TVS 600 tooperateeffcctivcly v:'l!ie submergedinoperatorliveability.Theintertorscanbefittcdfor
m u d o r water to a draft depth of 3'6" (1.07 r n ) . Ideal elther arctic or tropical applications.
p"

FOREPJOST IP!TERF\JATlQNAL INDUSTRIES LTD.


Tclcphone (403)272-3322 Telex 038-22772 1616 Meridian R03d N.E.. Calgary.
Alberta.
Canada T2A 2P1
- "-" " - ~ "
10 - 12

ENGINE: G.M. 3-53 Diesel (101 hp at 2800 rpm)


Optional - 300 cu. in. Fordgasoline (103 ho at 2800 rpm)
TRANSMISSION: Standard, providing 5 speeds forward and 1 speed reverse.
DIFFERENTIAL: Planetary axels with oil bath and controlled differential.
STEERING: Hydraulic steering, dual lever controlled.
BRAKES: Internal drum type system.
Optional Mico Lever Lock. -
TRACK ASSEMBLY: Fabric cord. rubber covered belting. Spring steel grousers. Support tires,10 ply 6.00 x 16.
Track width 33" (83.8cm)
SPROCKETS: Urethane drive and solid rubber idler.
SUSPENSION: Walking beam.
FRAME: All welded steel frame construction.
ELECTRICAL: 12 volt running system, 45 amp alternator.
WINCH: Optional- Front mounted8,000Ib. (3,628 kg.) line pull,
WEIGHTS: Vehicle weight 10,500Ib. 4,762 kg.
Payload 6,000 Ib. 2,721 kg.
Gross weight 16,500 I b. 7,483 kg.
DECK SIZE: Standard 7'7%" x 9'4'h" 2.32rn x2.86m
PERFORMANCE: Gradeability -
60% forward 40%
slope
side
DepthFording -
3'6" 1.07 m
Maximum
Speed -
13.5 mph 22 km/h
Turning
Inside Radius
Ground Clearance
8'8"
14% in.-
- 2.6 m
36.2 cm
Ground Pressure:
Tons Load PSI TonnesLoad Kg/cm*
0 1.3 0 .89
1.5 1.6 1.4 1.13
2.7 3 2.0 1.37

I S I

- '
/'
:'"_. .
":7
7
I FOR FURTHER INFORMATION
TELSMITH
e

!. -.

1
-. . :.
I

P-

__
'..
/z -\

TELSMITH DIVISION BARBER-GREENE COMPANY MILWAUKEE, WISCONSIN, U. S. A .


10 - 14

STANDARD
STANDARD LOW FINGER GYRASPliERE
PROFILE
HORIZONTAL SCREEN GATES CRUSHER

Operating Travel Weight, Basic Plant


Model No. Height Height (Note 2)
(Note 1) A B C D E F Pounds Kilograms
36s-G-CC 47,200 21,240
34"O" 13"5'/6" 13"5'/8 ' I 23"11" 6"9" 2'4''
367s-G-cc
36FC-G-CC (10363.2 mm) (4092.6 mm) (4092.6 mm) (7289.8 mm) (609.6 mm) (2057.4 mm)
48
4g:ooo
500 22,050
21.825
48s-G-CC ' 76,000 34,200
38"O" 26'"'' 13""' 14"33/4"
6"2% " 5t-3y4,,
489S-G-CC 77.750 34,988
(1 1582.4 mm) (4362.4 mm) (41 91.O mm) (8077.2 mm) (1 886.0 mm) (161 9.2 mm) 79,200
48FC-G-CC 35,640
66s-G-CC c-1 164,125 73,856
4s-G-CC 40"6" 661 17"7'/2 " 14"l '/z" 32"4" ' 5"9'/4" 6'-11" 165,375 74,418
66FC-G-CC (12344.4 mm) (5372.1 mm) (4305.3 mm) (9855.6 mm) (1759.0 mm) (2108.2 mm) 166,375 74,869
Note1-Dirnensmns shown are in customaryand metric systems. Note 2"Weight of basicplant without power.
BRIEF SPECIFICATIONS
MODEL NO. 36s-G-CC 367s-G-CC 489s-G-CC
48s-G-CC 36FC-G-CC 48FC-G-CC 66s-G-CC 6614s-G-CC 166FC-G-CC 1

77
CRU~FTER
Sue, Gyrasphere 36s 367s 36FC 48s 489s 48FC 66s 661 4 s
Diesel Engine,
Horsepower, Con-
tinuous Rating 80 100 190 120 190 250 310
Electric Motor,
L
Horsepower 60 75 100 150 150 200 250
RPM 1200 1200 1200 1200 1200 1200 870
SCREEN I
5'x14"' 4'x12" 4'x12"
5'x14"4'x12" Size,
5'xIHorizontal
4"' 6'x18" * 6'x18" 1 6'x18"
D.D. -(1219 x 3658 mm) - - (1 524 x 4267mm) - -(1 829x 6096 mm) -
Electric Motor,
Horsepower 15 15 20 20 20 4015 40 40
RPM 1750 1750 1750 1750 1750 1750 17501750
4'x14' D.D. screen can be furnished. "5'x16' D.D. screen
can
be
furnished. '"6'x20' D.D. screencan befurnished.

..
! . ..
I . .
i
t
L-"""." "". """"""__I &
."."."
10 - 15

"l "7
JOHNSON
Road Division
Mobile Mixer
KOEHRING
Models 124 and 224

CONDENSED SPEClFlCATIONS:
TRAVEL DlMENSIONS:
Length ........................................3 0 f t . 4 i n ....................................
.. 9.246M
Width. .............................:..........8 ft. 0 in. .................................... 2.438 M
Overall Height............................... .13ft. 1-1 12 in.. .............................. -4.001 M
Operating Height.. ............................
.13ft. 3 in.. .................................. 4.038 M
Weight-Basic Unit............................ 1 cubic yard mixer 19,500 Ibs.. ........ .8.845 Metric Tons
Weight-Basic Unit ...........................2cubic yard mixer22,OOO Ibs.. .........9.525 Metric Tons
POWER UNIT DRIVES
Diesel Engines 73HP -
2400 R.P.M. 1 c.y.mixer Mixer ...............................
.Hydraulic
105 HP 2400 R.P.M. -
2 c.y. mixer Belt conveyor ........................ .Hydraulic
-
Fuel Tank: approximately 30 U.S. gallons. Screw conveyor ...................... .Hydraulic
Air compressor .................
.V-belt sheaves -
ElectricMotors 75HP 1750 R.P.M. - 1 c.y. mixer
100 HP 1750 R.P.M. - 2 c.y. mixer
MIXER CAPACITIES
1 C.Y. (.76M3)mixer ........... .25to30c.y./hr.
-SCALE SYSi'EJ 2c.y. (1.52M3)mixer . . . . . . . . . . . .50to60c.y.Ihr.
Cement.. ..........................beam scales (Special Note: Capacities based on 60 second mix-
Aggregate .......................... .dial scales ing time)
1 cubic yard.. ...... 5,000 Ibs. ....... .2,500 kg.
2 cubic yard. ....... 10,000 Ibs. ...... .5,000 kg.
.. . . .. . -. -. ....
....
""""?
L i L
'.,-,yci: i . . . ". .. ' .C.' 7
"3
c, ..
qI?tty.*">
L . _...
Width.. ........24 in. (DeepTroughing). .. .610M

'.'.'ATER SYSTEf;l
2" (.051 meters) Impulse meter with piping to mixer.
"

I"".
"

"""
".-I "._""
""A.

...
""""
- -".
.- .

L" (9.24fihl)
v . .3 I :
10 "16
'. .

- LOADER CHARGING
~~~~ ~~

I 2 4 TON BIN BAG HOPPER CEMENT CHARGING

-
OPTlONAL EQUIP?;lEFJT
24 tonAggregateBin (3 compartments) (21.77 - 16'-3
metric tons)
45 ton Aggregate Bin (3 compartments in tandem) - (4.951Ml

(40.82 metric tons)


350 BBL Mobile Cement Silo
(8 11. X 10 ft. X 32 ft.-6 in. = 1,400 cu. ft.)
(2.438 meters X 3.048 meters X 9.905 meters =
89.62 cubic meters)
V. dr pump - 170 G.P. M .
Radialstacker conveyor with 10" X 10" charging
hopper.

-
45 TON BIN CONVEYOR CHARGING

'. *.
s
h
I$

I ,

&
1 c
16'4
(5.029M)

..~-.~"-"~.~-..-""..-
..-" . . .-..-*-.-* "....
. .... - . ".-. ."
-.-"."".
I.I - I-"" .. .. > -. .,..,""-."
~ .......-.
* *
"l.".".~
"
..", - _ ."- ~. _.-
"........~.,__...__,"
~ . -
~
I "
_._x
"-...
,."___
""-*IDcI
. "_
"_._".."& - .""..._ . _ _j
*_...
"~

WE RESERVETHERIGHTTOAMENDTHESESPECIFICATIONSATANYTIMEWITHOUTNOTICE.THE ONLY WARRANTY


-DLICARLE IS OUR STANDARD WRITTEN WARRANTY.WE MAKE NO OTHER WARRANTY, EXPRESSED OR IMPLIED.
\

p !J vEs
Division ol b t w Wu:t Coarl -ffPur.or1 T c t-1 lE
Rikhle
Company
P"10-22
us*
Voncouvor 4. B.C. 503 t s d Fender
Burnaby, 6.C. 55.19 Kin(3swoy
S?. 2 5 5 - 9 5 3 1 jt44) Tclux 0 4 - 5 3 4 4 i Kcxhrirq
P'an't-d
In 434-2461(604) Road Division
N a n n i m a , E.C. 123.5 Fror:.arh r d . 750-5??J ,6941
I Calgary 12G2L3 Al5ikta '.Olcj-lsr S1. S.E. 2YI-'2620 j.3031 Tolox 03-821810''nR'W* Champaign, Illinois 61020
Edmonton 16H 2J7 AlLurta 5915-10JA Sf. 434-6402 (4C.j) Tolox 03-723.10
//.

.. f

Modernconstructiontechniouesrequiremodern,high-per-
formance equipment, llke this PQH 650A-TC settrng pre-cast
concrete roof beams.

DependableP&HTruck Cranes are commonsightsaround


expressway construction, where deadlines must be met and
costs kept down.

Bulkyliftsrequireexceptionalload
control.The 650A-TC has it.

NOTE: In furtherance af ourpolicy of continual product imp;ovemmt. all designsandrpeclficalionr are subjecttochangewlthoutadrancwnotice.
Data publishedherein is informatlonal in natureandshallnot be construed to warrant rultablllly of themachine tor any particular purpou
F /-$\ as performance may wary with Ihm conditlonrmcountered.The only warranty applacable is our rlandard wrlllen warrantl tor this machine.
' Manufacturtdand sclC Inconfc:nan:c wllh IJ, S. D t ~ ~ r ! n e csf
! Commerce Commercnl S!andard CS 90 5 8 .

1" .n. .
10 - 18

On Rubber

I WARNING: Read for Safety

line, maximum lifted load including hook and swivel must not exceed
12.000 Ibs. Non-rotating rope ISapproved for single line operation.
Welding or other repair to tubular steel boom may weakenthe struc-
ture. See your P&H dealer
tor authorized boom repair service. Un-
authorizedboom repair service will void all warranties.

The wind effect on the lifted load can cause sufficient side load
to overstress boom or Ilb structure W h e n suspended load will not
remain in line with boom derate chart by 25'. We recommend stopping
operation when wind is above 30 M P H and being off or lowering
boom when wind IS above 50 MP H
10 - 19
FOLDER NO. 473 E
(Replaces No. 473 D)

hydraulic mobile crane


25,000 Ib. Capacity
Self-proportioning 3-section
hydraulic power boom
60"Boom Elevation

with dual controls


4-Wheel Drive with
rear axle disconnect
4-Wheel Steering
4-Wheel Power Brakes
Hydraulic Outriggers
with pilot check valves
Two Block &Crowd
Protection
(Patented Feature)
Engineered for
safety, dependability and
ease of operation
10 - 20

!Dads Model 125 hydraulic 7

c 3-SECTION POWER BOOM


LOAD IN LBS.
WORKING
RADIUS
360" ROTATION T OFF F R O N T OF CRANE
WITHOUT WITHOUT WITi4
OUTRIGGERS OUTRIGG?

10 17,900 25,000 25,000 25,000


12 15,150 20,830 20,830 20.830
14 11.800 17,850 16,000 17,850
W 16 9.230 15,620 12,750 15,620
18 7.300 13,860 10.450 13.860
STANDARD HOOK
BLOCK OPTIONAL HOOK
BLOCK
20 5.860 12.500 8.750 12,500
22 4,850 11.050 7,450 11,360
24 4,080 9.460 6,400 10,400
26 3.480 8,175 5,600 9,600
28 3.060 7,225 4,925 8,940
RETRACTABLETRAVELLENGTHS 30 2.640 6.450 4,340 8,330
32 2.300 5,785 3,820 7,800
34 1.980 5,185 3,360 _" 7,350
36 1,660 4.720 2,910 6.750
3-section power boom
with 1 8 extension

4-section power boom

II
3-section powerboom 4-SECTION POWER BOOM
with 8' extension LOAD IN LBS.
II
YORKING 360' ROTATION OFF F R O N T OF CRANE i
RADIUS
IN W I T H W I T HWlTHGlJT
OUT WITH I
FEET OUTRIGGERS OUTRIGGERS IUTRIGGERS I OUTRIGGER5 I

3-section power boo

I
10
12
14
15
16
18
13,700
10,600
9,350
8.300
6.600
25,000
25,000
2 1,400
20.@00
18.500
14,950
25.000
-_-
22,800
17,600
15.6CO
13.800
11.000
I 25,000
25.000
21,400
20,000
18.800
16,750
20 5,260 12,300 8,900 15.000
22 4,160 10,300 7.260 13,700
24 3,360 8.600
HORIZONTAL BOOM RANGE . 25 2.970 7,800
30 1,600 5.250 3.600 8.680
3-SECTION POWER BOOM 17'6" TO 37'6" 35 850 3,800 2,500 6.450
40 420 3,000 1.780 4.950
45 170 2,380 1.300 4,000
15'Jib 50 1,870 920 3,300
Lengthof Extension 8 18 w / 8 Ext. 55 1,440 590 2,500
60 1,100 3 50 2,300
Horizontal Range 19'2" 29'2" 34'2" 44'4"
Extension to to to
Retracted 39'2" 49'2" 54'2"
Rated lifting capacities shown are rnaxlmum
allowable loads. The maximumallcwable loads
Horizontal Range 25 6' 35'6" 40'6" 50'6" s h o w n above t h e s o l l d l l n e s are ba?cd o n the
Extension to to to structural strenctll of rl,;lctlirierycoll,l?cncnts. TI:<>
Extended 35'6" 55'6" 60'6'' 70'6- maxlnlurn allo.N.:h!e Ie-ds must r!OT be crcocc'-*1
at any time. If the maximum allowable loads are
. . . P > ,.%. A ; .1.. tho,, till !???":~'?ct.!r?:'r, ~:.,:x2">/
n d- -7
I ~ i U i ~ I Z O ~ EG3h:
~l 2;i;;GZ n o t apply 'llld IS vo~tlcd.
4-SECTiO;d PQ'aL'ER LGOICI 20' TO 60' Rattnt:s are bdscd on the crane starldlng on a
firm, level, urliforrn supportlnf: surface.
The wel[:ht of t h e hook block and all load han-
dllny: dcvlcrs are corlstdcrcd p,jrt of tllc load l ; : t ~ ~ t l
... !
i.
.
. .*
I
4
rl
. , .. . .. . . - .. .
. - . I
1
' N O l N O W O 3' l N 3 W l M V d 3 0
9NISVH3Mnd 01 A131VlCl3WWI E 9 Z '1 . . . ., .. , . .. __ . _i .. ...~. - ,I . - .
1 *' .
S l M V dl l W 8 f l S
S N O I l V M 3 d O M3HlO
- Mod "
. .. .- . - . . !
' N O l N O W a 3' l N 3 W l M V d 3 0 S331hM3S I
"
.. . .. . . . . .. I
I
. a i 3 1 4 01 A I ~ ~ V I O ~ W WP I 9 E ' 2 ' 1
S l M V dI I W B f l S - S N O I l V H 3 d O 3113MV &IO4
-L W O 13NNOS83d T O 1 801 SNOIUll8lSNI
3003 l V l Y 3 1 V l l
1
c
I
7. . '
I M P E R I A L O I L LIMITED
PRODUCTIONDEPARTMENT
5 0 0 S I X T H A V E N U ES O U T HW E S T ,C A L G A R Y ,A L B E R T AT 2 P OS1
E M KEMP
PRODUCTION OPERATIONS MANAGER

February 4, 1 9 7 5
File: 20300

0-65

Dr. M. J. Ruel
& Environmental
Water, Lands, Forest
Division
Department of Indian
and Northern Affairs
Centennial Tower
400 Laurier Avenue West
Ottawa K1A OH4
Ontario
Dear Dr. Ruel:
With reference to
our recent discussions concerning
Imperial's proposal for a harbour near King
Point and the rock
I hope that the following infor-
quarry at Mount Sedgewick,
mation may assist you in further evaluating our proposal.
The need for slope protection material is based on
the assumptions that the development of our Adgo discovery will
require up to four permanent artificial islands and that future,
discoveries in water depths up ofto 40 feet will also be
developed on artificial islands. The type, size and quantity
of slope protection material needed for these islands has been
calculated by our consultants, Hydronamic B . V . , on the basis of
a hypothetical program of exploration and development in the
Beaufort Sea. The timing of the requirements is based on our
assumption that Canada will urgently require additional oil
production by1 9 8 3 and that part of this production will origi-
nate from Adgo and from additional discoveries that may be
expected in the next few years as a result of our continued
exploration program in the Beaufort Sea.
Working back fromthe "On Production" yearof 1 9 8 3 ,
we believe that orderly and economical development
of the Adgo
pool will require that rip rap with weights5 0fromto 3,000 lbs
be available not later than1977. By that timewe will require
some permanent wells for full-scale production tests and the
islands on which these wells are located will also have to be
permanent. In the attached time schedule, we have attempted to
provide you with a logical chain of events and the timing that
is necessaryto reach our objective of havingrip rap available
by 1977.
- 2 -

A f t e r 1 9 7 7 , a d d i t i o n a l discoveries i n d e e p e r water
w i l l demand s l o p e p r o t e c t i o n materials w i t h w e i g h t s of up t o
1 1 . 5t o n s . The maximum s i z e o f t h e a v a i l a b l e q u a r r y s t o n e
i s 2.5 t o n s a n d r i p r a p heavier t h a n t h a t w i l l t h e r e f o r e have
t o b e c o n c r e t e blocks.
A reportprepared a t o u r r e q u e s t by N o r t h e r n Con-
s t r u c t i o n Company ofVancouver, a copyof which i s a t t a c h e d ,
shows t h e p r e l i m i n a r y p l a n s f o r a rock q u a r r y n e a r M t . Sedgewick
and a c o n c r e t em a n u f a c t u r i n gp l a n tn e a rK i n gP o i n t . The r e p o r t
i s meant t o be a f e a s i b i l i t y s t u d y a n d s h o u l d n o t b e c o n s i d e r e d
anengineeringproposal.

S e c t i o n 4 of t h e r e p o r t d e a l s w i t h c o s t s and shows
t h a t t h e cost p e r t o n of q u a r r y s t o n e i s $26.64 a s compared to
$ 1 2 6 . 7 6 f o rc o n c r e t e . I f it were n e c e s s a r y t o manufacture
c o n c r e t eb l o c k si n t h e f u l l r a n g e of r i p r a p r e q u i r e d ( 5 0 lbs
t o 11.5 t o n s ) , t h i s estimate wouldhave t ob er e v i s e d .C o n c r e t e
m a n u f a c t u r i n g i s much more l a b o u r i n t e n s i v e t h a n rock q u a r r y i n g
(see pages 4 - 2 1 and 4 - 2 2 o f t h e r e p o r t ) , a n d a proliferationof
c o n c r e t e block s i z e s wouldcause t h i s comparison t o become
worse. Where there i s some scope t o e f f e c t a r e d u c t i o n i n u n i t
c o s t s f o r t h e rock q u a r r y i n g o p e r a t i o n by i n c r e a s i n g t o t a l
o u t p u t , w e donot see t h i s o p p o r t u n i t y i n t h e c o n c r e t e manu-
facturingprocess.
The cost of s l o p e p r o t e c t i o n f o r p e r m a n e n t i s l a n d s
u s i n g a combination of q u a r r y s t o n e a n d c o n c r e t e h a s been
estimated a t 50%of t h e t o t a l cost of a ni s l a n d . The d e c i s i o n
touseonlyconcretecouldthereforeincrease t h e cost of each
i s l a n d by 2 0 0 % o r more.
We s h o u l d a l s o p o i n t o u t t h a t t h e FederalDepartment
o fP u b l i c Works i n t h e i r r e p o r t , " H e r s c h e l I s l a n d , F e a s i b i l i t y
of a M a r i n eT e r m i n a l " ,c o n s i d e r t h e M t . Sedgewick area t h e
logical source f o r quarrystoneforany of t h e i r f u t u r e p l a n s .

I n t h e area of environmentalimpact, we plan t o use


t h e CAGSL r e p o r t s c o v e r i n g t h e area a s a b a s i s and w e a r e
p r e s e n t l y c o n s i d e r i n g w h a t a d d i t i o n a ls t u d i e sn e e d t o be made.
We a p p r e c i a t ey o u rc o n c e r n t h a t w e s h o u l d n o t embark
on f a i r l y c o s t l y s t u d i e s i n v i e w o f t h e e v i d e n t o p p o s i t i o n of
t h e Departmentof the Environment t oo u rp r o p o s a l . However, w e
- 3 -

believe that we can operate the project in an environmentally


acceptable fashion, and are prepared to risk the study costs,
since without an early commencement, we will be unable to
achieve our objectives for island construction.

Yours very truly,

JJAdeJong :j n G. G. Mainland
Atts. Frontier Planning Manager