The document contains a table listing the details of branch locations for two district offices (DO), including branch code, asset count, distance from the DO, current travel duration, and estimated new travel duration if relocated to a proposed base location. It shows the total assets managed across all branches is 100, and provides travel time and distance data to help evaluate potentially relocating branches to optimize operations.
The document contains a table listing the details of branch locations for two district offices (DO), including branch code, asset count, distance from the DO, current travel duration, and estimated new travel duration if relocated to a proposed base location. It shows the total assets managed across all branches is 100, and provides travel time and distance data to help evaluate potentially relocating branches to optimize operations.
The document contains a table listing the details of branch locations for two district offices (DO), including branch code, asset count, distance from the DO, current travel duration, and estimated new travel duration if relocated to a proposed base location. It shows the total assets managed across all branches is 100, and provides travel time and distance data to help evaluate potentially relocating branches to optimize operations.
DO Location Branch Code Asset Count Current Distance From DO
Jorhat North Lakhimpur 486 32 450 KM
Jorhat Dhemaji 44D 26 520 KM Jorhat Bihpuriya 486T001 2 510 KM Jorhat Itanagar 516 3 315 KM Jorhat Ganga 516T001 6 320 KM Jorhat Pasighat 4002 14 560 KM Guwahat Biswanath Chariali 48G 15 245 KM Guwahat Rangapara 487T001 2 215 KM Total Assets 100 Current Approx Travel Duration Distance From Proposed Base Location 12 Hour 0 14 Hour 80 KM 13.30 Hour 55 KM 8 to 14 Hour 85 KM 9 to 14.30 Hour 90 KM 16 Hour 215 KM 7 to 8 Hours 155 KM 6.30 to 7.30 Hours 210 KM New Approx Travel Duration 0 3 Hour 2 Hour 4 Hour 4.30 Hour 7 to 8 Hour 5.30 to 6.30 Hour 7 to 8 Hour