Installation Guide
Issue: 08
Part Number: 31504449
Date: 2009-09-30
1
Safety Information
■ Abide by All Safety Requirements
To ensure personal and equipment safety, abide by safety precautions described in the label on
equipment or in the manual when you install, operate, or maintain the equipment.
The "Safety Warning", "Caution", and "Note" in the manual are not the contents of safety requirements.
They are provided as the supplement to the safety precautions. When operating Huawei products or
equipment, strictly follow all precautions and special safety instructions required by Huawei.
The "Safety Warning" in the manual is only based on the knowledge of Huawei. Huawei will not assume
any responsibility for the loss incurred by operations violating the universal safety rules or standards for
designing, producing, or using the equipment.
■ Abide by the Local Laws and Regulations
When operating the equipment, abide by the local laws and regulations.
■ Requirements for Personnel
The installation and maintenance personnel of Huawei equipment must be strictly trained. They are not
allowed to install, operate, or maintain the equipment until they have mastered the correct operation
method and got familiar with the safety requirements.
■ Symbol Description
■ Personal Safety
•Directly contacting or indirectly contacting high voltage power supply through wet objects is lethally dangerous.
•Incorrect high voltage operations will cause incidents such as fire or a shock hazard.
•Never perform any high voltage AC operations or perform operations on a tower or a mast during a
thunderstorm. It can be lethally dangerous.
•Any equipment must be grounded before it is connected to the power supply. Ungrounded equipment can be
lethally dangerous.
•Never perform any hot-line operation.
•Strong RF signals are harmful to human health. Ensure that the transmit antennas are shut down before an
antenna installation or maintenance operation on a tower or mast installed with multiple transmit antennas.
•During an operation involving optical cables, keep your eyes far away from optical output ports and do not
directly look at the optical output ports with bare eyes.
•Take measures to prevent dusts from entering your respiratory tract or eyes when drilling holes.
•Before connecting cables to storage batteries, disconnect the storage batteries from the power supply.
Otherwise, injuries may be incurred.
•When working aloft, take measures to prevent objects from falling.
Equipment Safety
•Before operating the equipment, check the electric continuity of the equipment that requires grounding to
ensure that it is reliably grounded.
•The static electricity produced by human body may damage the static-sensitive components, such as LSI on
boards. Take proper ESD prevention measures, for example, wear ESD wrist straps or gloves to prevent
boards, modules, and electronic components from being destroyed by static of the human body.
•When operating storage batteries, prevent battery short-circuiting and electrolyte overflow or leakage. The
electrolyte corrodes metal objects and the boards, producing rust and causing board short-circuiting.
2
Installation Tools
3
Installation Scenarios
1. APM30 2. APM30H(Ver.A)
3. APM30(+24V) 4. TMC
5. TMC11H(Ver.A)
4
Installation Scenarios
6. APM30H(Ver.B) 7. TMC11H(Ver.B)
5
Procedure
6
BBU Hardware
USCU Optional 1 S1 or S0 -
The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field
requirements.
7
Installing the BBU in the APM30
a Cable connections
c e
b d
f b a
e
From... To ...
a BBU power cable LOAD3 on PDU PWR on BBU
8
Installing the BBU in the APM30
b Cable connections of the BBU
Alarm Monitoring
Equipment Equipment
Transmission
equipment
c
b g e d
h
h b
a
f Power System
9
Installing the BBU in the APM30
c Installing BBU
1. Install the mounting ears at both sides of
the BBU reversely.
PDU
BBU
M6 bolt
d Installing cables
1. Install power cable.
Connect the OT terminal of the power cable to
the LOAD3 terminal of the PDU, and then fix the
3V3 connector of the power cable to the UPEU
port on the BBU.
LOAD3
NEG(-)
RNT(+)
PWR
10
Installing the BBU in the APM30
d Installing the BBU cables
2. Install optical cables.
Connect the longer end of the optical cable to the CPRI port on the WBBP. Then, connect the other end to the
RRU.
Optical module
Puller
Wrap the fiber tail with the winding pipe till the
first cable tie.
z Connect the fiber tails labeled 1A and 1B to
the CPRI_W port on the RRU.
z Connect the fiber tails labeled 2A and 2B to
one of the CPRI ports on the WBBP
Optical cable
connector
Winding pipe
11
Installing the BBU in the APM30
d Installing the BBU cables
3、Install the E1 transfer cable.
Fix one end of the E1 transfer cable to the INSIDE port on the UELP.
Fix the other end to the E1/T1 port on the WMPT.
E1 transfer cable
grounding clip
E1/T1
12
Installing the BBU in the APM30
d Installing the BBU Cables
FE transfer cable
OUTSIDE FE0
FE0
Thread the FE cable through the grounding clip. Then, tighten the screw on the grounding
clip to make the shielding layer of the FE cable in full contact with the grounding clip.
Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Shielding layer
of the FE cable
13
Installing the BBU in the APM30
d Installing the BBU Cables
7. Install the monitoring signal cable between the APMI and the BBU.
Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU.
MON1
TX+ RX-
TX- RX+
EXT-ALM1
External alarm
cable
14
Installing the BBU in the APM30
d Installing the BBU Cables
9. Install the EMUA monitoring signal cable.
Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the
four exposed bare wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the
relationship between the ports and wires. Fix the DB9 connector to the corresponding
port on the EMUA.
Pin on the RJ45 Pin on the DB9 Color Type Port on the APMI
Connector Male Connector
X1.1 X2.3 White Twisted pair TX+
15
Installing the BBU in the APM30H(Ver.A)
a BBU Cable Connections
The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see
pages 8–15. The following figure shows the cable connections of the BBU. Page 17 shows how to install the
monitoring signal cable between the HEUA and the BBU in the APM30H.
b c e d
f b a
c
e
b E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
d Monitoring signal cable COM IN port on the HEUA MON1 port on the BBU
f CPRI optical cable CPRI port on the WBBP CPRI port on the RRU
16
Installing the BBU in the APM30H(Ver.A)
HEUA
COM IN
MON1
UPEU on the
BBU
17
Installing the BBU in the APM30(+24 V)
a BBU Cable Connections
The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For details, see
pages 8–15. The following figure shows the cable connections of the BBU. Page 19 shows how to install the
monitoring signal cable of the cabinet.
b c d
b a
e
f
b E1 surge protection E1/T1 port on the WMPT INSIDE port on the UELP
transfer cable
d Monitoring signal cable Monitoring port on the cabinet EXT-ALM1 on the UPEU
for the cabinet
f CPRI optical cable CPRI port on the WBBP CPRI port on the RRU
18
Installing the BBU in the APM30(+24 V)
b Installing the Monitoring Signal Cable of the Cabinet
19
Installing the BBU in the TMC
a BBU Cable Connections
The procedure for installing the BBU in the TMC is the same as that in the APM30. For details, see
pages 8–15.
b c d
a
e b
From... To...
a BBU power cable LOAD6 terminal of the PDU PWR port on the BBU
b E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
d Monitoring signal cable Wiring terminal of cabinet monitoring ALM1 port on the BBU
e CPRI optical cable CPRI port on the WBBP CPRI port on the RRU
20
Installing the BBU in the TMC
b Installing the BBU Cables
c
Door status
sensor
d
b
a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the
BBU.
b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring
terminals on the door status sensor.
c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT+ and
OUT- alarm wiring terminals on the APMI.
d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring
terminals on the DCDU.
The white and green bare wire terminals are not distinguished from different wiring terminals.
21
Installing the BBU in the TMC11H(Ver.A)
a Installing the BBU
The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For details, see
pages 8–15.
d
a
b c d
a
e b
From... To...
a BBU power cable LOAD6 terminal on the DCDU PWR port on the BBU
b E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
d Monitoring signal cable Wiring terminal of cabinet monitoring MON1 port on the BBU
e CPRI optical cable CPRI port on the WBBP CPRI port on the RRU
22
Installing the BBU in the APM30H(Ver.B)
a Installing the BBU Case
1. Installing the BBU Case 2. Installing the SLPU Case
Slide the BBU close to the EPS01 to the 2 U Slide the SLPU close to the BBU to the 1 U
space along the guide rails, and then tighten space along the guide rails, and then tighten
the four M6 screws on the BBU panel. the four M6 screws on the SLPU panel.
M6X16 M6X16
EPS01
2N•m 2N•m
BBU
SLPU
M6
screws.
e d
Transmission
equipment
h b a c
f
Power System
b
h g
a BBU Power Cable e Alarm Cable
b E1 surge protection transfer cable f CPRI Optical cable
c E1 Cable g FE cable
d Monitoring Cable h FE surge protection transfer cable
23
Installing the BBU in the APM30H(Ver.B)
c Installing the BBU cables
1. Install power cable.
Connect the OT terminal at one end to the LOAD1 terminal of the EPS01, and then link the 3V3
connector at the other end to the -48V port on the BBU.
LOAD1
Winding
pipe
24
Installing the BBU in the APM30H(Ver.B)
c Installing the BBU cables
3. Install the E1 transfer cable.
3.1. Fix one end of the E1 transfer cable to the INSIDE port on the UELP
3.2. Fix the other end to the E1/T1 port on the WMPT.
FE cable
25
Installing the BBU in the APM30H(Ver.B)
c Installing the BBU Cables
7. Install the monitoring signal cable between the CMUA and the BBU.
COM_IN
MON1
26
Installing the BBU in the TMC11H(Ver.B)
a Installing the BBU
Slide the BBU to the TMC11H along Slide the SLPU to the TMC11H along
guide rails, and then tighten the four guide rails, and then tighten the four M6
M6 screws on the BBU panel. screws on the SLPU panel.
M6X16 M6X16
DCDU
BBU
2N•m 2N•m
BBU
SLPU
LOAD6
27
Installing the BBU in the TMC11H(Ver.B)
b Installing BBU Cables
z The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that in the
APM30H(Ver.B). For details, see the description on pages 23 to 26.
z For details on the BBU cable connections, see BBU Cable Connections on pages 23.
FE cable RJ45 connector FE0 port at the OUTSIDE side on the UFLP
FE Surge Protection RJ45 connector FE0 port at the INSIDE side on the UFLP
Transfer Cable
RJ45 connector FE0 port on the WMPT
28
Installing the BBU in the TMC11H(Ver.B, +24V)
a Installing the BBU
Slide the BBU to the TMC11H Slide the SLPU to the TMC11H (+24V)
(+24V) along guide rails, and then along guide rails, and then tighten
tighten the four M6 screws on the the four M6 screws on the SLPU
BBU panel. panel. M6X16
M6X16
2N•m
2N•m
BBU
EPS48100D
SLPU
BBU
ALM PRESENT
EXT-ALM1 EXT-ALM0
29
Installing the BBU in the TMC11H(Ver.B, +24V)
b Installing BBU Cables
z The procedure for installing BBU cables (except the power cable) in the TMC11H(+24 V) cabinet is the same as that in
the APM30H(Ver.B). For details, see the description on pages 23 to 26.
z For details on the BBU cable connections, see BBU Cable Connections on pages 23.
FE Surge Protection RJ45 connector FE0 port at the INSIDE side on the UFLP
Transfer Cable
RJ45 connector FE0 port on the WMPT
30
Installing the BBU in the 19-Inch Cabinet
a BBU Cable Connections
i a h
f g
d
c b
a
e
From... To...
a BBU power cable LOAD6 terminal of the DCDU PWR port on the BBU
e CPRI optical cable CPRI port on the RRU CPRI port on the BBU
f PPS signal cable PPS1 port on the WGRU RGPS port on the USCU
g GPS signal cable COM1 port on the WGRU RGPS port on the USCU
h WGRU power cable LOAD7~LOAD8 on the DCDU POWER port on the back of the
WGRU
i DCDU power cable External power device NEG(-) and RTN(+) on the DCDU
j GPS clock signal cable GPS antenna system ANT port on the back of the WGRU
31
Installing the BBU in the 19-Inch Cabinet
b Space Requirements
32
Installing the BBU in the 19-Inch Cabinet
d Installing the WGRU (optional)
Slide the WGRU case into the cabinet, and tighten the four M6 screws.
Front
Back
WGRU
33
Installing the BBU in the 19-Inch Cabinet
f Installing BBU Cables
Grounding bolt
on the right side
of the BBU
Grounding
bar
LOAD6
PWR
EXT-ALM0/1 MON0/1
34
Installing the BBU in the 19-Inch Cabinet
f Installing BBU Cables
4. Install the CPRI optical cable and the E1 cable.
Connect the longer end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other
end to the RRU.
E1/T1
Turn the puller on the optical module outwards, insert the optical module into CPRI
ports.
Turn outwards the puller on the optical module.
Optical module
Puller
Winding pipe
35
Installing the BBU in the 19-Inch Cabinet
g Installing the WGRU Cables
1. Install the PGND cable.
Back
Grounding bar
ANT
Back
POWER
LOAD8
The power cable is routed from the output terminal on the DCDU to the back,
avoiding the front panels of the DCDU and WGRU.
36
Installing the BBU in the 19-Inch Cabinet
g Installing the WGRU Cables
The GPS signal is transmitted over the COM1 port and the PPS signal is transmitted over the PPS1 port.
37
Installing the BBU on the Wall
a BBU Cable Connections
a
e
c f
b d
b CPRI optical cable DLC The connectors labeled 2A and 2B are connected to the optical
module on the port labeled CPRI0 to CPRI2 on the WBBP.
38
Installing the BBU on the Wall
a Space Requirements
DCDU-03C
≥20mm
BBU
mm
≥50
mm
≥50 0m m
≥ ≥10
60
0m
m
≥800mm
a
b Installing the BBU Case
M6X12
Mounting ear on
the BBU case
2N•m
Mounting ear
for wall installation
39
Installing the BBU on the Wall
c Installing the BBU
Place the mounting ears for wall installation against the wall, and then use
the marking pen to mark the holes of the mounting ears for wall installation.
wall
BBU
a
d Install the expansion bolts.
a
e Installing the BBU Case
Bolt M6×60
Spring washer 6
Flat washer 6
Expansion tube
Flat washer
Spring washer
M6X60
45N•m
40
Installing the BBU on the Wall
f Installing the DCDU-03C Case
Wall
M6X12
2N•m
Bolt M6 x 60
Nut
Spring washer 6
Flat washer 6
Ф8 Expansion tube
55mm~60mm
M6X60
45N•m
20mm
41
Installing the BBU in the OMB Cabinet
a Installing the brackets on the metal pole and mounting plate
1. Install the brackets on the metal pole.
Use a level bar to adjust the levelness of the brackets to ensure that the front and back
brackets are on the same plane.
M10x110
Flat washer
Spring washer
Bolt
255-306 kgf·cm
M10X40
255~306kgf·cm
Flat Spring
washer washer Bolt
42
Installing the BBU in the OMB Cabinet
b Installing the OMB Cabinet
Slide the BBU case into the OMB
cabinet gently. Then, tighten the four
M6 screws.
Grounding bar
43
Installing the BBU in the OMB Cabinet
c Installing the BBU Cables
2. Install the input power cable.
NEG(-)
RNT (+)
LOAD6
3. Install the BBU power cable.
44
Installing the BBU in the OMB Cabinet
c Installing the BBU Cables
E1/T1
d
INSIDE
b
c
PGND
Shielding layer
(25 mm) Shielding
layer
45
Installing the BBU in the OMB Cabinet
c Installing the BBU Cables
5. Install the FE cable (FE transmission).
c
a
c
b
Connect the longer end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other
end to the RRU.
1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
2. Turn outwards the puller on the optical module.
Optical module
Puller
46
参考信息
BBU Hardware Installation Checklist
SN Item
1 The position for each equipment conforms to the engineering design and meets the space requirement. Sufficient
space is reserved for equipment maintenance.
2 The BBU and auxiliary devices are properly installed. All screws are tighten.
3 The power cable and PGND cable are not short-circuited or reversely connected. The cables are intact.
4 No joint lies in the middle of the power cable or the PGND cable.
5 The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped.
6 The bare wires and lug handles at the wiring terminals are tightly coated with insulation tapes or heat-shrinkable
tubes.
7 The operating grounding and protection grounding of the NodeB and the surge protection grounding of the
building share one group of grounding conductors.
8 The connectors of signal cables are intact and securely linked. The signal cables are not damaged or broken.
9 The distance between the bundled fiber tails and the BBU panel is more than 40 mm and less than 70 mm.
10 All labels, tags, and nameplates are correct, legible, and complete. All the labels at both ends of the cables,
jumpers and feeders should match.
47
Appendix
a Checking the DIP Switches of the BBU
Wear an ESD wrist strap or a pair of ESD gloves when performing operations related to the boards, as shown
in the figure below.
48
Appendix
c Checking the DIP Switches of the UELP
75-ohm E1 Mode
Other Modes
49
Appendix
f Pin Assignment of the BBU Signal Cables
75-ohm E1 cable
Pin on the DB26 Male Connector Wire Type Coaxial SN. Label
50
Appendix
f Pin Assignment of the BBU Signal Cables
120-ohm E1 cable
Pin on the DB26 Male Connector Wire Color Wire Type Label
51
Appendix
f Pin Assignment of the BBU Signal Cables
FE cable
Pin on the RJ45 Wire Color Wire Type Pin on the RJ45
Connector Connector
Pin on the RJ45 Wire Pins on the X2, Wire Type Port on the APMI
Connector Color X3, X4, and X5
52
Appendix
f Pin Assignment of the BBU Signal Cables
Pin on the RJ45 Pin on the DB9 Wire Wire Type Port on the APMI
Connector Male Connector Color
Alarm cable
Pin on the RJ45 Pin on the RJ45 Wire Color Wire Type
Connector Connector
53
Change History
08 (2009-09-30)
This is the eighth commercial release.
Compared with issue 07 (2009-08-30), the configuration principles of the
BBU boards are modified.
Compared with issue 07 (2009-08-30), the installation scenarios of
APM30H(Ver.B), TMC11H(Ver.B) and TMC11H(Ver.B, +24V) are added.
07 (2009-08-30)
This is the seventh commercial release.
Compared with issue 06 (2009-06-30), the installation of WGRU is added.
06 (2009-06-30)
This is the sixth commercial release.
Compared with issue 05 (2009-01-23), the configuration principles of the
BBU boards is modified.
54
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People’s Republic of China
www.huawei.com