Professional Documents
Culture Documents
Sap HR Interview Que
Sap HR Interview Que
You can create muliple position by LSMW or batch programs for the
Tcode PP01 or PPOCE
8) What do is LANDSCAPE in SAP Project, I think its related to no. of
servers used, Pls correct me if I am wrong, Or what it is ?
It is related to Basis
Go to basic salary of india in Payroll india and group the employee first
depending on the allowances to be paid and this is
applied for even differantiating the employees into groups depending
on their pay structures.
2) In OM, how to get the details for group of employees (ex.) group of
Drivers in the organisation?
Drivers can be identified depending on their position at which they are
working and you can have a different job codes for them who do you
want to look into.
TM MGMT and Payroll are integrated in ways are time data is collected
from the info type 0007 and these hours are taken in basic as Number
of hours worked or utilizwed, and even with time evaluation and last
with schemas integration.
X000 schema carries xt00 and these data can be transfered between
other modlues.
6) Find the scenario and give the result : A,B,C are employees, where
A,B will get basic,HRA,DA. C gets Basic and DA. How to group for the
allowances?.
Allowances are paid depending on his gradation and even wages are
also paid on this criteria, if AB are paid bas, hra and DA then take three
wage types ans assign to the ES Grouping and don\\\'t give HRA wage
type to C.
Check basic salary of inda and ALlowances in indian payroll thorougly,
bcos first of all v have to undestand this first and
then you have to decide the emp sub gtroupings. *--
Praveen
A. For checking whether the person who is going on leave or who has
gone on leave, to find out just got to pa20 and enter infotype 2001
absence where you will be checking whether this guy is on leave or
not. If he is ill go onleave so the data will be stored in this infotype.
A. You should be able to book for all persons but it showing only for one
person means you need to check infotype 2001 and his workschedule.
If it showing for all the persons, just follow as below:
Create a calendar with open days means without any holidays and
assign in Training and Event Management --> Basic Settings -->
Controling days off --> Specify Factory Calendar in this thru drill
down/check box select the calendar which you have created in time
mangement without any holidays and try out if again. If it shows the
same message then remove time integration.
A. Schemas allows you to move, delete, copy and insert lines in line
editorcommands.here you can enter the commands and entered in the
area used forthe line numbers. You can overwrite any of the numbers
with the commnds. Sub-shemas are called by the copy commnad.
Q. I just wanted to know that when I am recruiting some body, I am
generating his personal no also. Then I want to give him a training also.
Now I just want to create 2 scenarios to clear my doubts.
1--How to create a time schedule for 1 day training where when the
breaks, working hours does not coincide with the training time and the
person is also booked .
2--How to create another time schedule that is coinciding with the
training time and the person is not booked. Show me the steps in time
management, so that i can understand by both the scenarios why a
person is booked and when he is not booked
A. If you want the know the working hours for checking this just goto
pa20 select personnel number then selet for 0007 infotype. Click
display and then click for workschedule icon which is available on top.
You will find the work timings on the day you require just select and
thru chek box you can find his timings.
BSP is a set of pages that represent a user interface (layout and page
flow definition). The layout part of a page normally contains ABAP or
JavaScript code which is inserted into the HTML structure. They can
contain server-side scripting code in either JavaScript or ABAP. BSP
applications use all the conventional ABAP technologies, such as Open
SQL and internal tables, allowing developers to create Web pages
quickly. This enables existing SAP logic, data structures, and interfaces
to be directly used in Web applications.
A. Variable or flexi break means if you are fixing the break as10.00-
12.00 and saying that only 30 min break then they can take a break of
30 min at any time in between 10:00-12:00.
For the second part of your question, YOU, the HR guy, will create
minimum information in FI and maybe CO (company code, maybe cost
centers). Just create an IMG project for PA HR, and the needed basic
FICO activities will be included.
*-- Battacharya
What are:
1. cost center and work center.
2. personnel area(WERKS) and personnel subarea.
3. Retrocalculating Account.
4. If i want to include some more wage types, say bonus from today.
How should i do that?
5. What is meant by payroll area? What are the uses of payroll area?
8. How do you create customized ITs? What is the no. range for
customer specific ITs?
9. What are day types? How many day types exist? What are they? Where
do you configure them?
15. How many health plans have you configured, what are they?
19. What are the IT\'s used in NUMKR? (I said NUMKR is associated with
Org. Assgnmt.)