You are on page 1of 2

Trimble REFTEK 160-03 High Resolution Aftershock

System Training

Training for Installers and Technical Staff


Class Agenda
Duration Location Date Time
2 Days Moquegua, Peru 6-7 April, 2016 0800-1700

Course Objectives:

Trimble RefTek 160-03

After completing this course you should:


 Understand the specifications and characteristics of the Trimble RefTek 160-03
 Understand the Trimble RefTek 160-03 installation and site considerations
 Be able to configure the Trimble RefTek 160-03

Agenda:
 Trimble RefTek 160-03
o Introduction and Overview
o Features
o Recorder Control Considerations
o General Recorder Parameters
o Power Control
o Wi-Fi Monitor Connection
o Unit Configuration and Control
o CPU Operating processes
 Acquisition Process
o 160-03 LED Status Display
o Field Procedures
o Firmware update process
o Sensors
o Leveling the 160-03
o Data Format
o User Parameters
o Converting the Data
o Viewing the Data
o Batteries
o External Power
o Battery Storage

http://www.trimble.com Page 1
 Trimble RefTek 160-03 Configuration
o Hands on Configuration of the Trimble RefTek 160-03

 Trimble RefTek 160-03 In Field Installation


o Field Installation Practical

Requirements:
General:
 Training conference room with enough seats for all attendees to be comfortable
 Projector for connecting to laptop and displaying power point slides and server
 White board and markers
 Trimble REFTEK 160-03

http://www.trimble.com Page 2

You might also like