You are on page 1of 15
wird INDIA aererot aE TEST REPORT >>> Hf AMO SANS iif =] DEN | vi Usa GV N aS q J HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE, P.B.NO.8066 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 4 of 3 TEST REPORT Test Report Number HVi(ICGyOsrB400!Indelec Dated : 07-07-2006. Name & Address of the customer Mis. Indelec India 416, Cenotaph Road, Teynampet, Chennai - 800018. India dated: 28-06-2006. Name & Address of the Manufacturer Indelec France 61 Chemin Des Postes F-59500 Douai(France) Particulars of Samples tosted Condition of the sample on Receipt, New. Type TS 2.10 Millenium, Designation Prevectron Early Streamer Emission. Serial Number M00008. Number of samples tested One, Date(s) of Test(s) 30-06-2006, CPRI Sample Code Number HvML2008S0382 Particulars of tosts conducted (Current Test /20us At 40 kA. Test in accordance with standard {As per Customer's Request. Specification, ‘Sampling Pian Not Applicable Customer's requirement 5 Positive Discharges, § Negative Discharges, 2 minute imerval between discharges. Unit must be checked with 4 special spark tester before and after Current test for ensuring its operating condition after the test Deviations if any Ni Name of the witnessing persons Customer's representatives Siu Damien EYSSAUTIER, nda County Manager. inaeee SA Other than cents representatives s Sesteusconvacied win Access ofthe * None ieberatoy Documents constituting this port (inwores) Number of sets Thee Number of sscllograma wo Number of raphe ni Number ef potas To Number of Test Cult Diagrams wi Nurnber of danigs Mi ee (une eo u- NCoetas Moin (WKANYA KUMAR eo riven Test Engineer “Joint Director AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB .P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 2 of 3 Test Report No. HV/1(ICGV08/2400/Indeleo Dated : 07-07-2006, TEST PROCEDURE (Photos enclosed) The Prevectron early emission streamer was connected to the spark tester before starting the 8/20us current test. Voltage was applied between the central electrode and the bottom side electrodes of the Prevectron early streamer and a spark was observed. After this initial check, 5 positive and 5 Negative 8/2018 40kA shots were applied to the sample. After the application of these 10 current impulse shots, the sample was again tested with spark tester and a spark was observed similar to the case when it was tested before the current test. This test procedure was adopted for carrying out pre and post check conditioning. CURRENT WITHSTAND TEST AT 40 kA Current (8/201) withstand test on Prevectron early streamer emission: Sample] Polariy | Curent] Oss No. Aeplied | No KA) 413 1005 “2, = sve Cato ai2—[ = ait . 41.0 att ve [Cant a2 ait Observations : 1. No deformation’ degradation of the prevectron eary streamer emission was observed, Laboratory Atmospheric contions during the above tests Temperaure in Degree CoRUS ‘mosphere Pressure Dae Dry Bulb Weteub inmm of Ha 30.06.2008 | 280 220 6820 (MKANYA KUMARI) Test Engineer HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB P.O. PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 1 of 3 TEST REPORT Test Report Number HVM(ICGyO6/3394/Indelec Dated : 07-07-2006. Name & Address of the customer Mis. Indelec India 16, Cenotaph Road, Teynampet, Chennai ~600018. india dated: 28-06-2006. Name & Address of the Manufacturer Indelec France 61 Chemin Des Postes F-59500 Douai(France) Particulars of Samples tested Condition of the sample on Receipt New. Type : S226 Millenium, Designation Prevectron Early Streamer Emission. Serial Number ‘M0801 14 Number of samples tested One, Date(s) of Testis) 30-06-2006, CPRI Sample Code Number HvMiz00880381 Particulars of tests conducted Current Test 8/20us At 40 KA, Test in accordance with standard ‘As per Customer's Request. Specification, ‘Sampling Plan Not Applicable Customer's requirement 5 Positive Discharges, § Negative Discharges, 2 minute interval between discharges. Unit must be checked with 4 special spark tester before and after Current test for ensuring its operating condition after the test Deviations it any Nil Name of the witnessing persons Customer's representatives Shr, Damien EYSSAUTIER, India Country Manager. Indelec S.A. Other than client's representatives = Test subcontracted with Address of the None. laboratory Documents constituting this report (in words) Number of sheets Three. Number of oscillogram/s Two, ‘Number of graphs Ni, Number of photols Two, Number of Test Circuit Diagrams Nil Number of drawings Nil 0” H rows — 9 \F 7 NYA KUMARI (P.V.VASUDEVAN NAMBUDIRI) Test Engineer ‘Joint Director ‘AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 2 of 3 Test Report No. HV/1(ICG)/06/3394/Indelec Dated : 07-07-2006. TEST PROCEDURE (Photos enclosed) ‘The Prevectron early emission streamer was connected to the spark tester before starting the 6/20, current test. Voltage was applied between the central electrode and the bottom side electrodes of the Prevectron early streamer and a spark was observed. After ths initial check, 5 postive and 5 negative 8/20y8 40KA shots were applied to the sample. After the application of these 10 current impulse shots, the sample was again tested with spark tester and a spark was observed similar to the case when it was tested before the current test. This test procedure was adopted for carrying out pre and post ‘check conditioning, CURRENT WITHSTAND TEST AT 40 kA Current (8/201) withstand test on Prevectron early streamer emission: Sample] Poly | Curent | Ose No Applied | No (ea) a4 | OS 413 ve [ans ecg ea 413 4 414 a3 sve [a2 ait ait Observations : 1. No deformation’ degradation ofthe prevectron early streamer emission was observed Laboratory Atmosphere condtons during the above tests. ‘Temperature mn Degree Celaus “Rimospheri Pressure Date Dry Bulb Wet Bub ‘nmmof Hg 30.06.2008 250 220 6820 «4 : essyah— (MA.KANYA KUMARI) Tost Engineer HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE, P.B.NO.6066 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 1 of 3 TEST REPORT Test Report Number : HVI(ICG)06/3389/Indelec Dated : 07-07-2006 Name & Address of the customer Mis. ndelec india 16, Cenotaph Road, Teynampet, Chennai = 600018. india dated: 28-06-2006. Name & Address of the Manufacturer Indelec France 61 Chemin Des Postes F-59500 Douai(France) Particulars of Samples tested Condition of the sample on Receipt New. ‘Type 783.40 Millenium, Designation Prevectron Early Streamer Emission. Serial Number ‘Mos-0171, Number of samples tested One, Date(s) of Tests) 30-08-2008. CPRI Sample Code Number HVML2006S0383. Particulars of tests conducted Current Test 8/20, At 40 KA. Test in accordance with standard! As per Customer's Request ‘Specification Sampling Plan Not Applicable Customer's requirement 5 Positive Discharges, 5 Negative Discharges, 2 minute interval between discharges. Unit must be checked with 4 special spark tester before and after Current test for ensuring its operating condlion after the test Deviations if any Nil Name of the witnessing persons oo c cies rae SS eh reece z nee teas Me Number of Test Circuit Diagrams Nit jp Number of drawings Ni { o) ° we Wy H \oustal Sucre ee He pense "AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB P.O. PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 1 of 3 TEST REPORT Test Report Number HVi(ICGyo6/3362"Indelec Dated : 07-07-2006. Name & Address of the customer Mis. Indelee India 16, Cenotaph Road, Teynampet, Chennai ~ 600018. india dated: 28-06-2006. Name & Address of the Manufacturer Indelec France 61 Chemin Des Postes, F-59500 Doual(France) Particulars of Samples tested Condition of the sample on Receipt, New. Type $4.50 Millenium, Designation Preveciron Early Streamer Emission, ‘Serial Number Mosoo4s, Number of samples tested One. Date(s) of Testis) 30-06-2008, CPRI Sample Code Number HvML2006s0384, Particulars of tests conducted Current Test 8/20us At 40 kA. Test in accordance with standard! As per Customer's Request. Specification Sampling Plan Not Applicable Customer's requirement 5 Positive Discharges, 5 Negative Discharges, 2 minute interval between discharges. Unit must be checked with 4 special spark tester before and after Current test for ensuring its operating condition after the test. Deviations if any Ni Name of the witnessing persons Contre representatives Son, Canon EYSSAUTIER, nda County Marager inoeos ter than lant epresetatves Tetaubcontacted wih Aedes ofthe None isa Docaments contin his report (worst) Ne sheets Tree Nabe of selogram/s wo Number of gape mt Nomber of pots Teo Nomber of Fst Greut Diagrams mt ; ‘Number of drawings Nil 4 Livy wn ) gv 4 \-| Vee Boma C9 \71 xara Kumar (PVYASUDEVAN NAMBUOIRD Test Engineer ‘oit Orector AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8086 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 81( 0) 80-23601917 Fax: +91 (0)80 - 23601213 ‘Shoot 2 of 3 Test Report No. HV/1(I6G)/06/3392/Indelee Dated : 07-07-2006, TEST PROCEDURE (Photos enclosed) The Prevectron early emission streamer was connected to the spark tester before starting the 8/20us current test Voltage was applied between the central electrode and the bottom side electrodes of the Prevectron early streamer and a spark was observed. After this intial check, 5 postive and 5 Negative 8/20 40kA shots were applied to the sample. After the application of these 10 current impulse shots, the sample was again tested with spark tester and a spark was observed similar tothe case when it was tested before the current test. This test procedure wes adopted for carrying out pre and post check conditioning. CURRENT WITHSTAND TEST AT 40 kA Current (8/2018) withstand test on Prevectron early streamer emission: Sample] Polaiiy | Current | Osc No. Applied | No (eA) ce 72 | = sve [Faia [= 412] = aia | 876 e a3] 977, a3 -ve (“ais a3 a3) Observations : 41. No deformation/ degradation of the prevecron early streamer emission was observed, Laboratory Atmospheric conditions during the above tests. “Temperature in Degree Celsius ‘Rimosphere Pressure Dale Dry Bulb WetBulb inmm of Hg. 30-08-2006, 26.0 220 682.0 1 UU: Lawt(orL (QAKANYA KUMAR Tost Engineer HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB P.O. PROF SIR C.V.RAMAN ROAD, BANGALORE -580 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 Sheet 1 of 3 TEST REPORT Test Report Number HVM(ICGYO6/3291!indelec Dated : 07-07-2006. Name & Address of the customer (Mis. Indelec india 16, Cenotaph Road, Teynampet, Chennai ~ 600018. india dated: 28-06-2006, Name & Address of the Manufacturer Indelec France 61 Chemin Des Postes F-88500 Douai(France) Particulars of Samples tested Condition of the sample on Receipt, New. Type $6.60 Millenium, Designation Prevectron Early Streamer Emission, ‘Serial Number ‘wo80 148 Number of sampies tested One. Date(s) of Tests) 30-08-2008. CPRI Sample Code Number HVML2006S0386. Particulars of tests conducted Current Test 8/20us At 40 kA, Test in accordance with standard? As per Customer's Request. Specification. ‘Sampling Plan Not Applicable Customer's requirement 5 Positive Discharges, § Negative Discharges, 2 minute interval between discharges. Unit must be checked with 2 special spark tester before and after Current test for ensuring its operating condition after the test Deviations if any Ni Name of the witnessing persons Customer's representatives Shri. Damien EYSSAUTIER, India Country Manager. Indelec S.A, Other than client's representatives: 7 Test subcontracted with Address of the None, laboratory Documents constituting this report (in words) Number of sheets Three. Number of oscilogram/s Two, Number of graphs Nil ‘Number of photo/s Two. ‘Number of Test Circuit Diagrams Nil iene vt an Pele — % Q (MKANYA KUMAR), (P.V.VASUDEVAN NAMBUDIRI Test Engineer Joint Director “AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8086 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213, Sheet 2 of 3 Test Report No, HV/1(ICG)/08/3391/Indelec Dated : 07-07-2006. TEST PROCEDURE (Photos enclosed) The Prevectron early emission streamer was connected to the spark tester before starting the 8/20us current test. Voltage was applied between the central electrode and the bottom side electrodes of the Prevectron early streamer and a spark was observed. After this intial check, 6 positive and 5 negative 8/20us 40kA shots were applied to the sample. After the application of these 10 current impulse shots, the sample was again tested with spark tester and a spark was observed similar to the case when it was tested before the current test This test procedure was adopted for carrying out pre and post check conditioning CURRENT WITHSTAND TEST AT 40 kA Current (8/2018) withstand test on Prevectron early streamer emission: Sample] Polarity | Current ) Ose No, Applied | No. (kA) 40.6 | 967 406 |— +Ve [405 205 i 407 ao a3 Ve [Tar2 a2 ai 1 = Observations : 41. No deformation! degradation of the preveciron early streamer emission was observed. Laboratory Atmospheric conditions during the above tests, “Temperature in Degree Celsius “Rimospheric Pressure Dats Dry Bulb Wet Bulb lnmm of Hg. 30-06-2006, 28.0 22.0 682.0 (M.KANYA KUMARI) Test Engineer EEN HIGH VOLTAGE DIVISION Cass CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB .P.O & PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 CPRI Sheet 3 of 3 Test Report No. HV/1(ICG)08/3361/Indelec Dated : 07-07-2006. NOTE a) The test results relate only to the item(s) tested b) Publication or reproduction of this test report/certificate in any form other than by complete set of the whole report and in the language written is not permitted without the written consent of CPRI. ©) Any corrections/erasure invalidates this test reporticertificate. ¢) Any anomaly/discrepancy in this test report/certificate should be brought to our notice within 45 days from the date of issue. e) The verification of the sample drawings by CPRI is limited to dimensional checks only wherever possible. i: lo ae (M.KANYA KUMARI Test Engineer Test Report No, HV/1(ICG/06/3391/Indelec Lightning Impulse (8/20 .S) Current Test Arrangement ee Dt 07-07-2006 M : Koy bY¥ yl \ (MLKANYA KUMARI TEST ENGINEER (MLKANYA KUMARD ‘TEST ENGINEER a8 aris 07-07-2008 Re as tH ' (or — Te Ba oc i Te POSITIVE POLARITY NEGATIVE POLARITY Lightning Impulse (8/20 18) Current Test: Sample No. 1 Test Report No. HVI1(ICG)/06/3391/Indelec HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB .P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0}80 - 23601213, Sheet 4 of 3 TEST REPORT Test Report Numbor HVI((CG)/06/3395/indelec Dated: 07-07-2006. Name & Address of the customer Mis. Indelec india 416, Cenotaph Road, Teynampet, Chennai - 600018, india dated: 28-06-2006. Name & Address of the Manufacturer: _Indelec France 61 Chemin Des Postes F-59500 Douai(France) Particulars of Samples tested Condition of the sample on Receipt New. Type DIGITAL-060209, Designation Indelec Counter Serial Number Nil Number of samples tested One, Date(s) of Testis) 30-08-2008. CPRI Sample Code Number 2 HVML2006S0386, Particulars of tests conducted Current Test 8/2018 At 40 kA. Test in accordance with standard! AS per Customer's Request, ‘Specification, ‘Sampling Plan Not Applicable Customer's requirement Three application of 8/20, 40KA current impulses with ‘wo minutes interval between the impulses, The counter reading to be noted down to check its operation, Deviations if any Nil. Name of the witnessing persons Chater represents Sov, Darien EYSSAUTER, nda County Manager maces Otter tan cents rpresartties ; Percmescitan aac the * Nene laboratory Documents constutng ths pot (in words) Aimbot sects tee Narr ams m Name ef rpne tt Name ees tt Namberot fst Gkut Diaens wt Nimberot ones st 1 wt \ 4 W ow ql = Uabegateb C7171 (AANA KUMAR) (PV.VASUDEVAN NaMBLONR Test engineer “ein bector ‘AUTHORISED SIGNATORIES HIGH VOLTAGE DIVISION CENTRAL POWER RESEARCH INSTITUTE P.B.NO.8066 SADASHIVANAGAR SUB P.O PROF SIR C.V.RAMAN ROAD, BANGALORE -560 080, INDIA Phone: + 91( 0) 80-23601917 Fax: +91 (0)80 - 23601213 CPRI ‘Shoot 2 of 3 Test Report No. HV/1(ICG)/06/3395/indelec Dated : 07-07-2006. ‘TEST PROCEDURE Three 8/20us 40kA current impulses are applied to the counter with an interval of two minutes between successive impulses. The counter reading was noted down during each impulse and results are tabulated Result ‘Counter reading before the application of | Counter reading affer the application of current ‘current impulse impulse o 3 1 Observations: 41, Increment of the counter was observed during each application of 4OkA ‘current impulse Laboratory Almospheric conditions during the above tests. ‘Temperature in Degree Celsius ‘Rimospherie Pressure Date. Dry Bulb ‘Wet Bub inmm of Hg. 30-06-2008 260) 220 682.0, acl — (M.KANYA KUMARI) ‘Test Engineer

You might also like