You are on page 1of 6

Fibre End-User Installation Consent Form

Project: FTTH - Release Work Pack ref:OT 00036488

Contractor : BAHWAN PROJECTS & TELECOMS L.L.C Date: 11.06.2017

Delivering fiber optical cable in your property

Your telecommunications service provider (OMANTEL/OOREDOO/ AWASR) has instructed us to in


stall fiber optical cable at your premises so you can receive broadband service.

Fiber optical cable at your premises so you can receive broadband service

I understand and agree that Oman Broadband ‫أوافق على قيام الشركة العمانية للنطاق العريض‬
(OBC) will provide a fibre optical cable to the ‫بتزويد العقار المملوك لي بكابل لأللياف البصرية‬
property and this cable could remain for a 25 ‫حيث يمكن أن يظل في الموضع المركب فيه لمدة‬
period up to 25 years which is the design life ‫ وأعلم أن الكابل‬،‫عاما وهو عمره اإلفتراصي‬
of the cable once buried for operation. The
‫الموصل بعقاري هو حصريا لتسهيل خدمة‬
cable supplied by OBC is exclusively to
‫األتصاالت ذات النطاق العريض والتي سيقوم‬
facilitate the telecommunications service
provider to provide a broadband service.
‫بتوفيرها مزود الخدمة‬.

I understand that OBC is not responsible for ‫كما أقر بأني على علم بأن الشركة العمانية للنطاق‬
the bandwidth or content of any services ‫العريض ليست مسؤولة عن خدمة األتصاالت ذات‬
delivered by the telecommunications service ‫النطاق العريض أو محتواها أو عن الخدمة المقدمة‬
provider. ‫من قبل مزود الخدمة‬.

I am aware of the work that OBC will carry ‫كما أقر بأني علي دراية كاملة باالعمال التي ستقوم‬
out to install fibre to my property and the ‫بها الشركة العمانية للنطاق العريض من اجل تزويد‬
terms on which they will carry out the work. I
‫ وأوافق‬. ‫العقار المملوك لي بكابل لأللياف البصرية‬
agree and undertake to provide the necessary
‫وأتعهد بتقديم الدعم الالزم و التعاون من اجل انجاز‬
support and cooperation towards that.
‫ذلك علي الوجه المطلوب‬.

I agree not to interfere with OBC’s installed ‫وأوافق على المحافظة على كابل األلياف البصرية‬
fibre optical cable, and agree to allow access ‫المزود من قبل الشركة العمانية للنطاق العريض و‬
for the OBC to this property in the future for ‫العناية بها و أن أسمح بدخول موظفي الشركة العمانية‬
the purpose of maintaining their network. ‫للنطاق العريض للعقار الغراض الصيانة متى ما‬
‫طلب مني ذلك‬.

WORK PACKS A – v3 Page 1 of 6


Property Information

Provided TAG NO Correct Tag (NO)


ALK207/20/4
Request New TAG (YES) Final TAG ALK207/18/7
Building Type ( SDU) No. Floor G+1
No. of 1 GROUND FLOOR
Connections\Apartments Floor No
Coordinate Latitude 23.598102 Longitude 58.231473
Area Name AL MAWALEH Way No
Building No Flat No
NAP location Road Cutting

Resident Name Resident GSM 98111993,24981542


MOHAMMAD ISMAIL
ELGHUSEIN
Owner Name Owner GSM

MDU manager MDU manager GSM

Watchman Watchman GSM

WORK PACKS A – v3 Page 2 of 6


Central Room Availability Distance from 25mm
to Central Room

Internal Distribution Ducts from Telco/Central Room


Availability

WORK PACKS A – v3 Page 3 of 6


I / We agree to the installation of a Fibre ‫كابل األلياف البصرية وفقا للطريقة تركيب على أوافق‬
Optic cable by the following method ‫التالية‬

-PROPOSE RED PIPE

-FIX THE CAP AS SHOWN IN FIGURE

Remarks ‫مالحظات‬

PROPOSE RED PIPE


NAP NOT FOUND

Approval House Owner Contractor Engineer

Signature

Date 12 / 06 / 2017

WORK PACKS A – v3 Page 4 of 6


Installation Draft Plan

<Building Outside Picture>

< Route Plan Pictures>

WORK PACKS A – v3 Page 5 of 6


Bill Of Materials

Tag Number ALK207/18/7


Customer Name MOHAMMAD ISMAIL ELGHUSEIN
GSM 98111993,24981542
Surveyed Date 11 / 06/ 2017

S.No Item Description Qty UOM Remark


1 25mm HDPE Feeder Duct 1 Meter
2 Supply of SC/APC pig Tails 4 Each
3 Customer premise Fibre
Termination unit 4 port 1 Each
SC/APC including adapters
and all mounting accessories
4 FO splice protection sleeves 7 Per 100
45mm
5 4 Fibre internal /External cable. 22 Meter
Single mode G657
6 Patch cord with SC/APC 1 Each
connectors 3m
7 PVC Trunking 1 Meter
8 PVC Pipe 20mm 0 Meter

Civil Work

1 Interlock brick removal, 1 Meter


excavation & Backfill
2 Soil land excavation 0 Meter

WORK PACKS A – v3 Page 6 of 6