Professional Documents
Culture Documents
Industrialised Building System
Industrialised Building System
PENCAPAIAN DAN CABARAN
Ir. Dr. Zuhairi Abd. Hamid
PENGARAH EKSEKUTIF
CONSTRUCTION RESEARCH INSTITUTE OF MALAYSIA (CREAM)
CIDB MALAYSIA
Delima Projek Binaan
Pembangunan IBS di Malaysia
IBS Roadmap 2003-2010
1999 2001 2003 2004 2005 2006 2007 2008 2009 2010 2015
3
“Encourage” “Mandate” Approved by the
Cabinet on 9 July 2010
Mengapa IBS?
Kualiti
• Penyiapan segera
Schools
6% 31%
Rekabentuk yang berulang-ulang
Perumahan Perumahan seperti flat, rumah teres, kondominium
1.84b 13.69b dll.
61% 49%
Unit individu seperti pusat membeli belah,
Bukan Perumahan Bukan Perumahan pejabat
20.72b 21.83b
33% 20%
Infrastruktur Infrastruktur IBS telah lama digunakan untuk
11.21b 9.26b projek-projek infrastruktur
high%
Fast track
Fast Track
Policy Driven untuk
option for
70%
scoring for
kebenaran
government
projects
all RM10m
projects
50%
scoring for Policy Driven
all RM10m
projects
Treasury
Treasury Circular
IBS Circular
Strategic 2005
2008
Polisi (Sektor Swasta)
Sporadic
developments
Plan – pencapaian skor min IBS
using IBS – insentif IBS
low Dayabumi
Pekeliling
Flats
58 IBS Projects
Applied for Levi
Exemption Time
1970-s 1999 2005 2008 today 2012 2015 2020
Penstrukturan Semula Halatuju IBS
2011 - - - - -
2012 - 50 50 50 50
2013 45 50 50 50 50
2014 45 55 55 55 55
2015 45 55 55 55 55
Roadmap IBS 2011-2015
Penstrukturan Semula Halatuju IBS
THE HOUSE OF IBS
Penggunaan Penjanaan
Tenaga Kerja Kewangan
Yang Kurang
Bangunan Yang Berkualiti Berterusan
Tinggi dan Masa Penyiapan Objektif
Yang Tepat
Tiang
Utama
• • Incentives
Membantu dalam membentuk polisi Æ menambahbaik pelaksanaan polisi sediada dan mengintegrasikan polisi baru
Fungsi untuk kelulusan Menteri yang bertanggungjawab
• Mengkordinasi perancangan Æ mengintegrasikan dan mengemaskini Pelan Induk IBS, Pelan Strategik IBS dan IBS
Pusat IBS Roadmap untuk kelulusan Menteri setelah mendapat input daripada jawatankuasa penasihat
Yang Meluas • PenguatkuasaanÆ bekerjasama dengan kementerian lain menguatkuaskan polisi yang dibentuk
• Mempromosikan dan mengukuhkan industri IBS Æ lebih fokus kepada prinsip, pendaftaran dan pensijilan bagi
memastikan ia selaras dengan teras strategik, mengurangkan polisi berkaitan insentif dan geran, mengurangkan kos dan
mempromosikan efisien industri IBS dan rangkaian pembekal
Penstrukturan Semula Halatuju IBS
Kejayaan pelaksanaan adalah melalui inisiatif kerjasama antara kementerian
Perekabentuk Sokongan
Kos pengambilan Standardisasi
professional Untuk Pembuatan eksport
Pekerja asing saiz komponen
sediada komponen
Adaptasi
IBS
37 Pelan Tindakan
Action Plans
The Roadmap will be implemented under four workstreams of institutional strengthening of Government machinery; IBS user;
product; and industry.
Institutional Strengthening
Action Plan R2 Action Plan R3 Action Plan R4 Action Plan R5 Action Plan R6 Action Plan R7
Strengthen institutional Upgrade Pusat IBS to the Prepare a 2-year Business
Appointing a Director to Set-up Customer Feedback
machinery to accelerate IBS IBSO, making it an “IBS One Plan for the IBSO with a Set up PMO
head the IBSO Forum
adoption Stop Centre” detailed operating budget
Action Plan R8 Action Plan R9 Action Plan R10 Action Plan R11 Action Plan R12 Action Plan R13
Conduct organisational Finalise headcount, and Foster a closer working Communicate and educate Implement and report progress
Establish and monitor
review of the existing Pusat headhunt for Senior relationship with Green the stakeholders on the IBS of Roadmap, identify gap
performance KPIs for IBSO
IBS Management of IBSO Building initiatives Roadmap closing measures
Action Plan R15 Action Plan R23 Action Plan R30 Action Plan R34
Action Plan R19 Action Plan R27
Facilitate the setting up of
Provide IBS training to the Promote ISO certification Review supply chain to find
Carry out a Pilot IBS Promote an “IBS Signature an IBS Manufacturer Forum
workforce for IBS manufacturers areas for improvements
Apprentice Programme Project” / Association
Action Plan R16 Action Plan R24 Action Plan R31 Action Plan R35
Action Plan R20 Action Plan R28
Partner with industry to Conduct readiness Enhancing existing CIDB e-
Reduce reliance on foreign Assess impact of IBS in Change the perception that
encourage Continuous assessment of the IBS portal to include an
labour by propagating a private sector projects IBS means unattractive
Employment Training manufacturers electronic IBS Marketplace
levy system modular buildings (often for Matching Demand to
(“CET”)
concrete-based) by Suppliers of IBS
Action Plan R25 Action Plan R32
Action Plan R21 promoting other non components
Action Plan R17 Mitigate the additional cost concrete-based IBS Support rapid
Centralise oversight of of using IBS method of products transformation of IBS
Increase emphasis on Action Plan R36
foreign labour to enable construction with non-cash manufacturers with
technical and vocational
better planning and incentives potential for innovation by
training colleges Re-energise private sector
monitoring facilitating financial and participation by 50:50
technical support for IBS representation in IBS
Action Plan R18 Action Plan R26 manufacturer in innovative Consultative Forum
Recognise and promote and technologically
Examine the employment
National and Regional advanced areas, to
working terms in the
Champions in IBS encourage R&D Action Plan R37
industry to attract
Malaysians
Create a Skills Council to
capture industry needs
22
*Action Plan 2 encompasses 6 major actions
17
Jenis IBS
1 2 3
4 5
Kayu Pre-fabrikasi Blok Sistem Berinovatif lain
Perbandingan Senarai Pengilang dan Kontraktor IBS mengikut negeri
Pengeluar IBS mengikut negeri dan jenis IBS
Steel
Innovativ Steel Formwor
Negeri Precast e Frame k Timber Block Onsite JUMLAH
Perlis 0
P.Pinang 2 1 3
Kedah 3 1 1 5
Perak 5 1 1 7
Selangor 9 6 12 18 9 3 6 63
Kuala Lumpur 2 5 1 4 5 17
Melaka 2 1 3
Negeri
Sembilan 4 1 2 1 8
Johor 6 2 2 10
Pahang 1 1 2
Terengganu 1 3 1 2 7
Kelantan 1 1 2
Sabah 1 1 1 1 4
Sarawak 2 2 1 1 1 7
25 * Sehingga 31 Mac 2011
JUMLAH 31 16 28 24 17 9 13 138
Industri:Komponen & Pengeluar
26
Pembuatan Komponen IBS
Precast Concrete 12
Steel Formwork 1
Steel Framing 3
Timber Framing 2
Block System 4
On-Site 6
Registered IBS System Provider (RISP)
Detail of Design
Review of Detail Invitation of
Amendment of (e.g. Structure
Design Manufacture
Design Design)
List of Pre-Qualified
Design Assessment Approved Manufacture
Factory Visit ‘Manufacture + System’
Session + System
in Document Contract
Awarded Contractor
must select IBS System
from the list of Pre-
Approved Manufacture
Delima Kontraktor Melayu?
• Melabur dalam kilang pembuatan?
• Melabur dalam proses pembuatan?
• Melabur dalam tenaga kerja?
• Membangunkan keupayaan reka cipta
• Mencipta sistem sendiri?
• Melabur dalam IT?
• Melihat dan mencari pengurusan rantaian
pengeluar dan pembekal yang baru?
Pengeluaran Tertutup Pengeluaran Terbuka
Gambar
•‘Value Engineering’
PERINGKAT IMPLEMENTASI
Capability Loop
•Corporate
Leadership STRATEGY
•Business Strategy
E
N
A •Information
•Skills
PEOPLE Technology
B Continues
•Training & Education
L Improvement
E
R
PROCESS
Design
Technology Management Management of
Selection and Integration supply chain
Masa depan kontraktor melayu
dalam IBS
• Gabungan dan konsortium
• Jaringan supply-chain yang beterusan
• Menggunakan kaedah kilang tetap dan
kilang “mobile”
41
Fasiliti Pusat IBS
s
era
Ch
Product Testing Facilities Conventional Hall
n
la
Ja Entrance 2
IBS Component Gallery
w
Ye
ke
Lo
n
la
Ja
IBS Village
Entrance 1
GALERI IBS