Jumlah
Jumlah
NO. ANALISA Sat. Bahan Upah+ Bahan
Rp.
/ Upah Rp.
I PEK. ELEKTRIKAL
I PEK. MEKANIKAL
1. Pas. Pipa PVC Ø 4"
1 m' Pipa 125,000.00 125,000.00
1 lot Fitting 15,000.00 15,000.00
0.3 m3 Galian 35,000.00 10,500.00
0.07 m3 Pasir urug 55,000.00 3,850.00
0.28 m3 Urugan tanah 25,500.00 7,140.00
1 ls Material bantu 6,500.00 6,500.00
1 ls Upah 12,500.00 12,500.00
Jumlah 180,490.00
HARGA
NO. URAIAN PEKERJAAN SAT. SATUAN KET
PEKERJAAN
I. HARGA SATUAN BAHAN
I Pekerjaan Elektrikal
A. Instalasi
2. Kabel NYM 3 x 2.5 mm2 M1 14,000.00
5. Kabel NYA 2 x 1 x 2.5 mm2 M1 8,000.00
6. Kabel NYA 1 x 1.5 mm2 M1 7,500.00
7. PVC Hight Impact dia. 20 mm2 M1 4,000.00
9. Coupling / Socket dia. 20 mm2 Bh 1,500.00
10. Clamp Cable dia. 20 mm2 Bh 1,000.00
11. Junction Box Bh 5,000.00
B. Kabel Feeder
NYY
### Kabel NYY 3 x 4 mm2 M1 17,500.00
### Kabel NYY 3 x 6 mm2 M1 25,500.00
### Kabel NYY 4 x 4 mm2 M1 31,250.00
### Kabel NYY 4 x 6 mm2 M1 36,040.00
### Kabel NYY 4 x 10 mm2 M1 70,000.00
### Kabel NYY 4 x 16 mm2 M1 110,000.00
### Kabel NYY 4 x 25 mm2 M1 125,000.00
### Kabel NYY 4 x 35 mm2 M1 145,800.00
Kabel NYY 4 x 50 mm2 M1 197,400.00
Kabel NYY 4 x 95 mm2 M1 382,500.00
Kabel NYY 4 x 120 mm2 M1 535,500.00
Kabel NYY 4 x 150 mm2 M1 685,500.00
Kabel NYY 4 x 185 mm2 M1 875,000.00
NYA
Kabel NYA 1 x 95 mm² M1 45,600.00
Kabel NYA 1 x 70 mm² M1 38,500.00
Kabel NYA 1 x 50 mm² M1 35,000.00
### Kabel NYA 1 x 35 mm² M1 30,000.00
### Kabel NYA 1 x 25 mm² M1 20,000.00
6. Kabel NYA 1 x 16 mm² M1 15,000.00
7. Kabel NYA 1 x 10 mm² M1 10,000.00
HARGA
NO. URAIAN PEKERJAAN SAT. SATUAN KET
PEKERJAAN
Kabel NYFGBY
Kabel NYFGbY 4 x 35 mm² M1 300,000.00
BC
### Kabel NYA 1 x 35 mm² M1 34,600.00
### Kabel NYA 1 x 25 mm² M1 27,800.00
### Kabel NYA 1 x 16 mm² M1 19,600.00
### Kabel NYA 1 x 10 mm² M1 14,300.00
### Kabel NYA 1 x 4 mm² M1 8,000.00
C. Panel
1. Box Besi 20 x 40 x 60 3 Fhase Unit 700,000.00
2. Box Besi 20 x 50 x 70 3 Fhase Unit 1,000,000.00
MCCB
### MCCB 3 Pole 63A Ajustable Bh 1,000,000.00
### MCCB 3 Pole 25A Ajustable Bh 700,000.00
MCB
### MCB Type DIN 1 Pole 25A Bh 55,000.00
### MCB Type DIN 1 Pole 16A Bh 55,000.00
D. Lampu
2. Lampu outbow ID LED LED 12 W Bh 150,000.00
Lampu ID LED LED 12 W Bh 150,000.00
HARGA
NO. URAIAN PEKERJAAN SAT. SATUAN KET
PEKERJAAN
E. Fixture
1. Stop Kontak Unit 47,500.00
2. Stop Kontak AC Unit 59,500.00
3. Sakelar Tunggal Unit 33,500.00
4. Sakelar Ganda Unit 43,500.00
6. Sakelar Hotel Unit 33,500.00
F. Penangkal Petir
1. Air Terminal, Radius Proteksi 150 M Unit 12,000,000.00
2. Obstruction lamp, 100W Bh 1,500,000.00
3. Obstruction lamp (NYM 3 x 2,5 mm2) ke LP-Atap Ttk 750,000.00
4. Tiang (pipa galvanis,Sling ), panjang 20 meter Bh 4,500,000.00
5. Copper rod diameter 5/8" Bh 2,500,000.00
6. Down Conductor Cable NYY 1 x 70 mm 2 M1 378,000.00
7. Cable Clamp Bh 5,500.00
8. Test Link Bh 1,000,000.00
9. Handhole ( Bak Kontrol 400 x 400 x 400 mm ) Bh 625,000.00
10. Instalasi grounding penangkal petir Lot 1,000,000.00
(Minimal Kedalaman 6 m, Dengan Tahanan pembumian □ 1 Ohm)
II Pekerjaan Mekanikal
E Roof Tank
Roof Tank Kapasitas 1M3 unit 1,500,000.00
Lengkap dudukan/pondasi
Pas. Fixture
1. Pas. Stop Kontak Bh 53,500.00
3. Pas. Sakelar Tunggal Bh 39,500.00
6. Pas. Stop Kontak AC Bh 65,500.00
II Pekerjaan Mekanikal
C Pek. Air Kotor, Hujan,Bekas,Pipa Vent (dalam bangunan) /M'
2. Pas. Pipa PVC Ø 4" M1 159,000.00
3. Pas. Pipa PVC Ø 3" M1 115,000.00
4. Pas. Pipa PVC Ø 2" M1 33,900.00
a. Listrik PLN
1 Biaya Penyambungan ( BP ) Ls 1.00 9,883,800.00 9,883,800.00
2 Uang Jaminan Langganan (UJL) Ls 1.00 2,550,000.00 2,550,000.00
3 Biaya Surat Jaminan Instalasi (SJI) Ls 1.00 1,020,000.00 1,020,000.00
4 Biaya SLO ( KONSUIL ) Ls 1.00 612,000.00 612,000.00
Jumlah 14,065,800.00
3 Pas. Ground Panel unit 1.00 5,000,000.00 5,000,000.00
5,000,000.00
II PEKERJAAN MEKANIKAL
II PEKERJAAN MEKANIKAL
1 Pekerjaan Instalasi Hydrant #REF!
2 Pekerjaan Instalasi Air Bersih #REF!
3 Pekerjaan Instalasi Air Bekas #REF!
4 Pekerjaan Instalasi Air Kotor #REF!
5 Pekerjaan Instalasi Pipa Air hujan #REF!
6 Pekerjaan Instalasi Pipa Tegak #REF!
7 Pekerjaan Septictank 10,000,000
8 Pekerjaan Roof Tank 3,000,000
9 Pekerjaan Ground Tank 5,000,000
10 Pekerjaan Pompa Transfer 2,000,000
11 Pekerjaan Instalasi AC #REF!
12 Pekerjaan Rak kabel #REF!
Terbilang : Tiga Milyar Seratus Empat Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Tujuh Ribu Delapan Ratus Empat Puluh Rupiah