MINIMUM CEMENT CONSUMPTION SHOULD BE AS PER THE CHART PROVIDED
FOR THE TENDER NAMED " CIVIL WORKS AT LONI TERMINAL" FOR ALL THE JOBS INCLUDING CIVIL BUILDING STRUCTURES, RCC DRIVE WAY, DYKEWALL, FIRE BREAK WALL ETC COMPLETE.
CEMENT CONSUMPTION FOR CONCRETE GRADES
NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 M10 ( 1:3:6 ) 4.4
2 M15 (1:2:4 ) 4.8
3 M20 (1:1.5:3 ) 5.5
4 M25 (1:1:2 ) 7.5
5 PCC M10 (1:3:6 ) 3
& (1:4:8 ) 2.3
CEMENT CONSUMPTION FOR CEMENT MORTAR
NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 (1:4) 6
2 (1:5) 5
3 (1:6) 4.3
CEMENT CONSUMPTION FOR PLASTER
NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 20 MM THICK (1:4 ) 18
2 12 MM THICK (1:4) 10.8
CEMENT CONSUMPTION FOR BRICK WORK / CuM
NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 ( 1:3 ) 2.5
2 (1:4 ) 2
3 (1:5 ) 1.65
4 (1:6 ) 1.4
ACTUAL CEMENT CONTENT REQUIRED MAY VARY AS PER APPROVED MIX
DESIGN BUT MINIMUM CONSUMPTION SHALL BE AS PER THE CHART.