You are on page 1of 18

FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 2

EARTHWORKS

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 32


FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 2 - EARTHWORKS

Page

2.1 CLEARING, GRUBBING AND STRIPPING TOPSOIL S2-35

2.1.1 Description S2-35


2.1.1.1 Clearing S2-35
2.1.1.2 Grubbing S2-35
2.1.1.3 Stripping Topsoil S2-35
2.1.2 Construction Methods S2-35
2.1.2.1 Areas To Be Cleared S2-35
2.1.2.2 Areas To Be Cleared, Grubbed and Stripped Of Topsoil S2-36
2.1.2.3 Topsoil S2-36
2.1.2.4 Timber S2-36
2.1.2.5 Structures S2-37
2.1.2.6 Disposal Of Material S2-37

2.2 EARTHWORKS S2-38

2.2.1 Definitions S2-38

2.2.2 General Requirements S2-39

2.2.3 Roadway Excavation S2-39


2.2.3.1 Dimensional Tolerances S2-39
2.2.3.2 Separation and Stockpiling of Suitable Material S2-40
2.2.3.3 Removal of Excavated Material From Site S2-40
2.2.3.4 Removal of Unsuitable Material S2-40
2.2.3.5 Replacement of Unsuitable Material Under Standing Water S2-40
2.2.3.6 Widening Cuts S2-40
2.2.3.7 Excavation of Rock S2-41
2.2.3.8 Storage and Handling of Explosives S2-42
2.2.3.9 Blasting S2-42
2.2.3.10 Safety Measures S2-42
2.2.3.11 Insecure Material S2-43

2.2.4 Earth Embankment S2-43


2.2.4.1 Material S2-43
2.2.4.2 Borrow Pits S2-43
2.2.4.3 Placement of Fill Material S2-43
2.2.4.4 Compaction S2-44

2.2.5 Rock fill Embankment S2-45

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 33


FOR INTERNAL USE ONLY Standard Specification For Road Works

Page

2.2.6 Embankment Over Soft Ground S2-46


2.2.6.1 Foundation Treatment S2-46
2.2.6.2 Surcharge and Staged Construction S2-46
2.2.6.3 Settlement Markers S2-46
2.2.6.4 Settlement Records S2-47

2.2.7 Subgrade S2-47

2.2.8 Protective Vegetation for Erosion Control S2-48


2.2.8.1 Topsoil S2-48
2.2.8.2 Turfing S2-48
2.2.8.3 Seeding S2-48

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 34


FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 2 - EARTHWORKS Clearing shall also include the


levelling of obsolete dikes,
terraces, ditches, etc., unless
2.1 CLEARING, GRUBBING AND otherwise directed by the S.O.
STRIPPING TOPSOIL
2.1.1.2 Grubbing
2.1.1 Description
Grubbing shall consist of the
This work shall consist of clearing, removal and disposal of surface
grubbing and stripping topsoil in the vegetation, the bases of stumps,
areas designated hereunder and/or roots, the underground parts of
shown on the Drawings and/or structures, and other obstructions
directed by the S.O., and of clearing to a depth of at least 0.50 metre
only in other areas designated here below ground level, all to the
under and/or shown on the Drawings satisfaction of the S.O.
and/or directed by the S.O., all as
specified herein and as required by 2.1.1.3 Stripping Topsoil
the S.O. The work shall also include
the demolition and disposal of Stripping topsoil shall consist of
structures in said areas, except where the removal of topsoil to an
otherwise provided for in the average depth of at least 100 mm
Contract, as specified herein and as below ground level, and its
required by the S.O. stockpiling for use in the Works,
and/or its disposal, as directed by
2.1.1.1 Clearing the S.O.

Clearing shall consist of the 2.1.2 Construction Methods


cutting and/or taking down,
removal and disposal of 2.1.2.1 Areas To Be Cleared
everything above ground
level, including objects The entire road reserve area shall
overhanging the areas to be be cleared as described above,
cleared such as tree branches, unless otherwise shown on the
except such trees, vegetation, Drawings and/or directed by the
structures or parts of structures, S.O.
and other things which are
designated in the Contract to Clearing shall be carried out to
remain, or be removed by others, the extents deemed necessary and
or which the S.O. directs are to approved or directed by the S.O.
be left undisturbed. The material in areas outside the road reserve
to be cleared shall include but not where channel excavation or
necessarily be limited to trees, other work is required.
stumps (parts above ground),
logs, brush, undergrowth, long In areas which are to be cleared
grasses, crops, loose vegetable only, and in which grubbing and
matter and structures (except stripping topsoil are not required,
those structures whose removal the methods of work shall be
or clearance is otherwise such as will not unduly damage
provided for in the Contract). the surface vegetation and
topsoil, and care shall be taken

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 35


FOR INTERNAL USE ONLY Standard Specification For Road Works

not to disturb the topsoil and the This work shall be considered
root systems of grasses and other incidental to the work of clearing,
surface vegetation. No topsoil grubbing and stripping topsoil,
shall be removed from such and shall not be measured for
areas, except as directed by the payment.
S.O., and any topsoil, grasses and
other surface vegetation other 2.1.2.3 Topsoil
wise removed or disturbed shall
be replaced and made good at the Topsoil to be stockpiled for the
Contractor's own expense, all to Works shall be sufficiently fertile
the satisfaction of the S.O. to promote and support the
growth of vegetation, and shall be
2.1.2.2 Areas To Be Cleared,Grubbed taken from such areas where
and Stripped Of Topsoil clearing, grubbing and stripping
topsoil is required as approved or
Except as otherwise shown on directed by the S.O. Before
the Drawings and/or directed by stockpiling, topsoil shall be
the S.O., clearing, grubbing and separated from objectionable
stripping topsoil shall be carried materials, all to the satisfaction of
out in all areas of roadway the S.O. The Contractor shall
excavation and in all areas where arrange for stockpile sites either
embankment is to be constructed, within or outside the road
except that grubbing and reserve, at his own expense, and
stripping topsoil shall not be all to the satisfaction of the S.O.
carried out in those areas where :-
Otherwise, topsoil removed
i) embankment is to be during grubbing and stripping
constructed on earth operations shall be separated
designated as swamp or soft from objectionable materials and
ground; spread within the road reserve or
borrow areas, or otherwise
ii) embankment is to be disposed of, as approved or
constructed to a height at the directed by the S.O.
centre-line of 1.50 metres or
more on ground with a 2.1.2.4 Timber
cross-slope of not more than 1
(vertical) to 30 (horizontal). The ownership of timber is
vested in the Government.
Clearing, grubbing and stripping topsoil shall Saleable timber shall be trimmed
be carried out to the extents deemed necessary and stacked in accordance with
and approved or directed by the S.O. in areas the requirements of the
both inside and outside the road reserve where appropriate Government agency,
channel excavation or other work is required. in accessible places within the
road reserve as approved or
Except where further excavation is required, directed by the S.O.
holes and cavities in the ground surface after
clearing, grubbing and stripping topsoil shall be The Contractor shall have the
filled with materials similar to the adjacent right to use unsaleable timber (or
ground, and such fill shall be compacted to a saleable timber when permission
dry density similar to that of the surrounding is granted in writing by the
material, all to the satisfaction of the S.O.
Cawangan Jalan, Ibu Pejabat JKR, K.L Page 36
FOR INTERNAL USE ONLY Standard Specification For Road Works

appropriate Government agency Combustible material


or authority) for his own including all timber (except
purposes in connection with the timber to be salvaged or
Contract, always provided that he used), all brush, stumps,
shall comply with the roots, vegetation and other
requirements of the S.O. agency combustible refuse may be
or authority) for his own piled up within the road
purposes in connection with the reserve and burned, where
Contract, always provided that he burning is allowed.
shall comply with the
requirements of the S.O. All burning shall be subject
to the prior approval of the
2.1.2.5 Structures relevant Government
authorities, and shall be
Major structures are those which carried out in conformance
cannot practicably be cleared by with all pertinent
bulldozer and/or hydraulic regulations. Burning shall
excavator, whose demolition also be carried out at such
requires pneumatic tools, places and at such times and
explosives and/or other in such a manner as to
specialised equipment. A brief prevent fire from damaging
description of each major vegetation and property
structure (if any) and depth to within the road reserve
which extent it shall be designated to be preserved,
demolished is given in the Bill of and from spreading to areas
Quantities. adjoining the road reserve
and damaging vegetation
All fences, buildings, structures, and property therein.
and encumbrances of any
character within the limits of the Should the clearing,
road reserve, except those to be grubbing and stripping of
removed by others or designated topsoil be carried out at a
to remain, shall be demolished time when burning is not
and removed by the Contractor. permitted, the Contractor
may pile up combustible
Materials designated in the materials within the road
Contract or directed by the S.O. reserve outside the limits of
to be salvaged, shall be carefully the road works, and burn it
removed and stored, and shall be at a time when burning is
the property of the Government. permitted.

2.1.2.6 Disposal Of Material Where burning is not


permitted at any time, or the
Unwanted material from clearing, Contractor elects not to burn
grubbing and stripping topsoil unwanted material,
(including the demolition of combustible material shall
structures) shall be disposed of as be disposed of together with
approved or directed by the S.O. incombustible material.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 37


FOR INTERNAL USE ONLY Standard Specification For Road Works

Incombustible material, including ii) any material


where appropriate the remains of
burning, shall be disposed of in a - consisting of highly
safe and tidy manner at solid organic clay and silt;
waste dumps outside the Site,
unless otherwise approved or - which is clay having a
directed by the S.O. The liquid limit exceeding
Contractor shall be solely 80% and/or a plasticity
responsible for making the index exceeding 55%;
necessary agreements, and paying
expenses and claims arising from - which is susceptible to
the use of such solid waste spontaneous combustion;
dumps whether on Government
or private land. - which has a loss of weight
greater than 2.5% on
ignition;
2.2 EARTHWORKS
- containing large amounts
2.2.1 Definitions of roots, grass and other
vegetable matter.
(a) Formation Level
Materials that are soft or unstable
Formation level means the top merely because they are too wet
surface of the subgrade. or too dry for effective
compaction are not to be
(b) Subgrade classified as unsuitable, unless
otherwise classified by the S.O.
Subgrade means that part of the
embankment or existing ground (e) Suitable Materials
in cutting which is immediately
below the subbase or lower Suitable materials shall mean
subbase of the road pavement those materials other than the
and shoulders. unsuitable materials defined in
Sub-Section 2.2.1 (d) above.
(c) Common Excavation
(f) Rock
Common excavation shall mean
excavation in any materials Rock shall mean material found
which are not rock or artificial in ledges or masses in its original
hard materials as defined in position which would normally
Sub-Sections 2.2.1 (f) and (g). have to be loosened either by
blasting or by pneumatic tools or,
(d) Unsuitable Materials if excavated by hand, by wedges
and sledge hammers. It shall not
Unsuitable materials shall include material which can be
include :- loosened with a track-type tractor
with mounted and drawn ripper
i) running silt, peat, logs, of the following descriptions :-
stumps, perishable or toxic
material, slurry or mud, or

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 38


FOR INTERNAL USE ONLY Standard Specification For Road Works

i) Tractor Unit : Equipment with a The Contractor shall provide where


minimum weight of 20 tonnes necessary temporary water courses,
and nett horse power rating of ditches, drains, pumping or other means of
200 brake horse power or more. maintaining the earthworks free from
The tractor unit is to be in good water. Such provision shall include
condition and operated by carrying out the work of forming the
experienced personnel skilled in cuttings and embankments in such a
the use of ripping equipment; manner that their surfaces have at all times
a sufficient gradient to enable them to shed
ii) Ripping Unit : The ripper to be water and prevent ponding.
attached to the tractor shall be the
most efficient parallelogram type In pumping out excavations and in the
recommended by the tractor or lowering of water tables the Contractor
ripper manufacturer. The ripper shall pay due regard to the stability of all
shall have a single shank in good structures.
working condition with
sharpened cutting point. Adequate means for trapping silt shall be
provided on all temporary drainage
Boulders or detached pieces shall only be systems. Similar arrangements shall be
regarded as rock if they individually made for all earthworks including
exceed 0.5 cubic metre. excavations whether for pile trenches,
foundations or cuttings.
(g) Artificial Hard Material
Should the surface of completed areas be
This shall mean any hard artificial damaged by erosion or by any other cause
material which would require the use the Contractor shall at his own cost make
of blasting or approved pneumatic good such areas to the satisfaction of the
tools for its removal but shall S.O.
exclude individual masses less than
0.5 cubic metre. The Contractor shall exercise care in
preventing wastage of suitable material
2.2.2 General Requirements needed for embankment or fill
construction.
The work shall include the
excavation of all types of material, 2.2.3 Roadway Excavation
backfilling, compaction, forming
embankments and slopes, etc., as is 2.2.3.1 Dimensional Tolerances
necessary for the completion of the
Works up to the formation levels, in Slopes in cutting shall be
accordance with the lines, grades, trimmed mechanically to neat
dimensions, shapes and typical and even surfaces which shall
cross- sections shown on the have gradients not steeper than
Drawings and to the approval of the that shown on the Drawings.
S.O. Widths of excavations shall not
exceed the dimensions shown on
the Drawings by more than 300
mm, unless otherwise approved
by the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 39


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.3.2 Separation and Stockpiling of 2.2.3.4 Removal of Unsuitable Material


Suitable Material
Unsuitable material shall be
Where excavation reveals a excavated to such depth and over
combination of suitable and such area as directed by the S.O.
unsuitable materials, the and be transported and disposed
Contractor shall, wherever the of in an approved manner. Unless
S.O. considers it practicable, approval of the S.O. to dump and
carry out the excavation in such a spread the unsuitable materials
manner that the suitable materials within the Site is obtained, the
are excavated separately for use Contractor shall be responsible
in the Works without for providing his own dump site
contamination by the unsuitable for such unsuitable materials.
materials. The Contractor shall The Contractor shall comply with
stockpile separately material for statutory requirements such as
subgrade as specified in Sub- payment of royalties,
Section 2.2.7. environmental protection, etc.
Voids created due to removal of
2.2.3.3 Removal of Excavated Material unsuitable material shall be
From Site backfilled with suitable material
compacted to a dry density not
No excavated material shall be less than that of the surrounding
removed from the Site except on material or that specified for the
the direction or with the approval respective part of the earthworks
of the S.O. Should the or as directed by the S.O.
Contractor be permitted to
remove suitable materials from 2.2.3.5 Replacement of Unsuitable
the Site to suit his operational Material Under Standing Water
procedure, then he shall make
good any consequent deficit of Where it is decided by the S.O.
fill material arising there from, at that replacement of unsuitable
his own expense. Unless material shall be done under
designated dump sites have been standing water, voids created due
shown on the Drawings, the to removal of unsuitable material
Contractor shall dispose of shall be backfilled with hard
surplus suitable material at his clean crushed rock, natural gravel
own dump areas outside the Site or sand having grading within the
as approved by the S.O. In doing respective limits specified in
so, the Contractor shall comply Table 2.1.
with statutory requirements such
as payment of royalties, environ 2.2.3.6 Widening Cuts
mental protection, etc.
The S.O. may instruct the
Contractor or the Contractor
himself may elect to obtain
material for the Works by
widening cuts. In the latter case,
the Contractor shall first request
permission in writing from the
S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 40


FOR INTERNAL USE ONLY Standard Specification For Road Works

TABLE 2.1 - GRADING LIMITS OF Where the rock is of satisfactory


MATERIALS FOR quality, the Contractor may elect to
REPLACEMENT OF crush and screen it to produce
UNSUITABLE MATERIAL aggregates required for concrete,
roadbase, subbase, or other purposes.
Excavated rock needed for earth
B.S. Sieve Size % Passing By work construction which the
Weight Contractor elects so to use for
producing select materials shall be
Crushed Rock or
replaced at the Contractor's own
Gravel expense by borrow of satisfactory
100 quality approved by the S.O.
63.0 mm 85 - 100
37.5 mm 0 - 20 Otherwise, excavated rock shall be
20.0 mm 0-5
used in the construction of
10.0 mm
embankment and fill, to the fullest
Sand practical extent, in either of the two
following ways :-
10.0 mm 100
5.0 mm 90 - 100
1.18 mm 45 - 80
300 um 10 - 30 i) excavated rock shall be broken
150 um 2 - 10 down to a maximum particle size
of 400 mm and used as rock fill
as described in Sub-Section 2.2.5;
2.2.3.7 Excavation of Rock ii) excavated rock shall be broken
down to a maximum particle size
Rock excavation shall be carried of 150 mm, blended with suitable
out by methods appropriate to earth fill material in a proportion
Site requirements as approved by not exceeding 1 rock to 1 earth,
the S.O. Where explosives shall and used as common fill.
be used, the relevant security
regulations dealing with The Contractor may only waste
purchase, transport, handling, excavated rock with the approval of the
storage and usage of explosives S.O. Excavated rock needed for
shall be complied with. earthwork construction which the
Contractor elects to waste shall be
All material from rock replaced at the Contractor's own expense
excavations shall be used as far by borrow of satisfactory quality
as is practicable in the Works. approved by the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 41


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.3.8 Storage and Handling of All necessary precautions shall be


Explosives taken to preserve in the soundest
possible condition the materials
Proper buildings or below and beyond the lines of all
magazines, with separate excavations. Delayed blasting to
compartments for detonators, reduce shock waves shall be used
in suitable positions for the to avoid damage to concrete and
storage of explosives in other works already completed.
manner and quantities to be As the excavation approaches its
approved shall be provided. final lines, blasting shall be
The prevention of any carried out by means of parallel
unauthorised issue or drill holes perpendicular to the
improper use of any explosive toe of the excavation and parallel
brought on the Works shall be to the finally required face.
the responsibility of the
Contractor and only 2.2.3.10 Safety Measures
experienced and responsible
men shall be employed to When blasting is carried out close
handle explosives for the to properties or roads, appropriate
purpose of the Works. safety rules shall be strictly
adhered to. Where necessary or
2.2.3.9 Blasting as directed by the S.O., the use of
heavy mesh blasting mats shall
Explosives shall be used in be used to ensure that no damage
the quantities and manner is caused to persons or property
recommended by the on or off Site. Special care shall
manufacturers. Blasting shall be taken in wet ground to ensure
be restricted to such periods that individual explosions are
as the S.O. may prescribe. If, reduced to such size as to
in the opinion of the S.O., preclude damage to any buildings
blasting would be dangerous or structures. Plaster shooting
to persons or property or to will not be permitted within 400
any finished work, or is being metres of any building or
carried on in a reckless structure. If traffic on any road
manner, he may prohibit it, or railway has to be interrupted
and order the rock to be for blasting operations, the
excavated by other means. Contractor shall obtain approval
The use of explosives in large of his schedule for such
blasts, i.e. exceeding 9 kg of interruption from the appropriate
explosive, as in seams, drifts, authorities and shall prove to the
shafts, pits, or large holes, is S.O. that he has obtained it, prior
prohibited unless authorised to the interruption.
in writing by the S.O. Such
authorisation shall not in any
way relieve the Contractor of
his liabilities under the
Conditions of Contract.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 42


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.3.11 Insecure Material 2.2.4.2 Borrow Pits

The slopes of cuttings shall be The Contractor shall be


cleared of all rock fragments responsible for locating
which move when prised with borrow pits. Designated
a crow-bar. Where, in the borrow pits shown on the
slopes of cuttings, layers of Drawings only indicate to the
rock and soft material Contractor potential areas for
alternate and the S.O. borrow. Whether the
considers that the slope, Contractor obtains materials
immediately after dressing, from the designated or his
will not permanently own borrow pit, it shall be his
withstand the effect of responsibility to ascertain the
weather, the Contractor shall suitability of the pit with
excavate any insecure respect to the quantity and
material to an approved depth quality of the materials, which
and build up the resulting shall be subject to the
spaces with grade 15P/20 approval of the S.O. The
concrete or masonry using Contractor shall pay all
rock similar to the adjoining necessary fees, taxes or
natural rock so as to ensure a royalties to the appropriate
solid face. authorities and observe all
relevant regulations. The
2.2.4 Earth Embankment Contractor shall keep the
borrow pits free from ponding
2.2.4.1 Material water and the excavation neat
and tidy and shall carry out
Fill materials for use in necessary erosion protection
forming embankments shall measures as instructed by the
be the suitable material S.O.
obtained from excavation in
cuttings. Where the quantity 2.2.4.3 Placement of Fill Material
of such materials is
inadequate, the Contractor All fill materials shall be
shall obtain suitable materials deposited in layers. The loose
from the designated borrow depth for each layer of fill
pits or from his own borrow shall be determined from the
pits which have been trial compaction. Each layer
approved by the S.O. shall extend over the full
width of the fill area and shall
be compacted in accordance
with the requirements of Sub-
Section 2.2.4.4. Each
compacted layer shall be
maintained at all times with a
sufficiently even surface in
order to drain away the
sur face water.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 43


FOR INTERNAL USE ONLY Standard Specification For Road Works

Where embankment is to be Compaction shall be


constructed on ground with a undertaken to the
cross-slope flatter than 1 requirements of this Section
(vertical) to 10 (horizontal) but by plant approved by the S.O.
steeper than 1 (vertical) to 30 All compaction requirements
(horizontal), the foundation shall be controlled by means
material, except where this is of field density measurement.
rock, shall be scarified to a depth
of 100 mm, blended with For compaction of
embankment fill material and embankment slope, the
compacted as described in Sub- Contractor may either extend
Section 2.2.4.4. each compacted layer beyond
the design slope surface by at
Where embankment is to be least 600 mm and then trim
constructed against existing back to the required slope
embankment or on ground with a angle, or he may employ a
cross-slope of 1 or more (vertical) tow type roller to compact the
to 10 (horizontal), the foundation sloping surface.
shall be excavated in all materials
(including hard rock) to form (b) Compaction Trials
benches with horizontal and
vertical faces from which con The B.S. 1377 Compaction
struction of the embankment shall Test (4.5 kg rammer method)
proceed. The benches shall be shall be used in determining
contiguous beneath the full width the moisture versus density
of the embankment, and shall be relation of soil.
of a suitable width to accomodate
construction equipment such as The Contractor shall submit to
motor-graders, trucks, rollers, etc. the S.O. for his approval the
Scarifying of the horizontal and proposed method of
vertical faces of the benches shall compaction for each main
not normally be required, and the type of material to be used in
material excavated in forming the the embankment. This shall
benches may normally be used as include the type of
fill in the embankment as compaction plant for each
approved by the S.O. type of material and the
number of passes in relation
2.2.4.4 Compaction to the loose depth of material
to achieve desired
(a) General compaction. The maximum
compacted thickness for fill
All materials used in shall be limited to 300 mm
embankments and as fill unless otherwise approved by
elsewhere shall be compacted the S.O. The Contractor shall
as soon as practicable after carry out field compaction
being placed and spread. trials, supplemented by any
necessary laboratory
investigations, as required by
the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 44


FOR INTERNAL USE ONLY Standard Specification For Road Works

This shall be done by using the moisture content at which each


procedures proposed by the soil type shall be compacted.
Contractor for earthworks and Water shall be added, or the
shall satisfy the S.O. that all the material aerated and dried to
specified requirements regarding adjust the soil to the proper
compaction can be achieved. moisture content to obtain the
Compaction trials with the main required density. A satisfactory
types of material likely to be method and sufficient equipment
encountered shall be completed as approved by the S.O. shall be
before the works with the used for the furnishing and
corresponding materials will be handling of water.
allowed to commence. Each trial
area shall be not smaller than If the natural water content of
8 m x 15 m. suitable materials is too high for
the proper compaction to be
(c) Degree of Compaction carried out, the Contractor can
either bring down the moisture
The whole of the embankment content by aeration or drying or
below the top 300 mm of the alternatively replace it with
subgrade shall be compacted to suitable materials of compactable
not less than 90% (for cohesive moisture range at his own cost.
material) or 95% (for
cohesionless material) of the 2.2.5 Rock fill Embankment
maximum dry density determined
in the B.S. 1377 Compaction Test Rock used in rock fill
(4.5 kg rammer method). embankments shall be of maximum
particle size of 400 mm so that it can
(d) Field Density Testing be deposited in horizontal layers,
each not exceeding 500 mm in
Field density tests on each layer compacted depth and extending over
of compacted earth fill shall be the full width of the embankment
carried out using the sand except for any specified external
replacement method in cover to slopes or new formation
accordance with B.S. 1377 or by level. The materials shall be spread
using other means of testing of and levelled by a crawler tractor
comparable accuracy approved weighing not less than 15 tonnes.
by the S.O. Each layer shall consist of
reasonably well graded rock and all
(e) Moisture Control large voids shall be filled with
broken fragments before the next
Each layer of earth fill shall be layer is placed. The top surface and
processed as necessary to bring side slopes of embankments so
its moisture content to a uniform formed shall be thoroughly blinded
level throughout the material, with approved fine graded material
suitable for compaction. The to seal the surface.
optimum moisture content as
determined by the B.S. 1377
Compaction Test (4.5 kg rammer
method) shall be used as a guide
in determining the proper

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 45


FOR INTERNAL USE ONLY Standard Specification For Road Works

There shall be a transition layer 2.2.6.2 Surcharge and Staged


between rock fill and earth fill or the Construction
top 300 mm of subgrade of at least
300 mm compacted thickness. This Where indicated in the Contract
shall consist of uniformly graded or directed by the S.O., the
crushed rock between 6 mm and 150 embankment shall be built to
mm as approved by the S.O. different heights in stages with or
without surcharge with allowance
Each layer of rock used as rock fill for consolidation time periods in
in embankments shall be between stages, all in accordance
systematically compacted by at least with the Contract. Where sur
12 passes of a vibrating roller with a charge is specified, the
static load per 25 mm width of roll Contractor shall be responsible
of at least 45 kg or a grid roller with for the provision of surcharge
load per 25 mm width of roll of at material and the removal and
least 200 kg or other approved plant. disposal of excess material on
completion of consolidation or
2.2.6 Embankment Over Soft Ground when directed by the S.O.

2.2.6.1 Foundation Treatment 2.2.6.3 Settlement Markers

Prior to forming embankment Markers shall be provided and


over soft ground, the soil over installed by the Contractor in the
which fill material shall be positions indicated on the
placed shall be given strength Drawings for the purpose of
improvement treatment as measuring settlements taking
specified and to the details as place under the embankments
shown on the Drawings or as during and after the construction
directed or approved by the period. The design of markers
S.O. Treatment by means of shall be as shown on the
replacement of unsuitable Drawings and the Contractor
material shall be as specified shall be responsible for supplying
in Sub-Sections 2.2.3.4 and and installing such markers and
2.2.3.5. for extending the markers as the
work proceeds. Adjustments to
The first layer or layers of fill the height of markers shall be
materials shall be deposited made when required by the S.O.
over the full width of the Each marker shall be identified
embankment and berms in by painting on it the chainage of
thicknesses and compacted as its position.
approved by the S.O. The
Contractor shall provide The Contractor shall take all
compaction plant suitable for necessary measures to protect
working over soft ground. markers from damage by plant
and vehicles at all times and shall
repair any such damage to the
satisfaction of the S.O. Readily
visible barriers shall be installed
around each marker.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 46


FOR INTERNAL USE ONLY Standard Specification For Road Works

2.2.6.4 Settlement Records (for cohesionless material) of the


maximum dry density determined in
Joint measurement of the B.S. 1377 Compaction Test (4.5
settlement shall be taken kg rammer method). If the S.O. is
weekly while fill is being fully satisfied that the subgrade in its
placed in the vicinity of the natural state possesses a density
markers. Thereafter, readings exceeding the requirements, then the
shall be taken fortnightly for a surface of the subgrade shall be
period as directed by the S.O. trimmed and rolled to obtain a
The readings shall be smooth finish.
submitted on an approved
printed form to be supplied by Where the material in cut area is
the Contractor. found to be unsuitable for use in the
top 300 mm of subgrade it shall be
For the measurement of the removed and replaced with suitable
volume that has settled below material which shall be compacted as
the original level of the indicated above.
foundation of the
embankment, the measured The subgrade shall be finished in a
settlement of each marker neat and workmanlike manner, and
shall be used for volume the widths of embankments and cuts
computation following the shall be everywhere at least those
method shown on the specified or shown on the Drawings
Drawings. on both sides of the centreline. The
top surface of the subgrade shall
2.2.7 Subgrade have the required shape,
superelevation, levels and grades and
Material for the top 300 mm of shall be finished everywhere to with
subgrade shall have a minimum in + 10 mm and minus 30 mm of the
California Bearing Ratio (CBR) required level.
as shown on the Drawings when
compacted to 95% of the i) Where rock surface extends over
maximum dry density determined the whole width of the
in the B.S. 1377 Compaction formation :-
Test (4.5 kg rammer method)
under 4 days soaked condition. The rock surface shall be
trimmed to a free draining
Throughout the top 300 mm of profile, at or below formation
subgrade, the material shall be levels. No high spot shall
compacted to not less than 95% protrude above the formation
(for cohesive material) or 100% levels.
(for cohesionless material) of the
maximum dry density determined Any voids or cavities more than
in the B.S. 1377 Compaction Test 0.5 metre below the formation
(4.5 kg rammer method). level shall be filled up with
approved lean concrete having
In cut area, the top 300 mm of 7-day cube strength greater than
the subgrade shall be scarified 7 N/sq.mm. The rock surface
and recompacted to 95% (for shall then be brought up to the
cohesive material) or 100% formation levels with approved

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 47


FOR INTERNAL USE ONLY Standard Specification For Road Works

crushed rock or gravel, regulated Turf sods shall be stacked and


and blinded. watered when they cannot be
laid immediately after cutting.
ii) Where rock outcrop occurs over
part of the formation only:- The surfaces to be turfed shall
be trimmed and thoroughly
The rock outcrop shall be cut wetted. The turf shall then be
down to a level not less than 300 carefully laid to form a complete
mm below the formation level. and uniform cover as shown on
The surface shall then be brought the Drawings. Turf laid on slopes
up to level with suitable subgrade steeper than 1 (vertical) and 3
material. (horizontal) shall be pegged
down with bamboo stakes
2.2.8 Protective Vegetation for Erosion approximately 250 mm in length.
Control Approved fertiliser shall be
applied after placing of turf at
2.2.8.1 Topsoil suitable times and at rates of
application approved by the S.O.
Topsoil stockpiled for the Works
in accordance with Sub- Sections All turf shall be regularly
2.1.1.3 and 2.1.2.3 shall be spread watered and fertilised to the
and lightly compacted to an even satisfaction of the S.O. until
thickness of 50 mm as directed the vegetation is satisfactorily
by the S.O. in areas to be turfed established. Any dead turf
and/or seeded, or used as the S.O. shall be replaced with new
shall otherwise direct for tree turf at the Contractor's own
planting and other purposes. expense.

2.2.8.2 Turfing
2.2.8.3 Seeding
Turfing shall be carried out as
soon as practicable on all earth Seeding or hydroseeding shall be
slopes and other areas as shown carried out as soon as practicable
on the Drawings and/or where on slopes and other areas as
directed by the S.O. The type of shown on the Drawings and/or
turf shall be as indicated on the directed by the S.O.
Drawings or other alternative
type as approved by the S.O. and The Contractor shall submit to
shall be free of lallang and the S.O. for his consideration and
essentially free of weeds. approval, at least four (4) weeks
in advance of the proposed work,
Turf shall be obtained in full details of his proposed
unbroken sods with a substantial method of seeding or
amount of topsoil and shall be hydroseeding. The information
approximately 250 mm x 250 submitted shall include, but not
mm in size and 100 mm thick, necessarily be limited to, a full
from an approved source, and description of the following
shall be placed in position as aspects of the work :-
soon as practicable after cutting.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 48


FOR INTERNAL USE ONLY Standard Specification For Road Works

i) the preparation of the areas to be xii) the cultivation and after-care of


seeded or hydroseeded, including the seeded areas, including rates
if appropriate the amount of top and frequencies of watering,
soil to be used and its method of fertilising, grass cutting and
application; general maintenance for at least 1
year after seeding;
ii) the details and results of
investigations to determine which xiii) the time after seeding required for
types of grass and legume are establishing permanent, dense
compatible with the soil in the growth of grasses, which will
areas to be seeded; require minimal maintenance;

iii) the types of grass and legume (if xiv) guarantees of the success of the
any) and strains of seed to be seeding work.
used, and the function, root and
growth characteristics of each All grass shall be regularly watered until
type; the vegetation is satisfactorily
established to the satisfaction of the S.O.
iv) the rates of application of the Any dead grass shall be replaced at the
grass and legume seeds; Contractor's own expense.

v) the composition of fertiliser to be


used at the time of seeding and its
rate of application;

vi) the composition of fertiliser to be


used after seeding, the times of
application after seeding, and the
rates of application;

vii) the type of mulch to be used and


its method and rate of
application;

viii) the amounts of lime or other


chemicals (if any) to be applied
to improve the soil before,
during and/or after seeding;

ix) the type and amounts of binding


agent to be applied with the
seeds, mulch, fertiliser, etc.,
as appropriate.

x) the proportions and methods of


preparation of the seeding mix;

xi) the equipment and methods to be


used in preparing and placing the
seeding mix and other materials;

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 49