Sac! ‘SAEI JET ENGINE TEST CELL ~
INSPECTION REQUEST FORM
RFH [261t-1
CONTRACTOR: GENCO/SAFRAN
PACKAGE TLE Cha
PACKAGE NO. 2sen40
70. GHAFARILLC Dae
“The ftoning Kem are ready fr your specton on (Dale) 23.Feb1B tine) {2am |
LOCATION Control Bung TEvEL xs
DRAWING REF alate
Description 8
stn Of door hardware excep interchangable core cylinder GF, FF 8 2nd Fr (TDI, 102, 703 & TD4)
» in Ina
Attachments:
AMC Requests For Inspection C-2650-1
Drawing Number: Attached
Wie certty tat the above tems have been coordinated bythe followng Subcontractrs:
Electrical Mechanial Elevators on
“A requests most be submilied atleast 26 hours por To the Fequved speStON and apBTOVa
JConractor Ste Engineer Project Manager
Constants Senate WES DS
SE
Tonsuttants Comments
Consultant Date:
Received Date Time, Contractor's Rep.
Permission to proceed shallot constutue acceptance or approval of Design Detats,Calulaions, Analyses, Test Methods, Materials, Work in
Progress, Means and Methods developed or selected by the contacto and shal not relieve contactor fom fll compliance wih contact