Professional Documents
Culture Documents
Uplink Control signaling is sent on PUCCH, for example such as scheduling request, ACK/
NACK, CQI reports etc
What is DRX?
The amount of time, after which RRC connection for the UE is released and UE is moved
from connected (active) mode into idle mode