Sni Lengkap 2006
PEKERJAAN KAYU
HARGA
KODE
INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN UPAH JUMLAH HARGA (Rp)
ANALISA
( Rp ) ( Rp )
A. PEKERJAAN PONDASI KAYU
A.1.BOW SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 M
DICINCIN, DILANCIP DAN DITUMBUK
0.0200 M3 Balok ulin @ 1,537,571.94 30,751.44
0.5100 OH tukang kayu @ 55,000.00 28,050.00
0.8750 OH pekerja @ 45,000.00 39,375.00
0.0510 OH kepala tukang @ 60,000.00 3,060.00
0.0440 OH mandor @ 60,000.00 2,640.00
JUMLAH 30,751.44 73,125.00 103,876.44
A.2 SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M
2 SAMBUNGAN DGN PIPA GALVANIS
0.0800 M3 Balok ulin @ 1,537,571.94 123,005.76
0.5100 OH tukang kayu @ 55,000.00 28,050.00
0.8750 OH pekerja @ 45,000.00 39,375.00
0.0510 OH kepala tukang @ 60,000.00 3,060.00
0.0440 OH mandor @ 60,000.00 2,640.00
JUMLAH 123,005.76 73,125.00 196,130.76
A.3 SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M'
0.0400 M3 Balok ulin @ 1,537,571.94 61,502.88
0.5100 OH tukang kayu @ 55,000.00 28,050.00
0.8750 OH pekerja @ 45,000.00 39,375.00
0.0510 OH kepala tukang @ 60,000.00 3,060.00
0.0440 OH mandor @ 60,000.00 2,640.00
JUMLAH 61,502.88 73,125.00 134,627.88
A. 4 1 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN
1.1000 M3 papan siring kayu ulin @ 1,737,571.94 1,911,329.13
3.0000 kg paku ulin @ 13,750.00 41,250.00
15.0000 OH tukang kayu @ 55,000.00 825,000.00
4.0000 OH pekerja @ 45,000.00 180,000.00
1.5000 OH kepala tukang @ 60,000.00 90,000.00
0.2000 OH mandor @ 60,000.00 12,000.00
JUMLAH 1,952,579.13 1,107,000.00 3,059,579.13
A. 5 1 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk )
1.1000 M3 balok ky ulin @ 1,537,571.94 1,691,329.13
15.0000 OH tukang kayu @ 55,000.00 825,000.00
5.0000 OH pekerja @ 45,000.00 225,000.00
1.5000 OH kepala tukang @ 60,000.00 90,000.00
0.2500 OH mandor @ 60,000.00 15,000.00
JUMLAH 1,691,329.13 1,155,000.00 2,846,329.13
Hal : 496
ANALISA HARGA SATUAN BOW
PEKERJAAN KAYU
HARGA
KODE
INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN UPAH JUMLAH HARGA (Rp)
ANALISA
( Rp ) ( Rp )
B. PEKERJAAN LANTAI KAYU
B. 1 1 M3 MENGERJAKAN SLOOF DAN GELAGAR KY ULIN
1.1000 M3 balok ky ulin @ 1,537,571.94 1,691,329.13
10.0000 Kg paku ulin @ 13,750.00 137,500.00
15.0000 OH tukang kayu @ 55,000.00 825,000.00
5.0000 OH pekerja @ 45,000.00 225,000.00
1.5000 OH kepala tukang @ 60,000.00 90,000.00
0.2500 OH mandor @ 60,000.00 15,000.00
JUMLAH 1,828,829.13 1,155,000.00 2,983,829.13
B. 2 1 M2 LANTAI PAPAN KAYU ULIN DIKETAM
0.0254 M3 papan kayu ulin @ 1,737,571.94 44,134.33
0.2500 Kg paku ulin @ 13,750.00 3,437.50
0.8000 OH tukang kayu @ 55,000.00 44,000.00
0.2800 OH pekerja @ 45,000.00 12,600.00
0.0800 OH kepala tukang @ 60,000.00 4,800.00
0.0140 OH mandor @ 60,000.00 840.00
JUMLAH 47,571.83 62,240.00 109,811.83
B. 3 1 M2 LANTAI PAPAN KAYU MERANTI DIKETAM
0.0254 M3 papan kayu meranti klas 1 @ 1,187,571.94 30,164.33
0.2500 Kg paku biasa @ 11,825.00 2,956.25
0.8000 OH tukang kayu @ 55,000.00 44,000.00
0.2800 OH pekerja @ 45,000.00 12,600.00
0.0800 OH kepala tukang @ 60,000.00 4,800.00
0.0140 OH mandor @ 60,000.00 840.00
JUMLAH 33,120.58 62,240.00 95,360.58
B. PEKERJAAN DINDING KAYU
B. 4 1 M3 MENGERJAKAN RANGKA RUMAH KAYU ULIN (termasuk kusen)
1.1000 M3 balok ky ulin @ 1,537,571.94 1,691,329.13
5.0000 Kg paku ulin @ 13,750.00 68,750.00
20.0000 OH tukang kayu @ 55,000.00 1,100,000.00
10.0000 OH pekerja @ 45,000.00 450,000.00
2.0000 OH kepala tukang @ 60,000.00 120,000.00
0.5000 OH mandor @ 60,000.00 30,000.00
JUMLAH 1,760,079.13 1,700,000.00 3,460,079.13
Hal : 497
ANALISA HARGA SATUAN BOW
HARGA
KODE
INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN UPAH JUMLAH HARGA (Rp)
ANALISA
( Rp ) ( Rp )
B. 5 1 M3 MENGERJAKAN RANGKA RUMAH KAYU MERANTI (termasuk kusen)
1.1000 M3 balok ky meranti @ 1,037,571.94 1,141,329.13
5.0000 Kg paku biasa @ 11,825.00 59,125.00
20.0000 OH tukang kayu @ 55,000.00 1,100,000.00
10.0000 OH pekerja @ 45,000.00 450,000.00
2.0000 OH kepala tukang @ 60,000.00 120,000.00
0.5000 OH mandor @ 60,000.00 30,000.00
JUMLAH 1,200,454.13 1,700,000.00 2,900,454.13
HARGA
KODE
INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN UPAH JUMLAH HARGA (Rp)
ANALISA
( Rp ) ( Rp )
B. 9 1 M2 DINDING PAPAN MERANTI SUSUN SIRIH DIKETAM
0.0250 M3 papan kayu meranti @ 1,187,571.94 29,689.30
0.2000 Kg paku biasa @ 11,825.00 2,365.00
0.8000 OH tukang kayu @ 55,000.00 44,000.00
0.2800 OH pekerja @ 45,000.00 12,600.00
0.0800 OH kepala tukang @ 60,000.00 4,800.00
0.0100 OH mandor @ 60,000.00 600.00
JUMLAH 32,054.30 62,000.00 94,054.30
1 2 3 4 = 6+5 5 6 7
A UPAH KERJA
1 Pekerja ( Buruh semi terlatih ) Hari 45,000.00 - 45,000.00
2 Tukang Batu Hari 55,000.00 - 55,000.00
3 Tukang Kayu Hari 55,000.00 - 55,000.00
4 Tukang Besi Hari 55,000.00 - 55,000.00
5 Tukang Cat Hari 55,000.00 - 55,000.00
6 Kepala Tukang Hari 60,000.00 - 60,000.00
7 Mandor Hari 60,000.00 - 60,000.00
8 Sopir Hari 50,000.00 - 50,000.00
9 Pembantu Sopir Hari 40,000.00 - 40,000.00
B Harga Bahan
1 Aluminium foil single sided Roll 450,000.00 - 450,000.00
2 Ampelas Lbr 2,500.00 - 2,500.00
3 Atap Asbes Gelombang Besar Lbr 23,000.00 - 23,000.00
4 Atap Genteng Kodok Bh 1,550.00 - 1,550.00
5 Atap Metal Berkualitas ( 2 ssn, 8 daun ) Lbr 40,000.00 - 40,000.00
6 Atap Plastik gelombang 60 x 170 Lbr 14,500.00 - 14,500.00
7 Atap Sirap Ikat 50,000.00 - 50,000.00 isi 100 bh
8 Atap Tilux Bh 21,000.00 - 21,000.00
9 Bahan Plafond Asbes Semen 5 mm M2 21,000.00 - 21,000.00
10 Bahan Plafond eternit 4 mm M2 25,000.00 - 25,000.00
11 Bahan Plafond Hardplex 5 mm 120 x 130 Lbr 42,500.00 - 42,500.00
12 Bahan Politur ( sirlak ) India Kg 32,000.00 - 32,000.00
13 Bak Air Fiber (60 x 60 cm) Bh 145,000.00 - 145,000.00
14 Bak Air Fiber (60 x 80 cm) Bh 185,000.00 - 185,000.00
15 Bak Cuci Piring Stainles Lobang 1 Bh 195,000.00 - 195,000.00
16 Bak Cuci Piring Stainles Lobang 2 Bh 250,000.00 - 250,000.00
17 Bak Kontrol 50 x 50 x 40 cm Bh 75,000.00 - 75,000.00
18 Bak air Traso Besar Bh 185,000.00 - 185,000.00
19 Balok Klas I Bangkirai M3 1,937,571.94 237,571.94 1,700,000.00 Jarak 46 - 70
20 Balok Klas I Ulin M3 1,537,571.94 237,571.94 1,300,000.00 Jarak 46 - 70
T. A 2006
JUMLAH HARGA BIAYA HARGA DASAR
NO URAIAN SAT SATUAN
KETERANGAN
ANGKUT TANPA PAJAK
192 Pipa PVC AW Dia 3/4 " Btg 15,000.00 - 15,000.00 4 m' / btg
193 Pipa PVC AW Dia 4 " Btg 85,000.00 - 85,000.00 4 m' / btg
194 Pipa stainless steel 2 " M' 30,250.00 - 30,250.00
195 Pipa stainless steel 3 " M' 37,812.00 - 37,812.00
196 Pitting Bh 6,000.00 - 6,000.00
197 Plamir Kg 28,000.00 - 28,000.00
198 Plitur Kg 8,500.00 - 8,500.00
199 Plint / list lantai keramik Bh 3,500.00 - 3,500.00
200 Plint marmer 10 x 40 cm Bh 12,500.00 - 12,500.00
201 Plywood 3 mm Lbr 46,000.00 - 46,000.00 15,333.33
202 Plywood 4 mm Lbr 61,500.00 - 61,500.00 61,333.33
203 Plywood 6 mm Lbr 92,000.00 - 92,000.00 92,000.00
204 Plywood 12 mm Lbr 184,000.00 - 184,000.00 184,000.00
205 Plywood 15 mm Lbr 230,000.00 - 230,000.00 230,000.00
206 Plywood 18 mm Lbr 276,000.00 - 276,000.00 276,000.00
207 Porselen 20 x 20 cm Bh 2,500.00 - 2,500.00
208 Polycarbonat - -
209 Rangka besi hollow M' 60,000.00 - 60,000.00
210 Rol Cat Tembok Bh 20,000.00 - 20,000.00
211 Rolling door - -
212 Roster beton 20 x 20 cm Bh 3,000.00 - 3,000.00
213 Roster beton 20 x 30 cm Bh 4,000.00 - 4,000.00
214 Roster kayu bangkirai 20 x 20 cm Bh 60,000.00 - 60,000.00
215 Rumput Hias M2 25,000.00 - 25,000.00
216 Saklar Ganda Bh 19,250.00 - 19,250.00
217 Saklar Tunggal Bh 16,500.00 - 16,500.00
218 Sekering Kas 3 Group + Instalasi Unit 100,000.00 - 100,000.00
219 Semen Abu - Abu / PC ( 50 kg/Zak ) Zak 43,000.00 - 43,000.00
220 Semen Warna Kg 1,600.00 - 1,600.00
221 Semen putih Kg 1,200.00 - 1,200.00
222 Seng gelombang Besar / kecil Lbr 30,000.00 - 30,000.00
223 Seng Plat Lbr 35,000.00 - 35,000.00
224 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 ) Unit 4,550,000.00 - 4,550,000.00
225 Septictank Kayu Unit 1,650,000.00 - 1,650,000.00
T. A 2006
JUMLAH HARGA BIAYA HARGA DASAR
NO URAIAN SAT SATUAN
KETERANGAN
ANGKUT TANPA PAJAK
Catatan :
1. Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal
2. Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran
3. Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut
4. Ongkos angkut tergantung jarak lokasi pekerjaan ke Quary ( sampel jarak angkut 46 - 70 )
5. Harga belum termasuk PPn
ANALISA HARGA SATUAN SNI 2006
HARGA
KODE
INDEK SATUAN URAIAN HARGA SATUAN ( Rp ) BAHAN UPAH JUMLAH HARGA ( Rp )
ANALISA
( Rp ) ( Rp )
A. PEKERJAAN PERSIAPAN
A. 6.6.1 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M
1.2500 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 11,875.00
2.5000 kg Semen portland @ 860.00 2,150.00
0.0050 m3 Pasir beton @ 324,567.03 1,622.84
0.0090 m3 Koral beton @ 314,567.03 2,831.10
0.0720 m3 Kayu 5/7 @ 650,000.00 46,800.00
0.0600 kg Paku biasa 2'-5' @ 11,825.00 709.50
0.4000 lt Residu @ 5,000.00 2,000.00
0.2000 oh Tukang kayu @ 55,000.00 11,000.00
0.4000 oh Pekerja @ 45,000.00 18,000.00
0.0200 oh Kepala tukang @ 60,000.00 1,200.00
0.0200 oh Mandor @ 60,000.00 1,200.00
JUMLAH 67,988.44 31,400.00 99,388.44
A. 6.6.2 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M
1.2500 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 11,875.00
2.5000 kg Semen portland @ 860.00 2,150.00
1.2000 Lbr Seng gelombang 3" - 5 " @ 30,000.00 36,000.00
0.0050 m3 Pasir Beton @ 324,567.03 1,622.84
0.0090 m3 Koral beton @ 314,567.03 2,831.10
0.0720 kg Kayu 5/7 @ 650,000.00 46,800.00
0.0600 kg Paku biasa 2'-5' @ 11,825.00 709.50
0.4500 Kg Meni besi @ 25,000.00 11,250.00
0.2000 oh Tukang kayu @ 55,000.00 11,000.00
0.4000 oh Pekerja @ 45,000.00 18,000.00
0.0200 oh Kepala tukang @ 60,000.00 1,200.00
0.0200 oh Mandor @ 60,000.00 1,200.00
JUMLAH 113,238.44 31,400.00 144,638.44
A. 6.6.3 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M
1.2500 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 11,875.00
2.5000 kg Semen portland @ 860.00 2,150.00
25.0000 kg Kawat Duri @ 11,000.00 275,000.00
0.0050 m3 Pasir Beton @ 324,567.03 1,622.84
0.0090 m3 Koral beton @ 314,567.03 2,831.10
0.0720 kg Paku biasa 2'-5' @ 11,825.00 851.40
0.2000 oh Tukang kayu @ 55,000.00 11,000.00
0.3000 oh Pekerja @ 45,000.00 13,500.00
0.0200 oh Kepala tukang @ 60,000.00 1,200.00
0.0200 oh Mandor @ 60,000.00 1,200.00
JUMLAH 294,330.34 26,900.00 321,230.34
Hal : 393
A. 6.6.4 1 M' MENGUKUR DAN MEMASANG BOUWPLANK
0.0120 m3 kayu meranti, balok @ 1,037,571.94 12,450.86
0.0200 kg Paku Biasa 2' - 5' @ 11,825.00 236.50
0.0070 m3 kayu papan 3/20 @ 1,037,571.94 7,263.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.1000 oh pekerja @ 45,000.00 4,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0050 oh mandor @ 60,000.00 300.00
JUMLAH 19,950.37 10,900.00 30,850.37
A. 6.6.5 1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN
1.2500 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 11,875.00
0.1800 kg Kayu @ 1,037,571.94 186,762.95
0.8500 m3 Kayu Biasa @ 1,037,571.94 881,936.15
1.1000 m3 Besi Strip @ 18,000.00 19,800.00
35.0000 kg Semen portland @ 860.00 30,100.00
0.1500 kg Pasir Pasang @ 249,567.03 37,435.05
0.1000 m3 Pasir Beton @ 324,567.03 32,456.70
0.1500 m3 Koral beton @ 314,567.03 47,185.05
30.0000 Bh Bata merah @ 550.00 16,500.00
0.2500 Lbr Seng Plat @ 30,000.00 7,500.00
2.0000 Bh Jendela Nako @ 150,000.00 300,000.00
0.0800 m2 Kaca Polos @ 80,000.00 6,400.00
0.0150 Bh Kunci Tanam @ 125,000.00 1,875.00
0.0600 Lbr Plywood 4 mm @ 61,500.00 3,690.00
2.0000 oh tukang kayu @ 55,000.00 110,000.00
1.0000 oh Tukang Batu @ 55,000.00 55,000.00
2.0000 oh pekerja @ 45,000.00 90,000.00
0.3000 oh Kepala tukang @ 60,000.00 18,000.00
0.0500 oh Mandor @ 60,000.00 3,000.00
JUMLAH 1,583,515.91 276,000.00 1,859,515.91
A. 6.6.6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT
1.7000 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 16,150.00
0.2100 kg Kayu @ 1,037,571.94 217,890.11
0.3000 kg Paku biasa 2'-5' @ 11,825.00 3,547.50
10.5000 kg Semen portland @ 860.00 9,030.00
0.0300 m3 Pasir Beton @ 324,567.03 9,737.01
0.0500 m3 Koral beton @ 314,567.03 15,728.35
1.5000 Lbr Seng gelombang @ 30,000.00 45,000.00
2.0000 oh Tukang kayu @ 55,000.00 110,000.00
1.0000 oh Pekerja @ 45,000.00 45,000.00
0.2000 oh Kepala tukang @ 60,000.00 12,000.00
0.0500 oh Mandor @ 60,000.00 3,000.00
JUMLAH 317,082.97 170,000.00 487,082.97
Hal : 394
A. 6.6.7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
3.0000 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 28,500.00
0.2760 kg Kayu @ 1,037,571.94 286,369.85
0.7000 kg Paku biasa 2'-5' @ 11,825.00 8,277.50
1.5000 Lbr Seng gelombang bljs 32 @ 30,000.00 45,000.00
1.5000 oh Tukang kayu @ 55,000.00 82,500.00
1.0000 oh Pekerja @ 45,000.00 45,000.00
0.1500 oh Kepala tukang @ 60,000.00 9,000.00
0.0500 oh Mandor @ 60,000.00 3,000.00
JUMLAH 368,147.35 139,500.00 507,647.35
A. 6.6.8 1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN
0.1000 oh pekerja @ 45,000.00 4,500.00
0.0500 oh mandor @ 364,000.00 18,200.00
JUMLAH - 22,700.00 22,700.00
A. 6.6.9 1 M2 PEMBUATAN BEDENG BURUH
1.2500 btg Dolken kayu dia 8-10/4 m' @ 9,500.00 11,875.00
0.1860 kg Kayu @ 1,037,571.94 192,988.38
0.3000 Kg Paku biasa 2'-5' @ 11,825.00 3,547.50
18.0000 kg Semen portland @ 860.00 15,480.00
0.0300 m3 Pasir Beton @ 324,567.03 9,737.01
0.0500 m3 Koral beton @ 314,567.03 15,728.35
1.5000 Lbr Seng gelombang bljs 32 @ 30,000.00 45,000.00
1.3500 Lbr Plywood 4 mm @ 61,500.00 83,025.00
2.0000 oh Tukang kayu @ 55,000.00 110,000.00
1.0000 oh Pekerja @ 45,000.00 45,000.00
0.2000 oh Kepala tukang @ 60,000.00 12,000.00
0.0500 oh Mandor @ 60,000.00 3,000.00
JUMLAH 377,381.24 170,000.00 547,381.24
A. 6.6.10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM
0.0360 m3 Kayu Terentang @ 1,037,571.94 37,352.59
0.0800 kg Paku biasa 2'-5' @ 11,825.00 946.00
1.0000 btg kaso 5/7 @ 25,000.00 25,000.00
0.3000 oh Tukang kayu @ 55,000.00 16,500.00
0.0015 oh Mandor @ 60,000.00 90.00
JUMLAH 63,298.59 16,590.00 79,888.59
A. 6.6.11 1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM
1.0000 btg Bambu dia. 6 - 8 / 600 cm @ 10,000.00 10,000.00
0.2500 kg Tali Ijuk @ 25,000.00 6,250.00
0.0170 oh Tukang kayu @ 55,000.00 935.00
0.2500 oh Pekerja @ 45,000.00 11,250.00
0.0020 oh Kepala tukang @ 60,000.00 120.00
0.0130 oh Mandor @ 60,000.00 780.00
JUMLAH 16,250.00 13,085.00 29,335.00
Hal : 395
A. 6.6.12 1 M2 PEMBUATAN JALAN SEMENTARA
0.1500 m3 Batu Belah 15/20 @ 165,000.00 24,750.00
0.0900 m3 Batu Pecah 5/7 @ 170,000.00 15,300.00
0.0100 m3 Pasir pasang @ 1,500,000.00 15,000.00
1.0000 oh pekerja @ 150,000.00 150,000.00
0.0500 oh mandor @ 10,000.00 500.00
JUMLAH 55,050.00 150,500.00 205,550.00
A. 6.6.13 1 M3 BONGKARAN BETON BERTULANG
6.6670 oh pekerja @ 45,000.00 300,015.00
0.3330 oh Mandor @ 60,000.00 19,980.00
JUMLAH - 319,995.00 319,995.00
A. 6.6.14 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH
6.6670 oh pekerja @ 45,000.00 300,015.00
0.3330 oh Mandor @ 60,000.00 19,980.00
JUMLAH - 319,995.00 319,995.00
A. 6.6.15 1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M
0.4340 m2 Pagar Kawat jaring @ 37,500.00 16,275.00
0.0420 oh Pekerja @ 45,000.00 1,890.00
0.0040 oh Kepala tukang @ 60,000.00 240.00
0.0420 oh Tukang @ 55,000.00 2,310.00
0.0020 oh Mandor @ 60,000.00 120.00
JUMLAH 16,275.00 4,560.00 20,835.00
A. 6.6.16 1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM
0.9860 lbr Panel Beton Pracetak @ -
0.5250 btg Kolom Beton Pracetak @ -
0.0740 m3 Pasir Beton @ 324,567.03 24,017.9601
0.1460 m3 Koral @ 314,567.03 45,926.7862
45.0000 kg Semen Abu- abu @ 43,000.00 1,935,000.0000
0.1250 oh Tukang batu @ 55,000.00 6,875.00
0.0120 oh Kepala tukang @ 60,000.00 720.00
0.3750 oh pekerja @ 45,000.00 16,875.00
0.0190 oh mandor @ 60,000.00 1,140.00
JUMLAH 2,004,944.75 25,610.00 2,030,554.75
B. PEKERJAAN TANAH
B. 6.6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M'
0.4000 oh pekerja 92.4000 45,000.00 18,000.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0400 oh mandor @ 60,000.00 2,400.00
JUMLAH 20,400.00 20,400.00
Hal : 396
B. 6.6.2 1 M3 GALIAN TANAH BIASA SEDALAM 2 M'
0.5260 oh pekerja 45,000.00 23,670.00
- oh tukang gali 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0520 oh mandor @ 60,000.00 3,120.00
JUMLAH 26,790.00 26,790.00
B. 6.6.3 1 M3 GALIAN TANAH BIASA SEDALAM 3 M'
0.7350 oh pekerja @ 45,000.00 33,075.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0730 oh mandor @ 60,000.00 4,380.00
JUMLAH 37,455.00 37,455.00
B. 6.6.4 1 M3 GALIAN TANAH KERAS SEDALAM 1 M'
0.6250 oh pekerja @ 45,000.00 28,125.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0620 oh mandor @ 60,000.00 3,720.00
JUMLAH 31,845.00 31,845.00
B. 6.6.5 1 M3 GALIAN TANAH CADAS SEDALAM 1 M
1.2500 oh pekerja @ 45,000.00 56,250.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.1250 oh mandor @ 60,000.00 7,500.00
JUMLAH 63,750.00 63,750.00
B. 6.6.6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M'
0.8230 oh pekerja @ 45,000.00 37,035.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0830 oh mandor @ 60,000.00 4,980.00
JUMLAH 42,015.00 42,015.00
B. 6.6.7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 M
0.0500 oh pekerja @ 45,000.00 2,250.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0050 oh mandor @ 60,000.00 300.00
JUMLAH 2,550.00 2,550.00
B. 6.6.8 1 M3 PEMBUANGAN TANAH SEJAUH 150 M
0.5160 oh pekerja @ 45,000.00 23,220.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0500 oh mandor @ 60,000.00 3,000.00
JUMLAH 26,220.00 26,220.00
Hal : 397
B. 6.6.9 1 M3 URUGAN KEMBALI
0.1920 oh pekerja @ 45,000.00 8,640.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0190 oh mandor @ 60,000.00 1,140.00
JUMLAH 9,780.00 9,780.00
B. 6.6.10 PEMADATAN TANAH
0.5000 oh pekerja @ 45,000.00 22,500.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0500 oh mandor @ 60,000.00 3,000.00
JUMLAH 25,500.00 25,500.00
B. 6.6.11 1 M3 URUGAN TANAH
1.2000 M3 Tanah urug @ 162,261.35 194,713.62
0.2500 oh pekerja @ 45,000.00 11,250.00
0.0250 oh mandor @ 60,000.00 1,500.00
1.0000 oh Ls biaya pemadatan @ 25,500.00 25,500.00
JUMLAH 194,713.62 38,250.00 232,963.62
B. 6.6.11.a 1 M3 URUGAN PASIR
1.2000 M3 pasir urug @ 199,567.03 239,480.43
0.3000 oh pekerja @ 45,000.00 13,500.00
0.0100 oh mandor @ 60,000.00 600.00
1.0000 oh Ls biaya pemadatan @ 25,500.00 25,500.00
JUMLAH 239,480.43 39,600.00 279,080.43
B. 6.6.12 1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL
0.3300 M3 pasir urug @ 199,567.03 65,857.12
0.1090 M3 kapur padam @
0.7630 M3 tanah liat @
0.8330 oh pekerja @ 45,000.00 37,485.00
0.4160 oh tukang batu @ 55,000.00 22,880.00
0.0400 oh kepala tukang @ 60,000.00 2,400.00
0.0830 oh mandor @ 60,000.00 4,980.00
JUMLAH 65,857.12 67,745.00 133,602.12
B. 6.6.13 1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL
0.2000 M3 kapur padam @ -
1.0000 M3 tanah liat @ -
0.8330 oh pekerja @ 45,000.00 37,485.00
0.4160 oh tukang batu @ 55,000.00 22,880.00
0.0410 oh kepala tukang @ 60,000.00 2,460.00
0.0810 oh mandor @ 60,000.00 4,860.00
JUMLAH - 67,685.00 67,685.00
Hal : 398
B. 6.6.14 1 M3 PEMASANGAN LAPISAN IJUK
1.2000 m3 ijuk @
0.1500 oh pekerja @ 45,000.00 6,750.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0150 oh mandor @ 60,000.00 900.00
JUMLAH - 7,650.00 7,650.00
B. 6.6.15 1 M3 URUGAN SIRTU
1.2000 M3 Sirtu @ 209,567.03 251,480.43
0.2500 oh pekerja @ 45,000.00 11,250.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.0250 oh mandor @ 60,000.00 1,500.00
JUMLAH 251,480.43 12,750.00 264,230.43
B. 6.6.16 1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM
0.2750 m3 batu belah @ 214,567.03 59,005.9329
0.0300 m3 kerikil @ 314,567.03 9,437.0109
0.0500 m3 pasir @ 249,567.03 12,478.3514
1.0000 oh pekerja @ 45,000.00 45,000.00
- oh tukang gali @ 55,000.00 -
- oh kepala tukang @ 60,000.00 -
0.1000 oh mandor @ 60,000.00 6,000.00
JUMLAH 80,921.30 51,000.00 131,921.30
C. PEKERJAAN PONDASI
C.6.6.1 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.7318
392.0000 kg semen porland @ 860.00 337,120.0000
0.3140 m3 pasir pasang @ 249,567.03 78,364.0471
1.5000 oh pekerja @ 45,000.00 67500.00
0.6000 oh tukang batu @ 55,000.00 33000.00
0.0600 oh kepala tukang @ 60,000.00 3600.00
0.0750 oh mandor @ 60,000.00 4500.00
JUMLAH 651,507.78 108,600.00 760,107.78
C.6.6.2 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.7318
267.0000 kg semen porland @ 860.00 229,620.0000
0.4270 m3 pasir pasang @ 249,567.03 106,565.1213
1.5000 oh pekerja @ 45,000.00 67500.00
0.6000 oh tukang batu @ 55,000.00 33000.00
0.0600 oh kepala tukang @ 60,000.00 3600.00
0.0750 oh mandor @ 60,000.00 4500.00
JUMLAH 572,208.85 108,600.00 680,808.85
Hal : 399
C.6.6.3 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
392.0000 kg semen porland @ 860.00 337,120.00
0.3140 m3 pasir pasang @ 249,567.03 78,364.05
1.5000 oh pekerja @ 45,000.00 67500.00
0.6000 oh tukang batu @ 55,000.00 33000.00
0.0600 oh kepala tukang @ 60,000.00 3600.00
0.0750 oh mandor @ 60,000.00 4500.00
JUMLAH 651,507.78 108,600.00 760,107.78
C.6.6.4 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
202.0000 kg semen porland @ 860.00 173,720.00
0.4850 m3 pasir pasang @ 249,567.03 121,040.01
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 530,783.74 108,600.00 639,383.74
C.6.6.5 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
163.0000 kg semen porland @ 860.00 140,180.00
0.5200 m3 pasir pasang @ 249,567.03 129,774.86
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 505,978.59 108,600.00 614,578.59
C.6.6.6 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
136.0000 kg semen porland @ 860.00 116,960.00
0.5440 m3 pasir pasang @ 249,567.03 135,764.46
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 488,748.20 108,600.00 597,348.20
C.6.6.7 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
117.0000 kg semen porland @ 860.00 100,620.00
0.5610 m3 pasir pasang @ 249,567.03 140,007.10
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 476,650.83 108,600.00 585,250.83
Hal : 400
C.6.6.8 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
91.0000 kg semen porland @ 860.00 78,260.00
0.5610 m3 pasir pasang @ 249,567.03 140,007.10
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 454,290.83 108,600.00 562,890.83
C.6.6.9 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
0.2290 kg kapur pasang @ 5,000.00 1,145.00
0.2290 m3 semen merah @ 1,600.00 366.40
0.5440 oh pasir pasang @ 249,567.03 135,764.46
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 373,299.60 108,600.00 481,899.60
C.6.6.10 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
0.1700 kg kapur pasang @ 5,000.00 850.00
0.1700 m3 semen merah @ 1,600.00 272.00
0.3400 oh pasir pasang @ 249,567.03 84,852.79
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 321,998.52 108,600.00 430,598.52
C.6.6.11 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
156.0000 kg semen portland @ 860.00 134,160.00
0.0320 m3 kapur pasang @ 5,000.00 160.00
0.5480 oh pasir pasang @ 249,567.03 136,762.73
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 507,106.46 108,600.00 615,706.46
Hal : 401
C.6.6.12 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
61.0000 kg semen portland @ 860.00 52,460.00
0.1470 m3 kapur pasang @ 5,000.00 735.00
0.4920 oh pasir pasang @ 249,567.03 122,786.98
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 412,005.71 108,600.00 520,605.71
C.6.6.13 1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps
1.1000 m3 batu belah 15/20 cm @ 214,567.03 236,023.73
41.0000 kg semen portland @ 860.00 35,260.00
0.1310 m3 kapur pasang @ 5,000.00 655.00
0.5230 oh pasir pasang @ 249,567.03 130,523.56
1.5000 oh pekerja @ 45,000.00 67,500.00
0.6000 oh tukang batu @ 55,000.00 33,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0750 oh mandor @ 60,000.00 4,500.00
JUMLAH 402,462.29 108,600.00 511,062.29
C. 6.6.14 1 M3 PASANGAN BATU KOSONG (AANSTAMPING)
1.2000 m3 batu gunung @ 214,567.03 257,480.43
0.3000 m3 pasir urug @ 199,567.03 59,870.11
0.7800 oh pekerja @ 45,000.00 35,100.00
0.3900 oh tukang batu @ 55,000.00 21,450.00
0.0390 oh kepala tukang @ 60,000.00 2,340.00
0.0390 oh mandor @ 60,000.00 2,340.00
JUMLAH 317,350.54 61,230.00 378,580.54
I. PEKERJAAN PLAFOND
I. 6.6.1 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM
1.1000 lbr pelat asbes tebal 6 mm @ 29,400.00 32,340.00
0.0100 kg paku plywood @ 20,000.00 200.00
0.0300 oh pekerja @ 45,000.00 1,350.00
0.0700 oh tukang kayu @ 55,000.00 3,850.00
0.0070 oh kepala tukang @ 60,000.00 420.00
0.0015 oh mandor @ 60,000.00 90.00
JUMLAH 32,540.00 5,710.00 38,250.00
I. 6.6.2 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM
1.1000 lbr pelat asbes tebal 5 mm @ 21,000.00 23,100.00
0.0100 kg paku plywood @ 20,000.00 200.00
0.0300 oh pekerja @ 45,000.00 1,350.00
0.0700 oh tukang kayu @ 55,000.00 3,850.00
0.0070 oh kepala tukang @ 60,000.00 420.00
0.0015 oh mandor @ 60,000.00 90.00
JUMLAH 23,300.00 5,710.00 29,010.00
Hal : 451
I. 6.6.3 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM
1.1000 lbr pelat asbes tebal 4 mm @ 22,000.00 24,200.00
0.0100 kg paku plywood @ 20,000.00 200.00
0.0300 oh pekerja @ 45,000.00 1,350.00
0.0700 oh tukang kayu @ 55,000.00 3,850.00
0.0070 oh kepala tukang @ 60,000.00 420.00
0.0015 oh mandor @ 60,000.00 90.00
JUMLAH 24,400.00 5,710.00 30,110.00
I. 6.6.4 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM
1.1000 lbr pelat asbes tebal 5 mm @ 21,000.00 23,100.00
0.0100 kg paku plywood @ 20,000.00 200.00
0.0300 oh pekerja @ 45,000.00 1,350.00
0.0700 oh tukang kayu @ 55,000.00 3,850.00
0.0070 oh kepala tukang @ 60,000.00 420.00
0.0015 oh mandor @ 60,000.00 90.00
JUMLAH 23,300.00 5,710.00 29,010.00
I. 6.6.5 1 M2 PLAFOND AKUSTIK (30 X 30) CM
11.5000 lbr akustik ukuran 30 x 30 cm @ -
0.0500 kg paku plywood @ 20,000.00 1,000.00
0.0600 oh pekerja @ 45,000.00 2,700.00
0.1200 oh tukang kayu @ 55,000.00 6,600.00
0.1200 oh kepala tukang @ 60,000.00 7,200.00
0.0030 oh mandor @ 60,000.00 180.00
JUMLAH 1,000.00 16,680.00 17,680.00
I. 6.6.6 1 M2 PLAFOND AKUSTIK (30 X 60) CM
5.8000 lbr akustik ukuran 30 x 60 cm @ -
0.0500 kg paku plywood @ 20,000.00 1,000.00
0.0600 oh pekerja @ 45,000.00 2,700.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0030 oh mandor @ 60,000.00 180.00
JUMLAH 1,000.00 8,980.00 9,980.00
I. 6.6.7 1 M2 PLAFOND AKUSTIK (60 X 120) CM
1.5000 lbr akustik arm strong 60 x 120 cm @ -
0.0500 kg paku plywood @ 20,000.00 1,000.00
0.0600 oh pekerja @ 45,000.00 2,700.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0030 oh mandor @ 60,000.00 180.00
JUMLAH 1,000.00 8,980.00 9,980.00
Hal : 452
I. 6.6.8 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM
0.3600 lbr Plywood 4mm @ 61,500.00 22,140.00
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 22,740.00 9,460.00 32,200.00
I. 6.6.9 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM
0.3600 lbr Plywood 6mm @ 92,000.00 33,120.00
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 33,720.00 9,460.00 43,180.00
I. 6.6.10 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM
0.3750 lbr Plywood 2mm @ 30,666.67 11,500.00
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 12,100.00 9,460.00 21,560.00
I. 6.6.11 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM
0.3750 lbr Plywood 6mm @ 92,000.00 34,500.00
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 35,100.00 9,460.00 44,560.00
I. 6.6.12 1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM
0.3600 lbr Teakwood 4 mm @ 113,500.00 40,860.00
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 41,460.00 9,460.00 50,920.00
Hal : 453
I. 6.6.13 1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM
0.3750 lbr Teakwood 4 mm @ 113,500.00 42,562.50
0.0300 kg paku plywood @ 20,000.00 600.00
0.0700 oh pekerja @ 45,000.00 3,150.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0035 oh mandor @ 60,000.00 210.00
JUMLAH 43,162.50 9,460.00 52,622.50
I. 6.6.14 1M2 PLAFOND LAT KAYU JATI, PAPAN
0.0240 lbr Kayu jati, papan @ 7,000,000.00 168,000.00
0.0100 Kg paku biasa @ 11,825.00 118.25
0.0500 kg paku sekrup @ 14,300.00 715.00
0.2000 oh pekerja @ 45,000.00 9,000.00
0.2000 oh tukang kayu @ 55,000.00 11,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0100 oh mandor @ 60,000.00 600.00
JUMLAH 168,833.25 24,200.00 193,033.25
I. 6.6.15 1M2 PLAFOND LAT KAYU MERANTI
0.0240 lbr Kayu meranti, papan @ 1,187,571.94 28,501.73
0.0100 Kg paku biasa @ 11,825.00 118.25
0.0500 kg paku sekrup @ 14,300.00 715.00
0.2000 oh pekerja @ 45,000.00 9,000.00
0.2000 oh tukang kayu @ 55,000.00 11,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0100 oh mandor @ 60,000.00 600.00
JUMLAH 29,334.98 24,200.00 53,534.98
I. 6.6.16 1M2 PLAFOND LAT KAYU BENGKIRAI
0.0240 lbr Kayu bengkirai, papan @ 2,137,571.94 51,301.73
0.0100 Kg paku biasa @ 11,825.00 118.25
0.0500 kg paku sekrup @ 14,300.00 715.00
0.2000 oh pekerja @ 45,000.00 9,000.00
0.2000 oh tukang kayu @ 55,000.00 11,000.00
0.0600 oh kepala tukang @ 60,000.00 3,600.00
0.0100 oh mandor @ 60,000.00 600.00
JUMLAH 52,134.98 24,200.00 76,334.98
I. 6.6.17 1M2 PLAFOND SOFTBOARD
0.3500 lbr Softboard 4' x 8' x 4 mm @ -
0.0300 Kg paku biasa @ 11,825.00 354.75
0.6000 oh pekerja @ 45,000.00 27,000.00
0.1000 oh tukang kayu @ 55,000.00 5,500.00
0.0100 oh kepala tukang @ 60,000.00 600.00
0.0030 oh mandor @ 60,000.00 180.00
JUMLAH 354.75 33,280.00 33,634.75
Hal : 454
I. 6.6.18 1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM
3.6000 M' Profil alumunium T @ -
0.1500 kg Kawat seng polos @ -
1.0000 bh Ramset / dina bold @ -
1.5000 lbr akustik arm strong 60 x 120 cm @ - -
0.1500 oh pekerja @ 45,000.00 6,750.00
0.5000 oh tukang kayu @ 55,000.00 27,500.00
0.0500 oh kepala tukang @ 60,000.00 3,000.00
0.0075 oh mandor @ 60,000.00 450.00
JUMLAH - 37,700.00 37,700.00
I. 6.6.19 1M2 PLAFOND KAYU PROFIL
1.1000 lbr List kayu profil bengkirai @ 4,250.00 4,675.00
0.0100 Kg paku biasa @ 11,825.00 118.25
0.0500 oh pekerja @ 45,000.00 2,250.00
0.0500 oh tukang kayu @ 55,000.00 2,750.00
0.0050 oh kepala tukang @ 60,000.00 300.00
0.0030 oh mandor @ 60,000.00 180.00
JUMLAH 4,793.25 5,480.00 10,273.25
I. 6.6.20 1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI
0.0120 m3 kayu meranti @ 1,037,571.94 12,450.86
0.0600 Kg paku biasa @ 11,825.00 709.50
1.1000 lbr asbes 1,00 x 1,00 m @ 21,000.00
0.1800 oh pekerja @ 45,000.00 8,100.00
0.3200 oh tukang kayu @ 55,000.00 17,600.00
0.0320 oh kepala tukang @ 60,000.00 1,920.00
0.0090 oh mandor @ 60,000.00 540.00
JUMLAH 13,160.36 28,160.00 41,320.36
I. 6.6.21 1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI
0.0230 m3 kayu meranti @ 1,037,571.94 23,864.15
0.0600 kg paku biasa @ 11,825.00 709.50
0.3900 lbr Plywood 4' x 8' x 4mm @ 61,500.00 23,985.00
0.2700 oh pekerja @ 45,000.00 12,150.00
0.4000 oh tukang kayu @ 55,000.00 22,000.00
0.0400 oh kepala tukang @ 60,000.00 2,400.00
0.0135 oh mandor @ 60,000.00 810.00
JUMLAH 48,558.65 37,360.00 85,918.65
I. 6.6.22 1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI
0.0230 m3 kayu meranti @ 1,037,571.94 23,864.15
0.0600 kg paku biasa @ 11,825.00 709.50
5.8000 bh akustik 30 x 60 cm @ - -
0.2600 oh pekerja @ 45,000.00 11,700.00
0.4000 oh tukang kayu @ 55,000.00 22,000.00
0.0400 oh kepala tukang @ 60,000.00 2,400.00
0.0130 oh mandor @ 60,000.00 780.00
JUMLAH 24,573.65 36,880.00 61,453.65
Hal : 455
I. 6.6.23 1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI
0.0270 m3 kayu meranti, balok @ 1,037,571.94 28,014.44
0.0600 kg paku @ 11,825.00 709.50
11.5000 bh akustik 30 x30 cm @ - -
0.3100 oh pekerja @ 45,000.00 13,950.00
0.4700 oh tukang kayu @ 55,000.00 25,850.00
0.0470 oh kepala tukang @ 60,000.00 2,820.00
0.0155 oh mandor @ 60,000.00 930.00
JUMLAH 28,723.94 43,550.00 72,273.94
I. 6.6.24 1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM
0.3640 lbr Gypsum board ( 120 x 240 x 9 ) mm @ 45,000.00 16,380.00
0.1100 kg paku sekrup @ 14,300.00 1,573.00
0.1000 oh pekerja @ 45,000.00 4,500.00
0.0500 oh tukang kayu @ 55,000.00 2,750.00
0.0050 oh kepala tukang @ 60,000.00 300.00
0.0050 oh mandor @ 60,000.00 300.00
JUMLAH 17,953.00 7,850.00 25,803.00
J. PEKERJAAN SANITAIR
J. 6.6.1 MEMASANG 1 BH CLOSED DUDUK / MONOBLOK
1.0000 bh closed duduk monoblok @ 1,200,000.00 1,200,000.00
6.0000 % perlengkapan (6 % harga klosed) @ 72,000.00 72,000.00
3.3000 oh pekerja @ 45,000.00 148,500.00
1.1000 oh tukang kayu @ 55,000.00 60,500.00
0.0010 oh kepala tukang @ 60,000.00 60.00
0.1600 oh mandor @ 60,000.00 9,600.00
JUMLAH 1,272,000.00 218,660.00 1,490,660.00
G. PEKERJAAN BETON
G.6.6.1 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr 724,228.17
G.6.6.2 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr 711,959.51
G.6.6.3 1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr 701,756.52
G.6.6.4 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr 84,209.69
G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) 890,375.49
G.6.6.6 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 764,265.49
G.6.6.7 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr) 798,974.46
G.6.6.8 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr) 707,504.35
G.6.6.9 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr) 824,168.79
G.6.6.10 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr) 859,109.40
G.6.6.11 1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON 886,637.14
G.6.6.12 1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR 813,325.49
G.6.6.13 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) 890,375.49
G.6.6.14 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 866,703.84
G.6.6.15 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr) 906,598.48
G.6.6.16 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr) 922,795.80
G.6.6.17 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr) 1,032,599.71
G.6.6.18 1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100 922,795.80
G.6.6.19 1M' MEMASANG PVC WATERSTOP LEBAR 150 MM 4,200.00
G.6.6.20 1M' MEMASANG PVC WATERSTOP LEBAR 200 MM 4,505.00
G.6.6.21 1M' MEMASANG PVC WATERSTOP LEBAR 230 MM 26,855.00
G.6.6.22 1M' MEMASANG PVC WATERSTOP LEBAR 250 MM 26,855.00
G.6.6.23 1M' MEMASANG PVC WATERSTOP LEBAR 300 MM 26,855.00
G.6.6.24 1M' MEMASANG PVC WATERSTOP LEBAR 320 MM 4,295.00
G.6.6.25 1 KG PEMBESIAN DG BESI POLOS 12,460.00
G.6.6.25 1 KG PEMBESIAN DG BESI ULIR 17,710.00
G.6.6.26 1 KG KABEL PRESSTRESSED POLOS/STRANDS 12,198.00
G.6.6.27 1 KG JARING KAWAT BAJA 22,010.00
G.6.6.28 1M2 PASANG BEKISTING UNTUK PONDASI 75,210.38
G. 6.6.29 1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai ) 80,398.24
G. 6.6.30 1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai ) 168,286.46
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
G. 6.6.31 1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai ) 172,299.17
G. 6.6.32 1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai ) 207,186.46
G. 6.6.33 1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai ) 179,498.60
G. 6.6.34 1 M2 PASANG BEKISTING UNTUK TANGGA 158,560.74
G. 6.6.35 1M3 MEMBUAT BETON DENGAN MUTU K 225 1,055,117.14
G. 6.6.36 1M3 MEMBUAT BETON DENGAN MUTU K 275 1,080,771.78
G. 6.6.37 1 M2 PASANG JEMBATAN COR 49,456.90
G. 6.6.38 1M3 MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING) 2,925,969.03
G. 6.6.39 1M3 MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING) 3,659,071.56
G. 6.6.40 1M3 MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING) 6,073,831.70
G. 6.6.41 1M3 MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING) 4,575,270.23
G. 6.6.42 1M3 MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING) 4,119,088.79
G. 6.6.43 1M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) 3,983,065.91
G. 6.6.44 1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING) 4,350,900.18
G. 6.6.45 1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM 54,451.90
G. 6.6.46 1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM 66,663.82
H. PEKERJAAN PENUTUP ATAP
H. 6.6.1 1M2 PASANG ATAP GENTENG PALENTONG KECIL 11,835.00
H. 6.6.2 1M2 PASANG ATAP GENTENG KODOK /GLAZZUR 50,585.00
H. 6.6.3 1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR 10,890.00
H. 6.6.4 1M2 PASANG ATAP GENTENG BUBUNG PALENTONG 45,186.14
H. 6.6.5 1M' PASANG BUBUNG GENTENG KODOK 55,186.14
H. 6.6.6 1M2 PASANG BUBUNG GENTENG PALENTONG BESAR 45,186.14
H. 6.6.7 1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM 11,416.25
H. 6.6.8 1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM 24,805.00
H. 6.6.9 1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM 27,105.00
H. 6.6.10 1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM 26,985.00
H. 6.6.11 1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM 30,435.00
H. 6.6.12 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM 21,235.00
H. 6.6.13 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM 22,845.00
H. 6.6.14 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM 22,865.00
H. 6.6.15 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM 24,475.00
H. 6.6.16 1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM 31,145.00
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
H. 6.6.17 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM 21,255.00
H. 6.6.18 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM 21,485.00
H. 6.6.19 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM 23,325.00
H. 6.6.20 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM 24,015.00
H. 6.6.21 1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM 25,855.00
H. 6.6.22 1M' PASANG BUBUNG STEL GELOMBANG 0,92 M 97,475.00
H. 6.6.23 1M' PASANG NOK STEL GELOMBANG 1,05 M 97,475.00
H. 6.6.24 1M' PASANG NOK STEL GELOMBANG 1,08 M 97,475.00
H. 6.6.25 1M' PASANG NOK paten 0,92 m 97,475.00
H. 6.6.26 1M' PASANG NOK PATEN 1,05 M 97,475.00
H. 6.6.27 1M' PASANG NOK PATEN 1,08 M 97,475.00
H. 6.6.28 1M' PASANG NOK STEL RATA 0,92 M 99,570.00
H. 6.6.29 1M' PASANG NOK STEL RATA 1,05 M 99,570.00
H. 6.6.30 1M2 PASANG ATAP GENTENG BETON 54,554.75
H. 6.6.31 1M2 PASANG ATAP GENTENG ASPAL 76,584.75
H. 6.6.32 1M2 PASANG ATAP GENTENG METAL 77,460.00
H. 6.6.33 1M' PASANG ATAP SIRAP 55,565.00
H. 6.6.34 1M' PASANG NOK GENTENG BETON 68,574.14
H. 6.6.35 1M' PASANG NOK GENTENG ASPAL 30,581.50
H. 6.6.36 1M' PASANG NOK GENTENG METAL 21,771.25
H. 6.6.37 1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm 41,558.29
H. 6.6.38 1 M2 MEMASANG ATAP SENG 30,706.00
H. 6.6.39 1 M2 MEMASANG BUBUNGAN ATAP SENG 61,395.00
H. 6.6.40 1 M2 PASANG ATAP ALUMUNIUM 49,340.00
H. 6.6.41 1 M2 PASANG NOK ALUMUNIUM 61,700.00
H. 6.6.42 1 M2 PASANG ALUMUNIUM FOIL /SISALATION 482,780.00
I. PEKERJAAN PLAFOND
I. 6.6.1 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM 38,250.00
I. 6.6.2 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM 29,010.00
I. 6.6.3 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM 30,110.00
I. 6.6.4 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM 29,010.00
I. 6.6.5 1 M2 PLAFOND AKUSTIK (30 X 30) CM 17,680.00
I. 6.6.6 1 M2 PLAFOND AKUSTIK (30 X 60) CM 9,980.00
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
I. 6.6.7 1 M2 PLAFOND AKUSTIK (60 X 120) CM 9,980.00
I. 6.6.8 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM 32,200.00
I. 6.6.9 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM 43,180.00
I. 6.6.10 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM 21,560.00
I. 6.6.11 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM 44,560.00
I. 6.6.12 1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM 50,920.00
I. 6.6.13 1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM 52,622.50
I. 6.6.14 1M2 PLAFOND LAT KAYU JATI 193,033.25
I. 6.6.15 1M2 PLAFOND LAT KAYU MERANTI 53,534.98
I. 6.6.16 1M2 PLAFOND LAT KAYU BENGKIRAI 76,334.98
I. 6.6.17 1M2 PLAFOND SOFTBOARD 33,634.75
I. 6.6.18 1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM 37,700.00
I. 6.6.19 1M2 PLAFOND KAYU PROFIL 10,273.25
I. 6.6.20 1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI 41,320.36
I. 6.6.21 1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI 85,918.65
I. 6.6.22 1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI 61,453.65
I. 6.6.23 1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI 72,273.94
I. 6.6.24 1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM 25,803.00
J. PEKERJAAN SANITAIR
J. 6.6.1 MEMASANG 1 BH CLOSED DUDUK / MONOBLOK 1,490,660.00
J. 6.6.2 MEMASANG 1 BH CLOSED JONGKOK KERAMIK 354,755.67
J. 6.6.3 MEMASANG 1 BH CLOSED JONGKOK TERASO 243,605.67
J. 6.6.4 MEMASANG 1 BH URINOIR 2,069,655.67
J. 6.6.5 MEMASANG 1 BH WASTAFEL 1,254,405.67
J. 6.6.6 MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3 339,205.67
J. 6.6.7 MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3 883,300.00
J. 6.6.8 MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 ) 1,558,890.11
J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN 64,125.00
J. 6.6.10 MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR 11,999,091.72
J. 6.6.11 MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR 1,588,500.00
J. 6.6.12 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM 10,704.41
J. 6.6.13 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM 13,496.08
J. 6.6.14 MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM 33,141.41
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
J. 6.6.15 MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM 67,984.21
J. 6.6.16 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 C 315,358.16
J. 6.6.17 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 C 259,898.59
J. 6.6.18 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 398,943.14
J. 6.6.19 MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2" 110,415.00
J. 6.6.20 MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4" 160,852.50
J. 6.6.21 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 " 211,290.00
J. 6.6.22 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 " 318,789.00
J. 6.6.23 MEMASANG 1M' PIPA GALVANIS DIAMETER 3" 1,267,014.00
J. 6.6.24 MEMASANG 1M' PIPA GALVANIS DIAMETER 4 " 1,499,708.00
J. 6.6.25 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 " 47,419.25
J. 6.6.26 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4" 55,825.50
J. 6.6.27 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 " 89,450.50
J. 6.6.28 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 " 131,481.75
J. 6.6.29 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2" 173,513.00
J. 6.6.30 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2" 215,544.25
J. 6.6.31 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3" 264,313.50
J. 6.6.32 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4" 297,938.50
J. 6.6.33 MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL 249,740.00
J. 6.6.34 MEMASANG 1 BH BAK CUCI PIRING TERASO 247,578.35
J. 6.6.35 MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2" 26,937.50
J. 6.6.36 MEMASANG 1BH FLOOR DRAIN 24,350.00
K. PEKERJAAN BESI
K. 6.6.1 1 KG PASANG RANGKA ATAP BAJA 5,408.00
K. 6.6.2 1 M2 PASANG PINTU BESI BAJA 3,408.00
K. 6.6.3 1 M2 PASANG JENDELA BESI 111,615.00
K. 6.6.4 1 M2 PASANG JENDELA BESI TAHAN API 119,550.00
K. 6.6.5 1 M2 PASANG PINTU GULUNG BESI 127,560.00
K. 6.6.6 1 M2 PASANG PINTU LIPAT 3,408.00
K. 6.6.7 1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM 52,640.00
K. 6.6.8 1 M2 PASANG ROLLING DOOR 136,362.00
K. 6.6.9 1 M2 PASANG PINTU ALLUMUNIUM 111,612.00
K. 6.6.10 1 M2 PASANG VENETIONS BLINDS 37,205.00
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
K. 6.6.11 1 M2 PASANG VERTIKALS BLINDS 37,205.00
K. 6.6.12 1 M2 PASANG TERALI BESI 327,756.00
K. 6.6.13 1 M2 PASANG KAWAT HARMONIKA 54,254.13
K. 6.6.14 1 M2 PASANG KAWAT NYAMUK 24,004.13
K. 6.6.15 1 M2 PASANG KAWAT KASSA 25,714.13
K. 6.6.16 1 M2 PASANG KAWAT BURUNG 31,214.13
K. 6.6.17 1 M2 PASANG JENDELA NAKO & TRALIS 186,946.50
K. 6.6.18 1 M' PASANG TALANG DATAR, SENG BLJS 28 70,933.07
K. 6.6.19 1 M' PASANG TALANG MIRING, SENG BLJS 28 83,566.24
K. 6.6.20 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28 75,771.37
K. 6.6.21 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24 81,466.24
L. PEKERJAAN KUNCI DAN KACA
L. 6.6.1 1 BUAH PASANG KUNCI TANAM ANTIK 164,480.00
L. 6.6.2 1 BUAH PASANG KUNCI TANAM BIASA 154,100.00
L. 6.6.3 1 BUAH PASANG KUNCI KAMAR MANDI 93,175.00
L. 6.6.4 1 BUAH PASANG KUNCI SILINDER 28,040.00
L. 6.6.5 1 BUAH PASANG ENGSEL PINTU 34,870.00
L. 6.6.6 1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU 26,580.00
L. 6.6.7 1 BUAH PASANG ENGSEL ANGIN 13,700.00
L. 6.6.8 1 BUAH PASANG SPRING KNIP 9,870.00
L. 6.6.9 1 BUAH PASANG KAIT ANGIN 17,870.00
L. 6.6.10 1 BUAH PASANG DOOR CLOSER 32,900.00
L. 6.6.11 1 BUAH PASANG KUNCI SELOT 13,160.00
L. 6.6.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER 32,900.00
L. 6.6.13 1 BUAH PASANG DOOR STOP 6,580.00
L. 6.6.14 1 BUAH PASANG REL PINTU DORONG 39,480.00
L. 6.6.15 1 BUAH PASANG KUNCI LEMARI 41,450.00
L. 6.6.16 1 M2 PASANG KACA, TEBAL 3 MM 62,670.00
L. 6.6.17 1 M2 PASANG KACA, TEBAL 5 MM 97,870.00
L. 6.6.18 1 M2 PASANG KACA, TEBAL 8 MM 151,652.50
L. 6.6.19 1 M2 PASANG KACA GELAP, TEBAL 5 MM 120,950.00
L. 6.6.20 1 M2 PASANG KACA CERMIN, TEBAL 5 MM 114,370.00
L. 6.6.21 1 M2 PASANG KACA CERMIN, TEBAL 6 MM 135,270.00
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
L. 6.6.22 1 M2 PASANG KACA CERMIN, TEBAL 8 MM 162,855.50
L. 6.6.23 1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM 9,870.00
L. 6.6.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM 284,870.00
M. PEKERJAAN PENUTUP LANTAI & DINDING
M.6.6.1 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM 82,613.69
M.6.6.2 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM 75,070.69
M.6.6.3 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM 65,053.15
M.6.6.4 1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM 83,017.64
M.6.6.5 1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM 70,689.64
M.6.6.6 1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM 79,603.64
M.6.6.7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 x 40 CM 96,193.69
M.6.6.8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 x 30 CM 107,754.69
M.6.6.9 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM 139,143.69
M.6.6.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM 143,300.69
M.6.6.11 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 40 X 40 CM 34,333.69
M.6.6.12 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM 35,085.69
M.6.6.13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM 39,193.92
M.6.6.14 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM 60,933.69
M.6.6.15 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM 71,579.18
M.6.6.16 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM 15,849.87
M.6.6.17 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM 10,864.61
M.6.6.18 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM 11,746.57
M.6.6.19 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM 11,194.70
M.6.6.20 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM 10,547.60
M.6.6.21 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM 13,166.97
M.6.6.22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM 15,734.30
M.6.6.23 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM 16,285.70
M.6.6.24 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM 18,028.20
M.6.6.25 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM 58,627.61
M.6.6.26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM 48,637.61
M.6.6.27 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM 48,637.61
M.6.6.28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM 48,637.61
M.6.6.29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM 48,637.61
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
M.6.6.30 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM 48,637.61
M.6.6.31 1 M2 PASANG TERASO COR DITEMPAT 46,260.00
M.6.6.32 1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM 46,260.00
M.6.6.33 1 M2 PASANG UBIN TAHAN ASAM 32,092.68
M.6.6.34 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM 133,718.62
M.6.6.35 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM 149,518.62
M.6.6.36 1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM 133,718.62
M.6.6.37 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM 18,187.61
M.6.6.38 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM 15,969.61
M.6.6.39 1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM 14,218.05
M.6.6.40 1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM 76,320.01
M.6.6.41 1 M' PASANG PLINT VINYL TANPA ADUKAN 8,720.00
M.6.6.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 108,649.82
M.6.6.43 1 M2 PASANG LANTAI KERAMIK 15 X 15 CM 111,118.62
M.6.6.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 117,718.62
M.6.6.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 117,718.62
M.6.6.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 117,718.62
M.6.6.47 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM 110,718.62
M.6.6.48 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP 114,718.62
M.6.6.49 1 M2 PASANG LANTAI KERAMIK 10 x 33 CM 110,718.62
M.6.6.50 1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL 76,152.11
M.6.6.51 1 M2 PASANG LANTAI MARMER 76,152.11
M.6.6.52 1 M2 PASANG LANTAI KARPET 100 % WOOL 18,530.00
M.6.6.53 1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON 18,530.00
M.6.6.54 1 M2 PASANG UNDRLYER, TEBAL 6 MM 13,080.00
M.6.6.55 1 M2 PASANG LANTAI KARPET 18,530.00
M.6.6.56 1 M2 PASANG LANTAI PARQUET JATI 18,530.00
M.6.6.57 1 M2 PASANG GYMFLOOR 52,550.00
M.6.6.58 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH 171,948.00
M.6.6.59 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA 220,340.21
M.6.6.60 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH 174,640.21
M.6.6.61 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA 197,140.21
M.6.6.62 1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA 196,140.21
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
M.6.6.63 1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA 186,570.07
M.6.6.64 1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM 171,140.21
M.6.6.65 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM 121,140.21
M.6.6.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM 106,140.21
M.6.6.67 1 M2 PASANG DINDING KERAMIK 15 x 15 CM 109,390.21
M.6.6.68 1 M2 PASANG DINDING KERAMIK 20 x 20 CM 115,140.21
M.6.6.69 1 M2 PASANG DINDING KERAMIK 10 x 20 CM 86,315.21
M.6.6.70 1 M2 PASANG DINDING MARMER 143,487.58
M.6.6.71 1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM 111,487.58
M.6.6.72 1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM 112,287.58
M.6.6.73 1 M2 PASANG DINDING BATU PAROS 69,889.85
M.6.6.74 1 M2 PASANG DINDING BATU TEMPEL HITAM 69,889.85
M.6.6.75 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I 16,350.00
M.6.6.76 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II 16,350.00
M.6.6.77 1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM 16,350.00
M.6.6.78 1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM 16,350.00
M.6.6.79 1 M2 PASANG WALL COVERING LEBAR 50 CM 44,630.00
M.6.6.80 1 M2 FLOOR HARDENER FERROVAX 13,080.00
M.6.6.81 1 M2 FLOOR HARDENER MASTERCRON 13,080.00
M.6.6.82 1 M2 PLINT KAYU 2 X 10 CM 30,595.00
N. PEKERJAAN CAT - CATAN
N. 6.6.1 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA 11,475.00
N. 6.6.2 1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT 12,000.00
N. 6.6.3 1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL 12,000.00
N. 6.6.4 1 M2 MENYABUN PERMUKAAN TEMBOK LAMA 12,000.00
N. 6.6.5 1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR 726,407.11
N. 6.6.6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU 5,791.25
N. 6.6.7 1 M2 PENGECATAN BIDANG KAYU LAMA 21,025.00
N. 6.6.8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR, 22,380.00
N. 6.6.9 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ) 31,365.00
N. 6.6.10 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL 10,995.00
N. 6.6.11 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 13,847.00
N. 6.6.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER 6,610.00
Hal : 515
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
N. 6.6.13 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS 20,185.00
N. 6.6.14 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir, 13,397.00
N. 6.6.15 1 M2 PENGECATAN TEMBOK LAMA 9,444.00
N. 6.6.16 1 M2 MELABUR TEMBOK DENGAN KALKARIUM 3,972.00
N. 6.6.17 1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH 10,911.14
N. 6.6.18 1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN ) 7,330.14
N. 6.6.19 1 M2 PEMASANGAN WALL PAPER 50,170.00
N. 6.6.20 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 16,275.00
N. 6.6.21 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH 30,075.14
N. 6.6.22 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 4,475.14
N. 6.6.23 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 4,650.00
N. 6.6.24 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 96,500.00
N. 6.6.25 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT 80,500.00
Hal : 515
724,228.17 1
711,959.51 1
701,756.52 1
84,209.69 1
890,375.49 1
764,265.49 1
798,974.46 1
707,504.35 1
824,168.79 1
859,109.40 1
886,637.14 1
813,325.49 1
890,375.49 1
866,703.84 1
906,598.48 1
922,795.80 1
1,032,599.71 1
922,795.80 1
4,200.00 1
4,505.00 1
26,855.00 1
26,855.00 1
26,855.00 1
4,295.00 1
12,460.00 1
17,710.00 1
12,198.00 1
22,010.00 1
75,210.38 1
80,398.24 1
168,286.46 1
1
Hal : 515
1
0
172,299.17 1
207,186.46 1
179,498.60 1
158,560.74 1
1,055,117.14 1
1,080,771.78 1
49,456.90 1
2,925,969.03 1
3,659,071.56 1
6,073,831.70 1
4,575,270.23 1
4,119,088.79 1
3,983,065.91 1
4,350,900.18 1
54,451.90 1
66,663.82 1
1
11,835.00 1
50,585.00 1
10,890.00 1
45,186.14 1
55,186.14 1
45,186.14 1
11,416.25 1
24,805.00 1
27,105.00 1
26,985.00 1
30,435.00 1
21,235.00 1
22,845.00 1
22,865.00 1
24,475.00 1
31,145.00 1
1
Hal : 515
1
0
21,255.00 1
21,485.00 1
23,325.00 1
24,015.00 1
25,855.00 1
97,475.00 1
97,475.00 1
97,475.00 1
97,475.00 1
97,475.00 1
97,475.00 1
99,570.00 1
99,570.00 1
54,554.75 1
76,584.75 1
77,460.00 1
55,565.00 1
68,574.14 1
30,581.50 1
21,771.25 1
41,558.29 1
30,706.00 1
61,395.00 1
49,340.00 1
61,700.00 1
482,780.00 1
1
38,250.00 1
29,010.00 1
30,110.00 1
29,010.00 1
17,680.00 1
9,980.00 1
1
Hal : 515
1
0
9,980.00 1
32,200.00 1
43,180.00 1
21,560.00 1
44,560.00 1
50,920.00 1
52,622.50 1
193,033.25 1
53,534.98 1
76,334.98 1
33,634.75 1
37,700.00 1
10,273.25 1
41,320.36 1
85,918.65 1
61,453.65 1
72,273.94 1
25,803.00 1
1
1,490,660.00 1
354,755.67 1
243,605.67 1
2,069,655.67 1
1,254,405.67 1
339,205.67 1
883,300.00 1
1,558,890.11 1
64,125.00 1
11,999,091.72 1
1,588,500.00 1
10,704.41 1
13,496.08 1
33,141.41 1
1
Hal : 515
1
0
67,984.21 1
315,358.16 1
259,898.59 1
398,943.14 1
110,415.00 1
160,852.50 1
211,290.00 1
318,789.00 1
1,267,014.00 1
1,499,708.00 1
47,419.25 1
55,825.50 1
89,450.50 1
131,481.75 1
173,513.00 1
215,544.25 1
264,313.50 1
297,938.50 1
249,740.00 1
247,578.35 1
26,937.50 1
24,350.00 1
1
5,408.00 1
3,408.00 1
111,615.00 1
119,550.00 1
127,560.00 1
3,408.00 1
52,640.00 1
136,362.00 1
111,612.00 1
37,205.00 1
1
Hal : 515
1
0
37,205.00 1
327,756.00 1
54,254.13 1
24,004.13 1
25,714.13 1
31,214.13 1
186,946.50 1
70,933.07 1
83,566.24 1
75,771.37 1
81,466.24 1
1
164,480.00 1
154,100.00 1
93,175.00 1
28,040.00 1
34,870.00 1
26,580.00 1
13,700.00 1
9,870.00 1
17,870.00 1
32,900.00 1
13,160.00 1
32,900.00 1
6,580.00 1
39,480.00 1
41,450.00 1
62,670.00 1
97,870.00 1
151,652.50 1
120,950.00 1
114,370.00 1
135,270.00 1
1
Hal : 515
1
0
162,855.50 1
9,870.00 1
284,870.00 1
1
82,613.69 1
75,070.69 1
65,053.15 1
83,017.64 1
70,689.64 1
79,603.64 1
96,193.69 1
107,754.69 1
139,143.69 1
143,300.69 1
34,333.69 1
35,085.69 1
39,193.92 1
60,933.69 1
71,579.18 1
15,849.87 1
10,864.61 1
11,746.57 1
11,194.70 1
10,547.60 1
13,166.97 1
15,734.30 1
16,285.70 1
18,028.20 1
58,627.61 1
48,637.61 1
48,637.61 1
48,637.61 1
48,637.61 1
1
Hal : 515
1
0
48,637.61 1
46,260.00 1
46,260.00 1
32,092.68 1
133,718.62 1
149,518.62 1
133,718.62 1
18,187.61 1
15,969.61 1
14,218.05 1
76,320.01 1
8,720.00 1
108,649.82 1
111,118.62 1
117,718.62 1
117,718.62 1
117,718.62 1
110,718.62 1
114,718.62 1
110,718.62 1
76,152.11 1
76,152.11 1
18,530.00 1
18,530.00 1
13,080.00 1
18,530.00 1
18,530.00 1
52,550.00 1
171,948.00 1
220,340.21 1
174,640.21 1
197,140.21 1
196,140.21 1
1
Hal : 515
1
0
186,570.07 1
171,140.21 1
121,140.21 1
106,140.21 1
109,390.21 1
115,140.21 1
86,315.21 1
143,487.58 1
111,487.58 1
112,287.58 1
69,889.85 1
69,889.85 1
16,350.00 1
16,350.00 1
16,350.00 1
16,350.00 1
44,630.00 1
13,080.00 1
13,080.00 1
30,595.00 1
1
11,475.00 1
12,000.00 1
12,000.00 1
12,000.00 1
726,407.11 1
5,791.25 1
21,025.00 1
22,380.00 1
31,365.00 1
10,995.00 1
13,847.00 1
6,610.00 1
1
Hal : 515
1
0
20,185.00 1
13,397.00 1
9,444.00 1
3,972.00 1
10,911.14 1
7,330.14 1
50,170.00 1
16,275.00 1
30,075.14 1
4,475.14 1
4,650.00 1
96,500.00 1
80,500.00 1
1
Hal : 515
REKAPITULASI ANALISA SNI
A. PEKERJAAN PERSIAPAN
A. 6.6.3 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M 321,230.34
B. PEKERJAAN TANAH
Hal : 505
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
B. 6.6.12 1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL 133,602.12
C. PEKERJAAN PONDASI
D. PEKERJAAN DINDING
Hal : 505
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
E. PEKERJAAN PLESTERAN
Hal : 505
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
E. 6.6.7 1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM 27,216.41
Hal : 505
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
F. PEKERJAAN KAYU
F.6.6.4 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH 2,643,086.33
F.6.6.21 1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI 407,554.75
F.6.6.22 1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 312,251.16
F.6.6.23 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI 402,804.75
F.6.6.24 1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 311,751.16
Hal : 505
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
F.6.6.30 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI 2,344,789.13
F.6.6.31 1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI 35,924.61
F.6.6.32 1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN 31,413.36
F.6.6.33 1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI 82,673.75
F.6.6.34 1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI 39,799.76
F.6.6.35 1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI 39,799.76
F.6.6.36 1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI 335,144.37
F.6.6.37 1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN 269,529.37
F.6.6.47 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI 68,291.25
F.6.6.48 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI 33,281.77
F.6.6.49 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI 96,261.25
F.6.6.50 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI 60,844.54
F.6.6.51 1M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI 58,204.29
F.6.6.52 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI 32,692.62
F. 6.6.53. 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN 29,252.62
F. 6.6.56 1M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI 92,628.16
F. 6.6.57 1M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER 166,948.16
Hal : 505
99,388.44 1
144,638.44 1
321,230.34 1
30,850.37 1
1,859,515.91 1
487,082.97 1
507,647.35 1
22,700.00 1
547,381.24 1
79,888.59 1
29,335.00 1
205,550.00 1
319,995.00 1
319,995.00 1
20,835.00 1
2,030,554.75 1
20,400.00 1
26,790.00 1
37,455.00 1
31,845.00 1
63,750.00 1
42,015.00 1
2,550.00 1
26,220.00 1
9,780.00 1
25,500.00 1
232,963.62 1
279,080.43 1
Hal : 505
1
133,602.12 1
67,685.00 1
7,650.00 1
264,230.43 1
131,921.30 1
760,107.78 1
680,808.85 1
760,107.78 1
639,383.74 1
614,578.59 1
597,348.20 1
585,250.83 1
562,890.83 1
481,899.60 1
430,598.52 1
615,706.46 1
520,605.71 1
511,062.29 1
378,580.54 1
1,460,569.29 1
824,370.24 1
768,177.43 1
601,502.76 1
179,040.25 1
166,625.36 1
160,297.60 1
155,292.73 1
153,797.84 1
Hal : 505
1
153,797.84 1
141,141.25 1
85,295.88 1
80,180.55 1
76,740.88 1
75,021.38 1
73,955.32 1
73,783.98 1
72,468.35 1
70,823.35 1
59,011.01 1
61,480.28 1
145,959.22 1
125,040.55 1
93,538.31 1
171,195.87 1
125,026.32 1
101,980.22 1
102,496.42 1
118,542.85 1
231,042.21 1
29,200.62 1
137,428.16 1
33,105.57 1
30,319.84 1
29,064.57 1
28,213.34 1
27,955.67 1
27,654.84 1
Hal : 505
1
27,216.41 1
26,962.97 1
23,856.34 1
26,096.77 1
21,048.84 1
22,534.53 1
42,220.84 1
39,976.74 1
38,652.68 1
37,457.28 1
37,053.41 1
28,744.95 1
43,054.37 1
45,319.85 1
44,116.35 1
43,041.51 1
55,323.85 1
52,452.11 1
50,818.62 1
48,823.92 1
22,821.11 1
22,116.24 1
26,640.21 1
25,471.11 1
7,984.13 1
154,000.40 1
120,904.00 1
25,958.27 1
13,133.27 1
32,877.40 1
Hal : 505
1
7,008,000.00 1
3,723,086.33 1
3,243,086.33 1
2,643,086.33 1
158,423.84 1
144,120.09 1
480,500.00 1
286,002.88 1
405,400.00 1
235,215.02 1
221,215.02 1
694,000.00 1
382,804.60 1
352,704.75 1
257,401.16 1
567,773.75 1
276,028.07 1
249,618.91 1
407,897.50 1
309,401.16 1
407,554.75 1
312,251.16 1
402,804.75 1
311,751.16 1
492,054.75 1
396,751.16 1
6,703,460.00 1
3,334,789.13 1
2,896,329.13 1
Hal : 505
1
2,344,789.13 1
35,924.61 1
31,413.36 1
82,673.75 1
39,799.76 1
39,799.76 1
335,144.37 1
269,529.37 1
87,682.50 1
50,933.36 1
46,325.86 1
144,673.75 1
74,237.90 1
53,537.90 1
170,715.00 1
88,029.44 1
63,729.44 1
68,291.25 1
33,281.77 1
96,261.25 1
60,844.54 1
58,204.29 1
32,692.62 1
29,252.62 1
92,628.16 1
82,028.16 1
92,628.16 1
166,948.16 1
176,927.50 1
30,969.25 1
7,882.50 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hal : 505
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hal : 505
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hal : 505
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hal : 505
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hal : 505
Hal : 505