You are on page 1of 4

9/19/2016

Project Na. : ACI


Calculation Sheet
of Project No. : BITUMEN PLANT

Foundation Client : MKS Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name ACI
Structure Name Solvent Tank Rev1

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Bi-Axial)
Ft.Name # L/C Fs Allowable Result
11 N/A 1.5 OK
12 33.567 1.5 OK
13 33.567 1.5 OK
21 N/A 1.5 OK
22 47.231 1.5 OK
F1 23 47.231 1.5 OK
24 5.792 1.5 OK
25 5.792 1.5 OK
31 N/A 1.5 OK
32 47.231 1.5 OK
33 47.231 1.5 OK

1.2 Check of Overturning Moment


Ft.Name # L/C X - OVM Y - OVM Allowable Result
11 N/A N/A 3 OK / OK
12 54.44 N/A 3 OK / OK
13 N/A 54.44 3 OK / OK
21 N/A N/A 3 OK / OK
22 76.6 N/A 3 OK / OK
F1 23 N/A 76.6 3 OK / OK
24 9.36 N/A 3 OK / OK
25 N/A 9.36 3 OK / OK
31 N/A N/A 3 OK / OK
32 76.6 N/A 3 OK / OK
33 N/A 76.6 3 OK / OK

1.3 Check of Bearing Pressure (Bi-Axial)


2
Ft.Name # L/C Qu(tonf/m ) Allowable Result
11 4.63 7.5 OK
12 4.95 10 OK
13 4.95 10 OK
F1
21 6.51 7.5 OK
22 6.83 10 OK
23 6.83 10 OK

Copyright (c) GS E&C. All Rights Reserved


9/19/2016
Project Na. : ACI
Calculation Sheet
of Project No. : BITUMEN PLANT

Foundation Client : MKS Page 2

24 9.15 10 OK
25 9.15 10 OK
31 6.51 9 OK
32 6.83 9 OK
33 6.83 9 OK

2. DESIGN OF FOOTING
2.1 Check of Reinforcement
(Unit : cm 2)
Ft.Name Sec.Nam # L/C Req.As top / bottom Used.As top / bottom Result
101 3.00 / 3.00 6.33 / 6.33 OK / OK
102 3.00 / 3.00 6.33 / 6.33 OK / OK
103 3.00 / 3.00 6.33 / 6.33 OK / OK
111 3.00 / 3.00 6.33 / 6.33 OK / OK
112 3.00 / 3.00 6.33 / 6.33 OK / OK
113 3.00 / 3.00 6.33 / 6.33 OK / OK
114 3.00 / 3.00 6.33 / 6.33 OK / OK
S1 (X)
115 3.00 / 3.00 6.33 / 6.33 OK / OK
116 3.00 / 3.00 6.33 / 6.33 OK / OK
117 3.00 / 3.00 6.33 / 6.33 OK / OK
118 3.00 / 3.00 6.33 / 6.33 OK / OK
119 3.00 / 3.00 6.33 / 6.33 OK / OK
121 3.00 / 3.00 6.33 / 6.33 OK / OK
122 3.00 / 3.00 6.33 / 6.33 OK / OK
F1
101 3.00 / 3.00 6.33 / 6.33 OK / OK
102 3.00 / 3.00 6.33 / 6.33 OK / OK
103 3.00 / 3.00 6.33 / 6.33 OK / OK
111 3.00 / 3.00 6.33 / 6.33 OK / OK
112 3.00 / 3.00 6.33 / 6.33 OK / OK
113 3.00 / 3.00 6.33 / 6.33 OK / OK
114 3.00 / 3.00 6.33 / 6.33 OK / OK
S1 (Y)
115 3.00 / 3.00 6.33 / 6.33 OK / OK
116 3.00 / 3.00 6.33 / 6.33 OK / OK
117 3.00 / 3.00 6.33 / 6.33 OK / OK
118 3.00 / 3.00 6.33 / 6.33 OK / OK
119 3.00 / 3.00 6.33 / 6.33 OK / OK
121 3.00 / 3.00 6.33 / 6.33 OK / OK
122 3.00 / 3.00 6.33 / 6.33 OK / OK

Copyright (c) GS E&C. All Rights Reserved


9/19/2016
Project Na. : ACI
Calculation Sheet
of Project No. : BITUMEN PLANT

Foundation Client : MKS Page 3

2.2 Check of One Way Shear (Unit : tonf)


Ft.Name Sec.Nam # L/C fVc Vu Result
101 16.11 0.00 OK
102 16.11 0.00 OK
103 16.11 0.00 OK
111 16.11 0.00 OK
112 16.11 0.00 OK
113 16.11 0.00 OK
114 16.11 0.00 OK
S1 (X)
115 16.11 0.00 OK
116 16.11 0.00 OK
117 16.11 0.00 OK
118 16.11 0.00 OK
119 16.11 0.00 OK
121 16.11 0.00 OK
122 16.11 0.00 OK
F1
101 15.16 0.00 OK
102 15.16 0.00 OK
103 15.16 0.00 OK
111 15.16 0.00 OK
112 15.16 0.00 OK
113 15.16 0.00 OK
114 15.16 0.00 OK
S1 (Y)
115 15.16 0.00 OK
116 15.16 0.00 OK
117 15.16 0.00 OK
118 15.16 0.00 OK
119 15.16 0.00 OK
121 15.16 0.00 OK
122 15.16 0.00 OK

2.3 Check of Two Way Shear (Unit : tonf)


Ft.Name # L/C Ct. Pr.Name fVc Vu Result
101 1 0.000 0.000 OK
102 1 0.000 0.000 OK
103 1 0.000 0.000 OK
111 1 0.000 0.001 OK
F1
112 1 0.000 0.000 OK
113 1 0.000 0.000 OK
114 1 0.000 0.000 OK
115 1 0.000 0.000 OK

Copyright (c) GS E&C. All Rights Reserved


9/19/2016
Project Na. : ACI
Calculation Sheet
of Project No. : BITUMEN PLANT

Foundation Client : MKS Page 4

116 1 0.000 0.000 OK


117 1 0.000 0.000 OK
118 1 0.000 0.000 OK
119 1 0.000 0.000 OK
121 1 0.000 0.001 OK
122 1 0.000 0.001 OK

Copyright (c) GS E&C. All Rights Reserved