Vivekananda College of Engineering & Technology PRJ02

[Sponsored by Vivekananda Vidyavardhaka Sangha, Puttur ®] Rev 2.0


Affiliated to Visvesvaraya Technological University ME
Approved by AICTE New Delhi & Govt of Karnataka 02/11/17
STUDENT PROJECTS
-
PROJECT PLAN
Department: Semester: Academic Year: 2017 – 18
A. Proposed Title of the Project:

B. Name(s) of guide(s): Prof. / Dr. / Mr. / Ms.

C. Name of Team Members (Strictly not more than four students in a batch):
USN Name
Mr. / Ms. Team Leader
Mr. / Ms. Team Member
Mr. / Ms. Team Member
Mr. / Ms. Team Member
D. Date of commencement of project: 30th October 2017
E. Probable date of completion of the project: 18th Feb 2018
F. If this project is an improvement / extension of an earlier project, please give the title of earlier
project and the year in which it was carried out. Specify the improvements / modifications clearly:

G. Objectives of the project highlighting its importance (not more than half a page):

H. Methodology (Not more than a page):

I. Expected Outcome of the project:

J. Application of the project:

K. Does the project proposed is relevant to any of the Industry or


Institution in and around your area (Yes / No):
L. If Yes, Please provide details of the Industry / institution and
contact details:
M. Budget:
Materials Cost: Source of Funds:
Labour Charges:
Any other cost: Self / Industry / Others
N. Expected Completion Time:

Prepared by: Checked by: HOD


Nehru Nagar, Puttur - 574 203, DK, Karnataka State – INDIA.
Phone :+91-8251-235955, 234555 Fax : 236444, Web: www.vcetputtur.ac.in, E-Mail: principal@vcetputtur.ac.in Page: 1
Vivekananda College of Engineering & Technology PRJ02
[Sponsored by Vivekananda Vidyavardhaka Sangha, Puttur ®] Rev 2.0
Affiliated to Visvesvaraya Technological University ME
Approved by AICTE New Delhi & Govt of Karnataka 02/11/17
STUDENT PROJECTS
Expected Time for Major Activities Schedule
Synopsis (Project Plan) submission to the Department 04/11/17
Presentation of synopsis 07/11/2017 to
15/11/2017
Last date for re-submission (if applicable) & review 25/11/2017
Submission of Progress Reports 1 & 2: Introduction & Requirements 25/11/2017
Specification and Analysis
Presentation 1: Introduction & Requirements Specification and 1st
Week of January
Analysis. 2017
Submission of Progress Reports 3 & 4: System Design & System 1st Week of March 2018
Implementation.
Presentation 2: System Design & System Implementation. 2nd Week of March 2018
Submission of Progress Reports 5 & 6: System Testing and 30/03/2018
Experimental Results & Conclusions and Scope for Future
Enhancement.
Submission of Complete Project Report with CD & Journal Paper 15/04/2018
Internal Viva and/or Project Exhibition 3rd / 4th Week of April
2018
O. Authors:
Student(s) / Author(s) Signature with date
1.
2.
3.
4.

Checked By: Signature with date:

P. Guidance:
Guide (s) allotted: Signature (s) with date
1. Guide: Prof. / Dr. / Mr. / Ms.
2. Co-Guide (if any): Prof. / Dr. / Mr. / Ms.

Prepared by: Checked by: HOD