HDPE PIPELINE INSTALLATION SEQUENCES

1. Storing the pipeline sections

2. Concrete weights are fixed to the pipeline


3. Two pipe sections are flanged together

4. Sinking process
5. The submerging process has started

6. Shortly before the end of the pipeline is leaving the surface