You are on page 1of 117

DAFTAR HARGA SATUAN BAHAN DAN UPAH

TAHUN 2013
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN

1 2 3
FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
30 Atap metal Toratora 1 x 4 Extra m2
31 Atap metal Toratora 1 x 4 Premium m2
32 Atap metal Toratora 2 x 4 Extra m2
33 Atap metal Toratora 2 x 4 Premium m2
34 Atap metal Toratora 3 x 4 Extra m2
35 Atap metal Toratora 3 x 4 Premium m2
36 Atap metal Toratora 4 x 4 Extra m2

Harga Barang dan Upah Hal. 1


NO NAMA BARANG SATUAN

1 2 3
37 Atap metal Toratora 4 x 4 Premium m2
38 Bentala paras bh
39 Bentala tanah liat bh
40 Besi profil WF kg
41 Besi strip kg
42 Bubungan Biasa bj
43 Bubungan Karang Pilang (glazur) isi 3,5/m bj
44 Bubungan Karang Pilang isi 3,5/m bj
45 Bubungan Ngalayur isi 3,5/m bj
46 Bubungan Plentong bj
47 Bubungan Utama isi 3,5/m bj
48 Genteng Kanmuri (glazur) isi 14/m2 bj
49 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
50 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
51 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
52 Genteng Morando Abadi isi 18/m2 bj
53 Genteng Morando Jatiwangi isi 18/m2 bj
54 Genteng Morando Ngalayur isi 20/m2 bj
55 Genteng Plentong bj
56 Genteng plentong dicat bj
57 Genteng Plentong Jatiwangi isi 24/m2 bj
58 Ijuk kg
59 Ikut celedu paras bh
60 Ikut celedu tanah liat bh
61 Murda paras bh
62 Murda tanah liat bh
63 Seng BJLS 0,20 gelombang lbr
64 Seng BJLS 0,25 gelombang lbr
65 Seng BJLS 0,28 gelombang lbr
66 Seng BJLS 0,32 gelombang lbr
67 Seng Plat 3" x 6" BJLS 28 lbr
68 Sirap Jati bh
69 Tali Ijuk kg
70 Tali pengikat alang-alang ikat

PENGGANTUNG
71 Engsel kupu-kupu ps
72 Engsel nylon ps
73 Espagnoleth set
74 Grendel biasa bh
75 Grendel hararo bh
76 Kaca 3 mm bening m2
77 Kaca 5 mm bening m2
78 Kaca 6 mm bening m2

Harga Barang dan Upah Hal. 2


NO NAMA BARANG SATUAN

1 2 3
79 Kaca 8 mm bening m2
80 Kaca 10 mm bening m2
81 Kaca 12 mm bening m2
82 Kaca Es/Kapur 3 mm m2
83 Kaca Es/Kapur 5 mm m2
84 Kaca nako daun
85 Kaca nako teralis bening m2
86 Kaca ryben 3 mm m2
87 Kaca ryben 5 mm m2
88 Kait angin biasa bh
89 Kunci pintu TOP bh
90 Kunci pintu Union bh
91 Kunci pintu Vanesa bh
92 Kunci pintu Yale bh
93 Kunci pintu YURI bh
94 Kunci slot bh
95 Kunci tanam 2 slag bh

KAYU DAN PLAFOND


96 Bambu besar Ukuran 4 m btg
97 Bambu sedang Ukuran 4 m btg
98 Bambu kecil Ukuran 4 m btg
99 Celling teak (0,62 x 2,40) m2 lbr
100 Eternit lbr
101 Formika lbr
102 Gedeg kulit kelas I m2
103 Gypsum Old lbr
104 Hard board MDF lbr
105 Kalsiboard 4,5 mm lbr
106 Kayu bekesting m3
107 Kayu bingkirai m3
108 Kayu bingkirai papan m3
109 Kayu dolken (pekerjaan sementara) btg
110 Kayu jati m3
111 Kayu jati papan m3
112 Kayu kamper balok m3
113 Kayu kamper usuk/reng m3
114 Kayu kamper papan m3
115 Kayu kruing balok m3
116 Kayu kruing usuk/reng m3
117 Kayu kruing papan m3
118 Kayu meranti balok m3
119 Kayu meranti usuk/reng m3
120 Kayu meranti papan m3

Harga Barang dan Upah Hal. 3


NO NAMA BARANG SATUAN

1 2 3
121 Kayu merbau m3
122 Kayu merbau papan m3
123 Kayu profil m1
124 Kayu seseh balok m3
125 Kayu seseh dolken m3
126 Lem Aibond kg
127 Lem Kayu ltr
128 List Gypsum standar m'
129 Minyak bekisting ltr
130 Multiplek 12 mm lbr
131 Multiplek 18 mm lbr
132 Multiplek 6 mm lbr
133 Multiplek 9 mm lbr
134 Plywood 12 mm lbr
135 Plywood 3 mm lbr
136 Plywood 4 mm lbr
137 Plywood 6 mm lbr
138 Plywood 9 mm lbr
139 Plywood aluminium lbr
140 Teak wood (0,9x2,20) m2 lbr
141 Teak wood (1,20x2,40) m2 lbr

KERAMIK
IKAD
142 Ikad (Keramik) Kw. I 10 x 20 cm m2
143 Ikad (Keramik) Kw. I 20 x 20 cm m2
144 Ikad (Keramik) Kw. I 20 x 30 cm m2
145 Ikad (Keramik) Kw. I 30 x 30 cm m2
146 Ikad (Keramik) Kw. I 40 x 40 cm m2
147 Ikad (Keramik) Kw. II 10 x 20 cm m2
148 Ikad (Keramik) Kw. II 20 x 20 cm m2
149 Ikad (Keramik) Kw. II 20 x 30 cm m2
150 Ikad (Keramik) Kw. II 30 x 30 cm m2
151 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA
152 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
153 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
154 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
155 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
156 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
157 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
158 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2

Harga Barang dan Upah Hal. 4


NO NAMA BARANG SATUAN

1 2 3
159 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
160 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
161 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
162 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA
163 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
164 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
165 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
166 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP m2
167 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
168 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP m2
169 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
170 Keramik Kelas I Domus m2
171 Keramik Kelas I Granity Imperiali m2
172 Keramik Kelas I Lavagna m2
173 Keramik Kelas I Mountain Peak m2

ROMAN
174 Keramik 20 x 20 tekstur kasar m2
175 Keramik 25 x 33 kelas I m2
176 Keramik 25 x 45 motif halus kelas I m2
177 Keramik 30 x 30 standard m2
178 Keramik 30 x 30 kelas I T. 1cm m2
179 Keramik 20 x 60 kelas I T. 1cm m2
180 Keramik 20 x 40 kelas I Motif standard m2
181 Keramik 30 x 60 kelas I Motif Dasar Muda m2
182 Keramik 40 x 40 kelas I krem m2
183 Keramik 40 x 40 kelas I white m2
184 Keramik 50 x 50 kelas I warna muda m2

PLATINUM
185 Keramik 25 x 33 kelas I m2
186 Keramik 25 x 40 kelas II m2
187 Keramik 30 x 60 kelas II bulgari m2
188 Keramik 40 x 40 kelas I brown m2

GRANIT
189 Granit star white L.60 m2
190 Granit BGYD red L.60 m2
191 Granit crystal pink L. 60 m2
192 Granit mongol black L. 60 m2

Harga Barang dan Upah Hal. 5


NO NAMA BARANG SATUAN

1 2 3
193 Granit gold black L. 60 m2

MARMER
194 Marmer cream BA 60 x 60 m2
195 Marmer cream BA 40 x 40 m2
196 Marmer cream BA 30 x 30 m2

MOZAIK
197 Mozaik keramik zehn crystal glass 30 x 30 biji
198 Mozaik batu alam 30 x 30 biji

ASIA
199 Keramik 20 x 30 kelas I warna muda m2
200 Keramik 30 x 30 kelas I warna muda m2
201 Keramik 30 x 30 kelas I warna tua m2
202 Keramik 40 x 40 kelas I warna muda m2
203 Keramik 10 x 20 kelas II m2
204 Keramik 20 x 20 kelas II m2
205 Keramik 20 x 30 kelas II m2
206 Keramik 30 x 30 kelas II m2
207 Keramik 40 x 40 kelas II m2

MULIA
208 Keramik 10 x 20 cm kelas I m2
209 Keramik 20 x 20 cm kelas I m2
210 Keramik 20 x 30 cm kelas I m2
211 Keramik 30 x 30 cm kelas I m2
212 Keramik 40 x 40 cm kelas I m2
213 Keramik 10 x 20 cm kelas II m2
214 Keramik 20 x 20 cm kelas II m2
215 Keramik 20 x 30 cm kelas II m2
216 Keramik 30 x 30 cm kelas II m2
217 Keramik 40 x 40 cm kelas II m2

SANITAIR
203 Bak mandi fibre glass 70x70x66 cm bh
204 Bak mandi keramik 50x50 bh
205 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
206 Floor drain plastik bh
207 Floor drain stainless bh
208 Kloset duduk INA Komplit bh
209 Kloset duduk Amerika Standar bh

Harga Barang dan Upah Hal. 6


NO NAMA BARANG SATUAN

1 2 3
210 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COM bh
211 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMP bh
212 Kloset duduk " TOTO Type AVANTE CW 823 J bh
213 Kloset duduk " TOTO Type CW 660J bh
214 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
215 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARN bh
216 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
217 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
218 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
219 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
220 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
221 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
222 Kloset porselin jongkok Kia (standar) bh
223 Kloset porselin jongkok Ina (standar) bh
224 Kran biasa bh
225 Kran SunEi bh
226 Kran TOTO T 205 LCSC bh
227 Kran TOTO T 205 MC bh
228 Kran TOTO T 23 B13 bh
229 Kran TOTO T 23 B13V7N bh
230 Kran TOTO T 26 - 13 bh
231 Kran TOTO TX 109 LH bh
232 Penyekat Urinoir " TOTO " Type A 100 " bh
233 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
234 Soap holder " TOTO " Type S 6 N " bh
235 Seal tape bh
236 Urinoir " TOTO U 57 M bh
237 Urinoir " TOTO U 57 M BODI bh
238 Urinoir " TOTO UW 447 JT 1 " bh
239 Urinoir " TOTO UW 447 JT 1 BODI bh
240 Urinoir " TOTO UW 447 JT 1,M " bh
241 Urinoir " TOTO UW 447 JT 1,M "BODI bh
242 Wastagel KIA Standard bh
243 Wastagel KIA Warna bh
244 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
245 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

PAKU
246 Paku 10 cm kg
247 Paku kalsiboard kg
248 Paku list SQ kg
249 Paku pancing 60 x 230 kg
250 Paku reng/usuk SQ kg

Harga Barang dan Upah Hal. 7


NO NAMA BARANG SATUAN

1 2 3
251 Paku seng kg
252 Paku seng import bj
253 Paku skrup 1/2" kg
254 Paku skrup 2" kg
255 Paku skrup 3.5" kg
256 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS


257 Bata gosok ex Tulikup bj
258 Bata Merah 5 x 11 x 22 cm bj
259 Batako kelas I bj
260 Batu kali /batu bulat 15/20 cm m3
261 Batu karang m3
262 Batu lahar Singaraja m3
263 Batu pecah 5-7 cm (manual) m3
264 Batu pipih Singaraja m3
265 Bata riyan ( abble ) bj
266 Roster Keramik bh
267 Koral Beton m3
268 Limestone m3
269 Paras Batik bh
270 Paras Buahan bh
271 Paras Karang Bukit bh
272 Paras Kerobokan Tebal 5 bh
273 Paras Malem bh
274 Paras Putih Bukit bh
275 Paras Silakarang tebal bh
276 Paras Silakarang tipis bh
277 Paras untuk pondasi bh
278 Batu alam RTM hijau 10 x 20 halus m2
279 Batu alam RTM hijau 20 x 20 halus m2
280 Batu alam RTS hijau 10 x 20 kasar m2
281 Batu pilah Jember 30 x 30 m2
282 Batu pilah Jember 20 x 30 m2
283 Batu pilah Jember 40 x 40 m2
284 Batu pilah Singaraja 30 x 30 m2
285 Batu pilah Singaraja 20 x 20 m2
286 Batu hitam Jember 5 x 20 halus m2
287 Batu hitam Jember 20 x 40 halus m2
288 Batu hitam Jember 15 x 30 halus m2
289 Batu hitam Singaraja 15 x 30 halus m2
290 Batu hitam Singaraja 20 x 40 halus m2

Harga Barang dan Upah Hal. 8


NO NAMA BARANG SATUAN

1 2 3
291 Batu AND 60 x 60 abu m2
292 Batu AND 50 x 50 hitam m2
293 Batu AND 40 x 40 hitam bkr m2
294 Batu AND 30 x 60 hitam bkr m2
295 Batu AND 40 x 60 hitam kilap m2
296 Batu AND 30 x 40 abu SS m2
297 Batu marmer kuning 10 x 20 m2
298 Batu marmer kuning PB1 10 x 20 m2
299 Batu marmer kuning PB2 10 x 20 m2
300 Batu marmer kuning 15 x 30 m2
301 Batu kuning serat 30 x 30 m2
302 Batu kuning serat 20 x 30 m2
303 Batu palimanan cirebon 20 x 30 m2
304 Batu palimanan cirebon 20 x 40 m2
305 Batu paras Jogja 60 x 60 m2
306 Batu candi hitam 60 x 60 m2
307 Batu candi hitam 20 x 20 m2
308 Batu candi hitam 30 x 30 m2
309 Batu candi hitam 40 x 40 T.5cm m2
310 Batu candi hitam 20 x 30 m2
311 Batu Bali green gelombang 20 x 40 m2
312 Batu Bali green kombinasi 20 x 40 m2
314 Batu serayu 20 x 60 m2
315 Pasir beton m3
316 Pasir pasang m3
317 Pasir urug m3
318 Sirtu m3
319 Tanah urug m3
319 Karung plastik bh

PIPA
320 Pipa Galvanis 1/2" ljr
321 Pipa Galvanis 3/4" ljr
322 Pipa Galvanis 1 1/4" ljr
323 Pipa Galvanis 1 1/2" ljr
324 Pipa Galvanis 1" ljr
325 Pipa Galvanis 1,5 BSA ljr
326 Pipa Galvanis 2" ljr
327 Pipa Galvanis 3" ljr
328 Pipa Maspion AW 1 ljr
329 Pipa Maspion AW 1/2 ljr
330 Pipa Maspion AW 10 ljr

Harga Barang dan Upah Hal. 9


NO NAMA BARANG SATUAN

1 2 3
331 Pipa Maspion AW 1-1/2 ljr
332 Pipa Maspion AW 1-1/4 ljr
333 Pipa Maspion AW 12 ljr
334 Pipa Maspion AW 14 ljr
335 Pipa Maspion AW 16 ljr
336 Pipa Maspion AW 2 ljr
337 Pipa Maspion AW 2-1/2 ljr
338 Pipa Maspion AW 3 ljr
339 Pipa Maspion AW 3/4 ljr
340 Pipa Maspion AW 4 ljr
341 Pipa Maspion AW 5 ljr
342 Pipa Maspion AW 6 ljr
343 Pipa Maspion AW 8 ljr
344 Pipa Maspion C 1 ljr
345 Pipa Maspion C 1-1/2 ljr
346 Pipa Maspion C 1-1/4 ljr
347 Pipa Maspion C 2 ljr
348 Pipa Maspion C 2-1/2 ljr
349 Pipa Maspion C 3 ljr
350 Pipa Maspion C 3/4 ljr
351 Pipa Maspion C 4 ljr
352 Pipa Maspion C 5/8 ljr
353 Pipa Maspion D 10 ljr
354 Pipa Maspion D 1-1/2 ljr
355 Pipa Maspion D 1-1/4 ljr
356 Pipa Maspion D 12 ljr
357 Pipa Maspion D 14 ljr
358 Pipa Maspion D 16 ljr
359 Pipa Maspion D 2 ljr
360 Pipa Maspion D 2-1/2 ljr
361 Pipa Maspion D 3 ljr
362 Pipa Maspion D 4 ljr
363 Pipa Maspion D 5 ljr
364 Pipa Maspion D 6 ljr
365 Pipa Maspion D 8 ljr

SEMEN & AIR CAMPURAN BETON


366 Semen Bosowa 50 kg zak
367 Semen Gresik 40 kg zak
368 Semen Gresik 50 kg zak
369 Semen Tiga Roga 50 kg zak
370 Semen Tonasa 50 kg zak

Harga Barang dan Upah Hal. 10


NO NAMA BARANG SATUAN

1 2 3
371 Semen warna/semen grouting kg
372 Air Campuran Beton ltr

BESI BETON DAN PAGAR


373 Besi beton kg
374 Kawat berduri roll
375 Kawat beton RRT kg
376 Pagar BRC asli T.120 diameter 6mm m'
377 Pagar BRC asli T.150 diameter 6mm m'
378 Pagar BRC asli T.175 diameter 7mm m'
379 Pagar BRC asli T.190 diameter 7mm m'
380 Pagar BRC asli T.90 diameter 6mm m'
381 Pagar HotDip Galvanized T.120 diameter 6mm m'
382 Pagar HotDip Galvanized T.150 diameter 7mm m'
383 Pagar HotDip Galvanized T.175 diameter 7mm m'
384 Pagar HotDip Galvanized T.190 diameter 7mm m'
385 Pagar HotDip Galvanized T.90 diameter 6mm m'
386 Tiang BRC asli T. 120 diameter 1 1/2" bh
387 Tiang BRC asli T. 150 diameter 2" bh
388 Tiang BRC asli T. 175 diameter 2" bh
389 Tiang BRC asli T. 190 diameter 2" bh
390 Tiang BRC asli T. 90 diameter 1 1/2" bh
391 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
392 Tiang HotDip Galvanized T. 150 diameter 2" bh
393 Tiang HotDip Galvanized T. 175 diameter 2" bh
394 Tiang HotDip Galvanized T. 190 diameter 2" bh
395 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK
396 Saklar (Broco) bh
397 Stop Kontak bh
398 Fitting bh
399 Steker bh
400 Coaxial cable 5C - 75 ohm commscof m1
401 Kabel NYM 3 x 2.5 mm ex. Supreme m1
402 Kabel NYM 4 mm m1
403 Kabel telephone m1
404 Lampu pijar 10 Watt (Philip) bh
405 Lampu pijar 15 Watt (Philip) bh
406 Lampu pijar 25 Watt (Philip) bh
407 Lampu TL 10 Watt (10 Watt) bh
408 Lampu TL 20 Watt (10 Watt) bh
409 Lampu TL 25 Watt (10 Watt) bh

Harga Barang dan Upah Hal. 11


NO NAMA BARANG SATUAN

1 2 3
410 Pipa clipsal 20 mm bt
411 Pipa flexible clipsal 20 mm m1
412 Sock clipsal 20 mm bj
413 Tee dos clipsal 20 mm bh
414 Klem clipsal 20 mm bj
415 Inbow dos plastik clipsal E 157 P bj

BUIS BETON
416 Buis beton 10 x 75 bh
417 Buis beton 15 x 75 bh
418 Buis beton 20 x 75 bh
419 Buis beton 25 x 75 bh
420 Buis beton 30 x 75 bh
421 Buis beton 50 x 75 bh

PAVING
422 Paving 10 x 20 cm tebal 6 cm K225 m2
423 Paving 10 x 20 cm tebal 6 cm K350 m2
424 Paving 10 x 20 cm tebal 8 cm K225 m2
425 Paving 10 x 20 cm tebal 8 cm K350 m2
426 Paving 10 x 20 cm tebal 8 cm K425 m2
427 Paving 20 x 20 cm tebal 6 cm K225 m2
428 Paving 20 x 20 cm tebal 6 cm K350 m2
429 Paving 20 x 20 cm tebal 8 cm K225 m2
430 Paving 20 x 20 cm tebal 8 cm K350 m2
431 Paving 20 x 20 cm tebal 8 cm K425 m2
432 Paving 20 x 20 cm tebal 10 cm K225 m2
433 Paving 20 x 20 cm tebal 10 cm K350 m2
434 Paving 20 x 20 cm tebal 10 cm K425 m2
435 Paving Tiga Berlian tebal 6 cm K225 m2
436 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1
437 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1
438 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1
439 Grass Block 36 X 54 cm tebal 9 cm K 225 m2
440 Koral Sikat zak/10 kg

LAIN-LAIN
441 Wall papper 29 x 29 lembar
442 Wall papper 70 x 100 lembar
443 Wall papper 50 x 70 lembar
444 Wall papper 30 x 60 lembar
445 Glass block bj
446 Dugul batu hitam 50 x 50 x 200 unit

Harga Barang dan Upah Hal. 12


NO NAMA BARANG SATUAN

1 2 3
447 Dugul batu hitam 60 x 70 x 250 unit
448 Dugul batu hitam 70 x 70 x 250 unit
449 Padmasari batu hitam 50 x 50 x 200 unit
450 Padmasari batu hitam 65 x 75 x 255 unit
451 Padmasari batu hitam 70 x 70 x 250 unit

Denpasar, Maret 2013


Kepala Dinas PU. Kota Denp

Ir. I Ketut Winarta


Pembina Utama Muda
NIP. 19571231 198803 1 1

Harga Barang dan Upah Hal. 13


AN UPAH

HARGA SATUAN

4,100.00
70,500.00
43,600.00
55,000.00
22,000.00
22,000.00
33,000.00
38,800.00
38,000.00
10,000.00
18,500.00
20,600.00
17,000.00
29,000.00
16,800.00
12,000.00
26,000.00
42,000.00
30,000.00
47,000.00
59,000.00
22,000.00
12,000.00

12,500.00
29,000.00
24,000.00
29,000.00
36,000.00
50,000.00
84,000.00
125,000.00
74,000.00
108,500.00
72,000.00
105,000.00
70,000.00

Harga Barang dan Upah Hal. 14


HARGA SATUAN

4
105,000.00
68,000.00
52,000.00
15,000.00
8,000.00
2,700.00
7,200.00
10,000.00
7,000.00
6,000.00
4,200.00
6,500.00
3,000.00
2,800.00
3,500.00
2,800.00
2,900.00
2,800.00
1,300.00
1,400.00
1,350.00
2,500.00
62,000.00
49,000.00
75,000.00
61,000.00
43,500.00
42,000.00
42,500.00
47,000.00
46,500.00
8,500.00
34,000.00
9,500.00

49,000.00
27,000.00
100,000.00
15,500.00
22,000.00
97,000.00
102,000.00
167,000.00

Harga Barang dan Upah Hal. 15


HARGA SATUAN

4
212,000.00
305,000.00
375,000.00
87,000.00
117,000.00
15,000.00
117,000.00
122,000.00
127,000.00
22,000.00
60,000.00
72,000.00
109,000.00
115,000.00
132,000.00
100,000.00
105,000.00

11,000.00
9,000.00
7,000.00
70,000.00
47,000.00
80,000.00
20,000.00
63,500.00
107,000.00
72,000.00
2,250,000.00
12,000,000.00
13,500,000.00
90,000.00
20,000,000.00
30,000,000.00
8,300,000.00
6,500,000.00
9,000,000.00
5,000,000.00
6,000,000.00
6,000,000.00
2,500,000.00
3,000,000.00
6,000,000.00

Harga Barang dan Upah Hal. 16


HARGA SATUAN

4
13,000,000.00
13,200,000.00
12,250.00
2,264,750.00
2,750,000.00
33,000.00
12,500.00
17,000.00
15,000.00
135,000.00
200,000.00
62,000.00
98,700.00
127,000.00
36,000.00
47,000.00
67,000.00
105,500.00
75,000.00
56,000.00
62,000.00

51,500.00
42,000.00
52,000.00
40,000.00
48,000.00
38,000.00
40,000.00
47,000.00
42,500.00
52,000.00

191,000.00
154,000.00
180,000.00
143,000.00
165,000.00
209,000.00
209,000.00

Harga Barang dan Upah Hal. 17


HARGA SATUAN

4
160,000.00
197,000.00
149,000.00
248,500.00

210,000.00
189,500.00
150,700.00
107,800.00
222,900.00
194,900.00
273,500.00
286,500.00
262,500.00
249,900.00
337,000.00

57,750.00
70,500.00
88,750.00
72,500.00
95,000.00
114,900.00
76,900.00
175,900.00
76,100.00
76,100.00
92,900.00

61,500.00
40,000.00
40,900.00
57,500.00

315,000.00
425,000.00
320,000.00
825,000.00

Harga Barang dan Upah Hal. 18


HARGA SATUAN

4
825,000.00

335,000.00
260,000.00
215,000.00

41,000.00
21,500.00

55,500.00
39,000.00
45,000.00
52,000.00
45,000.00
35,000.00
37,000.00
37,000.00
40,000.00

41,000.00
43,000.00
56,000.00
40,000.00
48,000.00
38,500.00
40,000.00
53,500.00
36,500.00
46,000.00

230,000.00
170,000.00
225,000.00
15,000.00
45,000.00
1,300,000.00
955,000.00

Harga Barang dan Upah Hal. 19


HARGA SATUAN

4
1,500,000.00
5,610,000.00
5,600,000.00
610,000.00
1,365,000.00
1,491,000.00
670,000.00
2,800,000.00
2,200,000.00
1,800,000.00
355,000.00
165,000.00
145,000.00
135,000.00
18,000.00
110,500.00
220,500.00
165,000.00
140,000.00
142,000.00
187,000.00
410,000.00
835,000.00
235,000.00
48,000.00
2,600.00
1,052,000.00
849,000.00
-
-
-
-
185,000.00
235,000.00
1,135,000.00
735,000.00

14,000.00
24,000.00
17,000.00
20,000.00
13,000.00

Harga Barang dan Upah Hal. 20


HARGA SATUAN

4
21,000.00
45,000.00
18,000.00
18,000.00
26,500.00
15,000.00

1,980.00
1,300.00
2,200.00
145,475.00
131,000.00
170,000.00
158,125.00
155,000.00
2,500.00
50,000.00
149,285.00
115,000.00
17,000.00
10,000.00
8,500.00
9,500.00
13,000.00
4,000.00
14,500.00
12,000.00
12,500.00
75,000.00
90,000.00
70,000.00
55,000.00
55,000.00
65,000.00
65,000.00
60,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00

Harga Barang dan Upah Hal. 21


HARGA SATUAN

4
190,000.00
190,000.00
140,000.00
140,000.00
160,000.00
100,000.00
75,000.00
90,000.00
70,000.00
100,000.00
70,000.00
70,000.00
80,000.00
80,000.00
120,000.00
75,000.00
70,000.00
75,000.00
185,000.00
75,000.00
105,000.00
100,000.00
90,000.00
138,600.00
149,285.00
107,000.00
100,855.00
93,000.00
6,000.00

359,605.00
-
-
-
581,555.00
436,195.00
673,195.00
926,038.00
32,000.00
22,000.00
112,000.00

Harga Barang dan Upah Hal. 22


HARGA SATUAN

4
59,480.00
45,000.00
1,550,000.00
1,900,000.00
2,400,000.00
89,000.00
103,000.00
140,000.00
25,000.00
225,000.00
373,000.00
494,000.00
768,000.00
14,700.00
19,500.00
16,500.00
35,000.00
45,000.00
50,000.00
10,000.00
63,000.00
5,500.00
784,000.00
32,000.00
28,000.00
1,270,000.00
1,650,000.00
1,877,568.00
42,000.00
62,000.00
86,000.00
120,000.00
209,000.00
254,000.00
449,000.00

62,000.00
55,000.00
67,000.00
60,000.00
62,000.00

Harga Barang dan Upah Hal. 23


HARGA SATUAN

4
13,000.00
50.00

8,451.00
85,000.00
16,000.00
170,000.00
178,000.00
251,000.00
268,000.00
137,000.00
140,000.00
191,000.00
205,000.00
220,000.00
120,000.00
167,000.00
215,000.00
245,000.00
250,000.00
140,000.00
147,000.00
172,000.00
190,000.00
200,000.00
127,000.00

12,700.00
16,000.00
6,000.00
30,000.00
6,000.00
12,000.00
6,000.00
4,000.00
6,000.00
7,000.00
8,000.00
27,500.00
35,000.00
34,000.00

Harga Barang dan Upah Hal. 24


HARGA SATUAN

4
12,000.00
10,500.00
2,000.00
7,000.00
750.00
10,000.00

31,000.00
39,000.00
40,000.00
43,000.00
54,000.00
75,000.00

55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
66,500.00
76,000.00
85,000.00
53,000.00
58,000.00
66,000.00
69,000.00
55,000.00
35,000.00

22,000.00
80,000.00
99,000.00
35,000.00
25,000.00
3,800,000.00

Harga Barang dan Upah Hal. 25


HARGA SATUAN

4
4,100,000.00
4,300,000.00
3,800,000.00
4,100,000.00
4,300,000.00

npasar, Maret 2013


Dinas PU. Kota Denpasar

Ir. I Ketut Winarta


mbina Utama Muda
9571231 198803 1 103

Harga Barang dan Upah Hal. 26


DAFTAR HARGA SATUAN UPAH
TAHUN 2013
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5

1 Mandor Hari 85,000.00


2 Kepala Tukang Hari 80,000.00
3 Tukang Politur Hari
4 Tukang Batu Hari 69,000.00
5 Tukang kayu Hari 70,000.00
6 Tukang Besi Hari 70,000.00
7 Tukang cat Hari 69,000.00
8 Tukang gali Hari 60,000.00
9 Tukang Listrik Hari 65,000.00
10 Tukang Pipa/ Tukang Ledeng Hari 65,000.00
11 Tukang Aspal Hari 57,000.00
12 Tukang masak Aspal Hari 57,000.00
13 Pekerja Hari 40,000.00
14 Tukang Ukir Hari 80,000.00
15 Operator Hari 65,000.00
16 Pembantu Operator Hari 50,000.00
17 Mekanik Hari 57,000.00
18 Pembantu Mekanik Hari -
19 Pasang Atap Alang-Alang Hari -
20 Pasang Bata Gosok Dua Muka M2 -
21 Pasang Bata Gosok Satu Muka M2 -
22 Pasang Batu Paras Diukir M2 -
23 Pasang Patu Paras Siap Diukir M2 -
24 Tukang Bongkar Begesting Hari 40,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).

Denpasar, Maret 2013


Kepala Dinas PU. Kota Denpasar

Ir. I Ketut Winarta


Pembina Utama Muda
NIP. 19571231 198803 1 103
DAFTAR ANALISA PEKERJAAN
TAHUN 2013
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 9,000.00
2.5000 kg Semen Portland 1,340.00
1.2000 lbr Seng gelombang 3" - 5" 43,500.00
0.0050 m3 Pasir Beton 138,600.00
0.0090 m3 Koral beton 149,285.00
0.0720 m3 Kayu Meranti Usuk 5/7 3,000,000.00
0.0600 kg Paku biasa 2" - 5" 13,000.00
0.4500 kg Meni Besi 22,000.00
0.2000 oh Tukang Kayu 70,000.00 14,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0200 oh Mandor 85,000.00 1,700.00
Total : 33,300.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 3,000,000.00
0.0200 kg Paku Biasa 2" - 5" 13,000.00
0.0070 m3 Kayu Papan Meranti 3/20 6,000,000.00
0.1000 oh Tukang Kayu 70,000.00 7,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 12,225.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m 90,000.00
0.1800 m3 Kayu Meranti 2,500,000.00
0.8500 kg Paku Biasa 2" - 5" 13,000.00
1.1000 kg Besi Strip 8,000.00
35.0000 kg Semen Portland 1,340.00
0.1500 m3 Pasir Pasang 149,285.00
0.1000 m3 Pasir Beton 138,600.00
0.1500 m3 Koral Beton 149,285.00
30.0000 bh Bata Merah 1,300.00
0.2500 lbr Seng Plat 46,500.00
2.0000 bh Jendela Nako 15,000.00
0.0800 m2 Kaca Polos 102,000.00
0.1500 bh Kunci Tanam 105,000.00
0.0600 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 70,000.00 140,000.00
1.0000 oh Tukang Batu 69,000.00 69,000.00
2.0000 oh Pekerja 40,000.00 80,000.00
0.3000 oh Kepala Tukang 80,000.00 24,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 317,250.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 9,000.00
0.2100 m3 Kayu Meranti 2,500,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
10.5000 kg Semen Portland 1,340.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0300 m3 Pasir Beton 138,600.00
0.0500 m3 Koral Beton 149,285.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
2.0000 oh Tukang Kayu 70,000.00 140,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.2000 oh Kepala Tukang 80,000.00 16,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 200,250.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 9,000.00
0.2760 m3 Kayu Meranti 2,500,000.00
0.7000 kg Paku biasa 2" - 5" 13,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.5000 oh Tukang Kayu 70,000.00 105,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.1500 oh Kepala Tukang 80,000.00 12,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 161,250.00

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 8,250.00

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 9,000.00
0.1860 m3 Kayu Meranti 2,500,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
18.0000 kg Semen Portland 1,340.00
0.0300 m3 Pasir Beton 138,600.00
0.0500 m3 Koral Beton 149,285.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.3500 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 70,000.00 140,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.2000 oh Kepala Tukang 80,000.00 16,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 200,250.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 2,500,000.00
0.0800 kg Paku Biasa 2" - 5" 13,000.00
1.0000 btg Kaso 5/7 84,000.00
0.3000 oh Tukang kayu 70,000.00 21,000.00
0.0015 oh Mandor 85,000.00 127.50
Total : 21,127.50

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 7,000.00
0.2500 kg Tali Ijuk 34,000.00
0.0170 oh Tukang Kayu 70,000.00 1,190.00
0.0020 oh Pekerja 40,000.00 80.00
0.2500 oh Kepala Tukang 80,000.00 20,000.00
0.0130 oh Mandor 85,000.00 1,105.00
22,375.00

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 145,475.00
0.0900 m3 Batu Pecah 5 - 7 158,125.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0100 m3 Pasir Pasang 149,285.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 44,250.00

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 40,000.00 266,680.00
0.3330 oh Mandor 85,000.00 28,305.00
Total : 294,985.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 40,000.00 266,680.00
0.0330 oh Mandor 85,000.00 2,805.00
Total : 269,485.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 40,000.00 30,000.00
0.0250 oh Mandor 85,000.00 2,125.00
Total : 32,125.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 40,000.00 36,000.00
0.0450 oh Mandor 85,000.00 3,825.00
Total : 39,825.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 40,000.00 42,000.00
0.0670 oh Mandor 85,000.00 5,695.00
Total : 47,695.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 40,000.00 40,000.00
0.0320 oh Mandor 85,000.00 2,720.00
Total : 42,720.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 40,000.00 60,000.00
0.0600 oh Mandor 85,000.00 5,100.00
Total : 65,100.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 40,000.00 48,000.00
0.0450 oh Mandor 85,000.00 3,825.00
Total : 51,825.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 40,000.00 2,000.00
0.0050 oh Mandor 85,000.00 425.00
Total : 2,425.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 40,000.00 13,200.00
0.0100 oh Mandor 85,000.00 850.00
Total : 14,050.00

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 40,000.00 20,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 24,250.00

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 107,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.0100 oh Mandor 85,000.00 850.00
Total : 12,850.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 2,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 7,275.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 100,855.00
0.2500 oh Pekerja 40,000.00 10,000.00
0.0250 oh Mandor 85,000.00 2,125.00
Total : 12,125.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 93,000.00
0.5000 oh Pekerja 40,000.00 20,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 24,250.00
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone 115,000.00
0.2500 oh Pekerja 40,000.00 10,000.00
0.0250 oh Mandor 85,000.00 2,125.00
Total : 12,125.00

16 PEMBUANGAN TANAH SEJAUH 150 METER


0.5160 oh Pekerja 40,000.00 20,640.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 24,890.00

17 PENGANGKUTAN BAHAN KELOKASI SEJAUH RATA-RATA 200 M'


k = a / 275 ( L + 75 )
k = ongkos angkuta, a = upah pekerja
L = jarak angkut
1.0000 oh Pekerja / Pekerja Tidak Terlatih 40,000.00 40,000.00
Total : 40,000.00

18 KISDAM SETINGGI 1 M DARI KARUNG PLASTIK DIISI TANAH


DENGAN TANAH EKS GALIAN
19.0000 bh Karung plastik 6,000.00
0.8000 M3 Tanah urug 93,000.00
3.0880 oh Pekerja / Pekerja Tidak Terlatih 40,000.00 123,520.00
0.1520 oh Mandor 85,000.00 12,920.00
Total : 136,440.00
Untuk 3X pakai

III PEKERJAAN PONDASI (SNI 2836 : 2008)


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 145,475.00
202.0000 kg Semen Portland 1,340.00
0.4850 m3 Pasir Pasang 149,285.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 69,000.00 51,750.00
0.0750 oh Kepala Tukang 80,000.00 6,000.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 124,125.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 145,475.00
163.0000 kg Semen Portland 1,340.00
0.5200 m3 Pasir Pasang 149,285.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 69,000.00 51,750.00
0.0750 oh Kepala Tukang 80,000.00 6,000.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 124,125.00

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 145,475.00
136.0000 kg Semen Portland 1,340.00
0.5440 m3 Pasir Pasang 149,285.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 69,000.00 51,750.00
0.0750 oh Kepala Tukang 80,000.00 6,000.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 124,125.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 145,475.00
117.0000 kg Semen Portland 1,340.00
0.5610 m3 Pasir Pasang 149,285.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 69,000.00 51,750.00
0.0750 oh Kepala Tukang 80,000.00 6,000.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 124,125.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 145,475.00
91.0000 kg Semen Portland 1,340.00
0.5840 m3 Pasir Pasang 149,285.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 69,000.00 51,750.00
0.0750 oh Kepala Tukang 80,000.00 6,000.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 124,125.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 145,475.00
194.0000 kg Semen Portland 1,340.00
0.3120 m3 Pasir Beton 138,600.00
0.4680 m3 Koral Beton 149,285.00
126.0000 kg Besi Beton -
1.8000 kg Kawat Beton -
3.4000 oh Pekerja 40,000.00 136,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.8500 oh Tukang Batu 69,000.00 58,650.00
0.0850 oh Kepala Tukang 80,000.00 6,800.00
0.1700 oh Mandor 85,000.00 14,450.00
215,900.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 145,475.00
194.0000 kg Semen Portland 1,340.00
0.3120 m3 Pasir Beton 138,600.00
0.4680 m3 Koral Beton 149,285.00
2.4000 oh Pekerja 40,000.00 96,000.00
0.8000 oh Tukang Batu 69,000.00 55,200.00
0.0800 oh Kepala Tukang 80,000.00 6,400.00
0.1190 oh Mandor 85,000.00 10,115.00
Total : 167,715.00

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 145,475.00
0.4320 m3 Pasir Urug 107,000.00
0.7800 oh Pekerja 40,000.00 31,200.00
0.3900 oh Tukang Batu 69,000.00 26,910.00
0.0390 oh Kepala Tukang 80,000.00 3,120.00
0.0390 oh Mandor 85,000.00 3,315.00
Total : 64,545.00
SNI 03-2836-2002
9 1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang
0.0160 m3 Pasir Urug 107,000.00
0.0800 m3 Pasir Beton 138,600.00
0.1250 m3 Koral Beton 149,285.00
49.0000 kg Semen Portland 1,340.00
34.5000 kg Besi Beton -
0.7000 kg Kawat beton 16,000.00
0.0270 m3 Kayu Bekesting 2,250,000.00
0.1200 kg Paku Reng SQ 13,000.00
0.2000 kg Plamir Tembok 30,000.00
0.0900 lt Minyak Bekisting 15,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
0.5000 oh Tukang Batu 69,000.00 34,500.00
0.0500 oh Kepala Tukang 80,000.00 4,000.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 73,900.00
10 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang
0.0190 m3 Pasir Urug 107,000.00
0.0940 m3 Pasir Beton 138,600.00
0.1500 m3 Koral Beton 149,285.00
60.5000 kg Semen Portland 1,340.00
45.0000 kg Besi Beton -
0.9000 kg Kawat beton 16,000.00
0.0320 m3 Kayu Bekesting 2,250,000.00
0.1200 kg Paku Reng SQ 13,000.00
0.2400 kg Plamir Tembok 30,000.00
0.0900 lt Minyak Bekisting 15,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.6700 oh Tukang Batu 69,000.00 46,230.00
0.0670 oh Kepala Tukang 80,000.00 5,360.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 95,840.00
IV PEKERJAAN DINDING (SNI 6897 : 2008)
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
43.5000 kg Semen Portland 1,340.00
0.0800 m3 Pasir Pasang 149,285.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0300 oh Mandor 85,000.00 2,550.00

41,950.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
32.9500 kg Semen Portland 1,340.00
0.0910 m3 Pasir Pasang 149,285.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0300 oh Mandor 85,000.00 2,550.00
41,950.00

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
26.5500 kg Semen Portland 1,340.00
0.0930 m3 Pasir Pasang 149,285.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0300 oh Mandor 85,000.00 2,550.00
41,950.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
22.2000 kg Semen Portland 1,340.00
0.1020 m3 Pasir Pasang 149,285.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0300 oh Mandor 85,000.00 2,550.00
41,950.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.5000 kg Semen Portland 1,340.00
0.1220 m3 Pasir Pasang 149,285.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0300 oh Mandor 85,000.00 2,550.00
41,950.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.9500 kg Semen Portland 1,340.00
0.0380 m3 Pasir Pasang 149,285.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
20,975.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
14.3700 kg Semen Portland 1,340.00
0.0400 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
11.5000 kg Semen Portland 1,340.00
0.0430 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
9.6800 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
8.3200 kg Semen Portland 1,340.00
0.0490 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
6.5000 kg Semen Portland 1,340.00
0.0500 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00
12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)
12.5000 bh Batako 2,200.00
7.5000 kg Semen Portland 1,340.00
0.0270 m3 Pasir Pasang 149,285.00
1.9500 kg Besi Beton 8 mm 8,451.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 21,775.00

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 2,200.00
7.5000 kg Semen Portland 1,340.00
0.0270 m3 Pasir Pasang 149,285.00
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 21,775.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 50,000.00
11.0000 kg Semen Portland 1,340.00
0.0350 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I 20,000.00
0.0140 m3 Kayu kamper usuk/reng 6,500,000.00
0.0120 kg Paku Biasa 13,000.00
0.0030 m3 List Kayu 2/4 6,500,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0020 oh Mandor 85,000.00 170.00
Total : 8,070.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 1,340.00
0.0160 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,340.00
0.0200 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 1,340.00
0.0230 m3 Pasir Pasang 149,285.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland 1,340.00
0.0240 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
5.1840 kg Semen Portland 1,340.00
0.0260 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 1,340.00
0.0270 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,340.00
0.0290 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 1,340.00
0.0270 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0220 oh Mandor 85,000.00 1,870.00
Total : 33,270.00

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 1,340.00
0.0310 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0220 oh Mandor 85,000.00 1,870.00
Total : 33,270.00

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
8.3200 kg Semen Portland 1,340.00
0.0320 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0220 oh Mandor 85,000.00 1,870.00
Total : 33,270.00
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,340.00
0.0350 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0220 oh Mandor 85,000.00 1,870.00
Total : 33,270.00

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 1,340.00
0.0360 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0220 oh Mandor 85,000.00 1,870.00
Total : 33,270.00

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 1,340.00
0.0130 m3 Pasir Pasang 149,285.00
0.0800 oh Pekerja 40,000.00 3,200.00
0.4000 oh Tukang Batu 69,000.00 27,600.00
0.0400 oh Kepala Tukang 80,000.00 3,200.00
0.0040 oh Mandor 85,000.00 340.00
Total : 34,340.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,340.00
0.0060 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,975.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland 1,340.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0750 oh Tukang Batu 69,000.00 5,175.00
0.0080 oh Kepala Tukang 80,000.00 640.00
0.0080 oh Mandor 85,000.00 680.00
Total : 12,495.00

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


(= 8 M')
1.6000 kg Semen Portland 1,340.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0350 oh Tukang Batu 69,000.00 2,415.00
0.0040 oh Kepala Tukang 80,000.00 320.00
0.0040 oh Mandor 85,000.00 340.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 5,875.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland 1,340.00
0.0120 m3 Pasir Pasang 149,285.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 69,000.00 10,350.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 24,825.00

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,340.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.1000 oh Tukang Labur/Cat 69,000.00 6,900.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0100 oh Mandor 85,000.00 850.00
Total : 8,550.00
VI PEKERJAAN KAYU (SNI 3434 : 2008)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA
KAYU KELAS I
1.1000 m3 Balok Kayu Kamper 8,300,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
7.0000 oh Pekerja 40,000.00 280,000.00
21.0000 oh Tukang Kayu 70,000.00 1,470,000.00
2.1000 oh Kepala Tukang 80,000.00 168,000.00
0.3500 oh Mandor 85,000.00 29,750.00
Total : 1,947,750.00

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing 5,000,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
6.0000 oh Pekerja 40,000.00 240,000.00
18.0000 oh Tukang Kayu 70,000.00 1,260,000.00
1.8000 oh Kepala Tukang 80,000.00 144,000.00
0.3000 oh Mandor 85,000.00 25,500.00
Total : 1,669,500.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 70,000.00 73,500.00
0.1050 oh Kepala Tukang 80,000.00 8,400.00
0.0180 oh Mandor 85,000.00 1,530.00
Total : 97,430.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing 6,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 70,000.00 73,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1050 oh Kepala Tukang 80,000.00 8,400.00
0.0180 oh Mandor 85,000.00 1,530.00
Total : 97,430.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 70,000.00 210,000.00
0.3000 oh Kepala Tukang 80,000.00 24,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 278,250.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper 9,000,000.00
0.3000 Kg Lem Kayu 12,500.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 70,000.00 168,000.00
0.2400 oh Kepala Tukang 80,000.00 19,200.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 222,600.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 70,000.00 210,000.00
0.3000 oh Kepala Tukang 80,000.00 24,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 278,250.00

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 70,000.00 210,000.00
0.3000 oh Kepala Tukang 80,000.00 24,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 278,250.00

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 70,000.00 168,000.00
0.2400 oh Kepala Tukang 80,000.00 19,200.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 222,600.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0600 m3 Papan Kayu Kamper 9,000,000.00
0.1500 Kg Paku 1-2,5 Cm 14,000.00
0.6700 oh Pekerja 40,000.00 26,800.00
2.0000 oh Tukang Kayu 70,000.00 140,000.00
0.2000 oh Kepala Tukang 80,000.00 16,000.00
0.3350 oh Mandor 85,000.00 28,475.00
Total : 211,275.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 70,000.00 168,000.00
0.2400 oh Kepala Tukang 80,000.00 19,200.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 222,600.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.8000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5000 Lbr Formika 80,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 70,000.00 168,000.00
0.2400 oh Kepala Tukang 80,000.00 19,200.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 222,600.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
5.6000 Kg Paku 12 Cm 14,000.00
4.0000 oh Pekerja 40,000.00 160,000.00
12.0000 oh Tukang Kayu 70,000.00 840,000.00
1.2000 oh Kepala Tukang 80,000.00 96,000.00
0.2000 oh Mandor 85,000.00 17,000.00
Total : 1,113,000.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
5.6000 Kg Paku 12 Cm 14,000.00
6.7000 oh Pekerja 40,000.00 268,000.00
20.1000 oh Tukang Kayu 70,000.00 1,407,000.00
2.0100 oh Kepala Tukang 80,000.00 160,800.00
0.3350 oh Mandor 85,000.00 28,475.00
Total : 1,864,275.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1.1000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
3.0000 Kg Paku 12 Cm 14,000.00
2.4000 oh Pekerja 40,000.00 96,000.00
7.2000 oh Tukang Kayu 70,000.00 504,000.00
0.7200 oh Kepala Tukang 80,000.00 57,600.00
0.1200 oh Mandor 85,000.00 10,200.00
Total : 667,800.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,000,000.00
0.0036 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 70,000.00 7,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 12,225.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,000,000.00


0.0072 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 70,000.00 7,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 12,225.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 8,300,000.00


0.2000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.1200 oh Tukang Kayu 70,000.00 8,400.00
0.0120 oh Kepala Tukang 80,000.00 960.00
0.0060 oh Mandor 85,000.00 510.00
Total : 14,670.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,000,000.00
0.2000 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.3000 oh Tukang Kayu 70,000.00 21,000.00
0.0300 oh Kepala Tukang 80,000.00 2,400.00
0.0750 oh Mandor 85,000.00 6,375.00
Total : 35,775.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 3,000,000.00
0.2500 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.3000 oh Tukang Kayu 70,000.00 21,000.00
0.0300 oh Kepala Tukang 80,000.00 2,400.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0100 oh Mandor 85,000.00 850.00
Total : 32,250.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

0.0108 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 70,000.00 14,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0050 oh Mandor 85,000.00 425.00
Total : 20,025.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

0.0110 m3 Papan Kayu Kamper 9,000,000.00


0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 70,000.00 14,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0050 oh Mandor 85,000.00 425.00
Total : 20,025.00

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU


KELAS II/III
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 70,000.00 31,500.00
0.0450 oh Kepala Tukang 80,000.00 3,600.00
0.0080 oh Mandor 85,000.00 680.00
Total : 41,780.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II

0.0280 m3 Balok Kayu Kamper 8,300,000.00


0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5600 Kg Lem Kayu 12,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 70,000.00 31,500.00
0.0450 oh Kepala Tukang 80,000.00 3,600.00
0.0080 oh Mandor 85,000.00 680.00
Total : 41,780.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.5600 Kg Lem Kayu 12,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.6000 oh Tukang Kayu 70,000.00 42,000.00
0.0600 oh Kepala Tukang 80,000.00 4,800.00
0.0100 oh Mandor 85,000.00 850.00
Total : 55,650.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1500 Kg Paku Skrup 10 cm 18,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
1.8000 oh Tukang Kayu 70,000.00 126,000.00
0.1800 oh Kepala Tukang 80,000.00 14,400.00
0.0300 oh Mandor 85,000.00 2,550.00
Total : 166,950.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 14,000.00
0.0250 oh Pekerja 40,000.00 1,000.00
0.0750 oh Tukang Kayu 70,000.00 5,250.00
0.0080 oh Kepala Tukang 80,000.00 640.00
0.0010 oh Mandor 85,000.00 85.00
Total : 6,975.00

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
247.0000 kg Semen Portland 1,340.00
869.0000 kg Pasir Beton 100.71
999.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
94,270.00

2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
276.0000 kg Semen Portland 1,340.00
828.0000 kg Pasir Beton 100.71
1,012.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00

3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,340.00
799.0000 kg Pasir Beton 100.71
1,017.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00

4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,340.00
760.0000 kg Pasir Beton 100.71
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1,029.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
352.0000 kg Semen Portland 1,340.00
731.0000 kg Pasir Beton 100.71
1,031.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,340.00
698.0000 kg Pasir Beton 100.71
1,047.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,340.00
692.0000 kg Pasir Beton 100.71
1,039.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,340.00
684.0000 kg Pasir Beton 100.71
1,026.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
413.0000 kg Semen Portland 1,340.00
681.0000 kg Pasir Beton 100.71
1,021.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,340.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
670.0000 kg Pasir Beton 100.71
1,006.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,340.00
667.0000 kg Pasir Beton 100.71
1,000.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
0.0280 oh Kepala Tukang 80,000.00 2,240.00
0.0830 oh Mandor 85,000.00 7,055.00
Total : 94,270.00
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
10.5000 kg Besi Beton (Polos/ Ulir) 8,451.00
0.1500 kg Kawat Beton 16,000.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0700 oh Tukang Besi 70,000.00 4,900.00
0.0070 oh Kepala Tukang 80,000.00 560.00
0.0040 oh Mandor 85,000.00 340.00
Total : 8,600.00

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III 2,500,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 70,000.00 18,200.00
0.0260 oh Kepala Tukang 80,000.00 2,080.00
0.0260 oh Mandor 85,000.00 2,210.00
Total : 43,290.00

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III 2,500,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 70,000.00 18,200.00
0.0260 oh Kepala Tukang 80,000.00 2,080.00
0.0260 oh Mandor 85,000.00 2,210.00
Total : 43,290.00

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 2,500,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 6,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 70,000.00 23,100.00
0.0330 oh Kepala Tukang 80,000.00 2,640.00
0.0330 oh Mandor 85,000.00 2,805.00
Total : 54,945.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 2,500,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0180 m3 Kayu Usuk 4/6 6,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 70,000.00 23,100.00
0.0330 oh Kepala Tukang 80,000.00 2,640.00
0.0330 oh Mandor 85,000.00 2,805.00
Total : 54,945.00

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 2,500,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 6,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
6.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 70,000.00 23,100.00
0.0330 oh Kepala Tukang 80,000.00 2,640.00
0.0330 oh Mandor 85,000.00 2,805.00
Total : 54,945.00

18 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III 2,500,000.00
0.4000 Kg Paku Biasa 5' - 12' 13,000.00
0.2000 Ltr Minyak Bekisting 15,000.00
0.0200 M3 Kayu Usuk 4/6 6,000,000.00
0.3500 Lbr Plywood 9 mm 105,500.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 90,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00
0.6600 Oh Pekerja 40,000.00 26,400.00
0.3300 Oh Tukang Kayu 70,000.00 23,100.00
0.0330 Oh Kepala Tukang 80,000.00 2,640.00
0.0330 Oh Mandor 85,000.00 2,805.00
54,945.00

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 2,500,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.1500 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 6,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 70,000.00 23,100.00
0.0330 oh Kepala Tukang 80,000.00 2,640.00
0.0330 oh Mandor 85,000.00 2,805.00
Total : 54,945.00

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0264 m3 Kayu Kelas III (Papan) 2,500,000.00
0.6000 kg Paku Biasa 5' - 12' 13,000.00
0.5000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0080 oh Mandor 85,000.00 680.00
Total : 10,580.00

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III 2,500,000.00
1.5000 kg Paku Biasa 5' - 12' 13,000.00
0.4000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,451.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.3000 oh Tukang Kayu 70,000.00 91,000.00
1.0500 oh Tukang Besi 70,000.00 73,500.00
0.2620 oh Kepala Tukang 80,000.00 20,960.00
0.2650 oh Mandor 85,000.00 22,525.00
Total : 438,960.00

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 2,500,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00
0.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,451.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.5600 oh Tukang Kayu 70,000.00 109,200.00
1.4000 oh Tukang Besi 70,000.00 98,000.00
0.3230 oh Kepala Tukang 80,000.00 25,840.00
0.2830 oh Mandor 85,000.00 24,055.00
Total : 502,070.00

23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III 2,500,000.00
4.0000 kg Paku Biasa 5' - 12' 13,000.00
2.0000 ltr Minyak Bekisting 15,000.00
315.0000 kg Besi Beton 8,451.00
4.5000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
0.1500 m3 Kayu Kelas II balok 5,000,000.00
3.5000 lbr Plywood 9 mm 105,500.00
20.0000 btg Dolken Kayu 8" /4 m 90,000.00
7.0500 oh Pekerja 40,000.00 282,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.6500 oh Tukang Kayu 70,000.00 115,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
2.1000 oh Tukang Besi 70,000.00 147,000.00
0.4030 oh Kepala Tukang 80,000.00 32,240.00
0.3530 oh Mandor 85,000.00 30,005.00
Total : 625,720.00

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III 2,500,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,451.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
0.1400 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
16.0000 btg Dolken Kayu 8" /4 m 90,000.00
6.3500 oh Pekerja 40,000.00 254,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.6500 oh Tukang Kayu 70,000.00 115,500.00
1.4000 oh Tukang Besi 70,000.00 98,000.00
0.3330 oh Kepala Tukang 80,000.00 26,640.00
0.3180 oh Mandor 85,000.00 27,030.00
Total : 540,145.00
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III 2,500,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.5000 kg Besi Beton 8,451.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
0.1200 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
32.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.3000 oh Tukang Kayu 70,000.00 91,000.00
1.0500 oh Tukang Besi 70,000.00 73,500.00
0.2650 oh Kepala Tukang 80,000.00 21,200.00
0.2650 oh Mandor 85,000.00 22,525.00
439,200.00
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III 2,500,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,451.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
0.1600 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
24.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.3000 oh Tukang Kayu 70,000.00 91,000.00
1.0500 oh Tukang Besi 70,000.00 73,500.00
0.2620 oh Kepala Tukang 80,000.00 20,960.00
0.2650 oh Mandor 85,000.00 22,525.00
438,960.00
27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III 2,500,000.00
3.0000 kg Paku Biasa 5' - 12' 13,000.00
1.2000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,451.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,340.00
0.5400 m3 Pasir Beton 138,600.00
0.8100 m3 Koral Beton 149,285.00
0.1050 m3 Kayu Kelas II balok 5,000,000.00
2.5000 lbr Plywood 9 mm 105,500.00
14.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 69,000.00 18,975.00
1.5600 oh Tukang Kayu 70,000.00 109,200.00
1.4000 oh Tukang Besi 70,000.00 98,000.00
0.3230 oh Kepala Tukang 80,000.00 25,840.00
0.2830 oh Mandor 85,000.00 24,055.00
502,070.00

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III 2,500,000.00
0.0100 kg Paku Biasa 5' - 12' 13,000.00
3.0000 kg Besi Beton 8,451.00
0.0450 kg Kawat Beton 16,000.00
4.0000 kg Semen Portland 1,340.00
0.0060 m3 Pasir Beton 138,600.00
0.0090 m3 Koral Beton 149,285.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.0200 oh Tukang Batu 69,000.00 1,380.00
0.0200 oh Tukang Kayu 70,000.00 1,400.00
0.0200 oh Tukang Besi 70,000.00 1,400.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0090 oh Mandor 85,000.00 765.00
Total : 12,625.00
29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III 2,500,000.00
0.0200 kg Paku Biasa 5' - 12' 13,000.00
3.6000 kg Besi Beton 8,451.00
0.0500 kg Kawat Beton 16,000.00
5.5000 kg Semen Portland 1,340.00
0.0090 m3 Pasir Beton 138,600.00
0.0150 m3 Koral Beton 149,285.00
0.2970 oh Pekerja 40,000.00 11,880.00
0.0330 oh Tukang Batu 69,000.00 2,277.00
0.0330 oh Tukang Kayu 70,000.00 2,310.00
0.0330 oh Tukang Besi 70,000.00 2,310.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 20,852.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 1,300.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 70,000.00 4,200.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0080 oh Mandor 85,000.00 680.00
Total : 11,360.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat 1,400.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 70,000.00 4,200.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0080 oh Mandor 85,000.00 680.00
Total : 11,360.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong 6,000.00
8.0000 kg Semen Portland 1,340.00
0.0320 m3 Pasir Pasang 149,285.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Kayu 70,000.00 14,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0020 oh Mandor 85,000.00 170.00
Total : 31,770.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 29,000.00
0.1200 kg Paku Pancing 60 x 230 20,000.00
0.1400 oh Pekerja 40,000.00 5,600.00
0.0700 oh Tukang Kayu 70,000.00 4,900.00
0.0070 oh Kepala Tukang Kayu 80,000.00 560.00
0.0070 oh Mandor 85,000.00 595.00
Total : 11,655.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 24,000.00
6.0000 kg Paku Skrup 3,5" 26,500.00
0.0840 oh Pekerja 40,000.00 3,360.00
0.1250 oh Tukang Kayu 70,000.00 8,750.00
0.0130 oh Kepala Tukang 80,000.00 1,040.00
0.0040 oh Mandor 85,000.00 340.00
Total : 13,490.00
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 8,500.00
0.2000 kg Paku Biasa 1/2" - 1" 14,000.00
0.1660 oh Pekerja 40,000.00 6,640.00
0.2500 oh Tukang Kayu 70,000.00 17,500.00
0.0250 oh Kepala Tukang 80,000.00 2,000.00
0.0080 oh Mandor 85,000.00 680.00
Total : 26,820.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 46,500.00
0.0600 kg Paku biasa 1/2" - 1" 14,000.00
0.0500 kg Paku biasa 2" - 5" 13,000.00
0.0040 m3 Kayu papan 3 cm 9,000,000.00
0.1250 oh Pekerja 40,000.00 5,000.00
0.2500 oh Tukang kayu 70,000.00 17,500.00
0.0250 oh Kepala Tukang 80,000.00 2,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0080 oh Mandor 85,000.00 680.00
Total : 25,180.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 12,500.00
0.5000 glg Tali pengikat 9,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.0100 oh Mandor 85,000.00 850.00
Total : 8,850.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 42,500.00
0.0200 kg Paku Biasa 1/2" - 1" 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.0600 oh Tukang Kayu 70,000.00 4,200.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0060 oh Mandor 85,000.00 510.00
Total : 9,990.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 29,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0080 oh Mandor 85,000.00 680.00
Total : 10,580.00

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 46,500.00
0.0400 kg Paku biasa 1/2" - 1" 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0700 oh Tukang Kayu 70,000.00 4,900.00
0.0080 oh Kepala Tukang 80,000.00 640.00
0.0060 oh Mandor 85,000.00 510.00
Total : 12,050.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5
MM DAN 6 MM
1.1000 lbr Asbes semen 47,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.0300 oh Pekerja 40,000.00 1,200.00
0.0700 oh Tukang Kayu 70,000.00 4,900.00
0.0070 oh Kepala Tukang 80,000.00 560.00
0.0040 oh Mandor 85,000.00 340.00
Total : 7,000.00

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS 47,000.00
0.0300 kg Paku Biasa 1/2" - 1" 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 70,000.00 7,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 12,225.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan 9,000,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
0.8000 oh Tukang Kayu 70,000.00 56,000.00
0.0800 oh Kepala Tukang 80,000.00 6,400.00
0.0400 oh Mandor 85,000.00 3,400.00
Total : 97,800.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil 12,250.00
0.1000 kg Paku list SQ 15,840.00
0.0500 oh Pekerja 40,000.00 2,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0030 oh Mandor 85,000.00 255.00
Total : 6,155.00

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm 9,000,000.00
0.0600 kg Paku Biasa 2" - 5" 15,840.00
1.1000 lbr Asbes 47,000.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.3200 oh Tukang Kayu 70,000.00 22,400.00
0.0320 oh Kepala Tukang 80,000.00 2,560.00
0.0090 oh Mandor 85,000.00 765.00
Total : 32,925.00

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Gypsum Board (120x240x9) 63,500.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0050 oh Mandor 85,000.00 425.00
Total : 8,325.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Kalsiboard 4.5 mm 72,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 70,000.00 3,500.00
0.0050 oh Kepala Tukang 80,000.00 400.00
0.0050 oh Mandor 85,000.00 425.00
Total : 8,325.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 1,365,000.00
6% x harga kloset Perlengkapan
3.3000 oh Pekerja 40,000.00 132,000.00
1.1000 oh Tukang batu 69,000.00 75,900.00
0.0010 oh Kepala Tukang 80,000.00 80.00
0.1600 oh Mandor 85,000.00 13,600.00
Total : 221,580.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1.0000 bh Kloset jongkok porselen 135,000.00
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 149,285.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.5000 oh Tukang batu 69,000.00 103,500.00
1.5000 oh Kepala Tukang 80,000.00 120,000.00
0.1600 oh Mandor 85,000.00 13,600.00
Total : 277,100.00

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 1,052,000.00
6% x harga Urin Perlengkapan
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 149,285.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.0000 oh Tukang batu 69,000.00 69,000.00
0.1000 oh Kepala Tukang 80,000.00 8,000.00
0.1000 oh Mandor 85,000.00 8,500.00
Total : 125,500.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 185,000.00
12% x harga wast Perlengkapan
6.0000 kg Semen Portland 1,340.00
0.0100 m3 Pasir Pasang 149,285.00
1.2000 oh Pekerja 40,000.00 48,000.00
1.4500 oh Tukang batu 69,000.00 100,050.00
0.1500 oh Kepala Tukang 80,000.00 12,000.00
0.1000 oh Mandor 85,000.00 8,500.00
Total : 168,550.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 230,000.00
18% x harga wast Perlengkapan
1.8000 oh Pekerja 40,000.00 72,000.00
2.7000 oh Tukang batu 69,000.00 186,300.00
0.5400 oh Kepala Tukang 80,000.00 43,200.00
0.1100 oh Mandor 85,000.00 9,350.00
Total : 310,850.00

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 581,555.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 65,000.00 5,850.00
0.0090 oh Kepala Tukang 80,000.00 720.00
0.0270 oh Mandor 85,000.00 2,295.00
Total : 11,025.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 926,038.00
35% x harga pipa Perlengkapan
0.1080 Oh Pekerja 40,000.00 4,320.00
0.1800 Oh Tukang Pipa 65,000.00 11,700.00
0.0180 Oh Kepala Tukang 80,000.00 1,440.00
0.0054 Oh Mandor 85,000.00 459.00
Total : 17,919.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
1.2000 m1 Pipa PVC 14,870.00
35% x harga pipa Perlengkapan
0.0360 oh Pekerja 40,000.00 1,440.00
0.0600 oh Tukang Pipa 65,000.00 3,900.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0018 oh Mandor 85,000.00 153.00
Total : 5,973.00

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 22,250.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 65,000.00 5,850.00
0.0090 oh Kepala Tukang 80,000.00 720.00
0.0027 oh Mandor 85,000.00 229.50
Total : 8,959.50

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC 56,250.00
35% x harga pipa Perlengkapan
0.0810 oh Pekerja 40,000.00 3,240.00
0.1350 oh Tukang Pipa 65,000.00 8,775.00
0.0135 oh Kepala Tukang 80,000.00 1,080.00
0.0041 oh Mandor 85,000.00 348.50
Total : 13,443.50

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air 18,000.00
0.0250 bh Seal tape 2,600.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang Pipa 65,000.00 6,500.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 8,125.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI


7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 15,000.00
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang besi 70,000.00 4,200.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0003 oh Mandor 85,000.00 25.50
Total : 4,945.50

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 117,000.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 18,000.00
7.0000 m' Besi strip 8,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.2000 oh Tukang besi 70,000.00 14,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0010 oh Mandor 85,000.00 85.00
Total : 23,685.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28
1.0500 lbr Seng plat 46,500.00
0.0150 kg Paku biasa 0,5" - 1" 18,000.00
0.0190 m3 Kayu papan kelas II/III 9,000,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4000 oh Tukang besi 70,000.00 28,000.00
0.0250 oh Kepala Tukang 80,000.00 2,000.00
0.0013 oh Mandor 85,000.00 110.50
Total : 36,110.50

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 105,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.5000 oh Tukang besi 70,000.00 35,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0050 oh Mandor 85,000.00 425.00
Total : 36,625.00

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu 27,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 70,000.00 10,500.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0008 oh Mandor 85,000.00 68.00
Total : 12,368.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 49,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang besi 70,000.00 7,000.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.0005 oh Mandor 85,000.00 42.50
Total : 8,242.50

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 22,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 70,000.00 10,500.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0008 oh Mandor 85,000.00 68.00
Total : 12,368.00

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 100,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang besi 70,000.00 14,000.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0010 oh Mandor 85,000.00 85.00
Total : 16,485.00

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca 102,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 70,000.00 10,500.00
0.0150 oh Kepala Tukang 80,000.00 1,200.00
0.0008 oh Mandor 85,000.00 68.00
Total : 12,368.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
XIII PEK. PENUTUP LANTAI DAN DINDING (SNI
7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm 4,090.91
10.0000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 149,285.00
1.5000 kg Semen warna/semen grouting 13,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 69,000.00 24,150.00
0.0350 oh Kepala Tukang 80,000.00 2,800.00
0.0350 oh Mandor 85,000.00 2,975.00
Total : 57,925.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 8,600.00
10.4000 kg Semen Portland 1,340.00
0.0450 m3 Pasir Pasang 149,285.00
1.6200 kg Semen warna/semen grouting 13,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 69,000.00 24,150.00
0.0350 oh Kepala Tukang 80,000.00 2,800.00
0.0350 oh Mandor 85,000.00 2,975.00
Total : 57,925.00
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM
3.3300 bh Keramik 30 x 30 cm 4,090.91
1.1400 kg Semen Portland 1,340.00
0.0030 m3 Pasir Pasang 149,285.00
0.1000 kg Semen warna/semen grouting 13,000.00
0.0900 oh Pekerja 40,000.00 3,600.00
0.0900 oh Tukang batu 69,000.00 6,210.00
0.0090 oh Kepala Tukang 80,000.00 720.00
0.0050 oh Mandor 85,000.00 425.00
Total : 10,955.00
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 8,600.00
9.3000 kg Semen Portland 1,340.00
0.0180 m3 Pasir Pasang 149,285.00
1.9400 kg Semen warna/semen grouting 13,000.00
0.9000 oh Pekerja 40,000.00 36,000.00
0.4500 oh Tukang batu 69,000.00 31,050.00
0.0450 oh Kepala Tukang 80,000.00 3,600.00
0.0450 oh Mandor 85,000.00 3,825.00
Total : 74,475.00
5 1 M2 PASANG BATU ALAM 30 X 30 CM
11.8700 bh Batu alam 30 x 30 cm 6,318.44
10.0000 kg Semen Portland 160.00
0.0450 m3 Pasir Pasang 85,000.00
1.5000 kg Semen warna/semen grouting 34,000.00
0.7000 oh Pekerja 1,340.00 938.00
0.3500 oh Tukang batu 45,000.00 15,750.00
0.0350 oh Kepala Tukang 13,000.00 455.00
0.0350 oh Mandor 68,000.00 2,380.00
Total : 19,523.00

6 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II 9,000,000.00
0.0500 kg Paku sekrup 3,5' 26,500.00
0.1200 oh Pekerja 40,000.00 4,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1200 oh Tukang kayu 70,000.00 8,400.00
0.0120 oh Kepala Tukang 80,000.00 960.00
0.0060 oh Mandor 85,000.00 510.00
Total : 14,670.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 22,000.00
0.1500 kg Dempul 29,000.00
0.1700 kg Cat dasar 43,600.00
0.2600 kg Cat Penutup 2x 55,000.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0090 oh Tukang cat 69,000.00 621.00
0.0060 oh Kepala Tukang 80,000.00 480.00
0.0025 oh Mandor 85,000.00 212.50
Total : 4,113.50

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 59,000.00
0.0500 kg Dempul 29,000.00
0.1000 lbr Amplas 4,100.00
0.0100 bh Kuas 16,800.00
0.1600 oh Pekerja 40,000.00 6,400.00
0.1600 oh Tukang cat 69,000.00 11,040.00
0.0160 oh Kepala Tukang 80,000.00 1,280.00
0.0025 oh Mandor 85,000.00 212.50
Total : 18,932.50
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 30,000.00
0.1000 kg Cat dasar 43,600.00
0.2600 kg Cat Penutup 2x 20,600.00
0.0200 oh Pekerja 40,000.00 800.00
0.0630 oh Tukang cat 69,000.00 4,347.00
0.0063 oh Kepala Tukang 80,000.00 504.00
0.0025 oh Mandor 85,000.00 212.50
Total : 5,863.50

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 43,600.00
0.1800 kg Cat Penutup 2x 20,600.00
0.0280 oh Pekerja 40,000.00 1,120.00
0.0420 oh Tukang cat 69,000.00 2,898.00
0.0042 oh Kepala Tukang 80,000.00 336.00
0.0025 oh Mandor 85,000.00 212.50
Total : 4,566.50

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 22,000.00
0.0100 lbr Kuas 16,800.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang cat 69,000.00 13,800.00
0.0200 oh Kepala Tukang 80,000.00 1,600.00
0.0100 oh Mandor 85,000.00 850.00
Total : 17,050.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 70,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang cat 69,000.00 4,140.00
0.0120 oh Kepala Tukang 80,000.00 960.00
0.0060 oh Mandor 85,000.00 510.00
Total : 5,850.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 47,000.00
2.0000 lbr Amplas 4,100.00
0.0600 oh Pekerja 40,000.00 2,400.00
0.0600 oh Tukang cat 69,000.00 4,140.00
0.0160 oh Kepala Tukang 80,000.00 1,280.00
0.0025 oh Mandor 85,000.00 212.50

Total : 8,032.50

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 1,980.00
8.4000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan 9,500.00
8.4000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan 1,980.00
4.2000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.2000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
Total : -

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) - -
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : -

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,340.00
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 55,000.00
0.2500 oh Tukang Batu 69,000.00 17,250.00
0.0250 oh Kepala Tukang 80,000.00 2,000.00
0.5000 oh Pekerja 40,000.00 20,000.00
0.0250 oh Mandor 85,000.00 2,125.00
Total : 41,375.00
2 Paving 10 x 20 cm tebal 6 cm K350 63,000.00 41,375.00
4 Paving 10 x 20 cm tebal 8 cm K225 63,000.00 41,375.00
5 Paving 10 x 20 cm tebal 8 cm K350 68,000.00 41,375.00
5 Paving 10 x 20 cm tebal 8 cm K425 75,500.00 41,375.00
7 Paving 20 x 20 cm tebal 6 cm K225 55,000.00 41,375.00
8 Paving 20 x 20 cm tebal 6 cm K350 63,000.00 41,375.00
10 Paving 20 x 20 cm tebal 8 cm K225 63,000.00 41,375.00
11 Paving 20 x 20 cm tebal 8 cm K350 68,000.00 41,375.00
12 Paving 20 x 20 cm tebal 8 cm K425 75,500.00 41,375.00
14 Paving 20 x 20 cm tebal 10 cm K225 66,500.00 41,375.00
15 Paving 20 x 20 cm tebal 10 cm K350 76,000.00 41,375.00
16 Paving 20 x 20 cm tebal 10 cm K425 85,000.00 41,375.00
18 Paving Tiga Berlian tebal 6 cm K225 53,000.00 41,375.00

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 55,000.00
0.0690 m3 Pasir Urug 107,000.00
0.5000 oh Tukang Batu 69,000.00 34,500.00
0.0500 oh Kepala Tukang 80,000.00 4,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.0500 oh Mandor 85,000.00 4,250.00
Total : 82,750.00

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 35,000.00
9.2800 zak Semen 1,340.00
0.2000 m3 Pasir pasang 149,285.00
0.2500 oh Tukang Batu 69,000.00 17,250.00
0.0100 oh Kepala Tukang 80,000.00 800.00
0.6250 oh Pekerja 40,000.00 25,000.00
0.0310 oh Mandor 85,000.00 2,635.00
Total : 45,685.00

21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225


1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 69,000.00
0.4500 zak Semen 50 Kg 1,340.00
0.0023 m3 Pasir Pasang 149,285.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3500 oh Tukang Batu 69,000.00 24,150.00
0.0350 oh Kepala Tukang 80,000.00 2,800.00
0.9500 oh Pekerja 40,000.00 38,000.00
0.0950 oh Mandor 85,000.00 8,075.00
Total : 73,025.00
22 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 55,000.00 73,025.00
23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 69,000.00 73,025.00

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 70,500.00
0.0710 kg Thiner 12,000.00
0.0300 oh Tukang Cat 69,000.00 2,070.00
0.0030 oh Kep. Tukang 80,000.00 240.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0150 oh Mandor 85,000.00 1,275.00
Total : 9,585.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
3.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
4.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 10,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 4,000.00
8.0000 bt Pipa Clipsal 20 mm putih 12,000.00
1.0000 bh Tee dos clipsal 20 mm putih 7,000.00
25.0000 bj Klem clipsal 20 mm putih 750.00
5.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 6,000.00
6.0000 bt Pipa Clipsal 20 mm putih 12,000.00
2.0000 bh Tee dos clipsal 20 mm putih 7,000.00
20.0000 bj Klem clipsal 20 mm putih 750.00
6.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

Denpasar,

Kepala Dinas PU

Ir. I Ketut
Pembina Ut
NIP. 19571231
AN

HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

11,250.00
3,350.00
52,200.00
693.00
1,343.57
216,000.00
780.00
9,900.00

295,516.57 328,816.57

36,000.00
260.00
42,000.00

78,260.00 90,485.00

112,500.00
450,000.00
11,050.00
8,800.00
46,900.00
22,392.75
13,860.00
22,392.75
39,000.00
11,625.00
30,000.00
8,160.00
15,750.00
2,820.00

795,250.50 1,112,500.50

15,300.00
525,000.00
3,900.00
14,070.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
4,158.00
7,464.25
63,750.00

633,642.25 833,892.25

27,000.00
690,000.00
9,100.00
63,750.00

789,850.00 951,100.00

8,250.00

11,250.00
465,000.00
3,900.00
24,120.00
4,158.00
7,464.25
63,750.00
63,450.00

643,092.25 843,342.25

90,000.00
1,040.00
84,000.00

175,040.00 196,167.50

7,000.00
8,500.00

15,500.00 37,875.00

21,821.25
14,231.25
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
1,492.85

37,545.35 81,795.35

294,985.00

269,485.00

32,125.00

39,825.00

47,695.00

42,720.00

65,100.00

51,825.00

2,425.00

14,050.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

24,250.00

128,400.00

128,400.00 141,250.00

15,000.00

15,000.00 22,275.00

121,026.00

121,026.00 133,151.00

111,600.00

111,600.00 135,850.00

138,000.00

138,000.00 150,125.00

- 24,890.00

- 40,000.00

114,000.00
74,400.00

188,400.00 324,840.00
108,280.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

174,570.00
270,680.00
72,403.23

517,653.23 641,778.23

174,570.00
218,420.00
77,628.20

470,618.20 594,743.20

174,570.00
182,240.00
81,211.04

438,021.04 562,146.04

174,570.00
156,780.00
83,748.89

415,098.89 539,223.89

174,570.00
121,940.00
87,182.44

383,692.44 507,817.44

69,828.00
259,960.00
43,243.20
69,865.38
-
-
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

442,896.58 658,796.58

65,463.75
259,960.00
43,243.20
69,865.38

438,532.33 606,247.33

174,570.00
46,224.00

220,794.00 285,339.00

1,712.00
11,088.00
18,660.63
65,660.00
-
11,200.00
60,750.00
1,560.00
6,000.00
1,350.00

177,980.63 251,880.63

2,033.00
13,028.40
22,392.75
81,070.00
-
14,400.00
72,000.00
1,560.00
7,200.00
1,350.00

215,034.15 310,874.15
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

182,000.00
58,290.00
11,942.80

252,232.80 294,182.80

182,000.00
44,153.00
13,584.94

239,737.94 281,687.94

182,000.00
35,577.00
13,883.51

231,460.51 273,410.51

182,000.00
29,748.00
15,227.07

226,975.07 268,925.07

182,000.00
24,790.00
18,212.77

225,002.77 266,952.77

91,000.00
25,393.00
5,672.83
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

122,065.83 143,040.83

91,000.00
19,255.80
5,971.40

116,227.20 137,202.20

91,000.00
15,410.00
6,419.26

112,829.26 133,804.26

91,000.00
12,971.20
6,717.83

110,689.03 131,664.03

91,000.00
11,148.80
7,314.97

109,463.77 130,438.77

91,000.00
8,710.00
7,464.25

107,174.25 128,149.25

27,500.00
10,050.00
4,030.70
16,479.45
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

58,060.15 79,835.15

27,500.00
10,050.00
4,030.70

41,580.70 63,355.70

1,500,000.00
14,740.00
5,224.98

1,519,964.98 1,540,939.98

30,000.00
91,000.00
156.00
19,500.00

140,656.00 148,726.00

20,775.36
2,388.56

23,163.92 47,988.92

13,700.16
2,985.70

16,685.86 41,510.86

10,419.84
3,433.56
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

13,853.40 38,678.40

8,361.60
3,582.84

11,944.44 36,769.44

6,946.56
3,881.41

10,827.97 35,652.97

5,917.44
4,030.70

9,948.14 34,773.14

4,631.04
4,329.27

8,960.31 33,785.31

18,266.88
4,030.70

22,297.58 55,567.58

13,893.12
4,627.84

18,520.96 51,790.96
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
11,148.80
4,777.12

15,925.92 49,195.92

9,262.08
5,224.98

14,487.06 47,757.06

7,889.92
5,374.26

13,264.18 46,534.18

670.00
1,940.71

2,610.71 36,950.71

5,788.80
895.71

6,684.51 27,659.51

4,164.72

4,164.72 16,659.72

2,144.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
2,144.00 8,019.00

8,495.60
1,791.42

10,287.02 35,112.02

4,355.00

4,355.00 12,905.00

9,130,000.00
17,500.00
12,500.00

9,160,000.00 11,107,750.00

6,000,000.00
17,500.00
12,500.00

6,030,000.00 7,699,500.00

360,000.00
700.00

360,700.00 458,130.00

240,000.00
700.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

240,700.00 338,130.00

360,000.00
6,250.00

366,250.00 644,500.00

216,000.00
3,750.00

219,750.00 442,350.00

576,000.00
6,250.00

582,250.00 860,500.00

225,000.00
420.00
6,250.00
47,000.00

278,670.00 556,920.00

230,400.00
420.00
6,250.00
47,000.00

284,070.00 506,670.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
540,000.00
2,100.00

542,100.00 753,375.00

230,400.00
420.00
6,250.00
56,000.00

293,070.00 515,670.00

225,000.00
420.00
10,000.00
56,000.00
40,000.00

331,420.00 554,020.00

9,130,000.00
120,000.00
78,400.00

9,328,400.00 10,441,400.00

9,960,000.00
120,000.00
78,400.00

10,158,400.00 12,022,675.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
9,130,000.00
120,000.00
42,000.00

9,292,000.00 9,959,800.00

42,000.00
23,400.00
3,500.00

68,900.00 81,125.00

42,000.00
46,800.00
3,500.00

92,300.00 104,525.00

1,369,500.00
2,800.00

1,372,300.00 1,386,970.00

46,200.00
2,800.00

49,000.00 84,775.00

48,900.00
3,500.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

52,400.00 84,650.00

97,200.00
1,400.00

98,600.00 118,625.00

99,000.00
700.00

99,700.00 119,725.00

232,400.00
2,100.00

234,500.00 276,280.00

232,400.00
2,100.00
48,160.00
7,000.00

289,660.00 331,440.00

232,400.00
2,100.00
40,420.00
7,000.00

281,920.00 337,570.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

63,000.00
1,400.00
2,700.00

67,100.00 234,050.00

18,800.00
700.00

19,500.00 26,475.00

330,980.00
87,516.99
92,497.41
5,375.00

516,369.40 610,639.40

369,840.00
83,387.88
93,701.08
5,375.00

552,303.96 646,573.96

400,660.00
80,467.29
94,164.03
5,375.00

580,666.32 674,936.32

436,840.00
76,539.60
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
95,275.11
5,375.00

614,029.71 708,299.71

471,680.00
73,619.01
95,460.29
5,375.00

646,134.30 740,404.30

497,140.00
70,295.58
96,941.73
5,375.00

669,752.31 764,022.31

514,560.00
69,691.32
96,201.01
5,375.00

685,827.33 780,097.33

544,040.00
68,885.64
94,997.34
5,375.00

713,297.98 807,567.98

553,420.00
68,583.51
94,534.39
5,375.00

721,912.90 816,182.90

588,260.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
67,475.70
93,145.54
5,375.00

754,256.24 848,526.24

600,320.00
67,173.57
92,590.00
5,375.00

765,458.57 859,728.57

88,735.50
2,400.00

91,135.50 99,735.50

100,000.00
3,900.00
1,500.00

105,400.00 148,690.00

100,000.00
3,900.00
1,500.00

105,400.00 148,690.00

100,000.00
5,200.00
3,000.00
90,000.00
36,925.00
180,000.00

415,125.00 470,070.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

100,000.00
5,200.00
3,000.00
108,000.00
36,925.00
180,000.00

433,125.00 488,070.00

100,000.00
5,200.00
3,000.00
90,000.00
36,925.00
540,000.00

775,125.00 830,070.00

75,000.00
5,200.00
3,000.00
120,000.00
36,925.00
270,000.00
8,000.00

518,125.00 573,070.00

75,000.00
5,200.00
2,250.00
90,000.00
36,925.00
180,000.00

389,375.00 444,320.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
66,000.00
7,800.00
45,000.00

118,800.00 129,380.00

500,000.00
19,500.00
6,000.00
1,326,807.00
36,000.00
450,240.00
74,844.00
120,920.85

2,534,311.85 2,973,271.85

675,000.00
26,000.00
9,000.00
1,774,710.00
48,000.00
450,240.00
74,844.00
120,920.85

3,178,714.85 3,680,784.85

1,000,000.00
52,000.00
30,000.00
2,662,065.00
72,000.00
450,240.00
74,844.00
120,920.85
750,000.00
369,250.00
1,800,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

7,381,319.85 8,007,039.85

800,000.00
41,600.00
24,000.00
1,774,710.00
48,000.00
450,240.00
74,844.00
120,920.85
700,000.00
295,400.00
1,440,000.00

5,769,714.85 6,309,859.85

800,000.00
41,600.00
24,000.00
1,331,032.50
36,000.00
450,240.00
74,844.00
120,920.85
600,000.00
295,400.00
2,880,000.00

6,654,037.35 7,093,237.35

600,000.00
41,600.00
24,000.00
1,326,807.00
36,000.00
450,240.00
74,844.00
120,920.85
800,000.00
295,400.00
2,160,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

5,929,811.85 6,368,771.85

625,000.00
39,000.00
18,000.00
1,774,710.00
48,000.00
450,240.00
74,844.00
120,920.85
525,000.00
263,750.00
1,260,000.00

5,199,464.85 5,701,534.85

5,000.00
130.00
25,353.00
720.00
5,360.00
831.60
1,343.57

38,738.17 51,363.17

7,500.00
260.00
30,423.60
800.00
7,370.00
1,247.40
2,239.28

49,840.28 70,692.28
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

32,500.00

32,500.00 43,860.00

35,000.00

35,000.00 46,360.00

30,000.00
10,720.00
4,777.12

45,497.12 77,267.12

21,750.00
2,400.00

24,150.00 35,805.00

57,600.00
159,000.00

216,600.00 230,090.00

510,000.00
2,800.00

512,800.00 539,620.00

18,600.00
840.00
650.00
36,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

56,090.00 81,270.00

81,250.00
4,750.00

86,000.00 94,850.00

29,750.00
280.00

30,030.00 40,020.00

30,450.00

30,450.00 41,030.00

13,950.00
560.00

14,510.00 26,560.00

51,700.00
140.00

51,840.00 58,840.00

17,625.00
420.00

18,045.00 30,270.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

135,000.00
140.00

135,140.00 232,940.00

12,862.50
1,584.00

14,446.50 20,601.50

108,000.00
950.40
51,700.00

160,650.40 193,575.40

1,980.00
23,114.00

25,094.00 33,419.00

1,980.00
26,208.00

28,188.00 36,513.00

1,365,000.00
81,900.00

1,446,900.00 1,668,480.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
135,000.00
8,040.00
1,492.85

144,532.85 421,632.85

1,052,000.00
63,120.00
8,040.00
1,492.85

1,124,652.85 1,250,152.85

185,000.00
22,200.00
8,040.00
1,492.85

216,732.85 385,282.85

230,000.00
41,400.00

271,400.00 582,250.00

697,866.00
203,544.25

901,410.25 912,435.25

1,111,245.60
324,113.30

1,435,358.90 1,453,277.90
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

17,844.00
5,204.50

23,048.50 29,021.50

26,700.00
7,787.50

34,487.50 43,447.00

67,500.00
19,687.50

87,187.50 100,631.00

18,000.00
65.00

18,065.00 26,190.00

17,250.00

17,250.00 22,195.50

128,700.00
180,000.00
56,000.00

364,700.00 388,385.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

48,825.00
270.00
171,000.00

220,095.00 256,205.50

105,000.00

105,000.00 141,625.00

27,000.00

27,000.00 39,368.00

49,000.00

49,000.00 57,242.50

22,000.00

22,000.00 34,368.00

100,000.00

100,000.00 116,485.00

112,200.00

112,200.00 124,568.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

48,559.09
13,400.00
6,717.83
19,500.00

88,176.92 146,101.92

227,900.00
13,936.00
6,717.83
21,060.00

269,613.83 327,538.83

13,622.73
1,527.60
447.86
1,300.00

16,898.18 27,853.18

227,900.00
12,462.00
2,687.13
25,220.00

268,269.13 342,744.13

74,999.88
1,600.00
3,825.00
51,000.00

131,424.88 150,947.88

27,000.00
1,325.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

28,325.00 42,995.00

4,400.00
4,350.00
7,412.00
14,300.00

30,462.00 34,575.50

8,850.00
1,450.00
410.00
168.00

10,878.00 29,810.50

3,000.00
4,360.00
5,356.00

12,716.00 18,579.50

5,232.00
3,708.00

8,940.00 13,506.50

2,200.00
168.00

2,368.00 19,418.00

21,150.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

21,150.00 27,000.00

24,534.00
8,200.00

32,734.00 40,766.50

217,800.00
11,256.00

229,056.00 229,056.00

130,625.00
11,256.00

141,881.00 141,881.00

108,900.00
5,628.00

114,528.00 114,528.00

220,000.00
5,628.00

225,628.00 225,628.00

108,900.00
53,900.00
7,035.00

169,835.00 169,835.00

108,900.00
5,628.00

114,528.00 114,528.00

220,000.00
5,628.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
225,628.00 225,628.00

108,900.00
53,900.00
7,035.00

169,835.00 449,835.00

55,000.00

55,000.00 96,375.00
63,000.00 104,375.00
63,000.00 104,375.00
68,000.00 109,375.00
75,500.00 116,875.00
55,000.00 96,375.00
63,000.00 104,375.00
63,000.00 104,375.00
68,000.00 109,375.00
75,500.00 116,875.00
66,500.00 107,875.00
76,000.00 117,375.00
85,000.00 126,375.00
53,000.00 94,375.00

55,000.00
7,383.00

62,383.00 145,133.00

42,000.00
12,435.20
29,857.00

84,292.20 129,977.20

69,000.00
603.00
343.36
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

69,946.36 142,971.36
97,292.20 170,317.20
111,292.20 184,317.20

20,022.00
852.00

20,874.00 30,459.00

96,000.00
36,000.00
14,000.00
11,250.00
6,000.00
10,000.00

173,250.00 198,250.00

120,000.00
36,000.00
7,000.00
11,250.00
8,000.00
10,000.00
10,500.00
25,000.00
227,750.00 252,750.00

100,000.00
96,000.00
7,000.00
18,750.00
10,000.00
10,000.00

241,750.00 266,750.00

120,000.00
72,000.00
14,000.00
15,000.00
12,000.00
10,000.00

243,000.00 268,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

Denpasar, Maret 2013

Kepala Dinas PU. Kota Denpasar

Ir. I Ketut Winarta


Pembina Utama Muda
NIP. 19571231 198803 1 103
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2013

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
7 1 M2 PEMBUATAN BEDENG BURUH
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM
9 1 M2 PEMBUATAN STEGGER DARI BAMBU
10 1 M2 PEMBUATAN JALAN SEMENTARA
11 1 M3 BONGKARAN BETON BERTULANG
12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER
9 1 M3 URUGAN KEMBALI
10 1 M3 PEMADATAN TANAH ( Per 20 Cm )
11 1 M3 URUGAN PASIR
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
15 1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS
NO URAIAN PEKERJAAN
1 2
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
8 1 M3 PASANGAN BATU KOSONG

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS
4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS
5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
12 1 M2 PASAANGAN BATU ALAM 30 X 30 CAMP 1PC : 2PS
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)
14 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI
15 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM
16 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
NO URAIAN PEKERJAAN
1 2
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')
17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
18 1 M2 PEKERJAAN ACIAN

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU
KELAS II
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III
Bentang 6 M'

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I


15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
24 KAYU KELAS II
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
25 KAYU KELAS II

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

VII PEKERJAAN BETON ( SNI 7394:2008)


NO URAIAN PEKERJAAN
1 2
1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


13 1 M2 PASANG BEKISTING UNTUK PONDASI
14 1 M2 PASANG BEKISTING UNTUK SLOOF
15 1 M2 PASANG BEKISTING UNTUK KOLOM
16 1 M2 PASANG BEKISTING UNTUK BALOK
17 1 M2 PASANG BEKISTING UNTUK LANTAI
18 1 M2 PASANG BEKISTING UNTUK DINDING
19 1 M2 PASANG BEKISTING UNTUK TANGGA
20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)
23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)
24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)
27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)
28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)
30 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
31 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
32 1 M3 PASANGAN BATU KOSONG
33 1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang
34 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
NO URAIAN PEKERJAAN
1 2
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
6 1 M2 PEKERJAAN ATAP SIRAP
7 1 M2 PEKERJAAN ATAP NOK SIRAP
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL
11 1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
3 MEMASANG 1 BUAH URINOIR
4 MEMASANG 1 BUAH WASHTAFEL KIA
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA
2 1 M2 PASANG JENDELA NAKO
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
NO URAIAN PEKERJAAN
1 2
2 1 PS PASANG ENGSEL PINTU
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
4 1 BH PASANG KAIT ANGIN
5 1 BH PASANG KUNCI SLOT
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
5 1 M1 PASANG PLIN KAYU 2 X 10 CM

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR
NO URAIAN PEKERJAAN
1 2
XV PEKERJAAN TETEMPELAN STYLE BALI
1 1 M2 PASANGAN BATA GOSOK 2 MUKA
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA
3 1 M2 PASANGAN BATA GOSOK 1 MUKA
4 1 M2 PASANGAN PARAS 1 MUKA
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA
6 1 M2 PASANGAN BATA GOSOK DIUKIR
7 1 M2 PASANGAN PARAS DIUKIR
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
2 Paving 10 x 20 cm tebal 6 cm K350
3 Paving 10 x 20 cm tebal 8 cm K225
4 Paving 10 x 20 cm tebal 8 cm K350
5 Paving 20 x 20 cm tebal 6 cm K225
6 Paving 20 x 20 cm tebal 6 cm K350
7 Paving 20 x 20 cm tebal 8 cm K225
8 Paving 20 x 20 cm tebal 8 cm K350
9 Paving 20 x 20 cm tebal 8 cm K425
10 Paving 20 x 20 cm tebal 10 cm K225
11 Paving 20 x 20 cm tebal 10 cm K350
12 Paving 20 x 20 cm tebal 10 cm K425
13 Paving Tiga Berlian tebal 6 cm K225
14 1 M2 PASANGAN GRASS BLOCK
15 1 M2 PASANGAN KORAL SIKAT
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
19 1 M2 PENGECATAN KANSTEIN

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
2 1 TITIK INSTALASI AC
3 1 TITIK INSTALASI TELEPHONE
4 1 TITIK INSTALASI MATV

Kepala Dinas Cipta Karya


NO URAIAN PEKERJAAN
1 2
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
ERJAAN

HARGA
3

Rp. 328,816.57
Rp. 90,485.00
Rp. 1,112,500.50
Rp. 833,892.25
Rp. 951,100.00
Rp. 8,250.00
Rp. 843,342.25
Rp. 196,167.50
Rp. 37,875.00
Rp. 81,795.35
Rp. 294,985.00
Rp. 269,485.00

Rp. 32,125.00
Rp. 39,825.00
Rp. 47,695.00
Rp. 42,720.00
Rp. 65,100.00
Rp. 51,825.00
Rp. 2,425.00
Rp. 14,050.00
Rp. -
Rp. 24,250.00
Rp. 141,250.00
Rp. 22,275.00
Rp. 133,151.00
Rp. 135,850.00
Rp. 150,125.00

Rp. 641,778.23
Rp. 594,743.20
Rp. 562,146.04
Rp. 539,223.89
HARGA
3
Rp. 507,817.44
Rp. 658,796.58
Rp. 606,247.33
Rp. 285,339.00

Rp. 294,182.80
Rp. 281,687.94
Rp. 273,410.51
Rp. 268,925.07
Rp. 266,952.77
Rp. 143,040.83
Rp. 137,202.20
Rp. 133,804.26
Rp. 131,664.03
Rp. 130,438.77
Rp. 128,149.25
Rp. 150,081.38
Rp. 79,835.15
Rp. 63,355.70
Rp. 1,540,939.98
Rp. 148,726.00

Rp. 47,988.92
Rp. 41,510.86
Rp. 38,678.40
Rp. 36,769.44
Rp. 35,652.97
Rp. 34,773.14
Rp. 33,785.31
Rp. 55,567.58
Rp. 51,790.96
Rp. 49,195.92
Rp. 47,757.06
Rp. 46,534.18
Rp. 36,950.71
Rp. 27,659.51
Rp. 16,659.72
HARGA
3
Rp. 8,019.00
Rp. 35,112.02
Rp. 12,905.00

Rp. 11,107,750.00
Rp. 7,699,500.00
Rp. 458,130.00
Rp. 338,130.00
Rp. 644,500.00
Rp. 442,350.00
Rp. 860,500.00

Rp. 556,920.00

Rp. 506,670.00
Rp. 753,375.00
Rp. 515,670.00

Rp. 554,020.00

Rp. 10,441,400.00
Rp. 12,022,675.00
Rp. 9,959,800.00
Rp. 81,125.00
Rp. 104,525.00
Rp. 1,386,970.00
Rp. 84,775.00
Rp. 84,650.00
Rp. 118,625.00
Rp. 119,725.00
Rp. 276,280.00

Rp. 331,440.00

Rp. 337,570.00
Rp. 234,050.00
Rp. 26,475.00
HARGA
3
Rp. 610,639.40
Rp. 646,573.96
Rp. 674,936.32
Rp. 708,299.71
Rp. 740,404.30
Rp. 764,022.31
Rp. 780,097.33
Rp. 807,567.98
Rp. 816,182.90
Rp. 848,526.24
Rp. 859,728.57

Rp. 99,735.50
Rp. 148,690.00
Rp. 148,690.00
Rp. 470,070.00
Rp. 488,070.00
Rp. 830,070.00
Rp. 573,070.00
Rp. 444,320.00
Rp. 129,380.00
Rp. 2,973,271.85
Rp. 3,680,784.85
Rp. 8,007,039.85
Rp. 6,309,859.85
Rp. 7,093,237.35
Rp. 6,368,771.85
Rp. 5,701,534.85
Rp. 51,363.17
Rp. 70,692.28
Rp. 658,796.58
Rp. 606,247.33
Rp. 285,339.00
Rp. 251,880.63
Rp. 310,874.15

Rp. 43,860.00
Rp. 46,360.00
HARGA
3
Rp. 77,267.12
Rp. 35,805.00
Rp. 230,090.00
Rp. 539,620.00
Rp. 81,270.00
Rp. 94,850.00
Rp. 40,020.00
Rp. 41,030.00
Rp. 26,560.00

Rp. 58,840.00
Rp. 30,270.00
Rp. 232,940.00
Rp. 20,601.50
Rp. 193,575.40
Rp. 33,419.00
Rp. 36,513.00

Rp. 1,668,480.00
Rp. 421,632.85
Rp. 1,250,152.85
Rp. 385,282.85
Rp. 582,250.00
Rp. 912,435.25
Rp. 1,453,277.90
Rp. 29,021.50
Rp. 43,447.00
Rp. 100,631.00
Rp. 26,190.00

Rp. 22,195.50
Rp. 388,385.00
Rp. 256,205.50

Rp. 141,625.00
HARGA
3
Rp. 39,368.00
Rp. 57,242.50
Rp. 34,368.00
Rp. 116,485.00
Rp. 124,568.00

Rp. 146,101.92
Rp. 327,538.83
Rp. 27,853.18
Rp. 342,744.13
Rp. 42,995.00

Rp. 34,575.50

Rp. 29,810.50
Rp. 18,579.50

Rp. 13,506.50
Rp. 19,418.00
Rp. 27,000.00
Rp. 40,766.50
HARGA
3

Rp. 229,056.00
Rp. 141,881.00
Rp. 114,528.00
Rp. 225,628.00
Rp. 169,835.00
Rp. 114,528.00
Rp. 225,628.00
Rp. 449,835.00

Rp. 96,375.00
Rp. 104,375.00
Rp. 104,375.00
Rp. 109,375.00
Rp. 96,375.00
Rp. 104,375.00
Rp. 104,375.00
Rp. 109,375.00
Rp. 116,875.00
Rp. 107,875.00
Rp. 117,375.00
Rp. 126,375.00
Rp. 94,375.00
Rp. 145,133.00
Rp. 129,977.20
Rp. 142,971.36
Rp. 170,317.20
Rp. 184,317.20
Rp. 30,459.00

Rp. 198,250.00
Rp. 252,750.00
Rp. 266,750.00
Rp. 268,000.00

ipta Karya
HARGA
3
Badung

Dharmayanty, M.T
Tk. I
994032001
DAFTAR HARGA SATUAN BAHAN TAMBAHAN
BULAN Januari TAHUN 2013
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN


1 2 3

BATU
Batu Candi
1 20x20x2 m2
2 15x30x2 m2
3 20x30x2 m2
4 20x40x2 m2
5 30x30x2 m2
6 40x40x2 m2
7 30x60x2 m2
8 20x40x3 m2
9 30x30x3 m2
10 30x30x5 m2
11 40x40x5 m2

Palimanan putih
1 20x20x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 20x40x3 m2
5 30x30x3 m2

Palimanan Serat Kuning


1 20x30 m2
2 20x40 m2
3 15x30 m2

Palimanan Cirebon
1 15x30x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 30x30x2 m2

Alur Bali Green Lurus


1 20x30 m2
2 20x40 m2

Alur Bali Green Cukil


1 20x30 m2
2 20x40 m2
3 20x20 m2

Batu Bali Green


1 15x30 m2
2 20x30 m2
3 20x40 m2

Harga Barang dan Upah Hal. 114


NO NAMA BARANG SATUAN
1 2 3
4 40x40 m2

PARAS
Paras Kerobokan
1 20x40x3 Bj
2 20x40x5 Bj

Paras Kelating
1 20x40x3 Bj
2 20x40x5 Bj

Alur Andesit Lurus


1 20x40 m3
2 30x60 m3

Alur and cukil


1 20x40 m2
2 15x30 m2

Alur And Gelombang m2


Alur And Gelombang lurus m2

Random Singaraja m2
Random Cirebon m2
Random Jember m2

Harga Barang dan Upah Hal. 115


AMBAHAN

HARGA SATUAN
4

78,000.00
78,000.00
78,000.00
80,000.00
80,000.00
105,000.00
115,000.00
135,000.00
135,000.00
165,000.00
185,000.00

65,000.00
67,000.00
68,000.00
110,000.00
110,000.00

75,000.00
75,000.00
75,000.00

72,000.00
73,000.00
75,000.00
80,000.00

105,000.00
105,000.00

105,000.00
105,000.00
105,000.00

75,000.00
75,000.00
75,000.00

Harga Barang dan Upah Hal. 116


HARGA SATUAN
4
80,000.00

6,000.00
8,000.00

6,000.00
8,000.00

135,000.00
140,000.00

135,000.00
135,000.00

140,000.00
140,000.00

25,000.00
65,000.00
45,000.00

Harga Barang dan Upah Hal. 117

You might also like