You are on page 1of 1

Issuance of NTP to the contractor

Preconstruction planning
4M's - Materials, Machines, Manpower, Money
Operation on site (Construction)
Completion, Handover
Period of feedbacking (feedbacks)
Performance bond (10% of the total project cost)

Assignment
1. Participants in the construction cycle
2. Major Stages of a construction project
3. Phases of construction management

Assignment 2
How to reduce construction cost
What is the meaning Force Majeure
Elements of Project Management
5 Management Functions
What is the meaning of Value Engineering
What is the meaning of Scheduling

Discuss all the scheduling tools

Basic Elements of CPM

You might also like