Professional Documents
Culture Documents
4M's - Material
4M's - Material
Preconstruction planning
4M's - Materials, Machines, Manpower, Money
Operation on site (Construction)
Completion, Handover
Period of feedbacking (feedbacks)
Performance bond (10% of the total project cost)
Assignment
1. Participants in the construction cycle
2. Major Stages of a construction project
3. Phases of construction management
Assignment 2
How to reduce construction cost
What is the meaning Force Majeure
Elements of Project Management
5 Management Functions
What is the meaning of Value Engineering
What is the meaning of Scheduling