According to the agreement No. 3/88 of 2013, "Constructor 2012" continued the rehabilitation process
of the No. 43 and No. 44 towers. The floor overlaps were restored with wooden beams and thin plates
of slate and triple layer of hydro-insulating material was laid. Then deck roof of the tower No. 44 was
arranged with wooden materials; Also were installed the ceramic pipe droppers; With new wooden
materials were prepared the similar constructions of existing balcony; The surface of arranged wooden
balcony was processed and painted with a lacquer; ჭერხოს ღია მხრიდან მოეწყო წნული.. On the
tower No.43, the damaged floor overlap was demolished and restored with wooden materials; This
overlap was covered with thin plates of slate and triple layer of hydro-insulating material. The floor
overlap was also filled and tamped with clay-land.