This curriculum vitae provides biographical information for Kiki Hadiyakso Sanur, including his name, date and place of birth, education, and work experience. He has worked as an instrument technician or skill instrument for several companies, including PT. Kontrol Power Utama and PT. Rekind Malaysia Sdn.Bhd, on projects located in Bontang, East Kalimantan, Malaysia, and Sri Lanka between 2011 and 2017.
This curriculum vitae provides biographical information for Kiki Hadiyakso Sanur, including his name, date and place of birth, education, and work experience. He has worked as an instrument technician or skill instrument for several companies, including PT. Kontrol Power Utama and PT. Rekind Malaysia Sdn.Bhd, on projects located in Bontang, East Kalimantan, Malaysia, and Sri Lanka between 2011 and 2017.
This curriculum vitae provides biographical information for Kiki Hadiyakso Sanur, including his name, date and place of birth, education, and work experience. He has worked as an instrument technician or skill instrument for several companies, including PT. Kontrol Power Utama and PT. Rekind Malaysia Sdn.Bhd, on projects located in Bontang, East Kalimantan, Malaysia, and Sri Lanka between 2011 and 2017.
Place and Date of Birth : Balikpapan, 18 juni 1984 Age : 32 th Sex : Male Marital Status : Marry Religion : Moslem Nationality : Indonesia Address : Jln.seruling no.13 rt.21 kel.bontang baru, kec. Bontang utara Phone : 0812 5333 6809 Email : kiki_hadiyakso@yahoo.com
EDUCATION BACKGRAUND
• Senior High School
WORKING EXPERIENCE
• Company : PT. KONTROL POWER UTAMA
Periode : 12 March 2017 up to 12 September 2017 Project Location : SRI – U3 Project Position : Skill Instrument
• Company : PT. Rekind Malaysia Sdn.Bhd
Periode : 25 July 2015 up to 15 March 2016 Project Location : SAMUR Project, (Sipitang Malaysia) Position : Skill Instrument
• Company : PT. KONTROL POWER UTAMA
Periode : 27 may 2013 up to 25 oktober 2014 Project Location : Kaltim – 5 (Bontang, East Kalimantan) Position : Instrumen tech 2
• Company : PT. KONTROL POWER UTAMA
Periode : 19 desember 2011 up to 25 maret 2012 Project Location : Improvement of all conduit installation at cooling water module #2 (Electrical Partion). (Bontang, East Kalimantan) Position : Electrical/Intrument Helper