Professional Documents
Culture Documents
Axeblade Unit Petroleum Cs PDF
Axeblade Unit Petroleum Cs PDF
The dull condition of the AxeBlade bit after drilling the Mahler 108-1H well demonstrates that it can be run in a similar application in future wells with the potential to increase WOB
to yield even greater ROP gains.
Unit Petroleum drilled the Mahler 108-1H well’s intermediate interval from 5,918 to 9,047 ft in
a single run at an ROP of 95.54 ft/h, a 27% increase over the offset well. Under similar drilling
parameters and using the same cutting structure layout, the AxeBlade bit not only increased ROP but
generated 20% less surface torque and impressive dull condition. This improved drilling performance
saved the operator 14.75 hours of rig time. The higher ROP enabled by the bit means that the operator
can finish the well sooner and reduce the cost of operations.
slb.com/AxeBlade
* Mark of Schlumberger
Other company, product, and service names
are the properties of their respective owners.
Copyright © 2016 Schlumberger. All rights reserved. 15-BT-12044